Loading...
HomeMy WebLinkAboutBLD2013--00362 RES DECK GARAGE - BLD Permit / Conditions - 6/13/2013 (2) FORM MUST BE COMPLETED IN INK MASON COUNTY PERMIT NO. _ PLEASE PRESS HARD BUILDING PERMIT APPLICATION 426 W. Cedar- P.O. Box 186, Shelton, WA 98584 Shelton (360) 427-9670 . Belfair (360) 275-4467 - Elma (360) 482-5269 On the web wvvw.co.mason.wa.us APPL! ANTE FOR TI N CONTRACTOR INFORMATIO Owner t Company Name Mailing Pddr, ess d Q• ?.?/f- Mailing Addre s City State y� State VJA' Zip Code 94 City State Zip Code Phone Other Ph. Phone Other h. Lien/Title Holder .A1 iA Contractor Reg. # Exp. E mail address E Mail Address Drivers Lic.# DOB I Drivers Lic.# DOB SEPTIC /WATER SYSTEM INFORMATION - Connect to New Septic Existing Septic Connect to Water System Name of Water System Well Sewer System Name of Sewer System PARCEL INFORMATION - 12 Digit Parcel No. ?io Fire Di trict Legal Description e Site Address (Please include street name, sire t number and city) 3 Directions to site ,)✓ -Lp 4o l o i oh 1 Will timber be cut and sold in parcel preparation?Yes I N Is property within 200' of Saltwater Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs 15% Is this permit submittal the result of a Stop Work Notice, Correction Notice or other enforcement act on?Yes/No TYPE OF JOB - New Add Alt Repair Other PRIMARY RESIDENCE SEASONAL ❑ Use of Building ----Describe Work eN/ No. of Bedroom No. of Bathrooms—Square Footage- 1st Floor 2nd Floor 3rd Floor Basement Deck Covered Deck, Other S4. ft. 15-04 Garage Attached —Detached Carport Attached D atached MANUFACTURED HOME INFORMATION - Make Model Year Length Width Serial No. No. of Bedrooms—No. of Bathrooms Type of Heat Purchase Price$ Replacement Unit? Yes/ No Installer Name Certification No. OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revo ation. Acknowledgement of such is by signature below. I declare that I am the owner,owners legal representative,or the contra or. I further declare that I am entitled to receive this permit and to do the work as proposed in the application. I declare that I have obtained the permission from all the necessary parties. If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application, I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection.This permit/application becomes null &void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 C ays. PROOF OF CONTINUATION OF WORK IS BY MEANS OFA ROGRESSINSPECTION.IN CTIVITYOF THIS PERMIT APPLICATION OF 80DAYSWILLINVALIDATETHE APPLICATION. X Date: rJ Owner/Owners Representative/Contractor (indicate which one) FOR OFFICIAL USE BEYOND THIS POINT Accept d by: Da e — DEPARTMENTAL REVIEW APPROVED DENIED NOTES Building Department Lh Planning Department Environmental Health Department Fire Marshal FEES Building Permit Fee Site Ins ec ion Plan Review Fee EH Review Fee Plumbing & Base Fee Planninq Review Fee Mechanical & Base fee Other Wood/Gas/ Pellet Stove Fee State Fee Violation Fee Pre-Paid at Submittal Valuation $ TOTAL FEES PERMIT N07­0�3— MASON COUNTY PLUMBING/MECHANICAL PERMIT APPLICATION 426 W. Cedar• P.O. Box 186, Shelton, WA 98584 Shelton (360)427-9670•Belfair(360)275-4467•EI a(360)482-5269 On the web www.co.mason.wa.us APPLICANT INFORMATION CONTRACTOR INFORMATION Owner IMF Company Name — Mailing Address Mailing Address — City State Zip Code City State Zip ode Phone Other Ph. Phone Other Ph. Lien/Title Holder Contractor Reg. # Exp E mail address E Mail Address Drivers Lic.# DOB Drivers Lic.# DOB SEPTIC INFORMATION - Connect to New Septic Existing Septic Connect to Sewer S stem Name of Sewer System PARCEL INFORMATION- 12 Digit Parcel No Fire District Legal Description Site Address(Please include street name,street number and city) Directions to site Is property within 200'of Saltwater Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluff > 15% TYPE OF JOB - New Add Alt Repair Other Use of Building Location of Fixtures/Units- 1st Floor 2nd Floor Basement Garage Closet PLUMBING FIXTURES (Show Number of each) MECHANICAL UNITS Type of Fixture No. of Fixtures Fees Fuel Type:Elec ric—LPG—Natural Gas Heat Pump_ Toilets jype of Unit No.of Units Fees Bathroom Sink ' Furnace Bath Tubs ' Heatpumps Showers Spot Vent Fan Water Heater Propane Tank Clothes Washer p4sputlets Kithen Sinks Wood)Gas/Pell t Stove Dishwasher klitchen Exhau Hood Hosebibs � DryerVent C Other Other Base Fee Base Fee TOTAL PLUMBING TOTAL MECHANICAL OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop ork order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parti s.If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application,I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents t at the information provided is accurate and grants employees of Mason County access to the above described p perty and structure for review anc inspection. PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. X Date: Owner/Owners Representative/Contractor (indicate which one) FOR OFFICIAL USE BEYOND THIS POINT Accepted by: Planning Pd Ck# Date Bld Pd Receiplt No. DEPARTMENTAL REVIEW APPROVED DENIED NOTES Building Department Occ Group—Type Constr. Planning Department Environmental Health Department FEES Plumbing & Base Fee Site Ins ectio Mechanical & Base fee UFC Plan Rev ew Fee Wood/Gas/Pellet Stove Fee Other Violation Fee TOTAL FEES 6yeo �5 1'3 Mason County Department of Communitv Develo ment Submittal Checklist For a Geotechnical Report Instructions: This checklist must be submitted with a Geotechnical Report and completed, signed, and stamped by the licensed professional(s)who prepared the Geotechnical Report for review by Mason County pursuant to the Mason County Resource Ordinance. If an item found to be not applicable, the report sho Id explain the basis for the conclusion. Applicant/Owner Mark Fenton Parcel# 4208-14-90042 &42 08-14-90043 Site Address W Dayton Trails Drive Shelton WA 98584 . (1) (a)A discussion of general geologic conditions in the vicinity of the proposed development, Located on page(s) Pages 1-3 (b) A discussion of specific soil types Located on page(s) Pages 2-3,4&5 (c) A discussion of ground water conditions Located on page(s) Page 4 (d) A discussion of the upslope geomorphology Located on page(s) Page 1 (e) A discussion of the location of upland waterbodies and wetlands Located on page(s) Page 3 (f) A discussion of history of landslide activity in the activity in the vicinity, as availab a in the referenced maps and records Located on page(s) Page 3 (2) A site plan which identifies the important development and geologic features. Located on Map(s) Geo-Rpt Plan Sheets 1 & 2 (3) Locations and logs of exploratory holes or probes. Located on Map(s) Geo-Rpt Plan Sheet 2 (4) The area of the proposed development, the boundaries of he hazard, and associateq buffers and setbacks shall be delineated (top, both sides, and toe) on a geologic map of the site. Located on Map(s) Geo-Rpt Plan Sheets 1 &2 (5) A minimum of one cross section at a scale which adequately depicts the subsurface profile, and which incorporates the details of proposed grade changes Located on Map(s) Plan Shts 3&4 and GALENA Stability Analysis pes 1 &3 of a ch analysis. (6) A description and results of slope stability analyses performed for both static and seic mic loading conditions. Analysis should examine worst case failures. The analysis should include the Simplified Bishop's Method of Circles. The minimum static safety factor is 1.5, the mi limum seismic safety factor is 1.1. and the quasi-static analysis coefficients should be a valL a of 0.15. Located on page(s) P2 4 GALENA Stability Analysis PIrintout Dages 2&4 of each rcl analysis. (7) (a)Appropriate restrictions on placement of drainage feato ties Located on page(s) Pages 4- 5 (b) Appropriate restrictions on placement of septic drain fields Located on page(s) Page 2 (c) Appropriate restrictions on placement of compacted fil s and footings Located on page(s) Page 5 Page 1 of 2 Form Effective June 008 Disclaimer: Mason County does not certify the quality of the work done in this Geotechnical Report. i (d) Recommended buffers from the landslide hazard areas shoreline bluffs and the taps of other slopes on the property. Located on page(s) Page 4 (e) Recommended setbacks from the landslide hazard areas shoreline bluffs and thel tops of other slopes on the property. Located on page(s) Page 4 (8) Recommendations for the preparation of a detailed clearing and grading plan which s Decifically identifies vegetation to be removed, a schedule for vegetation removal and replanting and the method of vegetation removal. Located on page(s) Page 5 (9) Recommendations for the preparation of a detailed temporary erosion control plan w i ch identifies the specific mitigating measures to be implement d during construction to potect the slope from erosion, landslides and harmful construction methods. Located on page(s) Page 5 (10) An analysis of both on-site and off-site impacts of the proposed development. Located on page(s) Page 5 (11) Specifications of final development conditions such as, ve etative management, drainage, erosion control, and buffer widths. Located on page(s) Page 5 (12) Recommendations for the preparation of structural mitigati n or details of other proposed mitigation. Located on page(s) Page 5 (13) A site map drawn to scale showing the property boundaries, scale, north arrow, and t ie location and nature of existing and proposed development on the site. Located on Ma s Plan Sheets 1 & 2 I, Alan A.Tahia,P.E. hereby certify under penalt of perjury that I am a civil engineer licensed in the State of Washington with specialized knowledge of geotechnical/geological engineering or a geologist or engineering eologist licensed in the State of Washington with special knowledge of the local conditions. I also certify that the Geotechnica Reports, dated 5/10/2013 ,and entitled Mark Fenton Geotechi ical Re ort meets all the Oquirements of the Mason County Resource Ordinance, Landslide Hazard Sect on, are complete and true, that the reports demonstrates conclusively that the risks posed by the landslide hazard can be mitigated through the included geotechnical design recommendations, and that all hazards are mitigated in suclp a manner as to prevent harm to property and public health and safety. (Signature and Stamp) i �F WA$kl �p 3078� ��SsroNaL Page 2 of 2 Form Effective June 2008 Disclaimer: Mason County does not certify the quality of the work done in this Geotechnical Report. TAHJA ENGINEERING, Inc. PO Box 235, Hoodsport, WA 98548 i (360) 877-9512 Mason County DCD PO Box 279 Shelton, WA 98584 Mark Fenton 301 E Wallace-Kneeland Blvd ST224-233 Shelton, WA 98584 (360)401-9229 RE: Residentia Geotechnical Report(s) W Dayton Trails Drive Shelton, A 98584 Mason Co,' Prcl No. 42008-14-9 042 & 42008-14-9 043 Mason Co. Case No.s WEL20131 00011 SWG2 13-00072 SWG2013 00071 INTRODUCTION I was contacted in April of 2013 by Mr. Mark Fenton who requ c sted my investigation a id documentation of slope stability and landslide hazard issues rel ting to improvements p anned on his residential properties identified above. The Fenton properties located in an area appi oximately six miles west and north of Shelton, Mason County Washington. I've visited the property in April and May of this year to collec 'topographic informatio and verify measurements and feature locations. Measurements were made using a Sokkia model No. 8047-55 inclinometer, 100 foot and 300 foot long fiberglass surveyor's I apes and other field equipment common to surveying. Software employed in creating a site plan and writing this report included AutoCAD 2006, a Terrain 3-d contour modeling program, GA �NA Slope Stability alysis software, and Microsoft Office Word 2003. The slopes located on the Fenton properties range from level o the north end of the two parcels to p p p slopes ranging between 35 and 38% on the southerly portion ofthe easterly parcel (Tra t 42). Neither of the two Fenton properties contains slopes greater than 40%,but both parcels are within 300 feet of slopes on an adjacent property that were measuredw.60% over an elevation difference of approximately 40 feet. A gravel borrow pit has been develope on the property immediately west of the southerly half of parcel 42008-14-90042 and immediately outh of parcel 42008-14 90043. The pit slopes were measured at 60%towards the north and east. The gravel pit and slopes e identified on the attached site plans as a HAZARD AREA because the pit slopes are greater than 0%with more than 10-feet of vertical relief. The upslope geomorpholog of the Fenton property may be described as flat. Because of the steep slopes (>40%under Mason County termij iology) on or within 300 feet of the owner's properties, Mason County requires a geotechnical repo be prepared to addres potential stability issues relating to the properties' development. File:C:TrojectsTentonlGeo-Rpt 1 of 5/10/ 013 TAHJA ENGINEERING, I . PO Box 235, Hoodsport, WA �8548 (360) 877-9512 The following thirteen elements are required by Mason County I o be addressed in geote hnical reports prepared to comply with Mason County's Critical Reso ce Ordinance Sections 17.01.100 through 17.01.104. 1. SURFACE AND GEOLOGIC CONDITIONS: The property is located in the rolling foothills south of the Olympic Mountain range. Nearly all of the Fenton site has been logged at some distant past time and now is typically covered vith a fairly even age stand of second growth timber, comprised mainly of Douglas fir, hemlock, cedar, and Jack Pine trees. An Onsite Septic System(OSS) is planned for each of the two cels under Mason Co ty Onsite Septic System Permits SWG2013-00071 & 00072. Greg Wald 'jck designed the septic s stems. Discussing soil conditions and depths with Greg, Greg report& that he had designed several septic systems in the W Dayton Trails community, and that the gravel apparent at the ground ace extended to a great depth throughout the area. The properties p e no problems for sittit g septic system components. A water well has been drilled on tract 3 in the location indicated o the attached site plans. Inspection of the portion of Department of Natural Resources) eologic map of the Shelton area on the following page finds the Fenton property located in an area roughly 2 miles east and north of Dayton and roughly 6 miles west and north of Shelton. The m and onsite investigatio# of the site's soils reveals the areas surrounding the Fenton property are mai ly Continental Glacial Deposits (Qgo) described as follows; Continental Glacial Deposit : Fraser Glaciation,Vashon Stade Proglaeial and recessional outwash,late NVisco dnan(Pleisto- ��° cene}--Typically poorly to moderately sorted,rou ded gravel and sand with localized coarser-and finer-grained co tituents;lithologi- cally varied mixture of mostly northern-provenanx clasts,especially containing granitic and metamorphic rocks that ic t ntify the unit as being deposited by the Puget lobe of the Cordillej an glacier;also con- tains varying amounts of locally derived Crescen ommation basalt, and in the Mox Chehalis Creek valley,central C ade Range— derived andesitic clasts;typically shades of gray ere fresh or brown where stained especially in proglacial and morainal areas; buff staining near the ground surface;fume sand,silt,and clay constitute local overbank sediments having relatively poor er meability or del- taic foreset bedding along north sides of valleys x.,ith higher permea- bility;porous and permeable enough to yield small to moderate quan- tities of groundwater;very poorly consolidated tc oose;moderately to well-rounded clasts;mostly unweathered with re weathered reworked clasts;thickness varies and is not well I i town;most com- monly occupies outwash channels scoured into oi hrough till. 'DNR OFR2003-15 Geologic Map of Shelton 1:100,000 Quadrangle,Wa ington File:C:IProjectslFentonlGeo-Rpt 2 of 6 5/10/ 013 TAHJA ENGINEERING, Inc. PO Box 235, Hoodsport, WA 98548 (360) 877-9512 r e ' F t n P a roes i. t « R n � t O8 m 0 � x a Inspection of Washington State Ecology's Landslide Hazard Maps reveals that the Fenton properties and surrounding area are classified as STABLE. Further inspection and soil analysis finds the soil to be classified under the Unified Soil Classification System (US CS) as a GW (well graded gravel & sandy gravels) soil division. Probing various areas of the Fenton property found fairly c nsistent soil characteristics over both parcels with roughly 3 feet of moderately compacted gravel over more consolidated gravel below a depth of roughly 3 feet. No upland water bodies or wetlands were found anywhere near or on the Fenton properties. 2. SITE PLAN WITH IMPORTANT DEVELOPMENT AND GEOLOGIC F ATURES: A site plan showing the general topography of the area surrounding the Fenton properti s is attached in this report's appendix. Plan sheet two of the plan set shows the locations of existing I eologic features. 3. LOCATIONS OF LOGS OF EXPLORATORY OLES OR PROBES: The attached site plan shows the locations of soil probing on the Fenton property along ith measured depths to the underlying more compact gravel layer. The undisturbed areas o the Fenton property revealed a fairly typical weathered gravel layer 3-feet thick resting on top of a more densely compacted gravel soil. 4. AREA OF PROPOSED DEVELOPMENT & BO JNDARIES OF HAZARDS, BUFFERS AND SETBA KS: The attached site plan shows the locations of the existing and r roposed Fenton property improvements, the locations of the hazard areas (slopes> 40%1, and the boundary of a 0' buffer line out from the crest and toe of the steep slopes located near he Fenton property. File:C:TrojectsTentonlGeo-Rpt 3 of 6 5/10 013 TAHJA ENGINEERING, Inc. PO Box 235, Hoodsport, WA 98548 (360) 877-9512 The Fenton properties themselves contain no slopes steep enou h to trigger the requirenients for a geotechnical report level report. The gravel pit excavation on the adjacent property triggered a geotechnical report level investigation and report, but any deve opment planned for the Fenton properties will be more than 50-feet away from any hazard area.itself, and no greater separation is needed to protect Fenton property improvements. 5. CROSS SECTION WITH PROPOSED GRADE CHANGES: A cross section view of each of the Fenton property parcels is r rovided in the attached I Ian sheets as well as part of the GALENA Stability Analysis Print-Out. The lurrently anticipated pro erty improvements will not require the construction of any structur 1 fill sections or changes to the existing slopes or grades. 6. SLOPE STABILITY ANALYSIS: The property itself does not display any instability indicators. For stability analysis, the hillside soils were investigated and have been characterized as moderately compacted gravelly sand to a depth of roughly 3-feet where the gravel becomes more compact to an i finite depth. Unified So 11 Classification System (USCS)typing places the soils in a GW ymbol category (sandy ravel). The soils are modeled as a homogenous GW soil characterized with a soil unit weight of 125 lbs/ft3, a phi angle of 38°, and a cohesion character of 50 lbs/ft2. The f oor of the gravel pit was found to have standing water, so the gravel pit floor (el. 300) is assumec to represent the phreati water elevation in the project area. The slope geometry and soil characteristics provide factors of safety for both Fenton parcels in a static and a dynamic analysis that exceeds the County's minimum safety requirements. The gravel pit slopes were measured at 60% or less. Two slopes which could potentially impact one or both of the Fenton parcels were analyzed with the following Factors o Safety (FoS); Parcel 42008-14-90042 Tract"2" Cross Section"B" Static FoS: 1.91 Dynamic FoS: 1.44 Parcel 42008-14-90043 Tract"3" Cross Section"A" Static FoS: 2.37 Dynamic FoS: 1.72 7. RECOMMENDED SETBACKS & DRAINAGE: Slope stability analysis indicates that the southerly & westerly descending slopes located west and south of the Fenton properties are stable in their present geometry and condition and do not represent a landslide or geological hazard to the anticipated developmen of the properties. Conformance to building department building setbacks (20' sideyard) will provide adequate separation between the hazard slopes, hazard area buffers and any property improvements. File: C:TrojectsTentonlGeo-Rpt 4 of 6 5110/ 013 TAHJA ENGINEERING, Inc. PO Box 235, Hoodsport, WA Q8548 (360) 877-9512 The gravelly soils on the Fenton properties infiltrate all precipi tion delivered to the gr und's surface. Drainage from the developed areas of the Fenton prop ies should be disperse into vegetated areas of the property and allowed to disperse. The se )aration between the anticipated Fenton property improvements and the hazard area slopes is great enough that storniwaler from the Fenton properties will have no impact on the neighboring prop rties slopes or the mode ate slopes (<40%) on the Fenton parcels. 8. CLEARING GRADING AND VEGETATI N MANAGEMENT: The proposed Fenton property improvements will generally occur in the already cleared and leveled areas of the property in the northerly half of each tract. No grading or disturbance of the steep sloping areas on the property are being proposed, so no mitigat n or changes to the moderately sloping areas of the property appears needed other than the dra age recommendations already made in this report. Natural vegetation should be promoted on the slc ping areas south of the operties. A formal clearing, grading &vegetation plan does not appear w anted for the Fenton properties. 9. EROSION AND SEDIMENT NTROL: Inspection of the Soil Survey of Mason County found Shelton avelly sandy loam and ove m gravelly sandy loas neither of which are identified in the Co ty's Critical Resource Ordinance as susceptible to severe erosion when disturbed, and do not requir the development of a site specific erosion and sediment control plan. Each of the two Fenton sites has already had an access develop d from W Dayton Trails Drive which are stable in their present conditions. The planned prope y improvements are generally located well inside the Fenton property boundaries. The Fentor properties themselves provide adequate filtration length through natural vegetation to provide for water quality treatm nt before any stormwater runoff is able to escape the property. 10. ON-SITE AND OFF-SITE IM ACTS: Construction and completion of the conjectural property impro ements on the Fenton pi operties are not expected to result in any adverse on-site or off-site impacts 11. SPECIFICATIONS OF FINAL DEV LOPMENT: Completion of the Fenton property improvements does not require any special specific ions for project completion other than already made earlier in this repoit and as identified on tht attached site plans. Building elements are expected to comply with Mason unty's current Internati onal Building Code or International Residential Code requirements. 12. RECOMMENDATIONS FOR THE PREPARATION F STRUCTURAL MITIGATION OR DETAILS OF OTHER PROPOSED MITIGATION: Modeling of the slopes in the proximities of the conjectural property development(s) indicates that the proposed Fenton property development will be safe. No strictural measures appear necessary other than ensuring that foundation footings bear on the moder itely compact native soil underlying the Fenton property, and that stormwater runoff is properly in aged/dispersed to minir iize concentrated flows of stormwater runoff off the Fenton properly. File:C:TrojectsTentonlGeo-Rpt 5 of 5110 013 TAHJA ENGINEERING, Inc. PO Box 235, Hoodsport, WA 98548 (360) 877-9512 13. SITE PLAN WITH THE LOCATION OF EXISTING AND PROPOS D DEVELOPMENT ON THE SITE: A site plan is attached as an appendix to this report and is hereby made a part of this replort along with the cross section views of the property and the stability analysis printouts. Summary & Conclusions: The proposed Fenton property development can be accomplished according to the owner's plans provided recommendations made in this report are implemented and incorporated into the site's development plans. Please feel free to contact me if there are any questions or concerns regarding this report or my findings. Sincerely, AT ,,p L •p 3D78� w� O� ��GISTERE9 �SsrONAL E�Gti Alan A. Tahja, P.E. Attached: Plan Views & Cross Section Sheets GALENATM Stability Analysis Printouts (2) File:C:I Projects TentonlGeo-Rpt 6 of 6 5/10 013 Rev# Description Date TAHJA ENGINEERING,INC. SITE PLAN A"."°° Alan Tahja,P.E. I lark Fenton Fenton PO Box 235 101 E Wall-Knee Blvd ST224 33 HoodspoA WA 98548 Shelton, WA 98584 1 of4 Mason Co.Prcl No.:42008-14-90042&43 (360)877-9512 360) 401-9229 - y o - S 4co U E F 1 o VO VO I / Q /lam ' a 8 i c rell - - - - - M 1 i --� 06 - 7 � r� 0 Q s. cd 0 0 00£— d)bill-I kijado dcq I N i i I / E ` o \ o cd Rev# Description Date TAHJA ENGINEERING,INC. S TE PLAN ft.P& Alan Tahja,P.E. I gark Fenton Fenton PO Box 235 301 E Wall-Knee Blvd ST224 233 , Hoodsport, WA 98548 Shelton, WA 98584 2 of Mason Co.hr No.:42008-14-90042&43 (360)877-9512 360) 401-9229 ri N 0 0 0 0 o, o, z�— —g an o a i.. c N — — — — _ _ _ — on E _ o a .aI oc � X2 2 I �I 2 Ic 10 In 0 I � 2 � L �>— • — J � ax 11/ 100 — aui7,CitadWd x I U .1 o cd m Cq Qi z`- Z Q N Cd 72 p. -- o N N p F Rev# Description Date TAHJA ENGINEERING,INC. S TE PLAN Alan Tahja,P.E. ark Fenton Fenton PO Box 235 301 E Wall-Knee Blvd ST224 33 Hoodspo4 WA 98548 Shelton, WA 98584 3 of4 Mason Co.Prc1 No.:42008-14-90042&43 (360)877-9512 360) 401-9229 i O O cM p o CO W O . 93 ti 4¢ost M u 2 -o 0 a� 03 c7 0 � M 4-A C) LO -------------------------------------------------- CY) 01 U U U O U \ tine � M bfl \ 09C M --- -- - --- --- --- -- --- -- -- Rev# Description Date TAHJA ENGINEERING,INC. S TE PLAN Fenton Alan Tahja,P.E. ark Fenton F PO Box 235 301 E Wall-Knee Blvd ST224�233 HoodspoA WA 98548 Sheltion, WA 98584 i4 of4 Mason Co.Prcl No.:42008-14-90042&43 (360)877-9512 360) 401-9229 0 0 J { Q IN, �C �o M sad` 9 O In � / fzraaOt 330 M U 1 M M S W y ° 4go 03 LL- / / TAHJA ENGINEERING, In PO Box 235, Hoodsport, WA �548 (360) 877-9512 Fenton Dayton Trails Tract 3 X-Section A-A St -c Stability Analysis GA ENA Ve-5.02 480 440 420 A T v� F WA 400 380 360 Development Area 30784 �+4' 340 �as�r S Gti "Ole,6 `SIONAL E, Homogenous Sandy Gravel og s1 ae 320 Gravel Pit Phreatic S�r:ace 300 -_-- --- - - _-. - - Anal sis: 1 Multi le Stability Analysis 280 Method: istlop Simplified Surface: circular 260 Results Crthcal(mi tmum) Fac br of safety: 2.37 240 0 50 100 150 200 250 300 Edbd IONiyX13 Processed.10 Mey 2013 Proiect: Fenton TR3 Static ile. C:\Documents and Settings\Cwner\My Documents\Galena Files\Models\Fenton TR3.gmf Tahja En jineeflng,Inc. Galena 5.02 Analysis Results Licensee: Tahja Engineering, Inc. DATA: Analysis 1 - Static Material Properties (1 material) ------------------- Material: 1 (Mohr-Coulomb Cu increases with depth) - Cohesion Phi PI UnitWeight Ru . 50.00 38.0 0 125.00 1.10 Water Properties ---------------- Unit weight of water: 62.40 Unit weight of water/m ium above ground: 62.40 Material Profiles (1 profile) ----------------- Profile: 1 (2 points) Material beneath: 1 - 0.00 400.00 300.00 400.00 Slope Surface (4 points) ------------- 0.00 350.00 120.00 340.00 183.00 310.00 290.00 300.00 Phreatic Surface (2 points) --- 0.00 300.00 300.00 300. 00 Failure Surface --------------- Initial circular surface for critical search defined : XL,XR,R Intersects: XL: 120.00 YL: 340.00 XR: 183.00 YR: 10.00 Centre: XC: 159. 91 YC: 342.66 Radius: R: 40.00 Variable Restraints ------------------- Parameter descriptor: XL XR R Range of variation: 60.00 60.00 40.00 Trial positions within range: 12 12 12 RESULTS: Analysis 1 - Static Bishop Simplified Method of Analysis - Circular Failu Surface File:C.IProjectslFenton TR3 X-Sec A-A Analysis Printout 1 of 4 5/10/2013 TAHJA ENGINEERING, In PO Box 235, Hoodsport, WA 548 (360) 877-9512 Critical Failure Circle Search using Multiple Circle neration Technique Factor of Safety for initial failure circle approxima on: 3.34 There were: 1083 successful analyses from a total of 29 trial circles 646 analyses terminated due to unacceptable geometry Critical (minimum) Factor of Safety: 2.37 Circle and Results Summary (Lowest 23 Factor of Safety circles) --------- ------- Circle X-Centre Y-Centre X-Left Y-Left X-Right Y-Right Radius FoS 1 169.33 376.49 122.73 338.70 169.36 31 .49 60.00 2.370 2 180.24 371.30 133. 64 333.51 180.27 31 .30 60.00 2.370 3 174.78 373.90 128.18 336.10 174.82 313.90 60.00 2.370 4 176.85 371.20 128.18 336.10 .180.27 311.30 60.00 2.374 5 171.39 373.80 122.73 338.70 174.82 313.90 60.00 2.374 6 181.57 369.60 133.64 333.51 185.73 30 .75 60.00 2.383 7 162.99 379.08 117.27 340.23 163.91 31 .09 60.00 2.383 8 167.58 372.83 122.73 338.70 169.36 31 .49 56.36 2.384 9 178.49 367.63 133.64 333.51 180.27 311.30 56.36 2.384 10 173.04 370.23 128.18 336.10 174.82 31 . 90 56.36 2.384 11 165.18 376.35 117.27 340.23 169.36 31 .49 60.00 2.389 12 184.83 369.74 139.09 330.91 185.73 309.75 60.00 2.395 13 167.18 379.00 122.73 338.70 163.91 311).09 60.00 2.396 14 178.09 373.81 133. 64 333.51 174.82 3111.90 60.00 2.396 15 183.54 371.21 139.09 330.91 180.27 311.30 60.00 2.396 16 172.63 376.40 128.18 336.10 169.36 31( .49 60.00 2.396 17 181.84 367.64 139.09 330.91 180.27 31 .30 56.36 2.398 18 170.93 372.84 128.18 336.10 169.36 31 .49 56.36 2.398 19 176.39 370.24 133.64 333.51 174.82 31 . 90 56.36 2.398 20 165.48 375.43 122.73 338.70 163.91 31 .09 56.36 2.398 21 161.32 375.40 117.27 340.23 163.91 31 .09 56.36 2.400 22 169.59 370.02 122.73 338.70 174.82 31 . 90 56.36 2.400 23 175.05 367.42 128.18 336.10 180.27 31 .30 56.36 2.400 File:C:1ProjectslFenton TR3 X-Sec A-A Analysis Printout 2 of 4 5/10/2013 TAHJA ENGINEERING, I PO Box 235, Hoodsport, WA Q 3548 (360) 877-9512 Fenton Dayton Trails Tract 3 X-Section A-A Dyngnic Stability Analysis GA LENA 460 440 a.1 so 420 400 380 360 Development Area 340 6pg 4-gendus Sandy Grace: "Id% 320 l� Grave..Pit � Phleai:c Sa:face 300 - --- - ------ -- ---_.- _..__ ___... -... An sir 1 Multiple Stability Analysis 280 Method: 3ishop Simplified Surface: ircular 260 Results Critical(mi qimum) Fa or of Safety. 1.72 240 0 50 100 150 200 250 300 EGfe 10 y 2013 ProGo d.10 May 2013 Proiect., Fenton TR3 Dynamic Filp. C:\Documents and Settings\Cwner\My Documents\Galena FilesWodels\Fenton TR3.gmf Tahja Engineering,Inc. Galena 5.02 Analysis Results Licensee: Tahja Engineering, Inc. DATA: Analysis 1 - Dynamic Material Properties (1 material) ------------------- Material: 1 (Mohr-Coulomb Cu increases with depth) - Cohesion Phi PI UnitWeight Ru 50.00 38.0 0 125.00 1.10 Water Properties ---------------- Unit weight of water: 62.40 Unit weight of water/m dium above ground: 62.40 Material Profiles (1 profile) ----------------- Profile: 1 (2 points) Material beneath: 1 - 0.00 ' 400.00 300.OD 400.00 Slope Surface (4 points) ------------- 0.00 350.00 120.00 340.00 183.00 1310.00 290.00 300.00 Phreatic Surface (2 points) --- 0.00 300.00 300.00 300. 0 Failure Surface --------------- Initial circular surface for critical search defined : XL,XR,R Intersects: XL: 120.00 YL: 340.00 XR: 183.00 YR: 310.00 Centre: XC: 159. 91 YC: 342.66 Radius: R: 40.00 Earthquake Force ---------------- Pseudo-static earthquake (seismic) coefficient: 0.15 Variable Restraints ------------------- Parameter descriptor: XL XR R Range of variation: 60.00 60.00 40.00 Trial positions within range: 12 12 12 RESULTS: Analysis 1 - Dynamic File:C:IProjectslFenton TR3 X-Sec A-A Analysis Printout 3 of 4 5/10/2013 TAHJA ENGINEERING, In PO Box 235, Hoodsport, WA Q8548 (360) 877-9512 Bishop Simplified Method of Analysis - Circular Failu2 Surface --------- Critical Failure Circle Search using Multiple Circle neration Technique Factor of Safety for initial failure circle approxima on: 2.46 There were: 1083 successful analyses from a total of 1 29 trial circles 646 analyses terminated due to unacceptab geometry Critical (minimum) Factor of Safety: 1.72 Circle and Results Summary (Lowest 99 Factor of Safety circles) --------- ----- Circle X-Centre Y-Centre X-Left Y-Left X-Right Y-Right Radius FoS 1 169.33 376.49 122.73 338.70 169.36 31 .49 60.00 1.717 2 180.24 371.30 133.64 333.51 180.27 31 .30 60.00 1.717 3 174.78 373. 90 128.18 336.10 174 .82 31 .90 60.00 1.717 4 176.85 371.20 128.18 336.10 180.27 31 .30 60.00 1.720 5 171.39 373.80 122.73 338.70 174.82 313. 90 60.00 1.720 6 162.99 379. 08 117.27 340.23 163.91 31 ).09 60.00 1.723 7 181.57 369. 60 133.64 333.51 185.73 30 .75 60.00 1.726 8 167.58 372.83 122.73 338.70 169.36 31 . 49 56.36 1.727 9 178.49 367.63 133. 64 333.51 180.27 31 .30 56.36 1.727 10 173.04 370.23 128.18 336.10 174.82 31 . 90 56.36 1.727 11 165.18 376.35 117.27 340.23 169.36 315.49 60.00 1.729 12 184.83 369.74 139.09 330.91 185.73 30 ).75 60.00 1.735 13 160.68 381.65 117.27 340.23 158.45 32 . 69 60.00 1.735 14 167.18 379.00 122.73 338.70 163. 91 31 ).09 60.00 1.735 15 178.09 373.81 133. 64 333.51 174.82 313.90 60.00 1.735 16 183.54 371.21 139.09 330. 91 180.27 31 .30 60.00 1.735 17 172. 63 376.40 128.18 336.10 169.36 315.49 60.00 1.735 18 161.32 375.40 117.27 340.23 163.91 319.09 56.36 1.736 19 181.84 367.64 139.09 330.91 180.27 311.30 56.36 1.737 20 170.93 372.84 128.18 336.10 169.36 316.49 56.36 1.737 21 165.48 375.43 122.73 338.70 163. 91 319.09 56.36 1.737 22 176.39 370.24 133.64 333.51 174.82 313.90 56.36 1.737 23 178.18 369.27 128.18 336.10 185.73 309.75 60.00 1.741 File:C:IProjectsEenton TR3 X-Sec A-A Analysis Printout 4 of 4 5/10/2013 TAHJA ENGINEERING, Inc. PO Box 235, Hoodsport, WA Q8548 (360) 877-9512 Fenton Dayton Trails Tract 2 X-Section B-B Stat c Stability Analysis GA ENA vs-5.02 460 440 420 A. T wa 400 380 1�r 360 Development Area 3078'� 340 ANAL 320 Grave:Pir t�aa1 11 mogenous Sandy Gravel Phrear:c S::`.a_a 300- ....__. -..-.._..-_._._.__._..--.. ._._..._-_�....._ Anal si 1 280 Multiple Stability Analysis Method: Bishop Simplified 260 Surface: Circular Results 240 Critical(mi imum) Fa or of Safety. 1.91 0 50 100 150 21 250 300 350 EdHad:10 N my 2013 Processed:10 May 2013 Proiea: Fenton TR2 Static Fes;, C:\Documents and Settings\UvnerWy Documents\Galena Files\Models\Fenton TR2 S.gmf Tahja Engineering,Inc. Galena 5.02 Analysis Results Lic see: Tahja Enginee ing, Inc. DATA: Analysis 1 - Static Material Properties (1 material) ------------------- Material: 1 (Mohr-Coulomb Cu increases with depth) - Cohesion Phi PI UnitWeight Ru 50.00 38.0 0 125.00 1.10 Water Properties ---------------- Unit weight of water: 62.40 Unit weight of water/me ium above ground: 52.40 Material Profiles (1 profile) ----------------- Profile: 1 (2 points) Material beneath: 1 - 0.00 400.00 350. 0 400.00 Slope Surface (4 points) ------------- 0.00 300.00 175.00 302.00 238.00 3 .00 347.00 350.00 Phreatic Surface (2 points) --- 0.00 300.00 350.00 300.00 Failure Surface --------------- Initial circular surface for critical search defined by: XL,XR,R Intersects: XL: 173.00 YL: 301. 98 XR: 240.00 YR: 340.18 Centre: XC: 198.26 YC: 335.53 Radius: R: 42.00 Variable Restraints ------------------- Parameter descriptor: XL XR R Range of variation: 60.00 60.00 45.00 Trial positions within range: 12 12 12 RESULTS: Analysis 1 - Static Bishop Simplified Method of Analysis - Circular Failu Surface File:C:IProjectslFenton TR2 X-Sec B-B Analysis Printout 1 of 4 5/10/2013 TAHJA ENGINEERING, Inc. PO Box 235, Hoodsport, WA Q 548 (360) 877-9512 Critical Failure Circle Search using Multiple Circle neration Technique Factor of Safety for initial failure circle approxima 'on: 2.80 There were: 1000 successful analyses from a total of 1729 trial circles 729 analyses terminated due to unacceptab geometry Critical (minimum) Factor of Safety: 1.91 Circle and Results Summary (Lowest 23 Factor of Safet circles) ---------' ------- Circle X-Centre Y-Centre X-Left Y-Left X-Right Y-Right Radius FoS 1 182.35 373.38 186. 64 309.02 237.27 339.56 64.50 1. 907 2 176.89 370.09 181.18 305.73 231.82 335.27 64.50 1.907 3 171.44 366.80 175.73 302.44 226.36 33 .98 64 .50 1.907 4 184.28 376.33 192.09 312.31 237.27 33 ).56 64.50 1. 909 5 173.37 369.75 181.18 305.73 226.36 332. 98 64.50 1.909 6 178.83 373.04 186.64 309.02 231.82 335.27 64.50 1.909 7 167.92 366.46 175.73 302.44 220. 91 32 ).69 64.50 1. 909 8 175.70 365.89 181.18 305.73 226.36 33 . 98 60.41 1. 919 9 186.61 372.47 192.09 312.31 237.27 33).56 60.41 1.919 10 181.16 369.18 186.64 309.02 231.82 33 .27 60.41 1.919 11 170.25 362.60 175.73 302.44 220.91 32).69 60.41 1. 919 12 180.53 370.23 181.18 305.73 237.27 33).56 64.50 1. 925 13 175.07 366. 94 175.73 302.44 231.82 335.27 64.50 1.925 14 179.29 366.11 181.18 305.73 231.82 335.27 60.41 1.927 15 184.75 369.40 186.64 309.02 237.27 339.56 60.41 1. 927 16 173.84 362.82 175.73 302.44 226.36 332.98 60.41 1.927 17 188.98 368.54 192.09 312.31 237.27 339.56 56.32 1. 934 18 178.07 361. 96 181.18 305.73 226.36 332.98 56.32 1.934 1 19 183.53 365.25 186.64 309.02 231.82 336.27 56.32 1. 934 20 172.62 358.67 175.73 302.44 220.91 329.69 56.32 1. 934 21 166.78 362.18 175.73 302.44 215.45 326.40 60.41 1. 936 22 188.60 375.34 197.55 315.60 237.27 339.56 60.41 1.936 23 183.15 372.05 192.09 312.31 231.82 336.27 60.41 1. 936 File:C:IProjectslFenton TR2 X-Sec B-B Analysis Printout 2 of 4 5/10/2013 TAHJA ENGINEERING, In c. PO Box 235, Hoodsport, WA 548 (360) 877-9512 Fenton Dayton Trails Tract 2 X-Section B-B Dyn is Stability Analysis GA ENA V.mon 5.02 450 440 420 400 380 380 Development Area 340 gyp% S1 320 Gravel Pi: e1 a H mogenous Sandy Grave. Phreac,S-f- 300 --------------------------- _...m.----- ..... -......... ------------ Anlsi 1 280 Multi le Stability Analysis Method: 3ishop Simplified 260 Surface: ircular Results 240 Critical(m imum) Fa or of Safety: 1.44 0 50 100 150 200 250 300 350 Edked 10 ay 2013 Processed,10 May 2013 Proiect: Fenton TR2 Dynamic fi& C:\Documents and SettingskCwner\My Documents\Galena Files\Models\Fenton TR2 D.gmf Tahja E ineering,Inc. Galena 5.02 Analysis Results Licensee: Tahja Engineer'ng, Inc. DATA: Analysis 1 - Dynamic Material Properties (1 material) ------------------- Material: 1 (Mohr-Coulomb Cu increases with depth) - Cohesion Phi PI UnitWeight Ru 50.00 38.0 0 125.00 1.10 Water Properties ---------------- Unit weight of water: 62.40 Unit weight of water/medi im above ground: 6 .40 Material Profiles (1 profile) ----------------- Profile: 1 (2 points) Material beneath: 1 - 0.00 400.00 350.00 400.00 Slope Surface (4 points) ------------- 0.00 300.00 175.00 302.00 238.00 340 DO 347.00 35).00 Phreatic Surface (2 points) --- 0.00 300.00 350.00 300.00 Failure Surface --------------- Initial circular surface for critical search defined : XL,XR,R Intersects: XL: 173.00 YL: 301.98 XR: 240.00 YR: 340.18 Centre: XC: 198.26 YC: 335.53 Radius: R: 42.00 Earthquake Force ---------------- Pseudo-static earthquake (seismic) coefficient: 0. 15 Variable Restraints ------------------- Parameter descriptor: XL XR R Range of variation: 60.00 60.00 45.00 Trial positions within range: 12 12 12 File:C:IProjectslFenton TR2 X-Sec B-B Analysis Printout 3 of 4 5/10/2013 i TAHJA ENGINEERING, Inc. PO Box 235, Hoodsport, WA 8548 (360) 877-9512 RESULTS: Analysis 1 - Dynamic Bishop Simplified Method of Analysis - Circular Failu Surface --------- -- Critical Failure Circle Search using Multiple Circle neration Technique Factor of Safety for initial failure circle approxima on: 2.16 There were: 1000 successful analyses from a total of 1 29 trial circles 729 analyses terminated due to unacceptab geometry Critical (minimum) Factor of Safety: 1.44 Circle and Results Summary (Lowest 22 Factor of Safet circles) --------- -------- Circle X-Centre Y-Centre X-Left Y-Left X-Right Y-Right Radius FoS 1 182.35 373.38 186.64 309.02 237.27 33 .56 64.50 1.438 2 176.89 370.09 181.18 305.73 231.82 336.27 64.50 1.438 3 171.44 366.80 175.73 302.44 226.36 33 . 98 64.50 1.438 4 184.28 376.33 192.09 312.31 237.27 33 .56 64.50 1.438 5 173.37 369.75 181.18 305.73 226.36 331. 98 64.50 1.438 6 178.83 373.04 186. 64 309.02 231.82 336.27 64.50 1.438 7 167.92 366.46 175.73 302.44 220. 91 32 . 69 64.50 1.438 8 175.70 365.89 181.18 305.73 226.36 33 . 98 60.41 1.446 9 186.61 372.47 192.09 312.31 237.27 339.56 60.41 1.446 10 181.16 369.18 186.64 309.02 231.82 33 .27 60.41 1.446 11 170.25 362.60 175.73 302.44 220. 91 32 ). 69 60.41 1.446 12 180.53 370.23 181.18 305.73 237.27 33 ).56 64.50 1.453 13 175.07 366. 94 175.73 302.44 231.82 33 ).27 64.50 1.453 14 179.29 366.11 181.18 305.73 231.82 33 .27 60.41 1.454 15 184.75 369.40 186. 64 309.02 237.27 33 ).56 60.41 1.454 16 173.84 362.82 175.73 302.44 226.36 331.98 60.41 1.454 17 188.98 368.54 192.09 312.31 237.27 339.56 56.32 1.459 18 178.07 361. 96 181.18 305.73 226.36 33 .98 56.32 1.459 19 183.53 365.25 186.64 309.02 231.82 333.27 56.32 1.459 20 172. 62 358.67 175.73 302.44 220.91 32 ). 69 56.32 1.459 21 166.78 362.18 175.73 302.44 215.45 323.40 60.41 1.460 22 188.60 375.34 197.55 315.60 237.27 33 ).56 60.41 1.460 File:C:IProjectslFenton TR2 X-Sec B-B Analysis Printout 4 of 4 5/10/2013 MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT WSEC/ Ventilation Code Compliance Application Owner: Parcel#: Type of project: 2 Total Sq. Ft. �O� 151 Floor: H 2" floor: eate asement: of heated area:: Heating System Type: O Electric wall heater O Electric Central Furr ace O LPG Furnace V,Heat Pump with electric furnace O Heat pump with gas furnace O Ductless Heat Pump O Boiler, specify fuel type: O Other: Specify: Glazing Compliance O Prescriptive Option (see reverse side) circle one: I II III Percentage: Method O Component Performance , Chapter 5— Calculation worksheets required N)A- °� Check ane:: ° O Other (Specify): Check one O Whole House Ventilation system *Whole House Venti ation O Other, Ventilation using exhaust fans&window or Integrated with a Forced Air describe: System wall fresh air vents (M1508.4) System (M1508.5) Referencing WSEC Section 901, "Additional Residential Energy Efficiency Requirements," all NEW residential units must develop 1credit from Table 9-1. Identify and describe which option(s)will be used ENERGY to comply. If the table is not attached to this form you can access the table on our we site at: CREDITS http://www.co.mason.wa.us/forms/Communit h Dev/index. . Option: Description: Table 9-1 ' R" `` V JOA Window & Door Schedule (If needed, attach an additional sheet) Total Manufacturer Room/location U-Factor Size Quantity 'Square Feet Windows: Win ows: Total Sq. ft. Doors: Doors: Total Sq. Ft Total window and door area Total window &door area / (divided by)total sq. ft of heated area = %of glazing