DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-340)
SEP2018-00007
Description of Proposal: INSTALL WASTE CHUTE, RE-PAVE TIPPING FLOOR AND
ROADS, IMPROVE DRAINAGE SYSTEM AND EXTERIOR
STAIRS
Proponent: MASON COUNTY PUBLIC WORK
Location of Proposal: 501 W EELLS HILL RD SHELTON
Parcel Number: 420044060000
Legal Description: N1/2 SE & N 100 ACRES OF SW
Directions to Site: DAYTON AIRPORT RD, R ON EELLS HILL RD TO TRANSFER
STATION
Lead Agency: Mason County
The Lead Agency for this proposal has determined that it does not have a probable significant
adverse impact on the environment. An Environmental Impact Statement (EIS) is not required
under RCW 43.21 C.030(2)(c). This decision was made after review of a completed
Environmental Checklist and other information on file with the Lead Agency. This information is
available to the public upon request.
Please contact Kell Rowen at ext. 365 with any questions. This DNS is issued under WAC
197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown
below, when the determination is final. Comments must be submitted to Dept. of Community
Development, 615 W Alder St, Shelton WA 98584 by 3/2/2018. Appeal of this determination
must be filed within a 14-day period following this final determination date, per Mason County
Code Chapter 15.11 Appeals.
� p 24 u,l rg
Authorized Local Government Official Date
i
sT��F
�r r
O
YHL IN89
STATE OF WASH INGTON
DEPARTMENT OF ECOLOGY
PO Box 47775 •Olympia, Washington 98504-7775 •(360)407-6300
711 for Washington Relay Service •Persons with a speech disability can call 877-833-6341
March 2, 2018
Mr. Kell Rowen
Mason County
Department of Community Development
Planning Division
PO Box 279
Shelton, WA 98584
Dear Mr. Rowen:
Thank you for the opportunity to comment on the mitigated determination of nonsignifi ance for
the Eells Hill Transfer Station Improvements Project(SEP2018-00007) located at 501 West Ealls
Hill Road in Shelton as proposed by Mason County Public Works. The Department of cology
(Ecology)reviewed the environmental checklist and has the following comment(s):
WATER QUALITY: Gary Lee(360)407-6291
A State Waste Discharge Permit(SWDP) is required for d' charging industrial wast iwater
from the facility to the publically owned treatment works OTW). The applicant should
contact Ecology's Southwest Regional Office (SWRO)Water Quality Program(WQ)to
initiate the SWDP application process.
Ecology's comments are based upon information provided by the lead agency. As such;they
may not constitute an exhaustive list of the various authorizations that must be obtained or legal
requirements that must be fulfilled in order to carry out the pri osed action.
If you have any questions or would like to respond to these coniments,please contact th
appropriate reviewing staff listed above.
Department of Ecology
Southwest Regional Office
(MLD:201800811)
cc: Gary Lee, WQ
Barb Stepp, Mason County Public Works (Applicant Coni tc
t)
t8 coo,
A. Background hf elpl
• 1. Name of proposed project, if applicable: 1hel
Eells Hill Transfer Station Improvements
2. Name of applicant: h[ elpl
Mason County Public Works
3. Address and phone number of applicant and contact person: hf gjpl
Mason County Public Works
100 W. Public Works Drive
Shelton, WA 98584
Attn: Bart Stepp, PE, Deputy Director/Utilities &Waste Management
(360) 427-9670 x652
4. Date checklist prepared: hf elpl
12/21/17
5. Agency requesting checklist: hf e
Mason County
6. Proposed timing or schedule (including phasing, if applicable): hel
December 2017—Submit SEPA and grading permit application to Mason County Community
Development for approval
• January 2018— Open contractor bids for project
February 2018—Award contract to Contractor, SEPA and grading permit approval
March 2018— Contractor begins construction
June 2018—Construction is complete
7. Do you have any plans for future additions, expansion, or further activity related to or
connected with this proposal? If yes, explain. hf e
This proposal is for improvements at the Eells Hill Transfer Station. Other improvements
at the station will be permitted under a different application.
8. List any environmental information you know about that has been prepared, or will be
prepared, directly related to this proposal. hI e
No environmental reports specific to this project have been created. The existing site
includes a closed landfill. Groundwater and leachate gas monitoring have been ongoing
on the site for over 20 years around the landfill. The proposed project will not impact the
landfill or the monitoring that will continue. The monitoring'to date has not indicated any
groundwater contamination from the landfill.
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes, explain. hI elpl
No
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 2 of 13
10. List any government approvals or permits that will be needed for your proposal, if known.
hf elpl
• A grading permit is needed through Mason County due to the amount of excavation for a new
stormwater pond. This project does not require approval from state or federal agencies. All of
the project funding is from County funds. Project size does not require a construction
stormwater permit from Ecology
11. Give brief, complete description of your proposal, including the proposed uses and the size
of the project and site. There are several questions later in this checklist that ask you to
describe certain aspects of your proposal. You do not need to repeat those answers on this
page. (Lead agencies may modify this form to include additional specific information on project
description.) h( e
The project proposal consists of improvements to the Eells Hill Transfer Station. Facility
improvements include: replacement of the tipping floor surfacing, installation of a steel load-
out chute and associated modifications to the load-out tunnel, installation of an exterior metal
staircase, repair of the rail for the tamping crane platform, and replacement of infrastructure
for the sanitary sewer and storm water utility systems including piping, catch basins,
cleanouts, a holding tank, and an infiltration pond.
12. Location of the proposal. Give sufficient information for a person to understand the precise
location of your proposed project, including a street address, if any, and section, township, and
range, if known. If a proposal would occur over a range of area, provide the range or
boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic
map, if reasonably available. While you should submit any plans required by the agency, you
• are not required to duplicate maps or detailed plans submitted with any permit applications
related to this checklist. hel
The Eells Hill Transfer Station is located at 501 W Eells Hill Road, Shelton, WA 98584. This is
located at Township 20 N, Range 4 W, in the SE '/4 of Section 20'.
B. ENVIRONMENTAL ELEMENTS hf elpl
1. Earth hf elpl
a. General description of the site: hf elpl
(circle one): Flat, rolling, hilly, steep slopes, mountainous, other
b. What is the steepest slope on the site (approximate percent slo e)? 1hel
20
c. What general types of soils are found on the site (for example, clay, sand, gravel, peat,
muck)? If you know the classification of agricultural soils, specify them and note any
agricultural land of long-term commercial significance and whether the proposal results in
removing any of these soils. hf ep
The soil is generally a sand and gravel mix.
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so,
describe. hf elpl
No
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 3 of 13
• e. Describe the purpose, type, total area, and approximate quantities and total affected area of
any filling, excavation, and grading proposed. Indicate source of fill. hf elpl
Approximately 3,000 cubic yards will be excavated to create a stormwater pond near the
transfer station building. The soil excavated will be deposited at another location on the
property that has been previously excavated. No soil will be removed from the property.
Construction debris (old asphalt, concrete, etc.)will be disposed of with regular solid
waste. No fill will be imported on to the site.
f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe.
hLLeM
Erosion could occur in the new stormwater pond area prior to establishment of the
hydroseed on the soil.
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)? hf e
The site already contains existing buildings and roads. The size of the buildings and
roads will not change although some will be improved. The area of the new storm pond
is undeveloped ground so pervious percentages will not change as a result of this
project. The creation of the stormwater pond and new drainage system will improve
infiltration of stormwater runoff on the site.
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: hf elpl
Contractor will employ best management practices as required in WSDOT specifications to
prevent erosion until project is complete and all ground is stabilized.
• 2. Air 1hel
a. What types of emissions to the air would result from the proposal during construction,
operation, and maintenance when the project is completed? If any, generally describe and
give approximate quantities if known. hf gM
During construction their will be construction vehicles like excavators and dump trucks
that will emit typical construction equipment emissions. The completed project will not
change how the transfer station is operated so emissions during normal operations will
not change once the project is complete.
b. Are there any off-site sources of emissions or odor that may aOect your proposal? If so,
generally describe. hf elpl
No
c. Proposed measures to reduce or control emissions or other im acts to air, if any: hf gM
All construction vehicles used will meet state emission requirements as applicable for that equipment.
3. Water h
a. Surface Water:
1) Is there any surface water body on or in the immediate vicinity of the site (including
year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe
type and provide names. If appropriate, state what stream or river it flows into. h� elpl
No
•
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 4 of 13
2)Will the project require any work over, in, or adjacent to (within 200 feet)the described
waters? If yes, please describe and attach available plans. hI e
• No
3) Estimate the amount of fill and dredge material that would be placed in or removed
from surface water or wetlands and indicate the area of the site that would be affected.
Indicate the source of fill material. hf e
Zero
4)Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities if known. hel
No
5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan.
hLeM
No
6) Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volume of discharge. 1hel
No
b. Ground Water:
1)Will groundwater be withdrawn from a well for drinking water or other purposes? If so,
give a general description of the well, proposed uses and approximate quantities
• withdrawn from the well. Will water be discharged to groundwater? Give general
description, purpose, and approximate quantities if known. [hel
The transfer station already has an existing well on-site for potable uses. The project will
not result in any changes to the water system. The completed project will not alter use
of the well.
2) Describe waste material that will be discharged into the ground from septic tanks or
other sources, if any(for example: Domestic sewage; industrial, containing the
following chemicals. . . ; agricultural; etc.). Describe the general size of the system, the
number of such systems, the number of houses to be served (if applicable), or the
number of animals or humans the system(s) are expected to serve. hf elpl
The transfer station includes an existing septic system that serves the bathroom in the
office. The proposed project does not alter the existing or future use of this system.
c. Water runoff(including stormwater):
1) Describe the source of runoff(including storm water) and method of collection
and disposal, if any(include quantities, if known). Where will this water flow?
Will this water flow into other waters? If so, describe. hf elpl
The existing transfer station is graded so runoff does not leave the transfer station
building area. All of the runoff on-site infiltrates at the low points of the property. The
runoff going to the stormwater pond in this project will infiltrate. No runoff will leave the
. site.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 5 of 13
• 2) Could waste materials enter ground or surface waters? If so, generally describe. hel
The project includes a separate system for the collection of leachate into vaults. The
vaults will be pumped out as needed and the waste disposed of at wastewater treatment
facilities. The stormwater runoff will be separated from this system and infiltrate in the
pond.
3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If
so, describe.
No
d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage
pattern impacts, if any: hj e
The improved stormwater system and separate leachate collection system will improve
stormwater management around the transfer station building. This will reduce the
amount of standing water that exists on-site during the winter and improve the sanitation
of the site.
4. Plants hf e
a. Check the types of vegetation found on the site: hel
_deciduous tree: alder, maple, aspen, other
x evergreen tree: fir, cedar, pine, other
• x shrubs
x grass
_pasture
_crop or grain
Orchards, vineyards or other permanent crops.
wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
_water plants: water lily, eelgrass, milfoil, other
x other types of vegetation
b. What kind and amount of vegetation will be removed or altered? hf elpl
The area of the new stormwater pond is primarily weeds, scotch broom, and
blackberries.
c. List threatened and endangered species known to be on or near the site. hf g!
Unknown
d. Proposed landscaping, use of Native plants, or other measures to preserve or enhance
vegetation on the site, if any: hel
The new stormwater pond will by hydroseeded to stabilize slopes and provide treatment
of the stormwater runoff.
e. List all noxious weeds and invasive species known to be on or near the site. hf elpl
Scotch Broom and Blackberries
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 6 of 13
5. Animals hf elpl
• a. List any birds and other animals which have been observed on or near the site or are known
to be on or near the site. hel
Examples include:
birds: hawk, heron, eagle, songbirds, other: Crows, Seagulls
mammals: deer, bear, elk, beaver, other: Coyotes, Rats
fish: bass, salmon, trout, herring, shellfish, other
b. List any threatened and endangered species known to be on or near the site. hI elM
Unknown
c. Is the site part of a migration route? If so, explain. 1LpjPJ
The County is part of the Pacific Flyway.
d. Proposed measures to preserve or enhance wildlife, if any: hf e
None
e. List any invasive animal species known to be on or near the site. 1hel
Rats (due to solid waste on-site)
6. Energy and Natural Resources lbpjpj
a. What kinds of energy(electric, natural gas, oil, wood stove, solar)will be used to meet the
completed project's energy needs? Describe whether it will be used for heating,
• manufacturing, etc. h� e
The transfer station uses electricity to power the Grizzly Crane and lights in the transfer
station building. Internal combustion vehicles are used to traverse the roads at the
transfer station building.
b. Would your project affect the potential use of solar energy by adjacent properties?
If so, generally describe. hI e
No
c. What kinds of energy conservation features are included in the plans of this proposal?
List other proposed measures to reduce or control energy impacts, if any: hI jpj
None. This project will improve operations of the facility which could lead to reduced use
of vehicles like the loader or Grizzly Crane.
7. Environmental Health h( e
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk
of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal?
If so, describe. hf e
No. This project does not make any changes to transfer station operations that would alter
the existing potential exposures at the transfer station from unknown solid waste entering
the site.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 7 of 13
1) Describe any known or possible contamination at the site from present or past uses.
hf elpl
The site includes an old County landfill that has been closed for over 25 years. Since it
has been closed the County has regularly monitored groundwater and leachate gas for
contamination from the landfill. No contamination has been found to date.
2) Describe existing hazardous chemicals/conditions that might affect project development
and design. This includes underground hazardous liquid and gas transmission pipelines
located within the project area and in the vicinity. hf elpl
Within the proposed construction area, there are no hazardous gas transmission
pipelines or hazardous facilities.
3) Describe any toxic or hazardous chemicals that might be stored, used, or produced
during the project's development or construction, or at any time during the operating
life of the project. hf elpl
Household hazardous waste is stored at the Eells Hill HHW shed. This is on the same
parcel as the proposed project, but the proposed project does not impact the HHW
shed. Operations of the HHW facility will not change as a result of this project.
4) Describe special emergency services that might be requirted. hf elpl
None
5) Proposed measures to reduce or control environmental health hazards, if any: h� e
Currently at the transfer station when solid waste is dumped into the container some of it
• will fall over the side of the container, requiring staff to use a loader to clean out the bay
chute from time to time. This project includes installing a new waste chute that will
surround the top of the transfer container. This will reduce or eliminate solid waste from
going over the side which is a food source for the invasive animals on-site (rats, crows,
and seagulls). Eliminating the food source will reduce this invasive population and help
keep the facility cleaner.
The propose project also improves the leachate collection system and separates it from
the stormwater runoff system. This will allow clean stormwater to infiltrate and allow the
County to pump leachate from vaults and dispose of that at wastewater treatment plants
for proper treatment.
b. Noise h( e
1)What types of noise exist in the area which may affect your project(for example:
traffic, equipment, operation, other)? hf e
None
2)What types and levels of noise would be created by or associated with the project on a
short-term or a long-term basis (for example: traffic, construction, operation, other)? Indi-
cate what hours noise would come from the site. 1hel
Typical construction noise would occur on-site. The County already uses semi-trucks,
excavators, and a loader on-site for operation so the project noise would be very similar
to existing operations. Since the Contractor will be allowed to deposit all excavated
material on-site and construction debris will be disposed of with the rest of the solid
waste, this project will not create a significant increase in truck traffic on Eells Hill Road.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 8 of 13
3) Proposed measures to reduce or control noise impacts, if any: h( elpl
The Contractor allowable hours are 10 hours between 7 AM —8 PM. In order to complete
• the project and maintain service during the week the Contractor will be allowed to work
on the weekends.
8. Land and Shoreline Use hf e
a. What is the current use of the site and adjacent properties? Will the proposal affect current
land uses on nearby or adjacent properties? If so, describe. h
The current use of the site is as a transfer station for the County. The property to the
north is the Ridge Motorsports Park. The property to the west is undeveloped land
owned by the County. Properties to the east and south are undeveloped or tree farms.
This project will not affect current properties during construction or after completion.
b. Has the project site been used as working farmlands or working;forest lands? If so, describe.
How much agricultural or forest land of long-term commercial significance will be converted to
other uses as a result of the proposal, if any? If resource lands have not been designated,
how many acres in farmland or forest land tax status will be converted to nonfarm or
nonforest use? hI elpl
No
1)Will the proposal affect or be affected by surrounding working farm or forest land normal
business operations, such as oversize equipment access, the application of pesticides,
tilling, and harvesting? If so, how: hf elpl
No
• c. Describe any structures on the site. h
Current structures on-site include the transfer station building, operator building,
attendant booth, office/garage, and HHW shed/storage building.
d. Will any structures be demolished? If so, what? hf jpj
No
e. What is the current zoning classification of the site? hf e
7f. Wh m rehensive plan designation of the site? hel
Rural Residential 20 Acres
g. If applicable, what is the current shoreline master program designation of the site? hel
NOT APPLICABLE, project is not within a shoreline area.
h. Has any part of the site been classified as a critical area by the city or county? If so, specify.
hl elpl
No
i. Approximately how many people would reside or work in the completed project? hf jP]
5—6 employees work at the Transfer Station when it is open. No one resides at the
transfer station.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 9 of 13
j. Approximately how many people would the completed project displace? hL
Zero
k. Proposed measures to avoid or reduce displacement impacts, if any: hel
None needed
L. Proposed measures to ensure the proposal is compatible with existing and projected land
uses and plans, if any: h( e
Project does not change existing use so the proposal is compatible with existing land
uses.
m. Proposed measures to reduce or control impacts to agricultural and forest lands of long-term
commercial significance, if any: hf jpJ
Project will not impact agricultural or forest lands so no measures are required.
9. Housing hf e
a. Approximately how many units would be provided, if any? Indicate whether high, mid-
dle, or low-income housing. h[ e
Zero
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing. hf gM
Zero
• c. Proposed measures to reduce or control housing impacts, if any: 1hel
None needed
10. Aesthetics hf elpl
a. What is the tallest height of any proposed structure(s), not including antennas; what is
the principal exterior building material(s) proposed? hf e
The transfer station building has a height of about 50' from the bottom of the waste chute
to the top of the roof. The principal exterior building material is corrugated metal. The
proposed project does not change the height of the structure or the exterior material.
b. What views in the immediate vicinity would be altered or obstructed? hf elpl
No views would be altered as this project does not alter the building height or
construction.
b. Proposed measures to reduce or control aesthetic impacts, if any: hI elpl
None. The completed project will improve drainage and reduce the amount of solid
waste spillage so overall cleanliness of the site should improve.
11. Light and Glare h� e
a. What type of light or glare will the proposal produce? What time of day would it mainly
• occur? hf elpl
None as lighting improvements are not a part of this project.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 10 of 13
• b. Could light or glare from the finished project be a safety hazard or interfere with views? hf jpJ
No
c. What existing off-site sources of light or glare may affect your proposal? h( elpl
None
d. Proposed measures to reduce or control light and glare impacts, if any: hf elpl
None
12. Recreation hf�]
a. What designated and informal recreational opportunities are in the immediate vicinity? hf e
The property to the north on the other side of Eells Hill Road is a private motorsports
park with race tracks.
b. Would the proposed project displace any existing recreational uses? If so, describe. hf jPJ
No
c. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any: h( e10
None proposed
13. Historic and cultural preservation hf elpl
• a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years
old listed in or eligible for listing in national, state, or local preservation registers ? If so,
specifically describe. h1�1
No
b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation?
This may include human burials or old cemeteries. Are there any material evidence, artifacts,
or areas of cultural importance on or near the site? Please list any professional studies
conducted at the site to identify such resources. h
No
c. Describe the methods used to assess the potential impacts to cultural and historic resources
on or near the project site. Examples include consultation with tribes and the department of
archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc.
h( el
The existing site has been used as a transfer station for and/or landfill for over 50 years.
Various parts of the parcel have been excavated and built on but no cultural resources
have been found.
d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance
to resources. Please include plans for the above and any permits that may be required. hf e
Contractor will be required to notify County if resources are found during construction.
No cultural resource permits are required.
•
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 11 of 13
14. Transportation hf e
• a. Identify public streets and highways serving the site or affected geographic area and
describe proposed access to the existing street system. Show on site plans, if any. hf e
The transfer station is located off of Eells Hill Road. The proposed project does not alter
the existing access or propose a new access.
b. Is the site or affected geographic area currently served by public transit? If so, generally
describe. If not, what is the approximate distance to the nearest transit stop? hel
The site is not served by public transit. The nearest bus stop is several miles away on
HWY 101.
c. How many additional parking spaces would the completed project or non-project proposal
have? How many would the project or proposal eliminate? hLelp1
This proposal would not create or destroy any parking spaces.
d. Will the proposal require any new or improvements to existing roads, streets, pedestrian,
bicycle or state transportation facilities, not including driveways',? If so, generally describe
(indicate whether public or private). hf elpl
The proposal would not require any improvements to transportation facilities.
e. Will the project or proposal use (or occur in the immediate vicinity of)water, rail, or air
transportation? If so, generally describe. hf e
The solid waste containers that are filled at Eells Hill are shipped to Centralia where they
are put on a train and shipped by rail to the Roosevelt Landfill in Klickitat County. The
• proposed project does not alter the existing transportation route of these containers.
f. How many vehicular trips per day would be generated by the completed project or proposal?
If known, indicate when peak volumes would occur and what percentage of the volume would
be trucks (such as commercial and nonpassenger vehicles). What data or transportation
models were used to make these estimates? hf e
The project does not alter transfer station operations so it will not increase or decrease
the amount of vehicular trips per day.
g. Will the proposal interfere with, affect or be affected by the movement of agricultural and
forest products on roads or streets in the area? If so, generally describe. h( elpl
No
h. Proposed measures to reduce or control transportation impacts,if any: h( e
None needed.
15. Public Services hf e
a. Would the project result in an increased need for public services (for example: fire protection,
police protection, public transit, health care, schools, other)? If so, generally describe. hf jpj
No
b. Proposed measures to reduce or control direct impacts on public services, if any. hf elpl
• None needed
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 12 of 13
16. Utilities hf eipl
• a. Circle utilities currently available at the site: het
electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system,
other_
b. Describe the utilities that are proposed for the project, the utility providing the service,
and the general construction activities on the site or in the immediate vicinity which might
be needed. hf elpl
The proposed project does not alter any existing utilities. The proposed project does
include a leachate collection system going into vaults. These vaults will be pumped out
when full and the leachate taken to a wastewater treatment plant for disposal.
C. Signature h( M
The above answers are true and complete to the best of my knowledge. I understand that the
lead agency is relying on them to make its decision.
Signature:
Name of signee Bart Stepp
Position and Agency/Organization Deputy Director/Utilities and;Waste Management for
Mason County Public Works
Date Submitted: 12/21/17
•
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 13 of 13
,
MASON COUNTY
DEPARTMENT OF PUBLIC WORKS
100 W PUBLIC WORKS DRIVE
SHELTON, WASHINGTON 98584
Phone(360)427-9670 ext.450
Fax(360)427-7783
March 2, 2018
MASON COUNTY
MISSION Tricia Woolett TO BE KEPT IN THE
The mission of Mason Building Inspector II PARCEL FILE
County Government is to Mason County Community Development
provide essential& 615 W Alder Street
mandated services which
will preserve&benefit the Shelton,WA 98584
health,safety&welfare of
the general public in a
professional and courteous Subject: EELLS HILL TRANSFER STATION IMPROVEMENTS STORMWATER MEMO
manner through the effective
and equitable management
of available public Dear Ms.Woolett,
resources.
This memo explains the need and purpose of the stormwater improvements that is
Mason County recognizes part of the Eells Hill Transfer Station Improvements Project.
that its employees&
volunteers are the
foundation upon which The transfer station building was built in 1993. I have copies of the design drawings
these services are provided. but no information on whether a stormwater report was completed at that time.
The original stormwater system consisted of catch basins that discharged into
perforated pipe that was buried in the ground to the west of the building by gravity.
At some point that perforated pipe became clogged. The County then put sump
pumps in the catch basins and ran pipe over the ground that discharged to an
infiltration ditch to the west of the building in the same area as the perforated pipe.
Then those pumps failed and now the runoff pools and stagnates near the building
and on top of the access roads until it infiltrates Or evaporates. County staff have to
walk through these puddles at times to access equipment and complete tasks.
The proposed improvements would replace the existing catch basins with new ones
and run new drain pipe by gravity to an expanded and deeper stormwater
infiltration pond/trench west of the building. The project does not increase
impervious area so the stormwater runoff amount is still the same as the original
construction. The runoff will still be directed to the same area as the original
perforated pipe design, but the improvements will eliminate existing ponding issues
and create a storm system that is easier to maintain. This will improve staff safety
and eliminate sanitary issues caused by standing water.
You can contact me at 360-427-9670 x652 or.bstepp@co.mason.wa.us if you would
like to discuss this.
Sincerely,
Bart Stepp, PE
Deputy Director/Utilities and Waste Management
c. Loretta Swanson, Mason County Public Works