Loading...
HomeMy WebLinkAboutBLD97-00648 Reissued SFR - BLD Permit / Conditions - 7/30/1997 Inspection Line (360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, WA 98584 RESIDENTIAL BUILDING PERMIT BLD97-00648 OWNER: KEN WOLLE RECEIVED: 6/10/1997 CONTRACTOR: LICENSE: EXP: ISSUED: 7/30/1997 SITE ADDRESS: 19282 E STATE ROUTE 106 BELFAIR EXPIRES: 1/26/1998 PARCEL NUMBER: 1220613901 LEGAL DESCRIPTION: I rN MRE TR 1-B OF SURV 2/111 TR B OF SP#2290 PROJECT DESCRIPTION: DIRECTIONS TO SITE: RESIDENCE, DECK, AND GARAGE COMPLETION. STRUCTURE .7 MILES SOUTH ON HWY 106 FROM HWY 3 INTERSECTION, HOME IS ON PREVIOUSLY PERMITTED AND EXPIRED OPPOSITE SIDE OF RD FROM HOOD CANAL General Information Construction &Occupancy Information Square Footage Information No.of Bedrooms: 3 Type of Constr.: 5N Type of Use: SF Insp.Area: 1 No.of Bathrooms: 3 Occ. Group: R3U 1 Lot Size:O Deck: 1,522 Type of Work: NEW Fire Dist.: 2 No.of Stories: 3 Occ. Load: 0 Building:3,604 760 Valuation: Building Height: 0 Occ. Status: Basement:1,042 Manufactured Home Information Setback Information Shoreline&Planning Information Make: Length: 0 Ft. Front: N 10.0 Ft. Shoreline: 0.0 Ft. Water Body: Rear: S 5.0 Ft. Slope: Ft. SEPA?: No Model: Width: 0 Ft. Shoreline Desig.: Side 1: E 5.0 Ft. Year: Serial No.: Side 2: W 5.0 Ft. Comp. Plan Desig.: Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Remodel under 50% KS $77.00 45033 Building plan check' KS $552.18 45033 EH Plan Review KS $26.00 45033 ADDTL PLAN CHECK KS $84.00 45033 Total $739.18 BLD97-00648 Please refer to the following pages for conditions of this permit. 1 of 3 CASE NOTES FOR BLD97-00648 CONDITIONS FOR BLD97-00648 1) This application is subject to Buffer and Landscaping requirements as established under Mason County Ordinance 1.03.036. X 2) The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10 gallons is not allowed without the approval of the Mason County Fire Marshal. X 3) Proposed structure or any portion thereof greater than 30" in height from grade line, must maintain a minimum of 5' setback from all property lines, easements and 10'from all County and State Road right of ways. X 4) Approved per dimensions and setbacks on submitted site plan. X 5) All approved plans are required to be on-site for inspection purposes. If inspection is called for and plans are not on site, Approval WILL NOT be granted. In addition, a Re-Inspection fee in the amount of$32.00 per hour(minimum 1 hour)will be charged and must be collected by this department prior to any further inspections being performed or approval granted. X 6) PURSUANT TO 1994 UNIFORM BUILDING CODE, SECTION 305(C)AND SECTION 513, ALL SITES MUST HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY. MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS. A REINSPECTION FEE, BASED ON RATES IN TABLE 3A OF THE 1994 UNIFORM BUILDING CODE WILL BE ASSESSED IF OWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING INSPECTIONS. X 7) The correction list, along with the Energy Compliance Worksheet(when applicable) is part of the plans and must remain attached thereto. It is the responsibility of the applicant to make corrections indicated on the plans from the correction lists. Once the plans are marked APPROVED, they may not be changed or altered without authorization from the Building Official. The permit holder is reponsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply will result in failure of required building inspections. Every permit shall expire by limitation and become null and void if the building or work authorized by such permits is not commenced within 180 days from the date of issuance, or if the building or work authorized by such permits is suspended or abandoned at any time after the work is commenced for a period of 180 days. X 8) Any changes in construction shall be reviewed by engineer of record and submitted in writing to the Mason County Building Department prior to construction. X 9) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND UBC REQUIREMENTS. X BLD97-00648 Please refer to the following pages for conditions of this permit. 2 of 3 10) Changes to approved building plans that effect compliance to the 1991 Washington State Energy Code, 1991 Ventilation and Indoor Air Quality Code, the Uniform Building Code and/or Mason County Regulations must be approved by Mason County prior to constructionX 11) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND UNIFORM BUILDING CODE.x 12) ALL CONSTRUCTION MUST MEET OR EXCEED LOCAL CODES. IF ANY QUESTIONS, PLEASE CALL THIS OFFICE BEFORE CONSTRUCTION. X This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection. The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. OWNER OR AGENT: DATE: BLD97-00648 Please refer to the following pages for conditions of this permit. 3 of 3 1 r 0 CONCRETE MECHANICAL MANUFACTURED HOME o Footings I Setbacks Date ey Ribbons r o Gas Piping in 0) Interior Date By Interior-Date By Date By w Exterior Date By Exterior-Date By set.uP X Point road I Isolated Footings INSULATION Date By Z BG I SLAB INSULATION Date By Data By FIRE DEPARTMENT Foundation Walls Floors Date By Date By Data By DECKS FRAMING waits Date By Date By Data By PROPANE TANKS PLUMBING Vault Date By Date By OTHER Groundwork Attic TYpe= Date By Data By Date By D.W.V DRYWALL type_ Int Brace Wall Date By W Date By Date ByEn FINAL INSPECTION W m Water Line Firs Sops ration t— Date By Date By Date Z /a By t0D 1 s Pass or Request Inspect. c Type of Insp. Fail Date Date Done By Comments CD o 00 7-6 m y O n O Q_ O O O EF y (D 3 0