Loading...
HomeMy WebLinkAboutBLD2008-01236 mechanical - BLD Permit / Conditions - 10/20/2008 Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Shelton,WA 98584 MECHANICAL PERMIT BLD2008-01236 OWNER: DON & MARY, ROGERS RECEIVED: 10/1/2008 CONTRACTOR: OLYMPIC HEATING & COOLING 360-426-9945 LICENSE: OLYMPHC986BA EXP: 1/1/201 ISSUED: 10/1/2008 SITE ADDRESS: 752 E PROMONTORY RD SHELTON EXPIRES: 4/1/2009 PARCEL NUMBER: 121195700010 LEGAL DESCRIPTION: HARTSTENE POINTE#10 LOT: 10 PROJECT DESCRIPTION: DIRECTIONS TO SITE: WATER HEATER, FURNACE NORTH ISLAND DR, L ON E PINTES DR W, L ON PROMONTORY TO SITE. General Information Setback Information Type of Use: SF Insp.Area: Front: Ft. Shoreline: Ft. Rear: Ft. Slope: Ft. Type of Work: MEC Fire Dist.: 5 Side 1: Ft. Valuation: Side 2: Ft. Mechanical Fixtures FEES Type Qty. Type By Date Amount Receipt Furnace<100K 1 Mechanical Fee KS 10/1/2008 $17.10 S220080000 Mechanical Base Fee KS 10/1/2008 $26.60 S220080000 Plumbing Fee KS 10/1/2008 $8.10 §220080000 Plumbing Base Fee KS 10/1/2008 $23.10 S220080000 Total $74.90 BLD2008-01236 Please referto the following pages for conditions of this permit. 1 of 3 CASE NOTES FOR BLD2008-01236 r CONDITIONS FOR BLD2008-01236 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 2) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X 3) ALL FURNACE INSTALLATIONS SHALL MEET THE MINIMUM EFFICIENCIES SET FORTH IN THE CURENT EDITION OF THE WASHINGTON STATE ENERGY CODE (WSEC). ANY PORTION OF THE MECHANICAL SYSTEM THAT IS ALTERED OR REPLACED SHALL MEET THE MINIMUM.STANDARDS SET FORTH IN THE WSEC AND INTERNATIONAL MECHANICAL CODE. X 4) In buildings of unusually tight construction, fuel-burning appliances (excluding cooking appliances and domestic clothes dryers) shall obtain combustion air from outside in accordance with the international codes. X, „ 5) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. X 6) Installation of heating equipment in single family residences shall meet the requirements of the current Washington State Energy Code. The furnace to be installed shall not exceed 150% of the heating and cooling design load. Heating and design load calculations for the purpose of sizing HVAC systems are required and shall be calculated in accordance with accepted engineering practice, including infiltration and ventilation. Design calculations shall be available for inspection during the framing inspection. Warm-air furnaces shall have a minimum efficiency of 78%AFUE or higher or 80% combustion efficiency. All ducts shall be securely fastened and sealed with welds, gaskets, mastics (adhesives), mastic-plus-embedded-fabric systems or tapes installed in accordance with manufacturers installation instructiow Duct tape is NOT permitted as a sealant on any ducts. Ducts in unheated spaces shall be insulated to R-8. X BLD2008-01236 Please referto the following pages for oonditionsof this permit. 2 of 3 7) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. OWNER OR AGENT: DATE: `.' BLD2008-01236 Please refer to the following pages for conditions of this permit. 3 of 3 co o CONCRETE Piping MANUFACTURED HOME p C) Interbr-Date By Q CD Footings I Setbacks Exlenor-Date By Ribbons m Date By INSULATION Date By Cn rn Foundation Walls BG r SLAB INSULATION Set-up p0 Date By Date By Date By Z FRAMING Floors FIRE DEPARTMENT 90 ic Date B Date By Date E3y D y Walls PLUMBING Date BY DECKS By < Groundwork vault TANKS Date BY Date By Date By Attic Date By OTHER Q.W.V Date By DRYWALL Type. Date Water Line DaLe By Type: Date By Int.Brace Wail Date By MECHANICAL ° seperatian By FINAL INSPECTION c Date B Date By Date By co O a Pass or Request Inspect. N EF Type of Insp. Fail Date Date Done By Comments 6 0 v 0 8 a 0 U) Vl (D 0