Loading...
HomeMy WebLinkAboutBLD2007-01004 Heatpump - BLD Permit / Conditions - 6/7/2007 Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 • Shelton, WA 98584 RESIDENTIAL BUILDING PERMIT BLD2007-01004 OWNER: RECEIVED: 6/7/2007 CONTRACTOR: LICENSE: EXP: ISSUED: 6/7/2007 SITE ADDRESS: 290 E RASOR LN BELFAIR EXPIRES: 12/7/2007 PARCEL NUMBER: 122077500390 LEGAL DESCRIPTION: TR 39 OF SURVEY 5/94-96 PROJECT DESCRIPTION: DIRECTIONS TO SITE: HEAT PUMP SOUTH SHORE TO RASOR ROAD TO RASOR LANE TO END General Information Construction &Occupancy Information Square Footage Information No. of Bedrooms: Type of Constr.: Type of Use: SF Insp.Area: No. of Bathrooms: Occ. Group: Lot Size: Deck: Type of Work: MEC Fire Dist.: 2 No. of Stories: Occ. Load: Building: Valuation: Building Height: Occ. Status: Basement: Manufactured Home Information Setback Information Shoreline& Planning Information Water Body: Make: Length: Ft. Front: Ft. Shoreline: Ft. SEPA?: Rear: Ft. Slope: Ft. Shoreline Desi Model: Width: Ft. Side 1: Ft. g Year: Serial No.: Side 2: Ft. Comp. Plan Desig.: Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Heat Pump 1 Mechanical Fee TAM 6/7/2007 $16.20 B12007000 Mechanical Base Fee TAM 6n12007 $25.30 612007000 Total $41.50 BLD2007-01004 Please refer to the following pages for conditions of this permit. 1 of 3 CASE NOTES FOR BLD2007-01004 CONDITIONS FOR BLD2007-01004 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800 647-0 2. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 2) In accordance with international codes and Title 14, Mason County Building Code, "Standards for Fire Apparatus Access Roads,"all new structures that require an address shall have approved numbers or addresses located at the beginning of long driveways when the address is not clearly visible from the access road. The numbers shall also be plainly visible and legible from the street or road fronting the property and shall contrast with their background. Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the international codes will be assessed if the owner and/or contractor fail to post the address on site prior to requesting inspectionD X 3) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in perm 6c�tion. X 4) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector �l made prior to requesting additional inspections. X ,� 5) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request p final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason Co nt r nances and building regulations. X 6) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a fipQinspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason ordinances and building regulations. X BLD2007-01004 Please refer to the following pages for conditions of this permit. 2 of 3 7) . All property lines shall be clearly identified at the time of foundation inspection. X This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a pr gress inspection.The ownL'nd agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described pr rty and structure for reviepection. OWNER OR AGENT: r L� d _ DATE: A i BLD2007-01004 Please refer to the following pages for conditions of this permit. 3 of 3 Mason County Dept. of Community Development Mason County Bldg. 3 426 W. Cedar P.O. Box 186 (360) 427-9670 Local (360) 482-5269 Elma rI4Shelton, WA 98584 (360) 275-4467 Belfair Notice to Obtain Final Inspection October 24, 2008 STEPHEN FARMER PO BOX 2008 BELFAIR WA 98528 Case No.: BLD2007-01004 Parcel No.: 122077500390 Proiect Descrir)tion: HEAT PUMP The Mason County Department of Community Development is currently reviewing all permits that are expired and have not been approved for occupancy and use. Pursuant to Mason County Code, Title 14 Building and Construction, a permit and final inspection for this type of activity is required under the 2006 International Building Code or the code your permit was issued and your property is currently in violation status of occupancy and use. Please contact our office to make the necessary arrangements 21 days from the date of this letter. Failure to contact our office to make the necessary scheduled inspections will result in enforcement actions. To bring your site into compliance, you must schedule an inspection. One (1) $68.00 site investigation fee will need to be paid prior to inspection along with any outstanding fees currently due on your building permit. For every inspection required after that, you will be charged $68.00 again, per inspection until final inspection and conditions are met. To schedule an inspection, please call (360) 427-9670 ext. 262. If you should have any questions regarding this notification, please contact me at (360) 427-9670 ext 595. Sincerely, l Rich Todd Balderston Mason County Department of Community Development Cc: Property File October 24, 2008 BLD2007-01004 co o CONCRETE MECHANICAL MANUFACTURED HOME o �. Footings Ribbons Setbacks Gas Piping By Plping C) Interior Date By Interior-Date By bate By CD Exterior Date By Exterior-Date By Sot-up Point Load!Isolated Footings INSULATION Date By BG 1 SLAB INSULATION Date By Data By FIRE DEPARTMENT Foundation Wails Floors Date By Date By Data By DECKS FRAMING Waft Date By Date By Data By PROPANE TANKS PLUMBING vault Date By Date By OTHER Groundwork AM Date By pate By Type: Date L Y D.W.v DRYWALL Type: Int.Brace Wall Date By Date By Oate By FINAL INSPECTION 0 CD Water Line Fire Separation C Date By Date By Date g By / / p m V Pass or Request Inspect. c 0 Type of Insp. Fail Date Date Done By Comments c 0 y O 8 a 0 N O N 'D (D 0