Loading...
HomeMy WebLinkAboutBLD2024-00074 DEMO - BLD Inspections - 2/26/2024 INSPECTION CARD Mason County N 615 W. Alder St. Building 8, Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov PERMIT# BLD2024-00074 PROJECT ADDRESS 80 E Soundview Dr Shelton, WA 98584 PARCEL# 320215802011 PROJECT DESCRIPTION DEMO SHED OWNER VARTIA KARIN ADDRESS 7002 BAILEY ST SE PHONE 360-789-6781 CONTRACTOR KINGS HOMES INC ADDRESS PO BOX 547 PHONE 253-225-3694 CONTRACTOR LICENSE KINGSH1836MR LENDER INSPECTION INSP DATE Comments INSPECTION INSP DATE Comments Connection has been verified by Demolition Final Inspection :S-Q 2IS& `( Mason County Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov B DD2024-00074 DEMO PROJECT DESCRIPTION: DEMO SHED ISSUED: 01/19/2024 SITE ADDRESS: 80 E SOUNDVIEW DR SHELTON EXPIRES: 07/17/2024 PARCEL: 320215802011 APPLICANT: VARTIA KARIN OWNER: VARTIA KARIN 7002 BAILEY ST SE 7002 BAILEY ST SE LACEY,WA 98513 LACEY,WA 98513 360-789-6781 GENERAL CONTRACTOR'S LICENSE: KINGS HOMES INC License: KINGSH1836MR PO BOX 547 Expires: 08/15/2025 OLALLA,WA 98359 253-225-3694 FEES: Paid Due State Fee-Residential $6.50 $0.00 Technology Flat Convenience $5.00 $0.00 Fee Demolition Fee $120.00 $0.00 Totals : $131.50 $0.00 REQUIRED INSPECTIONS Connection has been verified by Health or Utilities Demolition Final Inspection CONDITIONS " The Washington State Clean Air Act prohibits the burning of any construction or demolition debris in an outdoor fire. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. For public safety, it is the responsibility of the applicant to confirm through written verification all utility services(electric, gas, water, sewer, ...) have been terminated prior to demolishing a structure. Printed by:Anna Schaffran on:01/19/2024 02:33 PM Page 1 of 2 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov DEMO BLD2024-00074 " All construction debris must be removed from the site after project completion to an approved location. Proper disposal of construction debris must be on land in such a manner that debris cannot enter or cause water quality degradation of aquatic environments. * OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null& void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. " Proper erosion and sediment control practices must be used on the construction site and adjacent areas to prevent upland sediments from entering the aquatic environment. Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent soil from being carried into surface water by stormwater runoff.Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of state regulations.Any work in or adjacent to waterways that will adversely affect water quality must receive specific prior authorization from the Department of Ecology.Silt fencing, straw matting, etc. must be installed and maintained until seeding or upland vegetation has become established around all areas disturbed or newly created by construction activities. * The demolition and disposal of demolition debris must meet requirements as per Mason County regulations. it is unlawful for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos containing materials have been removed from the area to be demolished.work shall not commence on an asbestos project or demolition unless the owner or operator has obtained written approval from ORCAA @ 2490 B Limited Lane NW, Olympia WA 98502, 360-586-1044, 800-422-5623,www.orcaa.org I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By:L tiC 1�"1 Contractor or Authorized Agent: &Mjm,& J Date: G( D_©aL4� Printed by:Anna Schaffran on:01/19/2024 02:33 PM Page 2 of 2 DocuSign Envelope ID: F9948E08-4285-4016-B35B-03BD08522A23 ,�► �'' MASON COUNTY PERMIT NO. BLD2(724 -0oo-74 COMMUNITY SERVICES DEPARTMENT RECEIVED BUILDING.PLANNING•FIRE MARSHAL WWW.CO.MASON.WA.US (360)427-9670 Shelton ext.352 Mason County Bldg.#8,615 W.Alder St (360)275-4467 BelfairW49 2024 �as4 Shelton,WA 98584 (360)482-5269 Elma ext. 352 613 W.AMW DEMOLITION PERMIT APPLICATION OWNER INFORMATION: CONTRACTOR INFORMATION: NAME:Karin Vartia NAME:Josiah Kipperberg MAILING ADDRESS:7002 Bailey ST SE MAILING ADDRESS: CITY:Lacey STATE:WA ZIP:98513 CITY: STATE: ZIP: PHONE:360-789-6781 CELL: PHONE:253-225-3694 CELL: EMAIL:karinvartia@kw.com EMAIL :Josiah@kingshomesinc.com L&I REG# EXP. PARCEL INFORMATION: PARCEL NUMBER (12 DIGIT NUMBER) 320218502011 FIRE DISTRICT LEGAL DESCRIPTION (ABBREVIATED) SITE ADDRESS 80 E Soundview Drive CITY Shelton DIRECTIONS TO SITE ADDRESS: IS PROPERTY WITHIN 200 FT: SALTWATER[] LAKE[] RIVER/CREEK❑ POND❑ WETLAND[] SEASONAL RUNOFF[] STREAM ❑ DOES PROPERTY HAVE SLOPE(S)WITHIN 300 FT OF THE PROJECT-GREATER THAN 14% YES❑NO ❑ IF YOUR PROJECT IS LOCATED ADJACENT TO OR WITHINANAREA THAT IS LISTED ABOVE,PLEASE CONTACT THE PLANNING DIVISION OF COMMUNITY DEVELOPMENT PRIOR TO DEMOLITION TO ENSURE REDEVELOPMENT. USE OF STRUCTURE BEING DEMOLISHED(RESIDENCE,GARAGE ETC.) Shed HOW WILL THE DEBRIS BE DISPOSED OF?: Removal from property PROVIDE A PLOT PLAN INDICATING LOCATION OF STRUCTURE TO BE DEMOLISHED E oundview structure to be demolished OWNER/CONTRACTOR acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection.This permit/application becomes null&void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF IMPEftION11VACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. x 01/18/2024 F&AMIAM&f Applicant Date xKarin Vartia ✓QOWNER/❑✓ REPRESENTATIVE/0✓ CONTRACTOR Print Name DEPARTMENTAL REVIEW APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS BUILDING DEPARTMENT PLANNING DEPARTMENT