Loading...
HomeMy WebLinkAboutPAR2014-00023 - PAR Application - 4/11/2014 PAR 20114 - 6 •Z DATE - 11-Za i&A PRE-APPLICATION CONFERENCE REQUEST FORM The purpose of the pre-submission conference is to identify and/or eliminate as many potential problems as possible in order for the project to be processed without delay. Representatives for the Fire Marshal's Office, Building Department, Environmental Health, Planning, and Public Works Departments may attend the meeting to discuss rules and regulations applicable to the proposed project. Topics covered during the meeting will include the comprehensive plan, shoreline program, zoning, availability of sewer and potable water, development concepts, building construction, fire protection and life safety concerns of the proposed project. The pre-submission conference will be most informative when you provide accurate and detailed information on the Pre-Application Conference Application Form and the site plan.Applications will be accepted when all information is received and deemed complete. Pre-Application Conferences are held every Wednesday and last up to one hour. To schedule a meeting complete the applications and return with 10 copies of the detailed site plan, by 3:00 PM on the Wednesday two weeks prior to the proposed meeting. 1.Pre-Application/Dept. of Community Dev. 2. Environmental Health 426 W Cedar Street/PO Box 279 415 N 5 b /PO Box 1666 Shelton, WA 98584 Shelton, WA 98584 360.427.9670 ext. 352 360.427.9670 ext. 400 Check amount: $255.00 Check amount: $150.00 BOTH CHECKS MADE PAYABLE: MASON COUNTY TREASURER Applicant: Site Plan Name: Jsgjrl, LLC, Scott Griffin Submit 6 copies Mailing Address: 6820 - 20th Street, Suite A , Fife, WA 98424 Include the.following information Daytime Telephone: (253) 896-1300 Fax: 21 Indicate Scale and North Arrow Email address: 3 Property line dimensions,easements, and right-of-ways. Representative: Name: Hatton Godat Pantier, Jeff S. Pantier, PLS The location proposed all existing and structures.Include square Mailing Address: 3910 Martin Way E, Suite B, Olympia, WA 98506 footage of existing and proposed structures. Daytime Telephone: (360) 943-1599 Fax (360) 357-6299 ® Setback distance,in feet from all Email address: jeffp@hattonpantier.com property lines and structures. Parcel Number: (I2 digits) 4200 - 2750 - 0040 La Existing and proposed road access to and from the site. Description of Project: EX Include: 1) Square footage of structure,2)Use of building and rooms(i.e., Parking sites office,warehouse,restaurant,storage,etc), 3)Occupancy classification per 0 Location of on-site sewage tanks and drainfields. IBC, Section 302.1,and construction type.4)Provide two sets of plans,if 0 Location of drinking water supply. available. Use separate sheet if necessary Include location on the proposed site and surrounding parcels. Attached Narrative. 21 Steep bluffs,wetlands,streams,and bodies of water M Location of fire hydrants and emergency vehicle access roads, including grade. EX Surface and storm water run-off routes. 1 Has the project been discussed during a previous Pre-Application Conference: If yes, please indicate date. No. Will the building have employees?If yes, how many? Approximately 45 (Total) What is the water availability of the proposed project?If there is an existing well, what is the name of the system? Yes. Pine Acres Water System. What is planned for the on-site sewage system?If you are proposing a new on-site system provide detail on the required site plan. Yes. on-site septic systems will be provided. ADDITIONAL INFORMATION: APPLICABLE BUILDING CODES 2012 International Building Code/2009 International Residential Code 2012 International Fire Code-ANSI Al 17 2012 International Mechanical Code—WAC 51-42 2012 Uniform Plumbing Code—WAC 51-56/51-47 2012 International Energy Cons.Code/Washington State Energy Code—WAC 51-11C&51-11R Mason County Ordinance Title 14 Code changes are on a 3 year cycle; effective in July of that particular year. Date of Conference: A I I to,ZO i t4 Time of Conference: q;30 -AM Location of Conference: 426 West Cedar street,Shelton Planner: /'"r14C.� ext. .,3uo t NARRATIVE SUMMARY Pine Acres Marijuana Production and Processing Facility The proposed project will be completed in phases with a total of 15 buildings. Each building will be 4,800 square feet in size and will be used for production and processing of marijuana. Each building will require 3 employees, retail sales will not occur on-site; therefore parking for visitors will be minimal. The existing Pine Acres Water System will be used for water supply to the project and on-site septic systems will be installed for each building. Approximately 61 parking stalls will be provided for the completed project. E:\office\JOBS\2014\14-029 Pine Acres Way Marijuana Processing Facility\NARRATIVE SUMMARY-04.09.14.doc 4 AF __—___-____—__—__— W PINE ACRES WAY -—-—- - -—-—-—-— to 20 o, (D STORM --------------� / r--------i I I I I I I I I I I I I � I I I o I I I I i I I N z O SEPTIC DRAIN g2-7 AREA� @VILDINS5 2-2-] $ J O � � 0 n�Y ,1 � E o Z SEPl1G GRAINFIELD AREA � � � O BVILDIN651�-IS I V' y r------------ O I I I I ax L O � � z s �i 60' m N A ti 8 to a� S di - u 6 1 A i ~ A -1� 'z r b Nqtj o "o m /J�/ Z Ill 02 a OD An Z = w 3P N v _ m Id A,..Ct'.n � N 2 UJ `" � to � y y 6; 8.Do;!f� D ID, > o m � N WmD { Z � m 00 T � D �y A