HomeMy WebLinkAboutBLD2004-00028 SFR - BLD Permit / Conditions - 11/22/2004 Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext. 352
Mason County Bldg. 3 426 W. Cedar P.O. Box 186
_Iplo Shelton, WA 98584
RESIDENTIAL BUILDING PERMIT BLD2004-00028
OWNER: KARL ZEIGER RECEIVED: 1/13/2004
CONTRACTOR: ARMSTRONG HOMES OF TACOMA LICENSE: 600-038-815 EXP: 5/31/2004 ISSUED: 2/2/2004
SITE ADDRESS: 762 E LAGOON DR SHELTON EXPIRES: 8/2/2004
PARCEL NUMBER: 121195700031
LEGAL DESCRIPTION: HARTSTENE POINTE#10 LOT: 31 762 E LAGOON DR SHELTON
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
NEW RESIDENCE PICKERING. TURN RIGHT. GO TO DEAD END
General Information Construction & Occupancy Information Square Footage Information
No. of Bedrooms: 3 Type of Constr.: V-N
Type of Use: SF Insp. Area: OT No. of Bathrooms: 1 Occ. Group: R-3 Lot Size: Deck: 120
Type of Work: NEW Fire Dist.: 5 No.of Stories: 1 Occ. Load: Building:947
Valuation: Building Height: 16 Occ. Status: Seasonal Basement:
Manufactured Home Information Setback Information Shoreline& Planning Information
Make: Length: Ft. Front: N 28.0 Ft. Shoreline: 37.0 Ft. Water Body: Case Inlet
Rear: S 37.0 Ft. Slope: 37.0 Ft. SEPA?: No
I`:"-del: Width: Ft. Shoreline Desig.: Rural
Side 1: W 14.0 Ft.
Year: Serial No.: Side 2: E 17.0 Ft. Comp. Plan Desig.: Rural
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Dishwasher 1 Exhaust Hood 1 Plan Check Fee NJP 1/13/2004 $486.69 S22004
Hosebibs 2 Ventilation Fan 1 Planning Review Fee NJP 1/13/2004 $155.00 S22004
Kitchen Sink 1 WOodstove 1 Address Fee GMM 1/15/2004 $140.00 S22004
Lavatories 2 Dryer Vent 1 EH Plan Review PSD 1/16/2004 $75.00 s22004
Water Closets (Toilets) 1 Building State Fee JRN 1/22/2004 $4.50 S22004
Water Heaters 1 Building Permit Fee JRN 1/22/2004 $748.75 S22004
Bath Tubs 1 Mechanical Fee JRN 1/22/2004 $77.45 S22004
Clothes Washer 1 Mechanical Base Fee JRN 1/22/2004 $23.50 S22004
Plumbing Fee JRN 1/22/2004 $56.00 522004
Plumbing Base Fee JRN 1/22/2004 $20.00 S22004
Total $1,786.89
BLD2004-00028 Please referto the following pages for conditions of this permit. 1 of 4
CASE NOTES FOR
BLD2004-00028
CONDITIONS FOR
B LD2004-00028
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800-647-,0?82. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
2) The Uniform Fire Code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150' from an approved
access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where
such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. X
3) The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10 gallons is not allowed without the approval of
the Mason County Fire Marshal'-X `r%
4) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will
not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building
Departmepa prior to any further inspections being performed or approvals granted.
X
5) In accordance with the Uniform Building Code, all sites shall have approved numbers or addresses located in such a position as to be plainly visible and
legible from the street or road fronting the property. Mason County Building Department requires that this be completed prior to calling for any site
inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the Uniform Building Code will be assessed if the owner and/or
contracto 4 to post the address on site prior to requesting inspections.
X j
6) The plan review check list and corrections, along with the Energy Compliance Worksheet (when applicable) are part of the approved plans and must
remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they
shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of
plans op-ti �he duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections.
7) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL.
BLD2004-00028 Please referto the following pages for conditions of this permit. 2 of 4
8)f The "approved" plot plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" plot plan is not on site, then
approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Buildi partment prior to any further inspections being performed or approvals granted.
X
9) Any ch nges in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building
Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached
thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be
charged an all be collected by the Building Department prior to any further inspections being performed or approvals granted.
X
10) All construction must meet or exceed all local ordinances and the 1997 Uniform Building Code requirements as adopted and amended by Mason County
and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would
result in perb-N�jyocation.
X 1
11) Proposed cture or portions thereof, must maintain a 5'separation distance between adjacent structures and that furthest projection.
X
12) All changes to"approved" building plans that effect compliance with the Uniform Codes as amended and adopted, or any other Mason County ordinance
or reguI ust be reviewed and approved by Mason County prior to construction.
X /�
13) The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the Uniform Codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
Inspector all e/made prior to requesting additional inspections.
X
14) All property lines shall be clearly identified at the time of foundation inspection. X
15) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason�,t�ordinances and building regulations.
X rl
16) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a perio of exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder have pr6jn e�1 action from being taken. No more than one extension may be granted.
X �/
17) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners,
connectoalr d flashing. Install metal connectors approved for contact with the new types of pressure treated material.
X (( f n
18) All upland areas disturbed or newly a by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt
fencing or straw matting). X
BLD2004-00028 Please refer to the following pages for conditions of this permit. 3 of 4
19� Approved per dimensions and setbacks on submitted site plan. X
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. deuce of-continuation of work is a/progress inspection within the 180 day period. Fi al inspe- ion m st be approved before building can be occupied.
OWN ER O _ �J �- DATE: O
BLD2004-00028 Please referto the following pages for conditions of this permit. 4 of 4
o `
o CONCRETE MECHANICAL MANUFACTURED HOME
o -
i� Footings / Setbacks Date By Ribbons
00 Date By Gas Piping Date By
co Foundation Walls Date B y Set-up
Date By INSULATION Date By
B G / Slab Insulation Floors Final
Date By Date By Date By
F�h G�j Walls FIRE DEPT
Date � By Date IF By Date By
PLUMBING Attic OTHER
Groundwork Date By
Date By WALLBOARD NAILING
D AN N. Date g�". 2 7vY� By 7';
Date Y-6--<5>y By FINAL INSPECTION
Water Line Date tI dq e,4 By WiL
Date By Date By
En
0
s �y�/�i•g-� r_ .4-TTi C �c-�-�-rs -- �Lv y cS"y,4G.�Lv
g
Ll
cn
70
-
El p -
0