Loading...
HomeMy WebLinkAboutBLD2008-01346 Furnace - BLD Permit / Conditions - 3/25/2009 Inspection Line(360)427-7262 r „ MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Shelton,WA 98584 MECHANICAL PERMIT BLD2008-01346 OWNER: LAURA, GEORGE RECEIVED: 11/3/2008 CONTRACTOR: N W REFRIGERATION LICENSE: EXP: ISSUED: 11/3/2008 SITE ADDRESS: 795 E CHESAPEAKE DR SHELTON EXPIRES: 5/3/2009 PARCEL NUMBER: 121195700027 LEGAL DESCRIPTION: HARTSTENE POINTE#10 LOT: 27 PROJECT DESCRIPTION: DIRECTIONS TO SITE: NEW FURNACE HWY 3 PICKERING RD LEFT ON HARSTENE BRIDGE ROAD RIGHT ON E NORTH ISLAND DRIVE TO NANTUCKET RD TO POINTES DR EAST RIGHT THEN LEFT General Information Setback Information Type of Use: SF Insp.Area: Front: Ft. Shoreline: Ft. Rear: Ft. Slope: Ft. Type of Work: MEC Fire Dist.: 5 Side 1: Ft. Valuation: Side 2: Ft. Mechanical Fixtures FEES Type Qty. Type By Date Amount Receipt Furnace<100K 1 Mechanical Fee KS 11/3/2008 $17.10 S120080000 Mechanical Base Fee KS 11/3/2008 $26.60 S120080000 Total $43.70 BLD2008-01346 Please referto the following pages for conditions of this permit. 1 of 3 CASE NOTES FOR BLD2008-01346 CONDITIONS FOR B LD2008-01346 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X b 2) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X 3) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit vo�tion. X 4) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building InspeF4or s all be made prior to requesting additional inspections. 5) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with M C ynty ordinances and building regulations. 6) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder havl prevented action from being taken. No more than one extension may be granted. X £/ BLD2008-01346 Please referto the following pages for conditions of this permit. 2 of 3 This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at anytime after work is comm,nced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner�r the agent on the owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. OWN ER OR AGENT: 141 C DATE: BLD2008-01346 Please referto the following pages for conditions of this permit. 3 of 3 co o CONCRETE Gas Piping MANUFACTURED HOME m o — Interior-Date By O C) Footings t Setbacks Extencx-Gate By Ribbons . M Data By INSULATION Date By m rn Foundation Waft BG/SLAB INSULATION Date By Date By Date By C FRAMING FIO°� FIRE DEPARTMENT y Date By Date By Date 6y waft PLUMBING Date By DECKS Date By Groundwork Vault TANKS Date BY Date By Data gy Attic aW.v Date By OTHER Date By DRYWALL Typo. Date By Water tine Date By Typo: Date By Int.Brace Wall Date By MECHANICAL Date FINAL INSPECTION Firs Separation O 0 Date By Date By Date ' ,j�S O� By co c s Pass or Request Inspect. G, Type of Insp. Fail Date Date Done By Comments CD f LZ G m co CD N O a 0 0 Cn CD (D 0 MASON COUNTY PERMIT NO.b 1 a(T-8— PLUMBING/MECHANICAL PERMIT APPLICATION j3q�, 426 W. Cedar• P.O. Box 186, Shelton, WA 98584 Shelton (360)427-9670• Belfair(360) 275-4467• Elma(360) 482-5269 On the web www.co.mason.wa.us APPLICANT INFORMATION CONTRACTOR INFORMA I D Owner Company Name Mailing Addres Mailing Address City State li� Zip Code __9 WZ R r( City State — Zip Code Phone_u Ale ? 'AIaO_Other Ph. Phone - `3 11 041aer Ph. Lien/Title Holder Contractor Reg. # Exp. 1� E mail address E Mail Address Drivers Lic. # DOB Drivers Lic.# DOB SEPTIC INFORMATION - Connect to New Septic Existing Septic Connect to Sewer System Name of Sewer System PARCEL INFORMATION- 12 Digit Parcel No (.0 0 A Fire District Legal Description Site Address (Please include street name, street number and city)lc����� k�c,, Directions to site q dd Is property within 200' of Saltwater Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs > 15% TYPE C)F JOB - New Add Alt Repair Other Use of Building Location of Fixtures/Units - 1 st Floor 2nd Floor Basement Garage Closet PLUMBING FIXTURES (Show Number of each) MECHANICAL UrS Type of Fixture No. of Fixtures Fees Fuel Type:Electric—LPG—Natural Gas—Heat Pump_ Toilets Type of Unit No. of Units Fees Bathroom Sink Furnace l Bath Tubs Heatpumps Showers Spot Vent Fan Water Hcater Propane Tank Clothes Washer Gas Outlets Kithen Sinks Wood/Gas/Pellet Stove _ Dishwasher Kitchen Exhaust Hood Hosebibs Dryer Vent Other Other Base Fee Base Fee TOTAL PLUMBING TOTAL MECHANICAL OWNER i BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties.If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application,I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. PR CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. Date: wne Owners Representative/Contractor (indicate which one) FOR OFFICIAL USE BEYOND THIS POINT Accepted by: Planning Pd Ck# Date Bld Pd Receipt No. DEPARTMENTAL REVIEW APPROVED DENIED NOTES Building Department Occ Group—Type Constr. Plan nin Department Environmental Health Department FEES Plumbing & Base Fee Site Inspection Mechanical & Base fee UFC Plan Review Fee Wood/Gas/ Pellet Stove Fee Other Violation Fee TOTAL FEES