Loading...
HomeMy WebLinkAboutBLD2008-01380 SFR - BLD Permit / Conditions - 12/11/2008 Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 NP14 Shelton, WA 98584 RESIDENTIAL BUILDING PERMIT BLD2008-01380 OWNER: ALTON & CONNIE SHIMKOVITZ RECEIVED: 11/13/2008 CONTRACTOR: HILINE HOMES LICENSE: HILINH*981 BT EXP: 2/10/2010 ISSUED: 12/11/2008 SITE ADDRESS: 730 E ALDERWOOD RD BELFAIR EXPIRES: 6/11/2009 PARCEL NUMBER: 122077500010 LEGAL DESCRIPTION: TR 1 OF SURVEY 5/94-96 PROJECT DESCRIPTION: DIRECTIONS TO SITE: New SFR Hwy 106 to Alderwood Rd. to lot on right with large bunch of pink ribbons & Stock Plan yellow sign. Follow pink flags up hill to test holes. General Information Construction &Occupancy Information Square Footage Information No. of Bedrooms: 3 Type of Constr.: VB Type of Use: SF Insp.Area: No. of Bathrooms: 2 Occ. Group: R3 Lot Size: Deck: Type of Work: NEW Fire Dist.: 2 No. of Stories: 1 Occ. Load: Building:2,112 Garage-Attached 528 Valuation: Building Height: Occ. Status: Primary Basement: cov porch 96 Manufactured Home Information Setback Information Shoreline & Planning Information Make: Length: Ft. Front: E 110.0 Ft. Shoreline: Ft. Water Body: Rear: W 70.0 Ft. Slope: Ft. SEPA?: No Model: Width: Ft. Side 1: N 75.0 Ft. Shoreline Desig.: Not Applicable Year: Serial No.: Side 2: S 75.0 Ft. Comp. Plan Desig.: Rural Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Dishwasher 1 Exhaust Hood 1 Plan Check Fee KKK 11/13/200 $287.23 S22008000 Hosebibs 3 Furnace<100K 1 Building Permit Fee KKK 11/13/200 $1,436.15 S22008000 Kitchen Sink 1 Ventilation Fan 3 Building Permit Fee KKK 11/13/200 $1,436.15 B12008000 Lavatories 3 Heat Pump 1 EH Plan Review KKK 11/13/200 $40.00 S22008000 Showers 1 Dryer Vent 1 Water Adequacy Plan Review KKK 11/13/200 $40.00 S22008000 Water Closets (Toilets) 2 Address Fee KKK 11/13/200 $162.00 S22008000 Water Heaters 1 Planning Review Fee KKK 11/13/200 $190.00 S22008000 Bath Tubs 2 Fire Warden Review KKK 11/13/200 $68.00 S22008000 Clothes Washer 1 Building State Fee MAL 11/17/200 $4.50 612008000 Mechanical Base Fee MAL 11/17/200 $26.60 612008000 Mechanical Fee MAL 11/17/200 $80.05 B12008000 Plumbing Base Fee MAL 11/17/200 $23.10 B12008000 Plumbing Fee MAL 11/17/200 $103.81 612008000 EH Plan Review ADR 11/24/200 $60.00 612008000 Total $3,957.59 BLD2008-01380 Please referto the following pages for conditions of this permit. 1 of 5 CASE NOTES FOR BLD2008-01380 CONDITIONS FOR BLD2008-01380 1) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs at end of driveway in accordance with Mason County Title 14.28. X 2) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. X 3) All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. X zz-/_1 4) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. X 4Z 5) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. X C-;7 /. 6) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X 147� 7) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. X /,�_ BLD2008-01380 Please referto the following pages for conditions of this permit. 2 of 5 8) The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150' from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. X a 4� 9) The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10 gallons is not allowed without the approval of the Mason County Fire Marshal. X /_-� e 10) All activity shall adhere to the recommendations made by Michael Staten of Envirotech Engineering in the geotechnical report dated October 31, 2007. X 62- e /. 11) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. x ,��,'i' 12) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. No more than one extension may be granted. X 13) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. X /1"_Z1. 14) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be charged and must be collected by the Building Department prior tQ any further inspections being performed or approvals granted. X _ 15) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, aN flashing. Install metal connectors approved for contact with the new types of pressure treated material. X 4,_2 —� 16) All property lines shall be clearly identified at the time of foundation inspection. X 17) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at X 80-6 7�982. he person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. z BLD2008-01380 Please referto the following pages for conditions of this permit. 3 of 5 18) Retaining walls needed to support a surch�ar a such as structures, roads, or to support slopes, shall require a separate building permit and approval prior to construction of the retaining wall. X Lam=4�z 19) Per IRC - SECTION R905- REQUIREMENTS FOR ROOF COVERINGS - R905.1 Roof covering application. Roof coverings shall be applied in accordance with the applicable provisions of this section and the manufacturer's installation instructions. x a C- „Z 20) Per 2003 IRC - SECTION 1609 -WIND LOADS - 1609.1 Applications. Buildings, structures and parts thereof shall be designed to withstand the minimum wind loads prescribed herein. Decreases in wind load shall not be made for the effect of shielding by other structures. Per FIGURE 1609 BASIC WIND SPEED (3-SECOND GUST) the wind speed for Mason County is 85 MPH. X 42C _,_� 21) Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. x 22) The"approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" site plan is not on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. x- 4C_/ 23) Placement of structure must comply with standards set forth per the international codes regarding descending and/or ascending slopes. 6' x - (l 0 24) Stock Plan Identification number: 2006-0007 This project is approved subject to the provisions identified the Mason County Stock Plan Policy. The site plan approved by the Planning Department, original building plans, and all attachments approved by the Mason County Building Department shall be available for the Mason County Building Inspector at each required inspection. x � 25) A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater management system have been installed as approved on the stormwater site plan. X /_ BLD2008-01380 Please referto the following pages for conditions of this permit. 4 of 5 26) Washington State Energy Code Compliance has been approved using the following: Heat Type: Electric or other fuels, Compliance Method: Prescriptive option IV, Window(Max U-Factor):0.35, Skylight (Max U-Factor):0.58, Doors (Type/Max U-Factor):0.20 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation R-38, Vault Insulation R-38 (see exception), Slab Insulation R-10. Exception: R-30 insulation may be installed, up to 500 sq. ft., in single rafter or joist vaulted ceilings where the distance of the top of the ceiling and the underside of t�of sheathing is less than 12-inches and there is 1-inch vented airspace above the insulation. X �� 27) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your "Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed. X a e-Z 28) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to ensure these structures meet the setback conditions listed. X Q /, This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and insp tion. OWNER OR AGENT: DATE: BLD2008-01380 Please refer to the following pages for conditions of this permit. 5 of 5 co o CONCRETE MECHANICAL MANUFACTURED HOME _ w Footings /Setbacks fate / lG.-C / BY ��_ Ribbons � Gas Pip ng o Interior Date By Interior-Date By Date Ely O oExterior Date -S�a By/ /� Exterior-Date By Set-upPoint Load/Isolated Footings INSULATION Date By N BG!SLAB INSULATION Rate By Data By FIRE DEPARTMENT Foundation Walls Floors Date By O Date BY Data -P-S - By DECKS Z FRAMING walls J Date By 90 Date /(� By T�� Data 4,/ By PROPAN E TANKS p PLUMBING vault Date By Z Dam By OTHER m Groundwork Attic Date By Date By Type: Date By D.w.b / DRYWALL Type: Date 7 9 $ l� Int Brace Wall ^� pate By ICUy Date I By FINAL INSPECTION 0 CD Water Line Fire Seperationf I N Date �� By,� Date ve By OL/ Date By L/� CD m00 Pass or Request Inspect. o 0 Type of insp. Fail Date Date Done By Comments 00 h' 81 Cn /07 tiT fib pn-L t_145 0 =j� � 0 ACCESS & GRADE INSPECTION BLD Oy- 0/`:jS 5-'d ADDRESS: 44� INSPECTOR: Ala DRIVEWAY ACCESS Length: Width: Surface: Size of turn-around: Condition of shoulders: Vertical clearance: need post at end of driveway w'th reflective address numbers dtt� GRADE OF DRIVEWAY / %, OF ROAD % ROAD ACCESS Length: Width: Surface: Condition of Shoulders: Vertical clearance: (� BURN PERMIT REQUIRED FOR LAND CLEARING FIRE. LOT INSIDE UGA-NO OUTDOOR BURNING PERMITTED. LOT TOO SMALL FOR: BURN PERMITS 4 X 4 FIRES 2 X 3 FIRES PASSED ( ) FAILED ( ) ON HOLD ( ) REMARKS: Aa (j►,, `5 �� —1� JiiCI A Lik4-p,-+vQ kw Nee is / XISTING SINGLE 'LOPE TOP FAMILY RESIDENCE SCALE, 1 INCH = IM FEET 320FTt D SEPTICLL { *O 2 A � SINGLE { 0 2 SLOPE TOP FAMILY/ A { 6L51- * 2 25FT BUIL AND { VEGETATI DIFFER { 2� 2� { SLOPE �t D DRIVEWA SLOPE TOE TY LINE SOILS MEDIUM DENSE SILTY SAND WITH GRAVEL (SM) OVERLYING VERY DENSE SM +1 r r � o � o n OUT V ASH MATERIAL OBSERVED WATER BODY 2 Z2� PROJECT/ OVIER/ LOCATION SINGLE FAMILY RESIDENCE Z*o GEOTECHNICAL REPORT ALTON k CO WE SHDOCDVITZ PARCEL 12207 75 00010 DES, LEGEND MASON COUNTY, VASHGNGTON 1. CONTOURS ARE NOT PRECISE, AND ONLY DEPICT GENERAL �� TOPOGRAPHIC CONDITIONS. CONTOURS WERE EXTRAPOLATED f BUFFER FROM A PUBLIC LIDAR SOURCE, AND INCORPORATED FIELD E►VHUMCH ENGINEERING MEASUREMENTS. SLOPE DIRECTION 74 ME FAIR, ROAD BELFAIR, VAalINGTO N 985W w EXISTING CDNTOUR -275-9374 GEOLOGIC MAP �� Ir- 4.0 ENGINEERING ANALYSIS,CONCLUSIONS AND RECOMMENDATIONS The following sections present engineering analysis and recommendations for the proposed improvements of the Project. These recommendations have been made available based on the planned improvements as outlined in the Introduction Section of this report; general observations including drainage and topography as recapitulated in the Surface Conditions Section; and, soil conditions that were identified from the geotechnical investigation that is summarized in the Subsurface Investigation Section. Engineering analysis and recommendations for the Project that is provided herein, includes pertinent information for building foundations, earthwork construction, slope stability/ erosion control, and seismic considerations. In addition, recommendations are provided for the anticipated timber harvesting. 4.1 Building Foundation Recommendations Recommendations provided in this section account for the site development of a typical one- or two-story, single family residential structure. Below the upper 12 inches of Project soils, there is apparently two distinguishable layers of soil that will influence the bearing capacity and settlement of the structures. The recommended allowable bearing capacities and settlements as presented below, consider the probable type of construction as well as the field investigation results by implementing practical engineering judgment within published engineering standards. Evaluations include classifying site soils, and deriving probable relative densities, unit weights and angles of internal friction of the in-situ soils based on observed field conditions and soil testing for this Project. The frost penetration depth is not expected to extend beyond 12 inches below the ground surface for this Project under normal circumstances and anticipated design features. The soils on-site have moderate frost susceptible characteristics and should be used only to the extents provided in this report. 4.1.1 Bearing Capacity For the existing site conditions, bearing values should increase with depth. Existing in- situ soils at the Project site indicates that the structure can be established on shallow, continuous or isolated footings. Foundations shall be established on relatively undisturbed native soil. Alternatively, foundations may be constructed on selective re- compacted native soil or compacted engineered fill as described in the Earthwork Construction Recommendations Section of this report. Footing width and depth recommendations shall be adhered to,and are based on 2000 pounds per square feet(psf) maximum structural bearing pressure. For a bearing capacity requirement of no more than 2000 psf, a minimum footing width of 12 inches shall be placed at a minimum of 2 feet below the existing ground surface. These recommendations are made available based on adherence to the remaining recommendations that are provided in this report. 4.1.2 Settlement Total and differential settlement that a structure will undergo depends primarily on the subsurface conditions, type of structure, amount and duration of pressure exerted by the structure, reduction of pore water pressure, and in some instances, the infiltration of free moisture. Based on the expected native soil conditions, anticipated development, and construction abides by the recommendations in this report, the assumed foundation system may undergo a maximum of 1.0 inch total settlement,and a maximum differential settlement of 0.75 inch. 4.1.3 Concrete Slabs-on-Grade Interior slabs, if utilized, should be supported on a minimum of 6 inches of compacted granular material that is placed over undisturbed native subgrade or engineered fill. Native soils found at the Project site is not suitable material for supporting concrete slabs. Although not required for the structural integrity of the concrete slab-on-grade, a vapor barrier is usually used for damp-proofing. If vapor barriers are used, it is suggested to utilize a barrier that is sufficiently thick to resist puncturing during construction, or place a 2 inch layer of sand above the barrier prior to placing the concrete slab. 4.2 Lateral Earth Pressures Lateral earth pressures exerted through the backfill of a retaining wall are dependent upon several factors including height of retained soil behind the wall, type of soil that is retained, degree of backfill compaction, slope of backfill, surcharges, hydrostatic pressures, earthquake pressures, and the direction and distance that the top of the wall moves. Significant retaining structures are not anticipated for this Project. If retaining walls are later planned for this Project, prescriptive requirements from the County should be adhered to. For retaining structures with a height exceeding County prescriptive requirements, additional design parameters must be accounted for in the retaining wall analysis, and recommendations should only be provided by a qualified engineer after the type of backfill is acquired, inclination of backfill slope is estimated, and the final wall height is determined. 4.3 Earthwork Construction Recommendations Founding material for building foundations shall consist of undisturbed native soils. Compacted engineered fill, or selective re-compacted native soils may be used to the extents provided in this Earthwork Construction Recommendations Section. The recommendations include excavations, subgrade preparation,type of fill,and placement of fill for building foundations. 4.3.1 Excavation Excavation is recommended to remove any excessive organic content or other deleterious material, if present, beneath foundations and to achieve appropriate foundation depth. Additional sub-excavation will be required for this Project if the soils below the required foundation depth become loose, saturated, or otherwise incompetent due to inappropriate land disturbing, or excessive water allowed to saturate foundation excavations prior to footing construction. All soils below the bottom of the excavation shall be competent, and relatively undisturbed or properly compacted fill. If these soils are disturbed or deemed incompetent, removal and/or re-compaction of these soils below the anticipated footing depth is necessary. Excavations shall be completely dewatered, compacted, and suitable before placement of additional native soil, engineered fill or structural concrete. It is suggested that foundation excavations are inspected by a geotechnical engineer or qualified professional in order to assess the bearing material prior to placement of structural footings. 4.3.2 Placement and Compaction of Native Soils and Engineered Fill For engineered fill or disturbed native soils that will be utilized as fill material directly beneath foundations, observation and/ or geotechnical testing is recommended prior to foundation construction. The following placement and compaction requirements are necessary. For disturbed native soils or engineered fill beneath foundations, limits of compacted or re-compacted fill shall extend laterally from the bottom edge of the foundation at a rate of one foot for each foot of compacted or re-compacted fill beneath the foundation. See the illustration below. FOOTING COMPACTED NATIVE SOILS OR ENGINEERED 1 FILL I UNDISTURBED SUBGRAI)El Both engineered fill and native soils used as compacted fill should be free of roots and other organics, rocks over 6 inches in size, or any other deleterious matter. Engineered fill should consist of 65%to 100%gravel-sized material(particles between 3/16-inch and 3 inches),and less than 101/6 fines(particles passing#200 standard sieve)by weight. Compaction shall be achieved in compacted lifts not to exceed 8 inches and 12 inches for native soils and engineered fill, respectively. Each lift should be uniformly compacted to at least 95%of the modified Proctor maximum dry density (ASTM D 1557) and within 3% of optimum moisture content. Each lift surface should be adequately maintained during construction in order to achieve acceptable compaction and inter-lift bonding. 4.3.3 Retaining Wall Backfill As previously mentioned, significant retaining structures are not anticipated for this Project. However, if used, native soils should not be used as retaining wall backfill for this Project. Backfill should consist of engineered fill or borrow materials approved by a geotechnical engineer. Placement, compaction and extents of retaining wall backfill should also be specified by a geotechnical engineer or qualified professional. 4.3.4 Wet Weather Considerations Due to the types of subsurface soils, additional provisions may be required during prolonged wet weather. Every precaution should be made in order to prevent free moisture from saturating the soils within excavations. If the bottom of excavations used for footing placement changes from a moist and dense/hard characteristic as presented in this report to muck or soft, saturated conditions, then these soils become unsuitable for foundation bearing material. If this situation occurs, a geotechnical engineer should be notified, or these soils should be completely removed and replaced with suitable compacted material as presented in this section. 4.4 Slope Stability and Erosion Control Landslides are natural geologic processes, and structures near slopes possess an inherent risk of adverse settlement, sliding or structural damage due to these processes. These risks cannot be eliminated for any site with sloping grades because gravity is constantly inducing strain on the soil mass. Geotechnical engineering provides an acceptable factor of safety for developing on or near sloping terrain. These factor of safeties are based on engineering standards such as defining engineering properties of the soil,topography,water conditions and surcharges. Surface sloughing or other types of surficial slope movements usually do not affect the deep- _ seated structural capability of the slope. However, excessive and/or repeated surficial slope movements, if not repaired, may represent a threat to the structural integrity of the slope. With appropriate drainage and erosion control provisions for this Project during and after construction, it is unlikely_ that this Project will experience excessive surficial movements. However, maintenance of the slope must be completed if the situation does arise in order to prevent the possibility of further surficial or deep seated slope movements that may be damaging to life and property. According to the Coastal Zone Atlas of Mason County, Washington, the Project is within and near terrain labeled `Stable' and `Intermediate' regarding potential landslide activity. Stable slopes are generally not prone to landslides due to small grades and accommodating geology. Historically, intermediate terrains have no known landslides. However, this site is considered inherently hazardous due the existing geology and/ or topography, and additional analyses and recommendations concerning the slopes are presented herein. A Stability Map from the Coastal Zone Atlas for the general area of this Project may be found on the following page of this report. The Simplified Bishop Method, utilizing a spreadsheet program iterative approach, was used to analyze the static stability of the site slopes. Various radii's and center points of the circle were selected until the lowest factor of safety was found. Center points and radii's were carefully chosen to exploit the weakest points of possible slip planes. In addition, conservative values were used in the slope stability analysis in regards to topography, surcharges, water content, and cohesion of the site soils. Seismic conditions were estimated utilizing worst case scenario values from the static analysis, a horizontal acceleration coefficient of at least 0.15, and applying the applicable values to slope stability charts. These stability charts were presented by the American Society of Civil Engineers (ASCE) in the"Journal of Geotechnical and Geoenvironmental Engineering,"April 2002. Anticipated building loads,building pad cuts, or impacts from septic drainfields are not expected to have any detrimental influence on the global stability of the slopes, provided that the setback requirements, drainage and all other recommendations in this report are adhered to. Based on the aforementioned Project criteria, observations, slope stability analysis, and the recommendations in this report, the Project has an acceptable factor of safety of over 1.5 relative to deep-seated, static slope failures. Furthermore,an acceptable factor of safety of over 1.1 for seismic conditions was also concluded for this Project. See the slope stability information in Appendix D for input parameters and example of outputs. For this project, minimum factor of safeties for static and dynamic conditions were estimated to be 1.9 and 1.3,respectively. Project 1 Map from Washington State Department of Ecolo&Yy Website 4.4.1 Septic Drainfield Impacts The approximate location of the proposed septic drainfield is presented on the Site Plan in Appendix A of this report. To account for the presence of drainfields for this Project, the slope stability analysis accounted for saturation in the upper subsoils. Saturation of the subsoils induces a greater soil unit weight, reduces cohesion,and reduces the angle of internal friction. Based on the septic drainfield locations and slope stability analysis for this Project, the drainfield is not expected to adversely influence the stability of any slopes within and near the Project, or negatively impact the planned single family residence. 4.4.2 Building and Footing Setbacks Conservative surcharges from the existing site development on top of the nearby slope was used in the slope stability analysis. Provided that assumptions relating to construction occur and recommendations are followed as presented in this report, the factor of safety for slope stability is sufficient for a 25 feet footing setback from the bottom the 45%ascending slope. A 50 foot footing setback from the toe of the steep 65% slope is also specified. However this buffer is entirely on the adjacent property. 4.4.3 Temporary and Permanent Erosion Control Based on the USCS description of the Project soils, the surface soils are considered moderately erodible. Temporary and/ or permanent erosion control measures may be required for site development. Extents of temporary erosion control will mostly depend on the timeliness of construction, moisture content of the soil, and amount of rainfall during construction. Soil erosion typical to the existing site conditions and planned disturbance of the Project include wind-borne silts during dry weather, and sediment transport during prolonged wet weather. Sediment transport could be from stormwater runoff or tracking off-site with construction equipment. Erosion control measures may need to be employed if excessive erosion occurs or required by the County or other prevailing agencies. Erosion control during construction should include minimizing the removal of vegetation to the least extent possible. If necessary, erosion control measures during construction may include stockpiling cleared vegetation, temporary retention areas, silt fencing, intercepting swales, berms, straw bales, plastic cover or other standard controls. Silt fencing is presented in this report as the first choice for temporary erosion control. Any erosion control should be located down-slope and beyond the limits of construction and clearing of vegetation where surface water is expected to flow. If the loss of sediments appear to be greater than expected, or erosion control measures are not functioning as needed, additional measures must be implemented immediately. See Appendix E for sketches and general notes regarding selected erosion control measures. The Site Map in Appendix A depicts the recommended locations for erosion control facilities to be installed, if necessary. Permanent erosion control may also be necessary if substantial vegetation has not been established within disturbed areas upon completion of the Project. If utilized, temporary erosion control should remain in place until permanent erosion control has been established. Permanent erosion control may include promoting the growth of vegetation within the exposed areas by mulching, seeding or an equivalent measure. Selected recommendations for permanent erosion control are provided in Appendix E. Additional erosion control measures that should be performed include routine maintenance and replacement, when necessary, of permanent erosion control, vegetation, drainage structures and/or features. Sedimentation control should be adequate when utilizing the erosion control recommendations as presented herein together with implementing appropriate erosion controls with the degree of care as expected from a licensed contractor. Erosion control information and specifications in addition to what is provided in this report may be found in the current "Stormwater Management Manual for Western Washington," prepared by the Washington State Department of Ecology Water Quality Program. 4.4.4 Surface and Subsurface Drainage Positive drainage should be provided in the final design for all planned residential buildings. Drainage shall include sloping the ground surface, driveways and sidewalks away from the Project structures. All constructed surface and subsurface drains should be adequately maintained during the life of the structure. If drainage problems occur during or after construction, additional water mitigation will be required. This may include a combination of swales, berms, drain pipes, infiltration facilities, or outlet protection in order to divert water away from the structures. From a geotechnical perspective, both perimeter footing drains and roof drains are optional for the single family residence. If footings are established at depths greater than 2 feet below final grade, then perimeter footing drains are recommended. If utilized, subsurface water intercepted in the perimeter footing drains, and stormwater collected from roof drains shall be tight-lined to an appropriate infiltration area or outlet protection area located downslope and at least 10 feet from any structure. 4.4.5 Vegetation Considerations Vegetation is an excellent measure to minimize surficial slope movements and erosion on slope faces and exposed surfaces. As previously mentioned, existing surface conditions at the Project site appear to be sufficiently resistant to erosion hazards. Site development will require land disturbance and the removal of vegetation. Envirotech recommends to minimize removal of vegetation during and after construction and comply with the timber harvesting recommendations below. Vegetation that should not be disturbed is shown on the Logging Map in Appendix F. Complete vegetation removal is permitted in building, septic and driveway areas only. Stumps and roots shall remain in place where outlined in the Timber Harvesting Recommendations of this report. In addition, any tree may be removed if it poses a threat to life and property. 4.4.6 Off-site impacts From a geotechnical position, it is Envirotech's opinion that the adjacent properties to the proposed development should not be significantly impacted if all recommendations in this report are followed. This is based on the slope stability analysis by accounting for proposed surcharges and additional saturation of the soils. Drainage features that are required for this Project that have not been accounted for in this report shall include proper mitigation as to not adversely impact properties beyond the Project. 4.5 Seismic Considerations Soils immediately below the expected foundation depth for this Project are generally Type D, corresponding to the International Building Code (IBC) soil profiles. According to the IBC, the regional seismic zone is 3 for this Project. The estimated peak ground acceleration ranges from 0.50g to 0.60g. This estimation is based on the United States Geological Survey(USGS)National Seismic Hazard Project in which there is an estimated 2% probability of exceedance within the MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT r WSEC/VIAQ Compliance Application Owner: Mom - v elephone: Parcel#: Type of project ( ) New Residence ( )Addition ( ) Remodel Total Sq. Ft. 1S Floor : 2" floor: Heated Basement: of heated area:: Heating System Type: % Electric wall heater O Electric Central Furnace O LPG Furnace O Heat Pump with electric furnace O Heat pump with gas furnace O Boiler, specify fuel type: O Other: Specify Glazing O Prescriptive Option see reverse side circle one: 1 II IV Percentage: Compliance Method O Component Performance , Chapter 5— Calculation worksheets required Check one:: O Systems analysis, Chapter 4 O Whole House Ventilation system O Whole House Ventilation using a Heat Ventilation using exhaust fans&window or wall fresh air Recovery Ventilation System (VIAQ 303.4.4) System vents (VIAQ 303.4.1) Check one O Whole House Ventilation Integrated O Whole House Ventilation using an inline with a Forced Air System (VIAQ 303.4.2) supply fan. (VIAQ 303.4.3) Window & Door Schedule (If needed, attach an additional sheet) Total Manufacturer Room/location U-Factor Size Quantity Square Feet Windows: Windows: Total Sq. ft. Doors: Doors: Total Sq. Ft Total window and door area Total window &door area /(divided by) total sq.ft of heated area = %of glazing MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Permit Assistance Center SHELTON (360) 427-9670 BELFAIR (360)275-4467 Elma (360)482-5269 FAx: (360)427-7798 WEB SITE: www.co.mason.wa.us P.O. Box 186, SHELTON 98584 2006 Washington State Energy Code (WSEC) 2006 Ventilation and Indoor Air Quality Code (VIAQ) Effective July 1, 2007 Code Compliance Application Form The following information will be required for the WSEC and VIAQ plan review: 1. Complete the Washington State Energy Code/Ventilation and Indoor Air Quality Code (WSECNIAQ) application located on the reverse side. 2. The window and door schedule should include all windows, skylights, sliding glass doors, french doors and any other door with 50% glass or more. Use rough opening dimensions of windows and doors to calculate size. It is always helpful to list the u-factors of windows and doors, if known. If you do not know u-factors, the plan reviewer will assume all window & door glazing will have a u-factor of .35 or less. When using the area weighted average method to comply with the prescriptive path include calculations with submittal documents. 3. On your building plans note the location and fuel type of heating system, water heater, location of exhaust fans (bathroom, laundry, kitchen, etc.) and R-factor of proposed insulation for walls, floors, ceilings, and slabs. Outdoor lighting, permanently mounted to a residential building or to other buildings on the same lot shall be high efficacy luminaires or motion sensor with integral photocontrol photosensor. All linear fluorescent fixtures must be fitted with T-8 or smaller lamps, but not T-10 or T-12 lamps. To verify compliance, provide lighting information on plans. 4. Questions? Call Mason County Community Development at (360) 427-9670 ext. 352. Additional WSEC and VIAQ compliance information is also available on the WSU-Energy Program website at: http://www.energy.wsu.edu/code/ Prescriptive Requirements °,' for Group R Occupancy Climate Zone 1, Table 6-1 Glazing Glazing U-factor Vaulted Wall Wall Wall Area %of Door Ceiling Ceiling3 Above interior exterior Slab 6 Option Floor Ll s 2 See note Grade 4 below 4 Below Floor 5 on 10 vertical Overhead Factor below 12 grade Grade Grade I 10% .32 .58 .20 R-38 R-30 R-15 R-15 R-10 R-30 R-10 II* 15%* .35 .58 .20 R-38 R-30 R-21 R-21 R-10 R-30 R-10 IV Unlimited Single Family Res .35 .58 .20 R-38 R-30 R-21 R-21 R-10 R-30 R-10 (R-3)Only *Reference Case/Call(360)427-9670 ext.352 for footnote information. Log&solid timber wall with a min. avg.thickness of 3.5"are exempt from the above grade wall insulation requirements.Vaulted ceilings shall be limited to 500 sq.ft.of ceiling area for any one dwelling unit. r A Window Schedule H9!;r for 2112 plan H p Hiline Homes of Belfair Manufacturer: Milgard Windows Inc. Model: Classic Series Type: Vinyl U-Value = .36 Windows Quantity Size/ Handing Glazing area Total S . Ft. Location width x height 1 5'0 x 60 25 25 Bedroom 2 1 5'0 x 5'0 25 25 Bedroom 3 1 6'0 x 4'0 24 24 Den *1 6'0 x 4'0 24 24 Master Bedroom 1 SO x 3'0 9 9 Master Bath 1 4'0 x 3'6 14 14 Kitchen 1 4'0 x SO 20 20 Great Room 1 8'0 x 5'0 40 40 Great Room 1 2'0 x 5'0 10 10 Entry Slid. Glass Doors 1 6'0 x 6'10" sgd 41 41 Dining Total glazing area 232 sq. ft. 232 - 2112 = .109 X 100 = 11% Glazing Area z Conditioned floor Area Glazing Percentage " If a sliding glass door option was chosen, switch the appropriate window w/the sliding glass door and use the calculation below. 1 6'0 x 6'10"sgd 41 41 Appropriate Room 249 - 2112 = .117 X 100 = 12% Glazing Area = Conditioned floor Area Glazing Percentage All other doors,windows&skylights do not need to be calculated do to the fact they meet all minimum requirements. HiL INE - Building Permit Information Form - 2112 Plan E4 . .r This form contains the information you'll need to complete your building permit packet. We've included information for all counties, some of it may not apply to yours. If you have any questions, please give us a call at 360-275-1849 Applicant/Owner/Contact Information: Your name, address, phone number Contractor Information: Name: HiLine Homes Address: PO Box 3375 Belfair WA 98528 Phone: 360-275-1849 License# HILINH"981 BT Expiration: 02/10/10 Tax Parcel#/Assessor's Acct. # : This will be with your property information. Job Site Address: Your new home address(example: xxx Filmore St.) Legal Description: This will be with your property information. (example:Lot xx Large Lot Sub Division xxx in Lewis County etc.) This will be a New Single Family Residence Describe work/Type of Job: New Home construction Home Information: Floor Area: (sq.footage) Main /1st: 2112 #of stories: 1 Carports: 0 Second: 0 Bedrooms: 3 Decks: 0 Basement: 0 Bathrooms: 2 Porches: 96 Total: 2112 Garage: 528 (Attached) Construction Method: Wood frame Heating System: Be sure to choose the information below that correlates with the heat system you have ordered. HVAC/Mechanical Contractor is the company installing your heat system. Cadet/Wall Mount/Zone Heaters: Standard heats stem Installer: North Pacific Electric Contact: Bernie/Kim License#: NORTHPE957JA Phone: 360-943-6020 ,. Expiration: 04/01/09 Location: Olympia j Manuf: Marley Brand: Module#: KW: 10.5 WHF: AMPS: 20 On permits,for the#of wall heaters,put 1,or you'll be charged extra for every one. Heat Pump w/furnace w/HWH: Installer: Chehalis Sheet Metal Contact: Dave Pyles License#: CHEHASM252MH Phone: 360-748-9921 Expiration: 09/24/09 Location: Chehalis Manuf: Trane Module: 2TWR103OA1000A KW: 10 Tonnage: 2112 HSPF: 7.75 Seer: 10 LRA: 71 Efficiency: 100% 15' Building setback Pileated Woodpecker Tree II lo' buffer II I Alderwood Road Catc�,or•t Il Wetland l IU' tfier+ l building �;ett•�acl; t N 4 Nontishbearing stream 0 200' � FIGURE 2. SITE.MAP Project Name: Shimkovitz Wetland Delineation 7� Location: Belfair,Washington TM ND CORPS Project: TWC07-W316 Client: Connie Shimkovitz Date: 10I07 (warn ���Lq w° a� �-4- �% � . MASON COUNTY PERM T O. `— BUILDING PERMIT APPLICATION .�5 426 W. Cedar• P.O. Box 186, Shelton, WA 98584 Shelton (360) 427-9670 • Belfair (360) 275-4467 • Elma (360) 482-5269 On the web www.co.mason.wa.us APPLICANT INFORMA ON CONTRACTOR INFORMATION Owner 4 S Company Name Jq Mailing Add re s Mailin ddress 7 `s City State Zip Code City State Zip Code - Phone Other Ph. Phone ther Ph. Lien/Title Holder Contractor Reg. V Exp. E mail address QQhd /A E Mail Address Drivers Lic.# ,e°L DOB . /,f Drivers Lic.# DOB SEPTIC /WATER SYSTEM INFORMATION - Con ct to New Septic Existing Septic Wat er ter System Name of Water System Well {`, Sewer System Name of Sewer System PARCEL INFORMATION - 12 Digit Parcel No. 7,S.61 72 Ee - Fire District Legal Description Site Address (Please include street name, street mber and city) Directions to site L �"' ` Will timber be cut 6nd sold in parcel preparation?Yes/No Is property� in 200' of Saltwater Lake River/ Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes/No TYPE OF JOB - New dd Alt Repair Other PRIMARY RESIDENCE ❑ SEASONAL ❑ Use of BuildingDescribe Work No. of Bedroom No. of Bathrooms Z Square Footage- 1 st Flo 2nd Floor 3rd Floor Basement Deck Covered Deck Other Sq. ft. Garage Attached Detached Carport Attached Detached MANUFACTURED HOME INFORMATION - Make"""' y Model Year Length Width Serial No. No. of Bedrooms No. of Bathrooms Type of Heat Purchase Price$ - Replacement Unit? Yes/ No Installer Name Certification No. OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner,owners legal representative, or the contractor. I further declare that I am entitled to receive this permit and to do the work as proposed in the application. I declare that I have obtained the permission from all the necessary parties. If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application, I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf, represents that the informaticn provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OFAPROGRE S INSPECTION.INA TIVITY THIS PERMITAPPLICATION OF 180 D S WILL INVALIDATE THE APPLICATION. X Date ✓� � Owner/Owners R re a a ve/ ontrac r" (indicate which one) FOR OFFICIAL USE BEYOND THIS POINT Accepted by: Date DEPARTMENTAL REVIEW APPROV D DENIED NOTES Building Department l %MA�__ It o Planning Department Environmental Health Department S4 gIG zaa&n noaq-7 Fire Marshal FEES Building Permit Fee i5 Site Ins ection Plan Review Feel — EH Review Fee Plumbing & Base Fee Z3 % 0�� Planninq Review Fee Mechanical & Base fee r43 sbis Other Wood /Gas/ Pellet Stove Fee State Fee N Violation Fee Pre-Paid at Submittal 7 -- Valuation $ TOTAL FEES MASON COUNTY PERMIT NO. PLUMBING/MECHANICAL PERMIT APPLICATION 426 W. Cedar• P.O. Box 186, Shelton, WA 98584 Shelton (360) 427-9670 • Belfair (360) 275-4467 • Elma (360) 482-5269 On the web www.co.mason.wa.us APPLICANT INFOR ATION .` CONTRACTOR INFORMAT)ON Owner Company Name Mailing Addresg Mailing Address City State Zip Code City degair State Zip Code Phone Other Ph. Phone '2610 Other Ph. Lien/Title Holder Contractor Reg.4 1/Exp. E mail address E Mail Address Drivers Lic. # DOB Drivers Lic.# DOB SEPTIC INFORMATION - Connect to New Septic Existing Septic Connect to Sewer System Name of Sewer System PARCEL INFORMATION - 12 Digit Parcel No. Fire District Legal Description Site Address (Please include street name, street number and city) Directions to site "c Is property within 200'of Saltwater. Lake River/Creek Pond Wetland Seasonal Runoff-Stream-Slopes or Bluffs > 15% TYPE OF JOB - New Add Alt Repair Other _Use of Building Location of Fixtures/Units - 1st Floor 2nd Floor Basement Garage Closet PLUMBING FIXTURES (Show Number of each) MECHANICAL UNITS Type of Fixture No. of Fixtures Fees Fuel Type:Electric _ LPC'-L__ Natural Gas Heat Pump_ Toilets Type of Unit No. of Units Fees Bathroom Sink Furnace Bath Tubs Heatpumps Showers Spot Vent Fan Water Heater Propane Tank Clothes Washer Gas Outlets Kithen Sinks Wood/Gas/Pellet Stove Dishwasher Kitchen Exhaust Hood Hosebibs Dryer Vent Other Other Base Fee Base Fee TOTAL PLUMBING TOTAL MECHANICAL OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties.If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application,I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. X Date: Owner/Owners Representative/Contractor (indicate which one) FOR OFFICIAL USE BEYOND THIS POINT Accepted by: Planning Pd Ck# Date Bid Pd Receipt No. DEPARTMENTAL REVIEW APPROVED DENIED NOTES Building Department Occ Group-TVpe Constr. Planning Department Environmental Health Department FEES Plumbing & Base Fee Site Ins ection Mechanical & Base fee UFC Plan Review Fee Wood /Gas /Pellet Stove Fee Other Violation Fee TOTAL FEES Vicinity Map Owner Name: Alton and Connie Shimkovitz Mailing Address: NE 250 Roy Boad Rd Site Address: XXXX E Alderwood Rd City: Belfair City: Belfair Zip: 98528 Zip: 98528 Phone 1: 360-710-5675 Connie Cell Parcel Number: 122077500010 Phone 2: 360-731-5871 Alton Cell Miles From Hiline Sales Office: 3 Phone 3: �a 2 N J F 4 ►is �41 . Z Mi �Es� HILINH'983BD-HILINH'981 BT Page 9 of 10 Copyright HiLine Homes 2005,Revised Sept 2007 9-1 7 90 Z-0 32-o A E-9- P 1-4A PJ ?A APPROVED MASON COUNTY DCD PLANNING SITE PLAN REQUIRED TO BE ON SITE ES SU BJ ECT TO APPROVAL By Date a-'l-ek Plot Map Drawn To Meet HiUne Homes Specifications Any Revisions To Be Made By The Home owner