Loading...
HomeMy WebLinkAboutRock Bulkhead - BLD Engineering / Geo-tech Reports - 7/25/2008 • RECEIVED JUL .3-0 2008 426 W: CEDAR STI Rock Bulkhead Design and Calculations July 25, 2008 Job Number: BayMarine.Baker.BH ' Permit Number: Cti Bld 2007 01229 37 Prepared By: GeoResources LLC. 5007 Pacific Highway East, Suite 20 Fife, WA 98424 (253) 896-1011 phone EXPIRES 10 131 / p Si I (253) 896-2633 fax W. Glen Coad, PE Principal Prepared For: Site Address: Ms. Mary Baker 80 East Fair Harbor Lane 80 East Fair Harbor Lane Grapeview, WA Grapeview, WA P/N 1210JB3100050 c/o. i<ZI a S=3 i a ovs0 Bay Marine Contractors, Inc Attn: Dan Foss Contents TO BE KEPT IN THE Calculations............................................... .../'1RCEL FIL.. ...................................................2 SitePlan ........................................................................................................................................................4 CrossSection ................................................................................................................................................5 ~ Baker—Bulkhead Replacement July 25,2008 Page 2 of 5 Calculations Notes: 1) See attached cross section for project description 2) All calculations are per lineal foot of Bulkhead Assumptions: Density of rock (p): 170 pcf Porosity of Bulkhead(n): 25% Equivalent Fluid Pressure of Backfill (y): 35 pcf Coefficient of friction for rock to silty sand, DM-7, Table 10-1 (p): 0.5 Dimensions: T T= 2.Ofeet B= 2.5 feet H = Max Exposed Height=4.0 feet 7.V G ' Calculate Weights: T H' = H + 1.5 W1 = T* H'()D* (1 —n)) = t,403 ►bs � 1 W2 = (B —T) *H' *2* (P* (1 —n)) \Ilb Total = 1157H ib; A e Baker-Bulkhead Replacement July 25, 2008 Page 3 of 5 Resistance to Overturning: �MA = W1 * (2+ (B - T) I + W2 *3* (B - T) MA - Z, 1(3 -Ft • i bs Overturning Moment: Equivalent fluid pressure= y=35 pcf 1 Fi =2*H2 *Y ZeD i b s H H M'A = Fi * 3 /F, M A= 3-74 Factor of Safety for Overturning: A MA = MIA =5.f> ? 2.5 • o.k. H'Eq FP Calculate Sliding Resistance: Sliding force= F'R = F, = 2''b ibs Resistance to Sliding (neglecting passive pressure): Total Weight=W,+W2 = i s-7H 16% Friction Force = FR = Wcocal *µ = "7 69 16S Factor of Safety for Sliding: FR =F, =Zf3 >- 1.5 :• o.k. R c- PARCR #121053100050 SEC05-T21N-ROlWW.M. a 3.00ACRES ro a) CASE IN= 0 r-, 0 OD APPROX.42'OF REPLACEMENT. a EXISTING FAILING WOOD BULKHEAD ADJOINING WOOD TO BE REMOVED EMS TING CONCRETE FROM THE SITE. r CD BULllalEAD SLIUlliEADTOREMAIN. (D EXISTING VEGETATION AND TREES TO REMAIN. APPROX 7TOF ADDno ON BULKHEAD REPLACEMENT ANDADDITION SECTIONS SHALL BE CONSTRUCTED OF LARGE ANGULAR ROCK LANDMRD OF THE EXISTING NOADMNING ANDADJOINING BULKHEAD 8uL*lEAn- eO BLUFF CREST AND THE TOE OF THE SLOPE AT BEACH, QUARRY SPALLS AND FILTER FABRIC SHALL BE USED BEHIND THE NEW ,of BUIJI(HEAD SECTIONS, GUEST APPROK PH-pg: PROPERTY CR E--S D-E-NIC E TO GRAPLMILENVI-004-RD Q::� BULKHEAD PROPOSAL MOJECT MVE: BAKER RESDENCE NORTH DRAMM SCALE: nLf--- SFINWRAKER MARY BAKER BY, KLsaw PROJECTAI)ORESS: 30 E FAIR HARBOR LN 0 GRAPEEVIEW,WA ALL SME DTZ-W(M.AM IIA-M lLcqg 1, ROCK SIZES TO BE DETERMINED BASED ON WAVE ENERGY AND EXPOSURE. 1 3/4 OR GREATER 2' (min) 1 III= � moo IIIII ,I 1 OR GREATER -1 I II I� EXISTING NATIVE CUT SLOPE E o 0 12" MIN O Uj ALL LOC 1= QUARRY SPACES 0 II (12" MIN) GEOTEXTILE FABRIC FINISH I I; GRADE ),, --� \ �II� LO IIIIII _,� PLACE ROCK ON FIRM UNDISTURBED SOILS 2.5' (min) OR CONCRETE BASE SKETCH NO: PROJECT NAME: PROJECT NO: BY: DATE: Baker Residence BM.Baker DCB 7/25/2008 CONSTRUCTION FIELD SKETCH: GeoResources, LLC BULKHEAD 5007 Pacific Hwy. E,•Suite 20 PHONE: (253896-1011 80 E Fair Harbor Lane Fife, WA 98424 FAX: (253;896-2633 Garpeview, WA G E O-T 1=C I--I N I C A I Baymadne.Baker.BH.dwg 25 Jul 2008 — 10:03 am danab