Loading...
HomeMy WebLinkAboutPAR2014-00066 - PAR Application - 9/24/2014 R1z-J1/y PAR2QJ DATE PRE-APPLICATION CONFERENCE REQUEST FORM The purpose of the pre-submission conference is to identify and/or eliminate as many potential problems as possible in order for the project to be processed without delay. Representatives for the Fire Marshal's Office, Building Department, Environmental Health, Planning, and Public Works Departments may attend the meeting to discuss rules and regulations applicable to the proposed project. Topics covered during the meeting will include the comprehensive plan, shoreline program, zoning, availability of sewer and potable water, development concepts, building construction, fire protection and life safety concerns of the proposed project. The pre-submission conference will be most informative when you provide accurate and detailed information on the Pre-Application Conference Application Form and the site plan.Applications will be accepted when all information is received and deemed complete. Pre-Application Conferences are held every Wednesday and last up to one hour. To schedule a meeting complete the applications and return with 6 copies of the detailed site plan, by 3:00 PM on the Wednesday two weeks prior to the proposed meeting. 1. Pre-Application/Dept. of Community Dev. 2. Environmental Health 426 W Cedar Street 415 N 5th /PO Box 1666 Shelton,WA 98584 Shelton,WA 98584 360.427.9670 ext. 352 360.427.9670 ext.400 Check amount: $255.00 Check amount: $100.00 BOTH CHECKS MADE PAYABLE: MASON COUNTY TREASURER Applicant: �^ 2,40 L L� )o I Site Plan Name: PAUL VAUGHN /( �x v� 1 / _- Submit 6 copies Mailing Address: 7989 EAST BARSAY LN, PORT ORCHARD, WA 98366 Include the following information Daytime Telephone: 253.278.0277 Fax: 360.491.5296 0 Indicate Scale and North Arrow Email address: pevaughn@hotmail.com Property line dimensions,easements, and right-of-ways. Representative: Name: MIKE DRENNON,KAUFMAN CONSTRUCTION&DEVELOPMENT ❑✓ The location proposed all existing and structures.Include square Mailing Address: 7711 MARTIN WAY E, OLYMPIA,WA 98516 footage of existing and proposed structures. Daytime Telephone: 360.491.5230 Fax: 360.491.5296 kaufmancd.com ✓❑ Setback distance,in feet from all miked@kaufmancd.com address: °� property lines and structures. Parcel Number: (12 digits) 420027500040 ✓0 Existing and proposed road access to and from the site. Description of Project: Include: 1) Square footage of structure,2)Use of building and rooms(i.e., ✓❑ Parking sites office,warehouse,restaurant, storage, etc),3)Occupancy classification per ✓0 Location of on-site sewage tanks and drainfields. IBC, Section 302.1, and construction type. 4)Provide two sets of plans, if ❑✓ Location of drinking water supply. available.Use separate sheet if necessary EXISTING BUILDING IS 6,380 SF Include location on the proposed site THE BUILDING TO BE USED FOR PRODUCTION AND PROCESSING OF and surrounding parcels. MARIJUANA. THE ROOMS USES ARE AS NOTED ON THE FLOOR PLAN. ✓� Steep bluffs,wetlands,streams,and bodies of water THE OCCUPANCY OF THE BUILDING IS U(AGRICULTURE)AND F-1(PROCESSING OF MARIJUANA PLANTS). THE EXISTING BUILDING IS A PRE-ENGINEERED Location y fire hydrants and emergency vehicle access roads, METAL BUILDING WITH METAL SIDING AND METAL ROOF, TYPE IIB including grade. CONSTRUCTION. ✓71 Surface and storm water run-off routes. a ` Has the project been discussed during a previous Pre-Application Conference: If yes,please indicate=date. r , NO Will the building have employees?If yes, how many? 8 What is the water availability of the proposed project? If there is an existing well, what is the name of the system? H & R WATER WORKS INC. PO BOX 3, EAST OLYMPIA, WA 98540-0003 What is planned for the on-site sewage system?If you are proposing a new on-site system provide detail on the required site plan. EXISTING SEPTIC SYSTEM TO REMAIN AND BE USED, SEE ATTACHED AS-BUILT ADDITIONAL INFORMATION: pAIZ do l y- eji, t o00 Fk19 90N-000a3 Af :Se..ftC d PAR 9oly- r 4'l,cs a solr�wM l y-t- 10p2442 o4� ' /'�l�i' AJ oo -"-,a ram- 47"- . Ad-,ve- �v -� cam/ ��v �-+��✓ '�" Lau iva, -tb 1-6 575° l u-, a acd_ APPLICABLE BUILDING CODES 2012 International Building Code/2009 International Residential Code 2012 International Fire Code-ANSI A117 2012 International Mechanical Code—WAC 51-42 D 2012 Uniform Plumbing Code—WAC 51-56/51-47 y�N 2012 International Energy Cons.Code/Washington State Energy Code—WAC 51-I IC&51-11R Mason County Ordinance Title 14 Code changes are on a 3 year cycle;effective in July of that particular year. Date of Conference: 12,Lf Time of Conference: i Location of Conference: 426 West Cedar Street,Shelton Planner: ext. 61 PRE-SUBMISSION MEETING FOR WEDNESDAY, SEPTEMBER 24, 2014 PAR2014-00065 p APPLICANT: PURE MAGIC LLC MEETING DATE AND TIME: SEPT. 24, 2014 9:15/9:30-10:30 AM PARCEL NUMBER: 31909-76-00020 SITE ADDRESS: 150 SE HIDDEN SPRINGS RD, SHELTON �o l PROJECT DESCRIPTION: I502 PRODUCER& PROCESSOR LOCATION: 426 W CEDAR ST. SHELTON BLD III PLANNER: GRACE MILLER EXT. 360 PUBLIC HEALTH STAFF: CINDY WAITE EXT. 353 PAR2014-00066 APPLICANT: PAUL VAUGHN/ROOT WORKS MEETING DATE AND TIME: SEPT. 24, 2014 10:45/11:00-12:00 AM PARCEL NUMBER: 42002-75-00040 SITE ADDRESS: 190 W PINE ACRES WAY, SHELTON PROJECT DESCRIPTION: I502 PRODUCTION & PROCESSING LOCATION: 426 W CEDAR ST. BLD III PLANNER: GRACE MILLER EXT. 360 PUBLIC HEALTH STAFF: CINDY WAITE EXT. 353 ® MASON COUNTY (360)427-9670 Shelton ext.352 CO DEPARTMENT OF COMMUNITY DEVELOPMENT (360) 275-4467 Belfair ext. 352 BUILDING•PLANNING• FIRE MARSHAL (360)482-5269 Elma ext. 352 Mason County Bldg 8, 615 West Alder Street rhsr Shelton, WA 98584 www.co.masonma.us RE: Pre-Submission Conference PAR2015-00029 Parcel Number: 42002-24-90040/90050 Dear Applicant, Please find enclosed a computer-generated report summarizing the results of your pre-submission conference on 9/2/2015 if you have questions regarding the summary report, please do not hesitate to call the appropriate staff member. The various staff members, the departments they represent and their telephone extensions are listed below: DEPARTMENT STAFF MEMBER EXTENTSION INITIALS Fire Inspector/Comm. Dev. Jeromy Hicks 282 JNH Building/Comm. Dev. Trish Woolett - TW Environ. Health Spec./Public Health Alex Paysse 279 ALP Eng. Tech/Public Works Fred Perryman 625 FJP Planner/Comm. Dev. Grace Miller 360 GBM Planner/Comm. Dev. Rebecca Hersha 287 RDH Planner/Comm. Dev. Kell McAboy 365 KJM Planner/Comm. Dev Michael MacSems 571 MMS Stormwater Eng./Public Works Loretta Swanson 769 LGS The comments are based on the project discussed during the pre-submission conference. Any changes or alterations to the original proposal may significantly change the permit requirements. In this case a second pre-submission conference will most likely be required to discuss the changes. Information provided to the prospective applicant during the pre-submission conference is based on Mason County regulations in effect at the time of the conference. Revised or new regulations could affect a future development application. A pre-submission conference does not vest a future development application. If further assistance is needed please contact us at 360.427.9670 ext. 352 or www.co.mason.wa.us. O—k• Crl � 7c' .O � � A � N �-. co � .� p• -cci D �, O O O O � O pO O. cp in' � � •`S 'ti• � 'G CD co -e co 0 5 co CDCD CL CD R' coo W PO CD CD CD c CD o Q o io' R y -1 a o o q `00 o ° CD m O CD x a Z � � < o -1G) qQ Mil go o ° n o0 0\0 000 Z co CD CD �• c � a- � o 0 o G7 O oc Q cn s Cnp Cl) C) co Z � d p0 o D rn sw ° o "r ^° Q o w tr A tip d =:c c°o D x Z as w " � o' CD =° ,Ar Y..CD CD° ti F3 O .D 00 ... CD p CL CL CDCD Y CD oo a w O O � g = a z z z z wCD (D CD w C7 p.• co � � aCL x I'DCD N o � v�c� p o � ;Aa z O coo cr ° a co ° CD r ° o a CD p G7 O � w p D' C, ¢ c o O a o p CD 00 R UQ O O O CD co N TI C� 0 CD co `G• � `7 CD � cs Vi c� CL Cl) C ° CD O CD aQ m r � 'Fm bo r �//- v� � C '3 � p. � b -� b � 0Q 'o -� 'dy 'a 'o pj cam•. P'+ O w (D CRD (D p 'O — a QO o a w = w X ° = x �' CD CD o 0 0 o o c t? N y CD '* o i o00 `° oo `° o `° ° CD o �y aQ c y .� N n? v v n '' m !� v» CD p Et ur `< ;, :Q (D G. O O .7 n CD n UQ - E a � O �• i-y .*, ry .� i-y TS O v, v� r CD CD � - CDaoao�cxq � �' Z5' coffin o o � 00 CD CD R A� n C O CD O �_.'O S �. > (D S y CD m n " O rOii p� •B R ° (D CD �< G. Q' (D ° O A� .-� p� G. fD' t(Di 'O S alp p. ° t3 'C3 ,^�.' G < X O• '•'• ' v' O O O CD CD CD R° iy 0) CDX : 'F O CY b ^� O p CD C -aQ CD '3 O `D W CD b d uo oo 0 0 B :� W 'C N < O aOQ cSD 'B w p, o' °O aQ G. CDCD N Cn'a 9 ° ill " o ° c ° o �' O CD �, ° 0 G) CD CDriq aCD MX ��' o UQ �3 00 A� cam•. • `C3 �^. _ rn CD N N Q' •� ',�' � fD � y vivi D G G �.. cr a' E� aQ S J S (D aQ ri W O Z A O A w a�Q O0 c P o 0 o Tn G) �• p G �. aQ Q" Ct CCDD O. 6' P1 C v�i Rl go n o �' oo Z CA tQ CD y A, = rn Ll. O N Z 0 CD CD CD CD 7 CD S S O O p' n (D CD(OD O O G. a' Z aQ O (~D O n S Y CCD dQ 1[.J CD CD CD CDA� p `O R" 'ten C W CD CL CD c < ° w ° CD ao o �. c D CD C-D CD N O cD f aQ w �• o' ° cn N .C.. naQ : (IQ 0 N o CDe-r < ` CD CD aQ = a P a o o o N �+ D .p ... 5' Ul CD voQ a CD ° �' c o w -� O O IP-p-� (D ciQ CD w E CD 'd o b ° w z W O �O S ss o.w CD n CD cn CDrn r oCD ? G7 CD CD en" CD CD CD a CD O D3. n CD p� �" ^ "�' O CD ;• S CD m CD N x_ O c m oCD C:i CZ D' w D o o C) c Tl n CD co 't aQ E x N ao 0 0 CD w a CD < G7 � .cs a. � o- aD D O C7 0 0 aQCD w o o x w O n., O CD CD 0 (D CD '7 "O"' cam•. ° 'C x J O 7 _ CD n S S p CD CD CD ao C G) `° ? K n (n (D J CD CD aQ N CD O 'O a = y Cnq � .•ACT .- :5 -n 3- - R a Y � a o w CDo CD CD � �ro c r v� z �vtntn CDv � o ,mow RCD C'" co w o + aY3 x `* w o ° O ° Y tZ ° a k o ° aQ cro . ° o o I'D ° ¢ o a ° ° O i Y o a w = a co t Y u B Y M n• v' n V N r v, X •c_ M.O CA w CD .fl C'D Y w CD g - CD " csCD ° w� o d a g. �• a o- ~� o ° f r ° CD Y w w w Z CD CD CD CD ° = o a �° S' m c w � - a vOi O "CD do r CD S fn O 'O aQ Qy •`n o. °•• '3" O bQ w V) * cn CD Cc N w rn Y o a' CD aQ w .� CD o = 0 PD CD pi O K � " "O N ¢. O 0 O w w CD y 0 < _ Cn CD O -a. CD C. `� CD CAD a ° v CD a 0. ^_ = 'D CD m ~ 0 n • rn CD m < w• p' A `O a °° ° aQ"PD 7c CD w c c m CD `o Q w C°. cDo Cc a co o C7 " CD a CD W c �CDD � � Cl, � CD Q 0 aQ C w � o a � o co w CD � Z `; ¢ w w w o CD 0CDc w �. a. x ( o. w mGo o a w t go ID `n�° W o c o CD a ° a° UQ aoc m CD n CD n C].. aQ O << ° aQ '�3' cr w r� maw Z0 CD „n„ OUQ .w.r (D ° 'w-• (�D a CD v, m o' (n a ° A o co a < w oo (n ° w o a o' o o aQ a O pr (DD c w 3 a ,* a°Q ° °n a cCDD o y dCD 1� " (,CD ro °, CD CD OW CD w v o �• a CD w w Can w o cc o o H a s C7 n C"DCo CD CD C° n cD CD CD a a w- Z 00 aQ c C. w o v- o z n CD N ("D CD aq O O C CD A r Cn O y� CD v C '�• CCD ,•s O Q Oy F"y O CD " O� CD CD w < �" O 6' n3 'C3 CD c c0D is p 0 �p O •a o CD CD CD CDw ac m O O o CD w •w•t aQQ A N crD o co < < CyyD w o = W `'< w y •O•e < (D C1. �' CD CD f) C^y n M .^t`. C7. � o C EoaQ t. pa ° CR ° a°o �' w c Cn w CD caD CD 0 CD CD oC' CD ° cCDD TI CD r' CDCD CD C w CD 0 CD 0 ° p CI CD x CD CD CD < 'O' °, W o w CD "CD CD O w m CD k b �' p "` Z' .O O CD r"ti CD K w CD K 'CS CD CD Cl. ,.,, �• CD o - ao XJ Cr1 CD K w. a. CD °° -n o CD o a o o a a aQ < O w CD CD CD CL CD CD N N• CD (DIn. D•CD C �y p CS. 6 p� CD Cp cu b C o E o�• o ti !F as o CD C' a -0 o o a > a " RD Cl CD o D a o cxc O �d CD n o o � w o co -t CD CD rn W0 `= < KR o D o w to o -p tD � c�• � o o• � o Is � � 'd � x = pJ CD CD c w ' o t3 CO a ° o �.� R o m r. aI'D w o m < O _ c ° o � =s oa O 54 EL CD Ca. 00 CD o � � CD n0 7 CDa C� oCD CD E� n z Q° NCD n n Q'• a aa � CD n cr a, C� o x a o w p o 0 oC_n ' LL o O Z co c C/) CDRL CD w CD uo CD o Y q c CD —�i CD o o' C� a: a co CD r 0 ft f CD 'd o CD CD oc S 9 D a < o ID a Z b f� cr N C P o w CD O O O cC T3 CD =° CD cn �• �O O v� co o CD _ d CDrl CD CD O o P O O o T co CD G) CDN w o c CD W f3' CD a A O Cn c � • � O Cn iD ((D D � � CD �• v w CD v CD �o� coy MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Mason County Bldg. III, 426 West Cedar Street - Shelton, WA 98584 1854 www.co.mason.wa.us (360)427-9670 Belfair(360)275-4467 Elma(360)482-5269 MASON COUNTY PRE-SUBMISSION CONFERENCE NOTES • BUILDING DEPARTMENT REPRESENTATIVE: Rich Balderston (360)427-9670 x 285 E-Mail: rbalderston@co.mason.wa.us • DATE: September 2, 2015 • PROJECT/ PROJECT TRACKING NUMBER: PAR2015-00029 • PROJECT REPRESENTATIVE (S): James Vanhoute DESCRIPTION & SIZE OF PROJECT/OCCUPANCY CLASSIFICATION & USE: proposing 5 buildings 1-502, primary occupancy classification F-1, buildings will require separate building permits Complete building permit applications will include the following information that is applicable to the project:: • SETBACKS TO PROPERTY LINES: Provide a site plan, drawn to scale. Clearly identify all structures, including fences, fuel tanks and other similar items, with setback dimensions on site the plan. • DISTANCES TO OTHER STRUCTURES: Site plan, drawn to scale shall clearly identify distances, where required include fire-resistive details, including continuity, &tested assembly details. • FIRE RESISTANCE FOR EXTERIOR WALLS: When applicable include fire-resistive details, including continuity, &tested assembly details. • IDENTIFY TYPE OF CONSTRUCTION & PROVIDE ALLOWABLE AREA CALCULATIONS WHERE NEEDED. See Chapter 5, IBC. Type VB construction includes structures constructed with combustible construction such as wood framed structures. Type II construction includes steel structures constructed ENTIRELY by non-combustible construction. 2 complete copies of building plans and calculations are required for submittal • FIRE-RESISTIVE RATED CONSTRUCTION &TYPE OF CONSTRUCTION : Metal buildings, plans not submitted, assumed to be type II construction. Where required demonstrate compliance. Identify the location of the assembly, compliance to continuity requirements and construction details: EXTERIOR WALL(IBC704), FIRE WALL(IBC705), FIRE BARRIER(IBC706), SHAFT ENCLOSURES (IBC 707), FIRE PARTITIONS(IBC 708), SMOKE BARRIERS(IBC 709), SMOKE PARTITIONS(IBC 710), HORIZONTAL ASSEMBLIES(IBC 711), PENETRATIONS(IBC 712), FIRE-RESISTANT JOINT SYSTEMS(IBC 713), FIRE-RESISTANCE RATING OF STRUCTUURAL MEMBERS(IBC 714), OPENING PROTECTION(IBC 715), DUCT&AIR TRANSFER OPENINGS(IBC 716), CONCEALED SPACES(IBC 717), ETC, • NUMBER OF EXITS REQUIRED/OCCUPANT LOAD:(IBC 1004): Table 1004 is used to determine occupant load used to evaluate the structure for exiting purposes, plumbing fixture requirements, and other code related concerns. Include design calculations, demonstrating how occupant loads were calculated, on building plans. table 1004.1.2 provided • EXIT PLAN: Clearly identify the exit path and exit signage on construction plans. clearly show exit path and compliance to IBC chapter 10 • ENGINEERING REQUIRED: Structures that do not comply with prescriptive specifications of the 2012 International Code (IBC)shall be designed in accordance with Chapter 16 of the IBC. Referencing Washington State RCW 18.08.410 - Structures 4000 sq. ft or more shall have all plan pages reviewed and stamped by a Washington State licensed design professional. The review shall include a code evaluation addressing life-safety, plumbing & mechanical evaluation, and structural analysis. (ref. RCW 18.08.410) ALL PLAN PAGES SHALL BE STAMPED AND SIGNED BY THE DESIGN PROFESSIONAL, including plumbing and mechanical pages. engineering will be required for all proposed buildings, see design criteria • ACCESSIBILITY REQUIRED: YES, include compliance information including design calculations demonstrating compliance to Chapter 11 and details demonstrating compliance to ANSI 117.1 in effect at the time of submittal. Include information demonstrating compliance for restrooms, employee work areas, parking spaces, accessibility to structure, drinking fountain, signage, etc. When required verify that building plans contain compliance information. • PLUMBING SYSTEMS (Chapter 29 Washington Amendment to IBC): Using IBC Chapter 10, determine occupant load. The number of plumbing fixtures is determined based upon the occupant load. Plumbing fixtures need not be provided for unoccupied buildings. Permitted building shall comply. On plans, include design calculations for the following: water closets (M/F), Lavatories, Drinking Fountains, etc. • Referencing IBC/WAC 2902.2 separate plumbing fixtures shall be required for each sex, except when the calculated occupancy load is 15 or less, then unisex fixtures shall be allowed. To calculate the number of fixtures and referencing Table 2902.1 the following fixtures shall be required: Offices: 1 water closet per 25 for the first 50 and 1 per 50 for the remainder exceeding 50. 1 lavatory per 40 for the first 80. Storage(S1&S2): 1 water closet per 100 and 1 lavatory per 100. Plumbing fixture count can be for the entire facility, including all structures)for compliance purposes. Provide design calculations demonstrating how the fixture count was determined on construction plans. • NON-RESIDENTIAL ENERGY CODE: ALL enclosed spaces require Non-Residential Energy Conservation Code (IECC/WSEC). Provide completed compliance forms (envelope & mechanical). Forms are available at: http://www.neec.net/resources/resources.html • LIGHTING: All non-residential structures shall comply with IECC/WSEC lighting requirements. Complete compliance forms and provide a lighting plan that includes switching locations. WSEC forms and information can be accessed at: http://www.neec.net/resources/resources.html. In addition your local utility may have an incentive program, designed to help you lower energy consumption. To discuss incentive opportunities contact the Energy Services Department at PUD3 by calling (360)426-0777 or PUD1 at(360) 877-5249. • Ventilation and Indoor Air Quality Code compliance: Provide calculations when required. • COMMERCIAL KITCHEN: Show compliance to Chapter 5 of the International Mechanical Code when a kitchen is included in the project. • GEOTECH REPORT REQUIRED? YES / NO (Refer to planning requirements) • OIL SEPARATOR: REQUIRED when vehicle repair work is performed. Identify location and provide construction details. • PROVIDE A SPACE FOR STORAGE OF RECYCLED MATERIAL & SOLID WASTE (WAC51-50-009): Identify the location. • SPECIAL INSPECTION: Referencing IBC Chapter 17, Section 1704.1.1. Statement of special inspections prepared by registered design professional in responsible charge. Complete a Special Inspection authorization form. Special Inspection Authorization form provided • INTERIOR FINISHES: Include information demonstrating compliance to Interior finishes required in IBC Chapter 8. • STORAGE SPACES: Identify material stored, anticipated quantities, height, and if hazardous, include MSDS sheets for each product. • STORAGE RACKS greater than 5'9" shall be permitted either with the proposed project or separate building permit. Where required documents shall include design information demonstrating stability for seismic conditions. Special inspection may be necessary, reference IBC Section 1707.6 and 1705.3 (4.5), storage racks, provide compliance information. • MECHANICAL EQUIPMENT: Identify the location and type of mechanical equipment located within, and outside the structure. Address foundation and support systems for equipment. Where new equipment will be placed on site provide UL listing information and/or construction details stamped by a Washington State licensed design professional. Where applicable include duct information and duct support compliance information. • FIRE MARSHAL REQUIREMENTS: Carefully review Fire Marshal comments requirements including fire protection requirements and identify compliance information on the proposed building plans. Show the location of fire extinguishers and identify type. Fire apparatus access standards provided • SPRINKLER SYSTEM: Verify that design calculations include additional load attributed to required fire sprinkler system. Commercial fire flow worksheet provided • SUSPENDED CEILING SYSTEMS: Provide details and specifications relating to suspended ceilings where applicable. Details shall be designed and approved for seismic loading in accordance to IBC Chapter 16. Where required designate special inspection plan. • OTHER: PERMITS REQUIRED FOR PROJECT o BUILDING o PLUMBING/ MECHANICAL o GRADING PERMIT (When greater than 200 cubic yards) ❑ CHANGE OF USE o FIRE SUPPRESSION, where required. See Fire Marshal comments o SIGN z FENCE (Greater than 7'0" above grade) Ll ADDITIONAL NOTES: WHEN YOU ARE READY, SUBMIT FOUR(4 SITE PLANS, DRAWN TO SCALE ALONG WITH THREE (3) COMPLETE SETS OF BUILDING PLANS INCLUDING THE FOLLOWING. (NOTE,ALL PLAN PAGES SHALL BE STAMPED BY THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHEN THE STRUCTURE EXCEEDS 4000 SQ. FT.): • CONSTRUCTION PLANS, drawn to scale. Include floor plan, elevations, cross section, cross section, construction details, etc. • MECHANICAL PLAN, • PLUMBING PLAN AND • NON-RESIDENTIAL ENERGY CODE/VENTILATION & INDOOR AIR QUALITY CODE INFORMATION. • DEFERRED SUBMITTAL WILL NOT BE ACCEPTED. • A PLAN REVIEW FEE WILL BE COLLECTED WHEN THE BUILDING PERMIT IS SUBMITTED. VALUATIONS ARE BASED UPON THE MOST RECENT BUILDING STANDARDS VALUATION DATA RECOMMENDATIONS AND THE PERMIT FEE WILL BE DETERMINED BASED UPON TABLE 1-A OF THE 1997 UBC. DESIGN CRITERIA: SEISMIC ZONE: D2 WIND SPEED: 85 MPH basic 110 ultimate, Exp B (Unless proven otherwise) GROUND SNOW LOAD: 25 psf REFERENCE CODE EDITIONS: Effective July 1, 2013 2012 INTERNATIONAL BUILDING CODE(IBC), INCLUDING APPENDIX CHAPTERS C, E AND H, EXCLUDING H106; SECTIONS 101 THROUGH 107, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL,AND EXCLUDING APPENDIX CHAPTERS A, B, D, F, G, I, J AND KAND;ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51- 50,AND THE 2012 INTERNATIONAL EXISTING BUILDING CODE. 2012 UNIFORM PLUMBING CODE(UPC), PUBLISHED BY THE INTERNATIONAL ASSN. OF PLUMBING AND MECHANICAL OFFICIALS(IAPMO)AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-56 AND WAC 51-57, EXCLUDING SECTIONS 102.4 AND CHAPTERS 12, 15,AND 16, PART I. 2012 INTERNATIONAL MECHANICAL CODE(IMC), PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, AND THE 2009 INTERNATIONAL FUEL GAS CODE AS ADOPTED THROUGH THE WASHINGTON STATE BUILDING CODE WAC 51-52. 2012 INTERNATIONAL FIRE CODE, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, EXCLUDING APPENDIX A, D, AND K AND ADOPTING APPENDICES B,C,E,F, G AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51- 54. 2012 INTERNATIONAL ENERGY CONSERVATION CODE(IECC), AS AMENDED BY WASHINGTON STATE BUILDING CODE WAC 51-11 To view the Mason County Building and Construction Code and adopted amendments go to the Mason County website at: www.co.mason.wa.us. , ROOTWORX, LLC Operational Plan for ROOTWORX, LLC 190 West Pine Acres Way8584 Shelton, WA. Purpose/Product: We will grow and package cannabis flower for I-502 retailers. Facility—General The building is 6,250 square feet. Initially,we will build two "grow"rooms and put plasma grow lights in them giving us 1,750 feet of canopy. With 1,750 feet of canopy we will grow approximately 648 cannabis plants. When the two rooms are running,we will have one employee plus the two owners working primarily during the day on week days. Additionally, someone will be at the facility to water plants on most Saturdays and Sundays. We might periodically work evenings or nights during the harvest weeks or other times as needed. A rough layout with the lighting plan is attached. Facility Security The building will be inspected by the Washington State Liquor Board(WSLB)to ensure we comply with 1-502 regulations. The security system will have cameras covering every door and the 20 feet approaching the door and the doors will be alarmed. Additionally, a surveillance system inside the facility will monitor all employee activities. All employees must be 21 years of age and will pass a strict WSLB background check before being hired. Facility—Lighting Standard indoor grow operations utilize Metal Halide and High Pressure Sodium grow lights. The HID lights work well to grow plants but they come with 2 problems: 1. They consume a lot of power. The 1000w lights also need a ballast so they actually consume 1080 watts each. They also generate a lot of heat. As a general rule, it takes 330 watts of cooling to support each 1000 watt HID bulb 2. The HID bulbs have mercury in them and must be recycled properly. We have researched and/or tested several brands of LED lights, induction lights and plasma lights in an attempt to reduce our environmental footprint and to reduce our operational costs. We have selected a plasma light by Rocket Plasma. The plasma light by Rocket addresses both of the issues found with HID lighting. T . ` 1. Power Consumption: The Rocket Plasma reduces our power requirements by 68%. We will use 3 each 230 watt bulbs for a total of 690 watts to replace 2 each of the 1080 watt HID bulbs consuming 2160 watts. 690/2160 =32% 2. Disposal and the environment: The plasma bulb is only about 1"long and Rocket Plasma has a free recycling program for their customers. When we purchase new bulbs, we will ship the old bulbs back to the company and they will recycle them. Facility—Water The facility is a zero discharge facility. It has no drains in the grow rooms and we will water plants directly, not with broad sprinklers. The pots for the plants will be in saucers to capture any excess water. With the HPS lights we anticipated peak water usage would be approximately 350 gallons per day. The reduced heat from the plasma lights greatly reduces water lost through evaporation. Our initial tests indicate we'll only use about 250 gallons per day. Facility—Air Due to the low wattage lighting system, we will be able to air condition our rooms with a 68% less BTU's than if we were running HID bulbs. The grow rooms will be kept at 78 degrees while the lights are on and 68 degrees while the lights are off. CO2 will be added to aid in plant growth. Most of the time, the air in the room will be recycled, not vented. When we do exhaust the air, it will be at 18' above the ground and approximately 300' from the nearest residence. If odors are a nuisance at that or other residences, we will add carbon activated filters on the exhaust fans. Growing: o We will clone plants from existing"mothers" and grow them for 2 weeks. They take very little space. 400 clones fit in a 4'x4' area lit by one plasma light. o Clones will be transplanted into organic amended soil. The plants are then in vegetative state. They will grow for about 3 - 4 weeks in the vegetative room with 18 hours of light per day. There will be 16 plants under each light. o During vegetative state the plants will be treated with the organic miticides ■ Neem Oil ■ Azamax ■ SNS 217 o During vegetative state, natural fungicides may be applied ■ Sierra natural sciences SNS 244C ■ Physan 20 o After 3- 4 weeks,the plants will be moved to a flower room with 9 under each light o Plants will grow in the flower room for about 8 weeks depending on the phenotype. 9 plants will be place under each light. o During both vegetative and flower state, organic nutrients will be added. They will be stored on shelves along the North wall of the building. The nutrients are listed below with the volume in the containers and the quantity of containers that will be stored. 0 Clonex. 2 ea. 1 quart bottles o Fox Farms Big Bloom. 2 ea, 5 gallons. o Fox Farms Tiger Bloom. 2 ea 5 gallons. o Fox Farms Grow Big. 2 ea 5 gallons. o Fox Farms Beastie Bloom Bulker 2 ea, 2 lb cans. o Fox Farms Cha-Ching Resin Builder. 2 ea, 2 lb cans. o General Hydroponics Cal-Mag Plus. 2 ea 5 gallons o Humboldt Crystal Burst Resin Builder. 2 ea. 2.5 gallons o Humboldt Snow Storm Ultra Trichomes Builder. 2 ea. 2.5 gallons o Humboldt G-10 Flower Hardener. 2 ea 5 gallons Harvesting o Typically all the plants in a flower room will be harvested at about the same time. This will be 25 —551bs. o The stalk of the plant will be cut near the soil. The flowers/colas will be cut off the stem and put into a feeder of a mechanical trimmer. o The mechanical trimmer removes the leaves and chops them into small pieces. The trimmer waste will either be sold to other processes or will be processed as waste. o The stems themselves will be fed through an electric chipper. o The shredded stems and other waste will be mixed with shredded cardboard or other items approved by the WSLB. The waste will be bagged and taken to the land fill. Curing o The trimmed flower will be put in screened trays and placed in one of the curing closets. Curing closets will be locked. Curing will take 3 —20 days. o After curing the product will either be packaged or bagged in 1 lb bags and stored in a safe. Testing Every batch of product will be tested for potency and for microbial. Testing will be done by one of the WSLB certified labs. Packaging o Dried and cured flowers will be packaged in foil envelopes ranging from 1 gram to 28.3 grams per package. The foil envelopes will be heat sealed and packed in boxes. The boxes will be placed in shipping quarantine for 1 day then delivered to I-502 retailers. Some product will be packed in boxes and stored in a safe until sold. ! ! « � | � � \ � � § } 20w � � I < � 3 ( \% �3 } \ EE ! \ {, � ƒ \ \ \ ƒ\ , ! ] ■ � i ■ ■ ■ /\ ) § » ■ ■ ■ | ■ o � .} ~ � � # ■ ■ ■ . . _ � � � ■ ■ ■ ■ ■ ■ E \ \\ \ | ug : = � § • # ■ � � ■ ■ , } ` � � \ } „ / � ■ ■ � ■ � CL � ■ ■ ■� ■ ■ ■ ! R i 1 ■ ■ ■ ¢! § \ - � � � ■ 1 ■ 1 ■ � \ ■ ■ ■ ■ ■ ■ � � !� i � ■ � 1 � � / �� f . N00 o o p a op o c o y o a o � b o ClO n ° o 0 0 v' o 00 oo cU o o o 0 0 cc C O U m y z a� >. U oA p U � O W � � O dp Q U O p .SC N p .•O. OJ U � L' CIO 3 � y 00 o � r z Con Q 0 Q Q .2 N O U - o O U Cl. o •° O o � O G O � z zo z � z z U z O o 0 o a o m " " O o a� O O O ao CD c3 O °p cd p O O O O o O O CDa� O y�j O O O N O I� Q O `O � M y p .� M M cd O GJ Cf' Vl W � N t � z s� N .. Q. N N 0 o � N > ;WJ N N N N N N d p N N d' U Q' y on C� c D Q >cz to a N `° .o " a c oL l bju � Q? 12Lto o oov � � w b o w .� O O U O N O Z O p O o o c 3 0 3 o Q o o �.' N W N N M w Ncz Z N T N tt cz ct U O ct a o ni o t1 3 c4 P. � cu ID 0 0 CIO C) aj xcz od al a s ❑ O O O ai O O ' O O d a 2 � d c a Cl a Q a Q a c c Q N i w Cq y Q e ;- A ,7 U �_ N N � � � E ! ti � •� N In O � O Cal V U im. y A C7 C7 0 � o cz `d o •� s Cd -O � C7 E •c .� a .fl a- � -ac n c O Z U .O- bD L A L ` Q Q � � � d o .n � q Q •c c � U CIO o bb > Cd bA M --0 "' c -oCd O d c M cxo '� w ° c0• w Q chi O,7 U bA cc y 3 ° coOb O ai U V A d 8 Ed y �o E on y U m 3 .N m ca, a � � d• H � a� - o d � a� o ;.a � � � o � w o cdd N c cc cd c U °onto Cd cc Cd p 3 A O N •� ..d Ci. d 20- cwob one ' " d 3 0 > y CIOy T ° d �= 3 a > Cd 3 Tao a w o, Cd > ^ s ai a cz Ca� o n ° ° > 3 3 c m o ° m a°�i .� v v o ^o o °� o a�i U s E s 3 `� CZ cc o o °°' c Cd ° o Up�' o O ^ o 3 3 ou a a OQ, e 0 0. S° o Q o c�c a�i pQ, s W cn R, ° ..........:..::...i cC '.1, H s. E•" U Z C. Gt.. d F-. t.'" N m 7 v-1 N � d 3 U W w o 0 — o0 Q � N isa a p 0 0 3 � 3 w C N � 0 O O Q ' a O O O U h�l d• M€ O U CD v rl Q N ti N i M 'O rn U on V _ � cn u., a � � z y *- U O p bq c d ,n N c M z3 3oz a o z U a M � o `° M 3 '� 'C,2 .a H b 2ON o co o w Q L) e v d M A O Ogo ¢ QQ � Cj � y bio Ln3 � w � 3 �zx � o O� p. �. w ❑ o d W un . Q z t � O c U ��€ N 00 .O d C O a� i W z 0 0 Q bA M � N �+ O a �• o � w' N K' 00 oo 0 Op rq a � -- _ o y N � � N � � w � O O � y0„ O N w Cc N •P. 3 b cUC13 N L O O n U w C]. r Y cztL rq o on f� > CZ3 00 L L y o '- Ma. au N d N > v N c 0 w CIA 0. •_ U 3 N o a s c w " cCd � CID y o .L '� w~ o -o � � on to pp' Q y Q o fl a o o Q U U E-� d r; cv ai er vi v t� o0 of -- •-- •- ,-; Page 1 of 1 Barbara Adkins - Re: map error From: Nicole Burgess TO BE KEPT To: Adkins, Barbara THE Date: 7/24/2014 3:29 PM PARCEL FILE Subject: Re: map error Sure, We will do it today and the changes will appear on the website by Friday Aug. 1. ql f?l 1I/i( Nicole MICopy(- eVex� >>> On 7/24/2014 at 3:08 PM, <Barba rA@co.mason.wa.us> wrote: Nicole - Back in 2008 we had been made aware of a map error during the creation of the Shelton Urban Growth Area zoning regulations process. Parcel number 420027500040, 190 W Pine Acres was given a "mixed use" zone when it should have been given "industrial". We told the property owner it would be fixed and then promptly forgot about it. So, now it has come up again and it needs to be remedied. Can you fix it please? Barbara A.Adkins,AICP, Director Department of Community Development 426 West Cedar Street Shelton,WA 98584 360/427-9670 ext.286 Email: BarbarA@co.mason.wa.us