HomeMy WebLinkAboutCOM2024-00016 Warehouse - COM Application - 3/21/2024 I
MASON COUNTY PermitNo:C D I
3 COMMUNITY DEVELOPMENT
ECEIVED
Dill C' Permit Assistance Center, Building,Planning MAR 21 2024
BUILDING PERMIT APPLICATION
PROPERTY OWNER INFORMATION: CONTRACTOR INFORMATIO : Street
NAME:South Shore Enterprises LLC NAME:Kaufman Construction
MAILING ADDRESS:P.O.Box 249 MAILING ADDRESS:7908 Sweet Iron Court SE
CITY:Union STATE:wa ZIP:98592 CITY:Tumwater STATE:WA ZIP:98501
PHONE#1:360 898-2481 PHONE:360 4915230 CELL:
PHONE#2:360 490-5475 EMAIL:reid@kaufmancd.corn
EMAIL:mikeo@hoodcanal.net L&I REG 4548,388-01 EXP.
PRIMARY CONTACT: OWNER l] CONTRACTOR❑ OTHER❑
NAME MikeObrusio EMAIL mikeo@hoodcanal.net C
MAILING ADDRESS P.O.Box 249 CITY Ur4on STATE WA ZIP 9892
PHONE CELL 3ao4sasns r
PARCEL INFORMATION:
PARCEL NUMBER(12 Digit Number) 322324390013 ZONING 18-Res-All Other C
LEGAL DESCRIPTION(Abbreviated)LOT 3 OF SP#3059 FIRE DISTRICT 6
SITE ADDRESS750 E Dalby Rd CITyUnion tar•
DIRECTIONS TO SITE ADDRESS Heading North on McReavy Rd turn Left on to Dalby Road towords SR 106 the site locaion is on the
left hand side.The site is secured with a gate.Call the primary contact to access site.
IS THE PROJECT WITHIN 300 FT OF SLOPES)GREATER THAN 14%: YESE] NO❑ SNOW LOAD:_Psf
IS PROPERTY WITHIN 200 FT OF THE FOLLOWING: (Check all that apply):
SALTWATER❑ LAKE❑ RIVER/CREEK❑ POND❑ WETLAND❑ SEASONAL RUNOFF❑ STREAM❑
TYPE OF WORK: NEW❑ ADDITION❑ ALTERATION❑ REPAIR❑ OTHER ❑
USE OF STRUCTURE(Residmce,Gunge,Commercial Bldg,Etc.)Commercial Building for Storage of telecommunications products
IS USE: PRIMARY l] SEASONAL❑ NUMBER OF BEDROOMS 0 NUMBER OF BATHROOMS 0
HEATED STRUCTURE? YES(Who1e Blde)❑ YES(Part[s1 of Bldg)❑ NO❑�
DESCRIBE WORK Construction of a(4&,Urgft warehouse for storage on telecommunications products.
SQUARE FOOTAGE:(pmpased)
IST FLOORO sq.ft. 2ND FLOOR 0 sq.ft. 3RD FLOOR 0 ys�q.fL BASEMENTO sq.fL
DECKO sq.ft. COVERED DECKO sq.ft. STORAGE'6#"OO .ft. OTHER sq.ft.
GARAGE sq.ft. Attached❑ Detached❑ CARPORT sq.ft. Attached❑ Detached❑
MANUFAC *4 COPIES OF THE FLOOR PLAN REQUIRED*
MODEL LENGTH
TH BEDROOMS BATHS SERIAL '�_
ENVIRONMENTAL HEALTH:
SEWAGE/SEWER SOURCE: SEPTIC 0 SEWER❑ / NEW❑ EXISTING l]
PLUMBING IN STRUCTURE? YES❑ NO 0 Ifyes,attach completed Water Adequacy Form
PERIMETERTOUNDATION DRAINS PROPOSED? YES❑ NOO EXISTING SQ.FT.
EXISTING BEDROOMS 0 PROPOSED BEDROOMS 0 TOTAL BEDROOMS 0
OWNER acknowledges that submission of inaccurate Information may result in a stop work order or permit revocation.Acknowledgement of such is by
signature below,I declare that I am the owner and I further declare that I am entitled to receive this permit and to do the work as proposed.I have
obtained permission from all the necessary parties,including any easement holder or parties of interest regarding this project. The owner or legal
representative,represents that the information provided is accurate and grants employees of Mason County access to the above described property
and structure(s)for review and inspection. This permittapplication becomes null&void I work or authorized construction is not commenced within 180
days or if construction work is suspended for a period of 180 days.
PROOF OF CONTINUATION OF WORK ON THIS PERMIT IS BY MEANS OF INSPECTION. INACTIVITY OF THIS
PERMIT APPLICATION OF 180 DAYS OF MORE WILL CAUSE THE APPLICATION TO BE EXPIRED.(MASON
COUNTY CODE 14.08.42)
Signature of W ER Mus si ned b the OWNER) ate
DEPARTMENTAL REVIEW APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS
BUILDING DEPARTMENT
PLANNING DEPARTMENT
FIRE MARSHAL
PUBLIC HEALTH
1. Building Permit Application: Dated 2/23/24
• Owner-South Shore Enterprises, LLC; POB 249, Union WA 98592;
Primary Contact Mike Oblizalo, (360)490—5475,
mikeo@hoodcanal.net; LOT 3 of SP#3059;Address—750 E Dalby RD
• Contractor: Kaufman Construction;7908 Sweet Iron Court SE,
Tumwater 98501
• Type of Work Construction of a new Commercial Building for Storage of
Telecommunications equipment/supplies; 5,000 SF
2. Letter Dated 8/21/23 Envirotech Engineering SWMP Addendum#1;
Addressed to:South Shore Enterprise
• This letter is from the SWMP Engineer for this Project, Michael Staten, PE
• Primarily Roof runoff generated by new storage building would be
captured by a roof gutter and multiple downspouts and splash blocks
• Runoff Q was computed for a 6mon 24 hr storm (design)@0.956 cfs
• A filter strip has been sized to capture and manage driveway runoff;
Mannings equation was used to determine filter strip dimensions
3.Stormwater Management Plan(DWGS); 3 pgs of SWMP drawings (site plan
and section details)and specifications for erosion control
4. HCC Building 4C Plans;3 DWGs sheets of structural elevation views and
deck/footing and electrical details
5. HCC Exterior Cladding DWGS;Structural Construction Drawings of the
proposed 120 ft x 40ft wide CECO Pre-engineered Metal Building;Sealed by
Michael Cluster, PE
CONCLUSION/RECOMMENDATION: DPW Approval for Stormwater Permit
COM2024-00016 for South Shore Enterprises, LLC.
The Stormwater documentation is a comprehensive set of plans and
specifications necessary to ensure stormwater will be managed and
adequately disposed off onsite,along with adequate erosion control measures
during construction to protect project site and surrounding natural resources
against uncontrolled impact.
Stormwater Permit Reviewer: Peter P. Bautista, DPW Engineer II
Permit Approval completed on;April 16,2024