Good Faith Asbestos Survey
Attn: All West Coast Auto Wrecking
60 F. Anthony Rd
Grapeview,Wa 98546
Project M11 West Coast Auto Wrecking-
Demo
Dear All West Coast Auto Wrecking.
FGE is pleased to present our limited Good Faith Asbestos Survey for 5000 Sq. Ft.Commercial Building.
Sincerely,
Five Guys Excavating
DBA
Bill McTurnal Enterprises, LLC
Lisa Demmon
AIIERA Building Inspector
(Certificate Number: BUR-NES-02-
24-2023)
rt;e
P.O.Box 129
Shelton.Washington 98584
Phone:(360)432.0971
Fax: (360)462-3272
TABLE OF CONTENTS
1.0 INTRODUCTION .......................................................................................................................................I
I.I SUMMARY..............................................................................................................................1
1.2 SAMPLE LOG......................................................................................................................... 1
2.0 LIMITATIONS OF THE ASSESSMENT.................................................................................................2
2.1 OBJECTIVE........................................................................................
2.2 SCOPE OF WORK ...................................................................................................... ...........2
2.3 LIMITING CONDITIONS ......................................................................................................2
2.4 LIMITATIONS OF THE ASSESSMENT ...............................................................................2
2.5 WARRANTIES ........................................................................................................................3
3.0 PROJECT SUMMARY .................................................................................................................. .....3
3.1 ASBESTOS SURVEY METHODOLOGY .....................................................................................3
4.0 CONCLUSIONS AND RECOMMENDATIONS ............................................... ......................�4...............
TABLE
Table- Summary of Asbestos Sampling and Results
APPENDICES
Appendix A - iATI. Asbestos Analytical Reports and Chain-of-Custody
1.INTRODUCTION/SUMMARY
On the 5t'of December,2023 Five Guys Excavating was contracted by All West Coast Auto Wrecking to
collect samples from a burned out structure located at address:60 E. Anthony RD.Grapeview Wa. Project#
All West Coast Auto Wrecking.-Demo.
Samples were taken for the purpose of determining asbestos containing materials within a Commercial
structure with intent to demolish. The structure is approx.5000 sq fl.
The structure is a metal frame,metal roof and siding.There is no insulation,wall or sealing coverings. Five
Guys Excavating conducted an asbestos survey to identify possible ACM's(Asbestos Containing Materials)A
total of(0)samples were taken from the structure as shown in the chart below and(0)of the(0)samples were
found to contain a regulated level of asbestos.
1.2 SUMMARY
Five Guys Excavating conducted an asbestos survey to identify possible ACM's(Asbestos Containing
Materials). Sampling was conducted in accordance with sampling and analytical procedures required by
Asbestos Hazard Emergency Response Act(AHERA).Olympic Region Clean Air Agency(ORCAA),and the
Asbestos Survey Requirements of the State of Washington Department of Labor and Industries(L&I)WAC
296-62-077.
1.2 SAMPLE LOG
SEE ATTACHED
The owner should also use caution when performing demolition activities within the project areas.
Concealed materials may be encountered during the demolition project. ACBMs may be located between
walls,above ceilings,underneath floor, in pipe chases,or other inaccessible areas.A copy of the asbestos
survey document should be on site during all demolition activities.
2.0 LIMITATIONS OF THE ASSESSMENT
As addressed under 2.4 Limitations of the assessment in Project survey#All West Coast Auto Wrecking-
Demo The conclusions of the report are professional opinions based solely upon visual site observations and
interpretations of analyses as described in our report.Common construction techniques render portions of the
building inaccessible.
The opinions presented herein apply to the site conditions existing at the time of our investigation,and
interpretation of current regulations pertaining to asbestos.Therefore,our opinions and recommendations
may not apply to future conditions that may exist at the site. Future regulations pertaining to asbestos
material may impose stricter restrictions on demolition work.
2.1 ORIECTIVE
The objective of Five Guys Excavating's assessment work was to evaluate the presence of asbestos materials
from this residential home prior to a demolition project.
2.2 SCOPE OF WORK
The scope of services for the asbestos materials assessment included, and was limited to,the following
tasks:
• Perform an asbestos inspection to identify asbestos-containing building materials(ACBM)
present from this residential home. Sampling was conducted in accordance with AHF,RA
sampling requirements and analyzed by a N VLAP accredited laboratory for the presence of
asbestos using Polarized Light Microscopy(PLM).
Prepare a summary report documenting the findings of the assessment and providing tables
summarizing materials,analytical results,comments and recommendations.
2.3 LIMITING CONDITIONS
*Five Guys Excavating's site inspection included a physical inspection of accessible areas.
2.4 LIMITATIONS OF THE ASSESSMENT
*The conclusions of the report are professional opinions based solely upon visual site observations
and interpretations of analyses as described in our report.Common construction techniques render
portions of the building inaccessible.As a result,additional ACBM may be present in inaccessible
areas(e.g..crawl spaces,above ceiling,and behind walls)at the site.
•The opinions presented herein apply to the site conditions existing at the time of our investigation,
and interpretation of current regulations pertaining to asbestos.Therefore,our opinions and
recommendations may not apply to future conditions that may exist at the site. Future regulations
pertaining to asbestos material may impose stricter restrictions on demolition work.
2.5 WARRANTIES
•There are NO warranties written, expressed or implied.
3.0 PROJECT SUYIMARY
Information concerning the subject property was obtained from site inspections conducted by Lisa Demmon of
Five Guys Excavating.This section provides a sampling methodology and a brief discussion of Five Guys
Excavating's assessment results.Supporting documentation provided within the survey report includes
material summary tables and the Appendices section that includes the staff certification and laboratory
analysis reports with chain-of-custody documentation.
3.1 ASBESTOS SURVEY METHODOLOGY
Five Guys Excavating's asbestos survey was performed following the sampling protocol for the
renovation/demolition areas as outlined under AHERA,40 CFR 763,the Olympic Region Clean Air Agency
(ORCAA)and the State of Washington Department of Labor and Industries W AC 296-62-077.Sample
locations were chosen in a random fashion,with emphasis being placed on obtaining samples of each type of
accessible suspect material. Five Guys Enterprise's survey was conducted by Asbestos Hazard Emergency
Response Act(AHERA)accredited building inspector,an accreditation through training AHERA,29 CFR
Part 763, Lisa Demmon(Certificate Number: BI/R-NES-02-24-2023)during the asbestos inspection.Copy of
the building inspector certificate is provided in Appendix A.
Samples were collected in a non-abrasive manner by carefully removing small portions of the suspect
material with a sharp knife or other hand tool suitable to the material being sampled. Each sample was
placed in a pre-labeled plastic container immediately after collection.Sample containers were then
placed in a large re-sealable plastic bag for transportation to the laboratory.The sampling instrument was
subsequently wiped with a clean moist cloth to decontaminate the tool and prevent the potential release of
asbestos fibers or contamination of subsequent samples. Data pertinent to each sample(e.g.,date,sample
number, material description,and material condition)were recorded on a sample log sheet.The sample log
forms are kept on file at the Five Guys Excavating's office.
Asbestos bulk samples,copies of the sample log and chain-of-custody submittal sheets were
delivered to International Asbestos Testing Laboratories(iATL)in Mt. Laurel,New Jersey.iATL
participates in the National Voluntary Laboratory Accreditation Program(NVLAP)for quality control
procedures.As specified in 40 CFR Chapter I(1-1-87 edition)Part 763, Subpart F,Appendix A,each
sample was analyzed using polarized light microscopy(PLM)/dispersion staining techniques, in
accordance with U.S.EPA Method 600/M4-82-020. Detection limits for this type of analysis are
approximately one half percent(by volume). Materials containing at least one percent asbestos are considered
to be regulated asbestos-containing building materials(ACBM).
4.0 CONCLUSIONS AND RECOMMENDATIONS
Five Guys Excavating collected a total of zero(0)bulk samples from this residential home and zero(0)of the
zero(0)samples collected were found to contain a regulated level of asbestos.Asbestos abatement is not
required for these items shown in the Certificate of Analysis.
The owner should also use caution when performing demolition activities within the project areas.
Concealed materials may be encountered during the demolition project.ACBMs may be located between
walls,above ceilings, underneath floor,in pipe chases,or other inaccessible areas.A copy of the asbestos
survey document should be on site during all demolition activities.
Supporting documentation for the asbestos samples, including a copy of the laboratory analysis reports
with the chain-of-custody documents are provided in Appendix B.
TABLE
SUMMARY OF ASBESTOS SAMPLING AND ANALYTICAL RESULTS
Ay(
'Ayµ _._�R 5 p"'�f �7�. �� � _ � Y i x���� ��y� �`�` �P r f� f^ w•-,e
4-. 4,?� � "�;, '��t:.�tr�Li _ -.. :_ _....'r..�''.-4—`.�'.-�---t!1k"�3�.. �4-c t, ,# • �"
s r
�g 6
- 4
P
z s .a
t
PIP
_ S
A as
FBI
`#, F
o"S
u
Y
p
L
r
r
ti ,y J
K `w z
4
nw
ro x
V
r ■■ r w ■■ w w w w w w ■■ r w No r r w w w w w w w w ■ w w w w w w w w
a
AH.ERA
■
■
■
■
■
1
■
■ BUILDING INSPECTOR '
REFRESHER CERTIFICATE '
This is to certify that '
Lisa Demmon
` has attended and satisfactorily completed all requirements to
' maintain accreditation as an AHERA Building Inspector in
_ accordance with the Toxic Substance Control '
Act Title (Section 206) and 40 CFR 763. •
IL Accreditation No. BUR-NES-02-24-2023
■ � �'
_ - Course Date: February 24, 2023 '
Valid through-, February 4, 2024 Instructor: Mike Lawrence
■
■ NOW Environmental Services, Inc.
34004 — 9t' Avenue South, Suite # 12 ■
Federal Way, Washington 98003 ,
' (253) 927-5233
■
■
■
r w r r w r w w r w rrrr r r r r r
r r ■ r r ■ r r r ■ r ■ w r r ■ r r r ■ r r r ■r ■ ■ r ■ ■ r ■ ■ err