HomeMy WebLinkAboutSHX2021-00045 - SHX Application - 12/14/2021 (i)
RESEWED ------
Date received:
WASHINGTON STATE ofE9I DEC 14 2021
S-ft Dd 1
Joint Aquatic Resources Permit Agency(Sefq5e> # , �&-45
Application (JARPA) Form',2 li,ei Tax Parcel#(s):
USE BLACK OR BLUE INK TO ENTER ANSWERS IN THE WHITE SPACES BELOW.
/�aF�IL UV i
PLANNING -T -_b02Z21_-°`_7g5--_--
Part 1—Project Identification
1. Project Name (A name for your project that you create. Examples: Smith's Dock or Seabrook Lane Development) hel
Heath Bulkhead Replacement
Part 2—Applicant
The person and/or organization responsible for the project. h[ eio
2a. Name (Last, First, Middle)
Staten, Michael Clyde
2b. Organization (if applicable)
Envirotech Engineering, PLLC
2c. Mailing Address (Street or PO Box)
PO Box 984
2d. City, State, Zip
Belfair, Washington 98528
2e. Phone(1) 2f. Phone(2) 2g. Fax 2h. E-mail
360-275-9374 360-689-6045 n/a envirotech@geotechnicalinfo.com
Additional forms may be required for the following permits:
• If your project may qualify for Department of the Army authorization through a Regional General Permit(RGP),contact the U.S.Army Corps of
Engineers for application information(206)764-3495.
• If your project might affect species listed under the Endangered Species Act,you will need to fill out a Specific Project Information Form(SPIF)or
prepare a Biological Evaluation. Forms can be found at
htti)://www.nws.usace.army.m il/Missions/CivilW orks/Reou latory/PermitGuidebook/EndangeredSpecies.asl)x.
• Not all cities and counties accept the JARPA for their local Shoreline permits.If you need a Shoreline permit,contact the appropriate city or county
government to make sure they accept the JARPA.
2To access an online JARPA form with[help]screens,go to
httpJ/www.epermittino.wa.00v/site/alias resourcecenter/jaroa larga form/9984/iarpa form.asox.
For other help,contact the Governor's Office for Regulatory Innovation and Assistance at(800)917-0043 or help@oria.wa.00v.
ORIA-16-011 Page 1 of 14
Part 3—Authorized Agent or Contact
Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b of this
application.) [LeAi
3a. Name (Last, First, Middle)
Michael Staten
3b. Organization (If applicable)
Envirotech Engineering PLLC
3c. Mailing Address (street or PO Box)
PO Box 984
3d. City, State, Zip
Belfair, Washington 98528
3e. Phone(1) 3f. Phone(2) 3g. Fax 3h. E-mail
(360) 275-9374 360-689-6045 n/a envirotech@geotechnicalinfo.com
Part 4—Property Owner(s)
Contact information for people or organizations owning the property(ies) where the project will occur. Consider both
upland and aquatic ownership because the upland owners may not own the adjacent aquatic land. [help]
❑ Same as applicant. (Skip to Part 5.)
❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.)
❑ There are multiple upland property owners. Complete the section below and fill out JARPA Attachment A for
each additional property owner.
❑ Your project is on Department of Natural Resources (DNR)-managed aquatic lands. If you don't know, contact
the DNR at (360) 902-1100 to determine aquatic land ownership. If yes, complete JARPA Attachment E to
apply for the Aquatic Use Authorization.
4a. Name (Last, First, Middle)
Heath, Gregary B.
4b. Organization (If applicable)
4c. Mailing Address (street or PO Box)
2214 Tacoma Road
4d. City, State, Zip
Puyallup, Washington 98371
4e. Phone(1) 4f. Phone(2) 4g. Fax 4h. E-mail
253-770-8797 heatheng@comcast.net
ORIA-16-011 Page 2 of 14
Part 5—Project Location(s)
Identifying information about the property or properties where the project will occur. [nelpl
❑ There are multiple project locations (e.g. linear projects). Complete the section below and use JARPA
Attachment B for each additional project location.
5a. Indicate the type of ownership of the property. (Check all that apply.) [help]
® Private
❑ Federal
❑ Publicly owned (state,county,city, special districts like schools, ports, etc.)
❑ Tribal
❑ Department of Natural Resources (DNR) — managed aquatic lands (Complete JARPA Attachment E)
5b. Street Address (Cannot be a PO Box. If there is no address,provide other location information in 5p.) hf elpl
18801 E State Route 106
5c. City, State, Zip (If the project is not in a city or town, provide the name of the nearest city or town.) [help]
Belfair, Washington 98528
5d. County hf eM
Mason County
5e. Provide the section, township, and range for the project location. help]
1/4 Section Section Township Range
SW 6 22N 1 W
5f. Provide the latitude and longitude of the project location. [help]
• Example:47.03922 N lat./-122.89142 W long. (Use decimal degrees-NAD 83)
47.42229314132538 N Lat, -122.86295741910193 W Long.
5g. List the tax parcel number(s) for the project location. [help.]
• The local county assessor's office can provide this information.
12206-50-00006 & 12206-50-00903
5h. Contact information for all adjoining property owners. (If you need more space, use JARPA Attachment C.) hel
Name Mailing Address Tax Parcel # (if known)
Morrison, Alekzander 1014 Bay Street -- - 12206-50-00005
Port Orchard, Washington 98366
Albert Family LLC 12115 45`h Street CT E
-...... -_--._.__.-_------------------.--.-----------._.____________-- 12206-50-00007
Edgewood, Washington 98372
ORIA-16-011 Page 3 of 14
5i. List all wetlands on or adjacent to the project location. h[ elpl
n/a
5j. List all waterbodies (other than wetlands) on or adjacent to the project location. hei
Hood Canal
5k. Is any part of the project area within a 100-year floodplain? h[ eV
® Yes ❑ No ❑ Don't know
51. Briefly describe the vegetation and habitat conditions on the property. h[ eipj
Douglas Fir and Maple Trees
5m. Describe how the property is currently used. [Lei
Recreation
5n. Describe how the adjacent properties are currently used. [help]
Single family residences
50. Describe the structures (above and below ground) on the property, including their purpose(s) and current
condition. heI
None
5p. Provide driving directions from the closest highway to the project location, and attach a map. hLe
From town of Belfair, take Highway 3 south, then west on E State Route 106. Property on right side of the road.
ORIA-16-011 Page 4 of 14
Part 6—Project Description
6a. Briefly summarize the overall project. You can provide more detail in 6b. h( elp]
Replace existing wood bulkhead of approximately 100 If water frontage with reinforced concrete.
6b. Describe the purpose of the project and why you want or need to perform it. [hel
This project is to prevent additional erosion and bulkhead failure. Limited useable land remains on property.
6c. Indicate the project category. (Check all that apply) [hel
❑ Commercial ® Residential ❑ Institutional ❑ Transportation ❑ Recreational
❑ Maintenance ❑ Environmental Enhancement
6d. Indicate the major elements of your project. (Check all that apply) [help]
❑ Aquaculture ❑ Culvert ❑ Float ❑ Retaining Wall
❑ Bank Stabilization ❑ Dam /Weir ❑ Floating Home (upland)
❑ Boat House ❑ Dike/ Levee/Jetty ❑ Geotechnical Survey ❑ Road
❑ Boat Launch ❑ Ditch ❑ Land Clearing ❑ Scientific
Measurement Device
❑ Boat Lift ❑ Dock/ Pier ❑ Marina/ Moorage ❑ Stairs
❑ Bridge ❑ Dredging ❑ Mining ❑ Stormwater facility
® Bulkhead ❑ Fence ❑ Outfall Structure
❑ Swimming Pool
❑ Buoy ❑ Ferry Terminal ❑ Piling/Dolphin ❑ Utility Line
❑ Channel Modification ❑ Fishway ❑ Raft
❑ Other:
ORIA-16-011 Page 5 of 14
6e. Describe how you plan to construct each project element checked in 6d. Include specific construction
methods and equipment to be used. Lei-pi
• Identify where each element will occur in relation to the nearest waterbody.
• Indicate which activities are within the 100-year floodplain.
Existing bulkhead will be removed and replaced with small construction equipment landward of current
alignment.
6f. What are the anticipated start and end dates for project construction? (Month/Year) [help]
• If the project will be constructed in phases or stages, use JARPA Attachment D to list the start and end dates of each phase or
stage.
Start Date: 8/21/2022 End Date: 9/15/2022 ❑ See JARPA Attachment D
6g. Fair market value of the project, including materials, labor, machine rentals, etc. hel
$25,000
6h. Will any portion of the project receive federal funding? Lhel
• If yes, list each agency providing funds.
❑ Yes Z No ❑ Don't know
Part 7—Wetlands: Impacts and Mitigation
❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area.
(If there are none, skip to Part 8.) hel
7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. [hei�]
❑ Not applicable
7b. Will the project impact wetlands? hel
❑ Yes ❑ No ❑ Don't know
7c. Will the project impact wetland buffers? h[ elp]
❑ Yes ❑ No ❑ Don't know
ORIA-16-011 Page 6 of 14
7d. Has a wetland delineation report been prepared? hel
• If Yes,submit the report, including data sheets,with the JARPA package.
❑ Yes ❑ No
7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating
System? [help]
• If Yes, submit the wetland rating forms and figures with the JARPA package.
❑ Yes ❑ No ❑ Don't know
7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? h[ ell
• If Yes, submit the plan with the JARPA package and answer 7g.
• If No,or Not applicable,explain below why a mitigation plan should not be required.
❑ Yes ❑ No ❑ Don't know
7g. Summarize what the mitigation plan is meant to accomplish, and describe how a watershed approach was
used to design the plan. [tgjpj
7h. Use the table below to list the type and rating of each wetland impacted, the extent and duration of the
impact, and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a
similar table, you can state (below) where we can find this information in the plan. [Leipj
Activity (fill, Wetland Wetland Impact Duration Proposed Wetland
drain, excavate, Name' type and area (sq. of impact3 mitigation mitigation area
flood, etc.) rating ft. or type' (sq. ft. or
category' Acres) acres)
If no official name for the wetland exists,create a unique name(such as"Wetland 1"). The name should be consistent with other project documents,such
as a wetland delineation report.
z Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System.Provide the wetland rating forms with
the JARPA package.
3Indicate the days,months or years the wetland will be measurably impacted by the activity.Enter"permanent"if applicable.
°Creation C, Re-establishment/Rehabilitation R ,Enhancement E, Preservation P,Mitigation Bank/In-lieu fee B
Page number(s) for similar information in the mitigation plan, if available:
ORIA-16-011 Page 7 of 14
7L For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in cubic
yards that will be used, and how and where it will be placed into the wetland. hei l
7j. For all excavating activities identified in 7h, describe the excavation method, type and amount of material in
cubic yards you will remove, and where the material will be disposed. hei l
Part 8—Waterbodies (other than wetlands): Impacts and Mitigation
In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) [help]
® Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.)
8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment.
[help]
❑ Not applicable
Project constructed by manual labor and small equipment, avoiding machinery in the water. Net loss of beach
will not occur
8b. Will your project impact a waterbody or the area around a waterbody? [heipi
® Yes ❑ No
ORIA-16-011 Page 8 of 14
8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland
waterbodies? [hel
• If Yes, submit the plan with the JARPA package and answer 8d.
• If No,or Not applicable,explain below why a mitigation plan should not be required.
❑ Yes ® No ❑ Don't know
Project is small-scale, and mitigation is not known to be required.
8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was used
to design the plan.
• If you already completed 7g you do not need to restate your answer here. hel
n/a
8e. Summarize impact(s) to each waterbody in the table below. hf elAl
Activity (clear, Waterbody Impact Duration Amount of material Area (sq. ft. or
dredge, fill, pile name' location of impact3 (cubic yards) to be linear ft.) of
drive, etc.) placed in or removed waterbody
from waterbody directly affected
Bulkhead Hood Canal Adjacent permanent none 100 If
If no official name for the waterbody exists,create a unique name(such as"Stream 1")The name should be consistent with other documents provided.
2 Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent,provide the distance between the impact and the waterbody and
indicate whether the impact will occur within the 100-year flood plain.
Indicate the days, months or years the waterbody will be measurably impacted by the work. Enter"permanent"if applicable.
8f. For all activities identified in 8e, describe the source and nature of the fill material, amount (in cubic yards)
you will use, and how and where it will be placed into the waterbody. hel
Approximately 45 cy of concrete placed outside of the MHHW per standard design practice. Backfill behind wall
will be placed as necessary to construct the wall.
ORIA-16-011 Page 9 of 14
8g. For all excavating or dredging activities identified in 8e, describe the method for excavating or dredging,
type and amount of material you will remove, and where the material will be disposed. hel
No dredging will occur in waterbody.
Part 9—Additional Information
Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of
this section as you can. It is ok if you cannot answer a question.
9a. If you have already worked with any government agencies on this project, list them below. hel
Agency Name Contact Name Phone Most Recent
Date of Contact
9b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 of this JARPA on the Washington
Department of Ecology's 303(d) List? hel
• If Yes,list the parameter(s)below.
• If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at: https://ecologv.wa.gov/Water
Shoreli nes/W ater-quality/Water-improvement/Assessment-of-state-waters-303d.
❑ Yes ® No
9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? hel
• Go to http://cfpub.epa.gov/surf/locate/index.cfm to help identify the HUC.
—/110018C103
9d. What Water Resource Inventory Area Number (WRIA#) is the project in? hel
• Go to https://ecology.wa.goviWater-Shorelines/Water-supply/Water-availability/Watershed-look-up to find the WRIA#.
15
ORIA-16-011 Page 10 of 14
9e. Will the in-water construction work comply with the State of Washington water quality standards for turbidity?
heI
• Go to https://ecoIogy.wa.gov/Water-ShorelinesMater-guality/Freshwater/Surface-water-quality-standards/Criteria for the
standards.
M Yes ❑ No ❑ Not applicable
9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline
environment designation? hel
• If you don't know,contact the local planning department.
• For more information,go to:https:Hecology.wa.gov/Water-Shorelines/Shoreline-coastal-managemenVShoreline-coastal-
planning/Shoreline-laws-rules-and-cases.
❑ Urban ❑ Natural ❑ Aquatic ❑ Conservancy ❑ Other: Rural
9g. What is the Washington Department of Natural Resources Water Type? hei
• Go to http://www.dnr.wa.gov/forest-practices-water-typing for the Forest Practices Water Typing System.
® Shoreline ❑ Fish ❑ Non-Fish Perennial ❑ Non-Fish Seasonal
9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater
manual? [hel
• If No, provide the name of the manual your project is designed to meet.
® Yes ❑ No
Name of manual:
9i. Does the project site have known contaminated sediment? hf elp]
• If Yes, please describe below.
❑ Yes ® No
9j. If you know what the property was used for in the past, describe below. hel
unknown
I
9k. Has a cultural resource (archaeological) survey been performed on the project area? hei
• If Yes, attach it to your JARPA package.
❑ Yes ® No
ORIA-16-011 Page 11 of 14
91. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project
area or might be affected by the proposed work. LgjpJ
unknown
9m. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and
Species List that might be affected by the proposed work. heI
unknown
ORIA-16-011 Page 12 of 14
Part 10—SEPA Compliance and Permits
Use the resources and checklist below to identify the permits you are applying for.
• Online Project Questionnaire at http://apps.oria.wa.gov/opas/.
• Governor's Office for Regulatory Innovation and Assistance at (800) 917-0043 or helpOoria.wa.gov.
• For a list of addresses to send your JARPA to, click on agency addresses for completed JARPA.
10a. Compliance with the State Environmental Policy Act (SEPA). (Check all that apply.) [hel
• For more information about SEPA, go to hftps://ecology.wa.gov/regulations-permits/SEPA-environmental-review.
❑ A copy of the SEPA determination or letter of exemption is included with this application.
N A SEPA determination is pending with Mason County (lead agency). The expected
decision date is n/a
❑ I am applying for a Fish Habitat Enhancement Exemption. (Check the box below in 10b.) hel
❑ This project is exempt (choose type of exemption below).
❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt?
❑ Other:
❑ SEPA is pre-empted by federal law.
10b. Indicate the permits you are applying for. (Check all that apply.) Ltlel
LOCAL GOVERNMENT
Local Government Shoreline permits:
❑ Substantial Development ❑ Conditional Use ❑ Variance
N Shoreline Exemption Type (explain): minor construction/ repair
Other City/County permits:
❑ Floodplain Development Permit ❑ Critical Areas Ordinance
STATE GOVERNMENT
Washington Department of Fish and Wildlife:
N Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption —Attach Exemption Form
Washington Department of Natural Resources:
❑ Aquatic Use Authorization
Complete JARPA Attachment E and submit a check for$25 payable to the Washington Department of Natural Resources.
Do not send cash.
Washington Department of Ecology:
❑ Section 401 Water Quality Certification
FEDERAL GOVERNMENT
United States Department of the Army permits (U.S. Army Corps of Engineers):
❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters)
United States Coast Guard permits:
❑ General Bridge Act Permit ❑ Private Aids to Navigation (for non-bridge projects)
ORIA-16-011 Page 13 of 14
Part 11-Authorizing Signatures
Signatures are required before submitting the JARPA package. The JARPA package includes the JARPA form,
project plans, photos, etc. ih�]I
11a. Applicant Signature (required) N&
I certify that to the best of my knowledge and belief,the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work
only after I have received all necessary permits.
I hereby authorize the agent named in Part 3 of this application to act on my behalf in matters related to this
application. MCS (initial)
By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the
permitting agencies entering the property where the project is located to inspect the project site or any work
related to the project. MCS (initial)
Michael Staten ,fl c 11/15/21
Applicant Printed Name Date
11 b. Authorized Agent Signature h( eid
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work
only after all necessary permits have been issued.
Michael Staten c; 11/15/21
Authorized Agent Printed Name Authorized Agent Signature Date
11 c. Property Owner Signature (if not applicant) Mgigj
Not required if project is on existing rights-of-way or easements (provide copy of easement with JARPA).
I consent to the permitting agencies entering the property where the project is located to inspect the project site
or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the
landowner.
3 ---I � 5 � � zF, 2c2-.
Property Owner Printed Name Property Ownerdgigna6e Date
18 U.S.0§1001 provides that:Whoever,in any manner within the jurisdiction of any department or agency of the United States knowingly
falsifies,conceals,or covers up by any trick,scheme,or device a material fact or makes any false,fictitious,or fraudulent statements or
representations or makes or uses any false writing or document knowing same to contain any false,fictitious,or fraudulent statement or
entry,shall be fined not more than$10,000 or imprisoned not more than 5 years or both.
If you require this document in another format,contact the Governor's Office for Regulatory Innovation and Assistance(ORIA)at(800)
917-0043. People with hearing loss can call 711 for Washington Relay Service. People with a speech disability can call(877)833-6341.
ORIA publication number: ORIA-16-011 rev.07/2017
ORIA-16-011 Page 14 of 14
SCALE- 1 INCH 50 FEET
0 25 0
NEIGHBOR'S EXISTING
BLOCK BULKHEAD
EXISTING TIMBER
BULKHEAD TO BE
REMOVED & REPLACED
(PARCEL 12206-50-00903) CONCRETE RUBBLE AND
BASALT TO BE REMOVED
EXISTING LOG PILE
BULKHEAD TO BE PROPOSED CONCRETE
REMOVED & REPLACED STEPS. 6' WIDE
(PARCEL 12206-50-00006) PROPOSED CONCRETE
BULKHEAD. SEE DETAILS.
HOOD
CANAL
XX PARCE 2206-50-00903
EXISTING C❑NCRET
BULKHEAD TO REMAIN N
PARCEL 12206-50-0090 PARCEL 12206 0-00006
o`er
PARCEL 12206-5 00902
OJ
Q-
�O
S
EXISTING RIPRAP BULKHEAD PROJECT/ OWNER-
TO REMAIN ON NEIGHBOR HEATH CONCRETE BULKHEAD
PROPERTY DESIGN
GREGARY HEATH
18801 E STATE ROUTE 106
PARCEL 12206-50-00902
MASON COUNTY, WASHINGTON
ENGINEER-
L CLYDE ST ENVIROTECH ENGINEERING
�LQ+ OE"asy 9jPO BOX 3 84
BELFA R,WASHINGTON 98528
r� �2 PHONE, (360) 275-9374
9
- DRAWN BY: DATE,
MCS 11/4/21
DESIGNED BYi DATES
RF—STE/ R�0 taw Michae[ Staten, P.E. 11/4/21
��
�sS/�NALE`,G ff/4/zf SHEET
HET I OF2
—{ 12 IN 18 IN MIN—{
#4 REINFORCEMENT STEEL
HORIZONTAL 2 12 IN O.C.—
(TYP) _• :i`.
#4 REINFORCEMENT STEEL
VERTICAL 2 12 IN D.C.—
(TYP) COMPACTED GRAVEL,
SAND, SILTY SAND OR_::::.;.+•:.'-"; >,.
PORTLAND CEMENT CONCRETE SILTY_GRAVEL BACKFILL:' ,."'
AND FOOTING, 2500 psl MIN
NATIVE
UNDISTURBED
SOIL
#4 REINFORCEMENT STEEL
VERTICAL 2 12 IN D.C.
(TYP) r' LIMITS OF
e V z'V EXCAVATION
9 FT MAX _ -
#4 REINFORCEMENT STEEL
HORIZONTAL R 12 IN O.C.
(TYP) ;;POORLY GRADED CLEAN G AVEL (GP)
.:3/4 TO 1 1/2' CLEAN D AIN ROCK
MHHW ;'.:-TO WITHIN 6. IN. OF GR E
2.5FT �(2) 4' DIA. WE
a . .,HOLES2 8 FT O.C.
FILTER FABRIC WRAPPE
AROUND DRAIN ROCK _
�Y
BEACH ' : •
36 IN
I—6 IN 12 IN — #4 REINFORCEMENT STEEL
5 FT MIN (FLEXURAL) E 12 IN O.C.
(7) #4 REINFORCEMENT STEEL
(TEMPERATURE) 12' O.C. MAX.
UNDISTURBED, FIRM, UNYILDING SUBGRADE OR
COMPACTED ENGINEERED FILL
NOTES
1. RETAINING WALLS CALCULATED USING ACTIVE EARTH
PRESSURES.
2, RETAINING WALL DETAILS ARE PROVIDED FOR WALL HEIGHTS
LIMITED TO 9.0 FEET FROM THE BOTTOM OF THE FOOTING TO
THE TOP OF THE WALL, RETAINING WALLS WITH A HEIGHT LESS
THAN 4.0 FEET, SHOULD FOLLOW AGENCY PRESCRIPTIVE PROJECT/ OWNER,
REQUIREMENTS. HEATH CONCRETE BULKHEAD
3. LEVEL EARTH RETENTION (BACKFILL) IS REQUIRED.
4. ALL FOOTING SUBGRADES SHALL BE ON COMPETENT DESIGN
UNDISTURBED SOIL, OR RE-COMPACTED TO AT LEAST 957 OF GREGARY HEATH
MAXIMUM DENSITY PER ASTM D1557. 18801 E STATE ROUTE 106
5. ALL CONCRETE SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE PARCEL 12206-50-00902
STRENGTH OF 3000 psi. MASON COUNTY, WASHINGTON
6. CONCRETE SHALL BE PLACED USING MECHANICAL VIBRATION.
7, REINFORCEMENT STEEL SHALL BE EPDXY COATED, AND YIELD ENGINEER,
STRENGTH SHALL BE 60 ksi. ENVIROTECH ENGINEERING
8. CONCRETE COVER FOR STEEL MUST BE A MINIMUM OF 1.5 PO BOX 984
INCHES FOR WALLS, AND 3 INCHES FOR FOOTINGS. 3 INCHES PAL CLYDC ST BELFAIR, WASHINGTON 98528
IS RECOMMENDED FOR ALL. t� NVAS� N PHONE (360) 275-9374
9, BRACES AND TIE-DOWNS SHOULD HAVE A CORROSIVE RESISTENT �, pF /i J�
COATING. �� t� Lr �2
10. FILTER FABRIC SHALL BE FILTER MATERIAL THAT HAS BEEN DRAWN BY- DATE1
SPECIFICALLY DESIGNED TO IMPEDE THE ENTRANCE ❑F FINE MCS 11/4/21
PARTICLES.
11. CONTRACTOR SHALL USE EXTRA PRECAUTION TO PREVENT DESIGNED BY: DATE+
DISTURBED SOILS (SEDIMENTS) FROM ENTERING THE BEACH. 43045 Michael Staten, P.E. 11/4/21
12. ALL WORK ON BEACH SHALL BE DONE AT LOWER TIDES. �. RFGIST•ftt � SHEET
13, ALL WORK SHALL BE IN ACCORDANCE WITH PROPRIATE IBC, !;p yG�
STATE AND LOCAL CODES. S/0NAL0 �����1f
SHEET 2 OF 2