HomeMy WebLinkAboutTaylor Nanstad Tidelands Aquaculture - SHX Permit / Conditions - 9/12/2017 D
MASON COUNTY (360)427-9670 Shelton ext. 352
COMMUNITY SERVICES DEPARTMENT (360) 275-4467 Belfair ext. 352
Mason County Bldg. 8, 615 W.Alder Street (360)482-5269 Elma ext. 352
Shelton, WA 98584 wwwxo.mason.wams
September 12, 2017
Taylor Shellfish Farms
Att: Audrey Lamb
130 SE Lynch RD
Shelton, WA 98584
RE: Application for shellfish aquaculture on Case Inlet, Mason County.
Project Name: Nanstad Tidelands. PN: 12108-24-00120.
Dear Ms. Lamb:
This project is for the commercial intertidal culture of Manila clams and Pacific
Oysters. After review of your submitted Joint Aquatic Permit Application
(JARPA) forms that we received on August 18, 2017, Mason County concludes
that the proposed shellfish farm operation, on marine tidelands in Case Inlet, does
not constitute development under the Mason County Shoreline Master Program
and does not cause substantial interference with the normal public use of the water
(AGO 2007 No. 1). Therefore, a Substantial Development Permit is not required
nor a letter of Shoreline Exemption.
Mason County has determined that the proposed shellfish farm is consistent with
the Mason County Shoreline Master Program Policies and Use Regulations for
Aquaculture and the Shoreline Management Act. Please let me know if you have
any questions. Thank you.
Sincerely,
L
Grace Miller, Planner
DEPT OF COMMUNITY DEVELOPMENT
SWh ��1�e.c L`1 ► i7 ;----------REC Ems------
WASHINGTON STATE
Date received: AUG 18 2017
Joint Aquatic Resources Permit os�;neeg
Application (JARPA) Form' ; Agency reference : � blfly8
USE BLACK OR BLUE INK TO ENTER ANSWERS IN WHITE SPACES BELOW.
Tax Parcel#(s):
12If - Z - C701a5
Part 1—Project Identification
1. Project Name (A name for your project that you create. Examples: Smith's Dock or Seabrook Lane Development) hf eM2
Nanstad Tidelands
Part 2—Applicant
The person or organization responsible for the project. LbLeM
2a. Name (Last, First, Middle) and Organization (if applicable)
Taylor Shellfish Farms
2b. Mailing Address (Street or PO Box)
SE 130 Lynch Road
2c. City, State, Zip
Shelton, WA 98584
2d. Phone (1) 2e. Phone (2) 2f. Fax 2 . E-mail
(360) 426-6178 (360) 432-3305 (360) 427-0327 AudreyL@taylorshellfish.com
Part 3—Authorized Agent or Contact
Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b. of this
application.) hell
3a. Name (Last, First, Middle) and Organization (if applicable)
Audrey Lamb
3b. Mailing Address (Street or PO Box)
SE 130 Lynch Road
3c. City, State, Zip
Additional forms may be required for the following permits:
• If your project may qualify for Department of the Army authorization through a Regional General Permit(RGP), contact the U.S.Army Corps of
Engineers for application information(206)764-3495.
• If your project might affect species listed under the Endangered Species Act,you will need to fill out a Specific Project Information Form(SPIF)or
prepare a Biological Evaluation. Forms can be found at
http://www.nws.usace.army.mil/PublicMenu/Menu.cfm?sitename=REG&pagename=mainpage_ESA
• If you are applying for an Aquatic Resources Use Authorization you will need to fill out and submit an Application for Authorization to Use State-
Owned Aquatic Lands form to DNR,which can be found at http://www.dnr.wa.gov/Publications/aqr_use_auth_app.doc
• Not all cities and counties accept the JARPA for their local Shoreline permits. If you think you will need a Shoreline permit,contact the appropriate
city or county government to make sure they will accept the JARPA.
2To access an online JARPA form with(help]screens,go to
http://www.epermitting.wa.gov/site/alias resourcecenter/jarpa_jarpa_form/9984/jarpa_form.aspx.
For other help,contact the Governor's Office of Regulatory Assistance at 1-800-917-0043 or help@ora.wa.gov.
JARPA 2010 v1 3/30/2010 Page 1 of 14
Shelton, WA 98584
3d. Phone (1) 3e. Phone(2) 3f. Fax 3g E-mail
(360) 426-6178 (360) 432-3305 (360) 427-0327 AudreyL@taylorshelifish.com
Part 4-Property Owner(s)
Contact information for people or organizations owning the property(ies) where the project will occur. hel
❑ Same as applicant. (Skip to Part 5.)
❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.)
There are multiple property owners. Complete the section below and fill out JARPA Attachment A for
each additional property owner.
4a. Name (Last, First, Middle) and Organization (if applicable)
Laura Nanstad
4b. Mailing Address (Street or PO Box)
P.O. Box 702
4c. City, State, Zip
Grapeview, Washington 98546
4d. Phone(1) 4e. Phone (2) 4f. Fax 4 . E-mail
Part 5-Project Location(s)
Identifying information about the property or properties where the project will occur. (help]
❑ There are multiple project locations (e.g., linear projects). Complete the section below and use JARPA
Attachment B for each additional project location.
5a. Indicate the type of ownership of the property. (Check all that apply.) h[ elp]
❑ State Owned Aquatic Land (If yes or maybe, contact the Department of Natural Resources (DNR) at(360) 902-1100)
❑ Federal
❑ Other publicly owned (state, county, city, special districts like schools, ports, etc.)
❑ Tribal
X Private
51b. Street Address (Cannot be a PO Box. If there is no address, provide other location information in 5p.) h[ Alp]
121 East Jack Powell Loop
5c. City, State, Zip (If the project is not in a city or town, provide the name of the nearest city or town.) hl elp]
Grapeview, Washington 98546
5d. County hf elpl
Mason
JARPA 2010 v1 3/30/2010 Page 2 of 14
5e. Provide the section, township, and range for the project location. hf eM
'/4 Section Section Township Range
8 21 North 1 West, W.M.
5f. Provide the latitude and longitude of the project location. hf elal
• Example: 47.03922 N lat./-122.89142 W long. (NAD 83)
47.326475, -122.834028
5g. List the tax parcel number(s) for the project location. h[ elpl
• The local county assessor's office can provide this information.
12108-24-00120
5h. Contact information for all adjoining property owners. (If you need more space, use JARPA Attachment C.) h� eipl
Name Mailing Address Tax Parcel # (if known)
Kristen Corley P.O. Box 2 12108-24-00130
Grapeview, Washington 98546
Mary Dickey et al P.O. Box 546 12108-21-00090
Grapeview, Washington 98546
5i. List all wetlands on or adjacent to the project location. hf pm
None.
5j. List all waterbodies (other than wetlands) on or adjacent to the project location. hf elpl
Marine tidelands in Case Inlet
5k. Is any part of the project area within a 100-year flood plain? h[ elp]
❑ Yes X No ❑ Don't know
51. Briefly describe the vegetation and habitat conditions on the property. hL�l
JARPA 2010 v1 3/30/2010 Page 3 of 14
The project is comprised of sand substrate with little or no other habitat features. This is a
sandy/muddy beach with a private dock that will not be access for the farming activities. There
are marine mammals, birds, and invertebrates that use this area.
5m. Describe how the property is currently used. h( eM
The property is private tidelands currently used for low intensity private recreation including
beach walking and boating.
5n. Describe how the adjacent properties are currently used. hf eM
Adjacent tideland properties are in shellfish culture. Other uses include low intensity private
recreation including beach walking and boating.
So. Describe the structures (above and below ground) on the property, including their purpose(s). of eM
None
5p. Provide driving directions from the closest highway to the project location, and attach a map. nei
JARPA 2010 v1 3/30/2010 Page 4 of 14
The site is located in Case Inlet and is accessed by boat. Property is accessed by land from East Jack
Powell Loop in Grapeview.
Part 6—Project Description
6a. Summarize the overall project. You can provide more detail in 6d. hf pm
This project is for commercial intertidal culture of Manila clams and Pacific oysters. Manila clam seed is
broadcast by hand into the intertidal area that may or may not have been netted with canopy-type
netting. Harvest takes place by hand digging into sacks or mechanical harvest for pick up by boat and
trucked to processing plant. Oysters are grown in bags, longlines, near-bottom, and on bottom. Harvest
takes place by manually forking oysters into tubs for pick up and transfer. Bags are pulled and emptied
onto barge for transfer.
6b. Indicate the project category. (Check all that apply) hf e
X Commercial ❑ Residential ❑ Institutional ❑ Transportation ❑ Recreational
❑ Maintenance ❑ Environmental Enhancement
6c. Indicate the major elements of your project. (Check all that apply) [help]
X Aquaculture ❑ Culvert ❑ Float ❑ Road
❑ Bank Stabilization ❑ Dam /Weir ❑ Geotechnical Survey ❑ Scientific
❑ Boat House ❑ Dike / Levee / Jetty ❑ Land Clearing Measurement Device
❑ Boat Launch ❑ Ditch ❑ Marina / Moorage ❑ Stairs
❑ Boat Lift ❑ Dock / Pier ❑ Mining ❑ Stormwater facility
❑ Bridge ❑ Dredging ❑ Outfall Structure ❑ Swimming Pool
❑ Bulkhead ❑ Fence ❑ Piling ❑ Utility Line
❑ Buoy ❑ Ferry Terminal ❑ Retaining Wall
❑ Channel Modification ❑ Fishway (upland)
❑ Other:
6d. Describe how you plan to construct each project element checked in 6c. Include specific construction
methods and equipment to be used. hLeM
• Identify where each element will occur in relation to the nearest waterbody.
• Indicate which activities are within the 100-year flood plain.
JARPA 2010 v1 3/30/2010 Page 5 of 14
Oysters are grown in bags, longlines, near-bottom, and on bottom. Harvest takes place by manually
forking oysters in to tubs for pick up and transfer. Bags are pulled and emptied onto barge for transfer.
Hatchery seed is used.
Oysters grown on bottom are harvested manually be forking oysters into tubs for pick up and transfer.
Oysters grown in bags are harvested by emptying oysters onto barges or scows and then transported to
trucks. Bags are reused. Oysters grown on longlines are harvested manually pulling the lines and
placing on scows and barges for transport to processing docks. Oysters grown in near-bottom will be
grown in a variety of ways including bags attached to lines with floats.
Manila clam seed is broadcast by hand into the intertidal area that may or may not have been netted with
canopy-type netting. Harvest takes place by hand digging into sacks for pick up by boat.
Littleneck and butter clams are harvested incidentally when Manila clams are harvested.
6e. What are the start and end dates for project construction? (month/year) h� elpl
• If the project will be constructed in phases or stages, use JARPA Attachment D to list the start and end dates of each phase or
stage.
Start date: Upon permit approval End date: On-going ❑ See JARPA Attachment D
6f. Describe the purpose of the project and why you want or need to perform it. LtLeM
Commercial cultivation of shellfish for human consumption.
6g. Fair market value of the project, including materials, labor, machine rentals, etc. h� eM
Greater than statutory limits for Shoreline Substantial Development Permit
6h. Will any portion of the project receive federal funding? hf eM
e If yes, list each agency providing funds.
❑ Yes X No ❑ Don't know
Part 7—Wetlands: Impacts and Mitigation
❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area.
(If there are none, skip to Part 8.) h( eld
7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. h( eM
❑ Not applicable
JARPA 2010 v1 3/30/2010 Page 6 of 14
7b. Will the project impact wetlands? hf gid
❑ Yes ❑ No ❑ Don't know
7c. Will the project impact wetland buffers? hf eM
❑ Yes ❑ No ❑ Don't know
7d. Has a wetland delineation report been prepared? hf eM
• If yes, submit the report, including data sheets,with the JARPA package.
❑ Yes ❑ No
7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating
System? hf e
• If yes, submit the wetland rating forms and figures with the JARPA package.
❑ Yes ❑ No ❑ Don't know
7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? hf eM
• If yes, submit the plan with the JARPA package and answer 7g.
• If No, or Not applicable, explain below why a mitigation plan should not be required.
❑ Yes ❑ No ❑ Not applicable
7g. Summarize what the mitigation plan is meant to accomplish, and describe how a watershed approach was
used to design the plan. h( eld
7h. Use the table below to list the type and rating of each wetland impacted; the extent and duration of the
impact; and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a
similar table, you can state (below) where we can find this information in the plan. h( M
JARPA 2010 v1 3/30/2010 Page 7 of 14
Activity (fill, Wetland Wetland Impact Duration Proposed Wetland
drain, excavate, Name' type and area (sq. of impact3 mitigation mitigation area
flood, etc.) rating ft. or type' (sq. ft. or
category2 Acres) acres)
If no official name for the wetland exists,create a unique name(such as"Wetland 1"). The name should be consistent with other project documents,such
as a wetland delineation report.
2 Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System. Provide the wetland
rating forms with the JARPA package.
3 Indicate the days,months or years the wetland will be measurably impacted by the activity. Enter"permanent"if applicable.
`Creation (C), Re-establishment/Rehabilitation(R), Enhancement(E), Preservation (P), Mitigation Bank/In-lieu fee(B)
Page number(s) for similar information in the mitigation plan, if available:
7i. For all filling activities identified in 7h., describe the source and nature of the fill material, the amount in cubic
yards that will be used, and how and where it will be placed into the wetland. nL elpl
7j. For all excavating activities identified in 7h., describe the excavation method, type and amount of material in
cubic yards you will remove, and where the material will be disposed. h(
Part 8—Waterbodies (other than wetlands): Impacts and Mitigation
In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) hf eM
X Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.)
8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment.
b2_1121
❑ Not applicable
JARPA 2010 v1 3/30/2010 Page 8 of 14
Shellfish aquaculture has been considered a beneficial use of the shoreline area by providing three-
dimensional structure, water quality enhancement, eutrophication moderation and facilitation of
benthic-pelagic coupling of nutrients. Shellfish culture requires a healthy marine ecosystem to be
successful.
Taylor Shellfish employs Environmental Codes of Practice to ensure all activities meet environmental
standards.
8b. Will your project impact a waterbody or the area around a waterbody? hf eM
X Yes ❑ No Minimal and localized impacts may occur, including positive impacts.
8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland
waterbodies? h( eM
• If yes, submit the plan with the JARPA package and answer 8d.
• If No,or Not applicable,explain below why a mitigation plan should not be required.
❑ Yes ❑ No X Not applicable
8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was
used to design the plan.
• If you already completed 7g., you do not need to restate your answer here. hf elpl
NA.
8e. Summarize impact(s) to each waterbody in the table below. Lgipj
Activity (clear, Waterbody Impact Duration of Amount of material Area (sq. ft. or
dredge, fill, pile name' location impact3 to be placed in or linear ft.) of
drive, etc.) removed from waterbody
waterbody directly affected
Minimal and Case Inlet Marine Temporary Approximately
localized tidelands effects O.IZacres
effects from during
activities may short
occur. Positive periods
effects may
also occur.
JARPA 2010 v1 3/30/2010 Page 9 of 14
If no official name for the waterbody exists, create a unique name(such as"Stream 1")The name should be consistent with other documents provided.
z Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent, provide the distance between the impact and the waterbody and
indicate whether the impact will occur within the 100-year flood plain.
3 Indicate the days, months or years the waterbody will be measurably impacted by the work. Enter"permanent"if applicable.
BE For all activities identified in 8e., describe the source and nature of the fill material, amount (in cubic yards)
you will use, and how and where it will be placed into the waterbody. of pid
8g. For all excavating or dredging activities identified in 8e., describe the method for excavating or dredging,
type and amount of material you will remove, and where the material will be disposed. n( eM
NA.
Part 9—Additional Information
JARPA 2010 v1 3/30/2010 Page 10 of 14
Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of
this section as you can. It is ok if you cannot answer a question.
9a. If you have already worked with any government agencies on this project, list them below. hf eM
Agency Name Contact Name Phone Most Recent
Date of Contact
9b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 on the Washington Department of
Ecology's 303(d) List? hf elf
• If yes, list the parameter(s) below.
• If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at:
httr)://www.ecV.wa.gov/programs/Wq/303d/.
® Yes ❑ No
Fecal coliform, others unknown
9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? hf elpJ
• Go to http://cfpub.epa.gov/surf/locate/index.cfm to help identify the HUC.
17110019
9d. What Water Resource Inventory Area Number (WRIA#) is the project in? hf eM
• Go to http://www.ecy.wa.gov/services/gis/maps/wria/wria.htm to find the WRIA#.
WRIA 14
9e. Will the in-water construction work comply with the State of Washington water quality standards for
turbidity? hL eM
• Go to http://www.ecy.wa.qov/programs/wg/swgs/criteria.htmi for the standards.
X Yes ❑ No ❑ Not applicable
9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline
environment designation? h[ elo
• If you don't know, contact the local planning department.
• For more information, go to: http://www.ecy.wa.gov/programs/sea/sma/laws rules/173-26/211 designations.html.
X Rural ❑ Urban ❑ Natural X Aquatic ® Conservancy ® Other Unsure
9g. What is the Washington Department of Natural Resources Water Type? h[ eM
• Go to http://www.dnr.wa.qov/BusinessPermits/Topics/ForestPracticesApplications/Pages/fp watertypinq.aspx for the Forest
Practices Water Typing System.
X Shoreline ❑ Fish ❑ Non-Fish Perennial ❑ Non-Fish Seasonal
JARPA 2010 v1 3/30/2010 Page 11 of 14
9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater
manual? h[ M
• If no, provide the name of the manual your project is designed to meet.
❑ Yes ❑ No NA.
Name of manual:
9i. If you know what the property was used for in the past, describe below. hf elpl
9j. Has a cultural resource (archaeological) survey been performed on the project area? h[ elp
• If yes, attach it to your JARPA package.
❑ Yes ❑ No Unknown.
9k. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project
area or might be affected by the proposed work. hkM
See listings from US Fish and Wildlife Service and NOAA Fisheries in addition to the following:
hftp://www.nmfs.noaa.gov/pr/pdfs/species/esa—table.pdf
http://ecos.fws.gov/tess_publ is/pub/stateListingindivid ual.jsp?state=WA&status=listed
See Programmatic Biological Assessment, Shellfish Activities in Washington State Inland Marine
Waters, U.S. Army Corps of Engineers Regulatory Program, October 2015. Programmatic Biological
Opinion, National Marine Fisheries Service, September 2015. Programmatic Biological Opinion for
Shellfish Activities in Washington State Marine Inland Waters, U.S. Fish and Wildlife Service, August
2016.
91. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and
Species List that might be affected by the proposed work. hf M
See link for county-specific listings: http:/Iwdfw.wa.gov/conservation/phs/list/
Part 10—SEPA Compliance and Permits
Use the resources and checklist below to identify the permits you are applying for.
• Online Project Questionnaire at http://apps.ecy.wa.gov/opas/.
• Governor's Office of Regulatory Assistance at (800) 917-0043 or help(0-).ora.wa.gov.
• For a list of agency addresses to send your application, click on the "where to send your completed
JARPK at http://www.epermitting.wa.gov.
JARPA 2010 v1 3/30/2010 Page 12 of 14
10a. Compliance with the State Environmental Policy Act (SEPA). (Check all that apply.) h[ elpl
• For more information about SEPA, go to www.ecy.wa.gov/programs/sea/sepa/e-review.htmi.
❑ A copy of the SEPA determination or letter of exemption is included with this application.
❑ I am applying for a Fish Habitat Enhancement Exemption. (Check the box below in 10b.) hel
❑ This project is exempt (choose type of exemption below).
❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt?
❑ Other:
❑ SEPA is pre-empted by federal law.
10b. Indicate the permits you are applying for. (Check all that apply.) h! elpl
LOCAL GOVERNMENT
Local Government Shoreline permits:
❑ Substantial Development ❑ Conditional Use ❑ Variance
❑ Shoreline Exemption Type (explain):
Other city/county permits:
❑ Floodplain Development Permit ❑ Critical Areas Ordinance
STATE GOVERNMENT
Washington Department of Fish and Wildlife:
❑ Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption
Washington Department of Ecology:
X Section 401 Water Quality Certification
Washington Department of Natural Resources:
❑ Aquatic Resources Use Authorization
FEDERAL GOVERNMENT
United States Department of the Army permits (U.S. Army Corps of Engineers):
X Section 404 (discharges into waters of the U.S.) X Section 10 (work in navigable waters)
United States Coast Guard permits:
❑ General Bridge Act Permit ❑ Private Aids to Navigation (for non-bridge projects)
Part 11—Authorizing Signatures
Signatures are required before submitting the JARPA package. The JARPA package includes the JARPA form,
project plans, photos, etc. hf e!d
11 a. Applicant Signature (required) h( eel i
JARPA 2010 v1 3/30/2010 Page 13 of 14
certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work
only after I have received all necessary permits.
hereby authors the agent named in Part 3 of this application to act on my behalf in matters related to this
application. (initial)
By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the
permitting agencies enteri, the property where the project is located to inspect the project site or any work
related to the project. L (initial)
/�d cev h
Applicant Printeh Name Applicant 0nature Date
11 b. Authorized Agent Signature hf go
certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work
only after all necessary permits have been issued.
Avvck" l,n V4 'I", I,
-,-
Authorized Agent Printed Name Authorized 6jent Signature Date
11 c. Property Owner Signature (if not applicant). hf eM
Not required if project is on existing rights-of-way or easements.
I consent to the permitting agencies entering the property where the project is located to inspect the project site
or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the
landowner.
Property Owner Printed Name Property Owner Signature Date
18 U.S.0§1001 provides that:Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly
falsifies, conceals, or covers up by any trick, scheme, or device a material fact or makes any false,fictitious, or fraudulent statements or
representations or makes or uses any false writing or document knowing same to contain any false,fictitious, or fraudulent statement or
entry, shall be fined not more than$10,000 or imprisoned not more than 5 years or both.
If you require this document in another format, contact The Governors Office of Regulatory Assistance(ORA). People with hearing loss
can call 711 for Washington Relay Service. People with a speech disability can call (877) 833-6341.
ORA publication number: ENV-019-09
DARPA 2010 v1 3/30/2010 Page 14 of 14
11 c. Property Owner Signature(if not applicant). n( elal
Not required if project is on existing rights-of-way or easements.
I consent to the permitting agencies entering the property where the project is located to inspect the project site
or any work. These inspections shall occur at reasonable times and, if practical,with prior notice to the
landowner.
roperty Owner Printed Name Property Owner Sigriature bate
18 U_S.0§1001 provides that Whoever,in any manner within the jurisdiction of any department or agency of the United States knowingly
falsifies,conceals,or covers up by any trick,scheme,or device a material fact or makes any false,fictitious,or fraudulent statements or
representations or makes or uses any false writing or document knowing same to contain any false,fictitious,or fraudulent statement or
entry,shall be fined not more than$10,000 or imprisoned not more than 5 years or both.
If you require this document in another format,contact The Govemor's Office of Regulatory Assistance(ORA).People with hearing loss
can call 711 for Washington Relay Service.People with a speech disability can call(877)833-6341_
ORA publication number: ENV-019-09
i
JARPA 2010 v1 3/30/2010 Page 15 of 16
SeaTas
.;irRac� YBSt'.n>z Island
htr.ocs;.n? — r r»s
t
P,ra•
Po*Jai^n Ta;i 3a —
` ---
co�k�rnw,.A Gig k3rbor
� ilaikMS — gg.
f ,
Tacoma
f zrar P t , ve.m q, Fife
iiar'Sf•nP!$fiifll� ace
Y PuyaFDA
--waan i.akewood
t 5GR P3rkiwd '�"
tsiand• r
j 7c*an -aria'
N 3md
'avoG} GtiP•xi Spanaway
8e t
Rdrt:iL.37v Elk P'ax sham
Go �E Gi = sDia fir.;- = Skm = Map,Report a map error
tii::n.:zl.a
REFERENCE: r LOCATION: 5I +tk 15l1- PROPOSED PROJECT
APPLICANT:kgor LAT/LONG: r�`` �
ADJACENT PROPERTY �� si%xq-jC '27 IN: VAS n
l IG�S+tn Co COUNTY: W�w
2. (kG vIC &k' STATE:Wa3�{n�/1
3. 4
4. PAGE�OF 3 DATE 41-30 114
O/JWGV 1 I
Mason County Map
I I
i
ry
##i
i
Y
0 E JACK POWEU L"_
i
1
{
1
DISCLAMffiR AND LIMITATION OF LIAB[Lr1Y_
The data used to make this map have been tested for accuracy,and every effort has been made LEGEND
to ensure that these data are timely.accurate and reliable.However,Mason County makes no
guarantee or warranty to its accuracy as to labeling,dimensions,or placement or location of
any map features contained herein.The boundaries depicted by these data are approximate,
and are not necessarily accurate to surveying or engineering standards,and are intended for
informational purposes only.Mason County does not assume any legs]liability or
responsibility arising from the use of this map in a manner not intended by Mason County.In z 4
no event shall Mason County be liable for direct,indirect,incidental,consequential.special, .t
as Iola
benefits arising from use of or reliance on the information contained herein 1 77
C 2009-Mason County GIS _
f�11 _l00 W P"hh'Wn kl 1lr P .`r S c.,,t_• p„_...
Reference Number:
Applicant Name: T'N1W S4 ZAr
Proposed Project:�#Avw '
C.�Location: , I,
Sheet,f 3 Date: W
i
ao data(c)9m-?r nni..�,n... .-'- - - ................�......
�-l�• 3�.G5��� -t2 z.�`I 133
- � zz. �3�Z��
Reference Number:
Applicant Name:"Ca tw 5►-�b�h h
Proposed Project: �0aNyivN
Location:c ��4
Sheet�f 3 Date: