HomeMy WebLinkAboutBLD2023-00459 Cancelled Mechanical - BLD Inspections - 4/16/2024 INSPECTION CARD
Mason County
615 W. Alder St.
Building 8, Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
PERMIT# BLD2023-00459 PROJECT ADDRESS 130 NE RAINBOW PL NORTH BELFAIR, WA 98528
PARCEL# 222025700022 PROJECT DESCRIPTION Installation of new heatpump system
OWNER GRANT ET UX CHRISTOPHER L ADDRESS KATHRYN ANN RADOMSKI PHONE
CONTRACTOR Dana's Heating Inc ADDRESS Po Box 4566 PHONE (360)876-7670
CONTRACTOR LICENSE DANASHI000DZ LENDER
INSPECTION INSP DATE Comments INSPECTION INSP I DATE Comments
Mechanical/Plumbing Final
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
B DD2023-00459 MECHANICAL:RESIDENTIAL
PROJECT DESCRIPTION: INSTALLATION OF NEW HEATPUMP 02/2023
SYSTEMSITE ADDRESS: 130 NE RAINBOW PL NORTH BELFAIR E29/2023
PARCEL: 222025700022
APPLICANT: GRANT ET UX CHRISTOPHER L OWNER: GRANT ET UX CHRISTOPHER L
KATHRYN ANN RADOMSKI KATHRYN ANN RADOMSKI
WEST RICHLAND,WA 99353 WEST RICHLAND,WA99353
CONTRACTOR: Dana's Heating Inc
Po Box 4566
BREMERTON,WA98312
(360)876-7670
GENERAL CONTRACTOR'S LICENSE: Dana's Heating Inc License: DANASHIOOODZ
Po Box 4566 Expires: 08/23/2023
BREMERTON,WA98312
(360)876-7670
FEES: Paid Due
Mechanical Fees $19.00 $0.00
Final Inspection $80.00 $0.00
Technology Flat Convenience $5.00 $0.00
Fee
State Fee-Residential $6.50 $0.00
Mechanical Base Fee $30.00 $0.00
Totals : $140.50 $0.00
FIXTURES
(�yt Mechanical Fixtures
1.0000 Heat Pump(s)
REQUIRED INSPECTIONS
Printed by:Nikita Huckabey on:05/02/2023 03:12 PM
Page 1 of 3
Mason County
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
MECHANICAL - RESIDENTIAL BLD2023-00459
Mechanical/Plumbing Final Inspection
CONDITIONS
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* All furnace installations shall meet the minimum efficiencies set forth in the current edition of the Washington state energy
code (WSEC). any portion of the mechanical system that is altered or replaced shall meet the minimum standards set forth
in the WSEC and international mechanical code.
* OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
* The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency
(ORCAA).
It is unlawful for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos
containing materials have been identified and removed from the area to be demolished. Work shall not commence on an
asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B
Limited Lane NW, Olympia WA98502, 360.586.1044/800.422.5623 www.orcaa.org
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
Printed by:Nikita Huckabey on:05/02/2023 03:12 PM
Page 2 of 3
Mason County
Mason County - Division of Community Development
615 W. Alder St.
N'C Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
MECHANICAL - RESIDENTIAL BLD2023-00459
hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By:
Contractor or Authorized Agent: Date:
Printed by:Nikita Huckabey on:05/02/2023 03:12 PM
Page 3 of 3