HomeMy WebLinkAboutBLD2008-00611 Cancelled Heatpump - BLD Permit / Conditions - 5/22/2008 Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352
Mason County Bldg. 3 426 W. Cedar P.O. Box 186
Shelton, WA 98584
MECHANICAL PERMIT BLD2008-00611
OWNER: FIONA, LESLIE RECEIVED: 5/22/2008
CONTRACTOR: HOOD CANAL HEATING & COOLING (360) 275-4992 LICENSE: HOODCHCO05DB EXP: ISSUED: 5/22/2008
SITE ADDRESS: 373 E POINTES DR EAST SHELTON EXPIRES: 11/22/2008
PARCEL NUMBER: 121195300122
LEGAL DESCRIPTION: HARTSTENE POINTE #4 LOT: 122
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
Heat pump and furnace Hartstene Point Development on Hartstine Island
General Information Setback Information
Fro Ft. Shoreline: Ft.
Type of Use: SF Insp.Area: Re Ft. Slope: Ft.
Type of Work: MEC Fire Dist.: ? R31de Ft.
Valuation:
id 2: Ft.
Mechanical Fti
FEES
Type Type By Date Amount Receipt
Furnace<100K Mechanical Fee TAM 5/22/2008 $34.10 B120080000
Heat Pump Mechanical Base Fee TAM 5/22/2008 $26.60 6120080000
Total $60.70
BLD2008-00611 Please refer to the following pages for conditions of this permit. 1 of 3
CASE NOTES FOR
BLD2008-00611
Jr
CONDITIONS FOR
BLD2008-00611
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance
Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
x A
2) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28.
X�,f7
3) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
permit revocatiofi—
X
4) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED
BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
Inspector shall be made prior to requesting additional inspections.
x
5) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason County ordinances and building regulations.
X
6) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder have prevented action from being taken. No more than one extension may be granted.
x do-
IFt
7) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to ensure
these structures meet the setback conditions listed.
X 1j�
BLD2008-00611 Please referto the following pages for conditions of this permit. 2 of 3
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
wok is..f means of n,progress inspection.The owner or the agent on the owners behalf,represents that the information provided is accurate and grants employees of Mason County access to
the above described property and structure for review and inspection.
OWNER OR AGENT. - DATE:
BLD2008-00611 Please refer to the following pages for conditions of this permit. 3 of 3
W
o CONCRETE Gas Piping MANUFACTURED HOME
o Interior-Date By — — _- Im
CDFootings!Setbacks Exterior-Date ey Ribbons
rnDate B+ INSULATION --- Date By
m
Foundation Walls BGISLAB INSULATION Set-up O
Da to By Date By Date By Z
FRAMING Floors FIRE DEPARTMENT
Date By Date By
Date BY Walls
PLUMBING Date ay DECKS
. _,._. Date By
Groundwork Vault ---
TANKS
Date Date By Date By
Attic
D.W.V _ Date By OTHER
Date By DRYWALL Type.
Date By
Water Line Date BY
Type:
Date By Int. Brace Wall Date B
MECHANICAL 100
�r�sep8ra�cn Ely
FINAL INSPECTION o
Y�
Date By Date By Date By 0O0
O
s Pass or Request Inspect. Co
5 Type of Insp. Fail Date Date Done By Comments
a
fi��4� /G 27,c� s•2 8'�' Z22
v
Cn
C /
a
o —
O
N
i
a
I
0
M