HomeMy WebLinkAboutBLD2010-00251 Reroof - COM Permit / Conditions - 4/6/2010 Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352
Mason County Bldg. III 426 W. Cedar P.O. Box 186
Shelton,WA 98584
RESIDENTIAL BUILDING PERMIT BLD2010-00251
OWNER: GIRL SCOUTS OF WESTERN WA RECEIVED: 4/6/2010
CONTRACTOR: STEPHEN JOHNSON 360-275-6734 LICENSE: STEPHJ"199LW EXP:6/1/2010 ISSUED: 4/6/2010
SITE ADDRESS: 251 E LAKE DEVEREAUX ALLYN EXPIRES: 10/6/2010
PARCEL NUMBER: 122074060000
LEGAL DESCRIPTION: S 3/4 OF E1/2 ELY OF R.R. R/W&WLY OF SR 3 EX., & SW 1/4 NW 1/4 IN SEC 8, W OF SR 3 (DOR#1807 004)
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
REROOF OF CARETAKERS RESIDENCE WITHIN THE GIRL SCOUT CAMP
General Information Construction &Occupancy Information Square Footage Information
No.of Bedrooms: Type of Constr.:
Type of Use: OTH Insp.Area: No. of Bathrooms: Occ. Group: Lot Size: Deck:
Type of Work: RR Fire Dist.: 5 No.of Stories: Occ. Load: Building:
Valuation: Building Height: Occ. Status: Basement:
Manufactured Home Information Setback Information Shoreline&Planning Information
Make: Length: Ft. Front: Ft. Shoreline: Ft.
Water Body:
Rear: Ft. Slope: Ft. SEPA?:
Model: Width: Ft. Side 1: Ft. Shoreline Desig.:
Year: Serial No.: Side 2: Ft. Comp. Plan Desig.:
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Re-Roof Fee GMM 4/6/2010 $117.50 S12010000
Building State Fee GMM 4/6/2010 $4.50 S12010000
Total $122.00
BLD2010-00251 Please referto the following pages for conditions of this permit. 1 of 3
CASE NOTES FOR
BLD2010-00251
CONDITIONS FOR
BLD2010-00251
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800-647-0982. Thee rs signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X
2) Owner/Agent is re s d'post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28.
X
3) SINGLE RAFTER T ROOF REPLACEMENT SHALL BE INSULATED TO A MI OF R-30 ALLOWING FOR A MINIMUM OF ONE INCH
CONTINUOUS VENTED AIRSPACE ABOVE THE LEVEL OF INSULATION. X
4) Existing roof shall be insulated to a minimum of R-30 if: The roof is uninsulated or insulation is removed to the level of the sheating, OR All insulation in
the roof/ceiling pre iou y installed exterior to the sheating or nonexistant.
X
5) Per 2003 IRC TION 1609 -WIND LOADS - 1609.1 Applications. Buildings, structures and parts thereof shall be designed to withstand the
minimum wind loads prescribed herein. Decreases in wind load shall not be made for the effect of shielding by other structures. Per FIGURE 1609
BASIC WIND SP -S COND GUST)the wind speed for Mason County is 85 MPH.
X
6) Per IRC -SECT R905 - QUIREMENTS FOR ROOF COVERINGS - R905.1 Roof covering application. Roof coverings shall be applied in
accordance with the ap cable provisions of this section and the manufacturer's installation instructions.
X
7) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
permit revocation.
X
BLD2010-00251 Please referto the following pages for conditions of this permit. 2 of 3
1 8) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED
' BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the international c as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
Inspector shall be I e r to requesting additional inspections.
X
9) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspectprLor to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason County ordin es gilding regulations.
X
10) All permits expir4180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period not excee 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder have prevented a fro being taken. No more than one extension may be granted.
X
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuati f work is a pr ress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a progres specti .The,—oer or he agent on the owners behalf,represents that the information provided is accurate and grants employees of Mason County access to
the above described grope and st ture for iew an inspe ion.
'r
OWN ER OR AGENT: DATE:
BLD2010-00251 Please refer to the following pages for conditions of this permit. 3 of 3
o CONCRETE MECHANICAL MANUFACTURED HOME
o `
o Date By
Footings J Setbacks Ribbons r
Gas Piping
o Interior Date By interior-Date By Date By 0
cCn Exterior Date By Exterior-Date By Set-up
Point Load J Isolated Footings INSULATION Cate 8y N
BG!SLAB INSULATION
Date By Data By FIRE DEPARTMENT _._. O
Foundation Walls Floors Date By C
Date By Data By DECKS M
MING walls Date By 4 FRA
Date By Data By PROPANE TANKS
PLUMBING vault gate ey Z
Date _ By OTHER
Groundwork Attic . D
Date By Type_
Date By _.-- Date By
D.W.v DRYWALL Type:
Date By Int Brace Wall Date
Date ey FINAL INSPECTION
Water Line Fire Separation ►�
Date By Date By Date By CD
� o
Pass or Request Inspect. c
0 Type of Insp. Fail Date Date Done By Comments r_j
C
CD
Cn
v
a
8
a
0
m
0
CD
m
� F
I
0