HomeMy WebLinkAboutBLD2013-00415 Cancelled Reroof - BLD Permit / Conditions - 6/6/2013 Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone. (360)427-9670, ext. 352
Mason County Bldg. III 426 W. Cedar P.O. Box 279
Shelton, WA 98584
too
RESIDENTIAL BUILDING PERMIT BLD2013-00415
OWNER: RICHARD CHILDS
CONTRACTOR: THE ROOF DOCTOR (360)427-8611 LICENSE: ROOFDI*168N8 EXP.- 5/10/2015 RECEIVED: 6/6/2013
ISSUED: 6/6/2013
SITEADDRESS: 577 E POINTES DR WEST SHELTON
EXPIRES: 12/6/2013
PARCEL NUMBE%iiiij,21195300151,
LEGAL DESCRIPTION: HARTSTENE POINTE#4 LOT: 151
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
RE-ROOF HARSTENE POINTE
General Information Construction &Occupancy Informatiol ISquare Footage Information
No. of Bedrooms: Type of Constr.:
Type of Use: SF Insp.Area: No. of Bathrooms: Occ. Group. Lo S Deck:
Type of Work: RR Fire D' t.: 5 No. of Stories: Lo g:
Valuation: Building Height: (Oo
cc. tat s: Prim Basement:
Manufactured Home Inforliation Se ack nfor ation Shoreline& Planning Information
Make: Length: Ft. (Fro t: Ft. S Ine: Ft. Water Body:
Rea � Ft. Slope: Ft. SEPA?:
Model: Width: Ft. de Ft. Shoreline Desig.:
Year: Serial No.: de Ft. Comp. Plan Desig.:
Plumbing Fixtures Mechanical Fixtures FEES
Type Type Qty. Type By Date Amount Receipt
Building State Fee TW 6/6/2013 $4.50 S2201300000001
Re-Roof Fee TW 6/6/2013 $ 117.50 S2201300000001
Total $ 122.00
BLD2013-00415 Please refer to the following pages for conditions of this permit. Page 1 of 4
g) Un-vented roof assemblies are approved provided installation conforms with the Washington State Amendment to the International Building Code, Section
1203.2 and the International Residential Code, Section R806.4
In addition Mason County shall require proof that manufacturer specifications for the roofing material verifying that the manufacturer's warranty is
approved for an un-vented attic assembly. Minimum required R-Values shall be maintained as required by the applicable energy code.
If spray foam insulation is proposed Mason County shall require a site inspection, review of proposed material, and approval of the application prior to
installation. Provide manufacturer specifications and identify the certified installer for review and approval.
WSEC Section 502.1.6.3 Roof/Ceilings: Roof/ceiling assemblies where the ventilation space above the insulation is less than an average of 12 inches
shall be provided with a vapor retarder. Faced batt insulation where used as a vapor retarder shall be face stapled. Single rafter joist vaulted ceiling
cavities shall be of sufficient depth to allow a minimum one-inch vented air space above the insulation.
EXCEPTION: Un-vented attic assemblies (spaces between the ceiling joists of the top story and the roof rafters) shall be permitted if all the following
conditions are met:
1. The un-vented attic space is completely contained within the building thermal envelope.
2. No interior vapor retarders are installed on the ceiling side (attic floor) of the un-vented attic
assembly.
3. Where wood shingles or shakes are used, a minimum 1/4 inch (6 mm)vented air space
separates the shingles or shakes and the roofing underlayment above the structural sheathing.
4. Any air-impermeable insulation shall be a vapor retarder, or shall have a vapor retarder
coating or covering in direct contact with the underside of the insulation.
5. Either Items a, b or c shall be met, depending on the air permeability of the insulation directly
under the structural roof sheathing.
a. Air-impermeable insulation only. Insulation shall be applied in direct contact to the underside
of the structural roof sheathing.
b. Air-permeable insulation only. In addition to the air-permeable insulation installed directly below the structural sheathing, R-10 rigid board or R-10 sheet
insulation shall be installed directly above the structural roof sheathing for condensation control.
c. Air-imper eable and air-permeable insulation. Minimum R-10 air-impermeable insulation shall be applied in direct contact to the underside of the
structural r sheathing for condensation control. The air-permeable insulation shall be installed directly under the impermeable insulation.
X
9) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a fin i spection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason County lordinances and building regulations.
x n VV ---
10) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period no a eeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder have prevente n from being taken. No more than one extension may be granted.
io
X V-1-
BLD2013-00415 Please refer to the following pages for conditions of this permit. Page 3 of 4
CASE NOTES FOR
BLD2013-00415
CONDITIONS FOR
BLD2013-00415
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800-61 7-09.82. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X
2) Owner/Agei t i responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28.
X
3) Single rafter joist roof r la ern all be insulated to a minimum of R-38 allowing for a minimum of one-inch continuous vented airspace above the
level of insulation. X -
4) Existing r09f deck shall be insulated to a minimum of R-38 if: The roof is un-insulated or existing insulation is removed to the level of the sheathing, OR All
insulatiA i the roof/ceiling was previously installed exterior to the sheathing or non-existent.
X
5) WIND LOADS - Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind speed for Mason County is 85
MPH.
X C�
6) REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the
manufacturer' i stallation instructions.
X
7) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. cupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
permit revocation.
X
BLD2013-00415 Please refer to the following pages for conditions of this permit. Page 2 of 4
This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any
time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be
occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate
and grants employees Mason County access to the above described property and structure for review and inspection.
OWNER OR AGENT: O� � DATE:
BLD2013-00415 Please refer to the following pages for conditions of this permit. Page 4 of 4
o CONCRETE MECHANICAL MANUFACTURED HOME n
2
CD Footings
By r
w Footings!Setbacks Gas Piping Ribbons 0
o Intenor Date By Interior-Date By Date By
Exterw Date BY Exterior-Date Set-up X
INSULATION n
Point Load!isolated Footings Date By
BG 1 SLAB INSULATION - - -
Date By Date By FIRE DEPARTMENT ;>J
Foundation Walls Floors Date By 0
Date By Date By DECKS
FRAMING walls Date By
Date By Data By PROPANE TANKS
PLUMBING vault Date By
Date By OTHER
Groundwork Attic
Date By Type-
Date By Data By
D.w.v DRYWALL Type-
Int.Brace Wall Date ;
T Date By Data BY ____ ._ r
CDFINAL INSPECTION
N
y Water Line Firs Saperation N
m Date By Date By Data By
m W
g Pass or Request Inspect. c
s Type of Insp. Fail Date Date Done By Comments
CD
o v,
0
f0
N
CD
fD
V1
O
n
O
7
a
o'
rn
0
(A
a
m
3
N
CD
0
MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
_ Mason County Bldg. III, 426 West Cedar Street
— PO Box 186, Shelton, WA 98584
1854 www.co.masonma.us (360)427-9670 Belfair(360)275-4467 Elma (360)482-5269
NON-STRUCTURAL RE-ROOF APPLICATION
Roof Slope: _ �c
Old Roof Material: C +Z.Nj�1
New Roofing Material: b'sr) C i_��71-\
Sheathing. ;
Underlayment:
Existing Insulation:_
h
New Insulation:
Use of Structure(s) - (i.e. garage, dwelling, etc.):
`Roof Slope: IRC section R904.1
Roof slope must be indicated to ensure selected roof covering is allowed on designed pitch.
Roof Covering IRC section R905
Selected roof covering must be installed in accordance with manufacturer's specifications and IRC
requirements.
Insulation: WSEC 101.3.2.5 exception 2a & 2b
Existing roofs shall be insulated to the requirements of this Code if:
a) The roof is not insulated or insulation is removed to the level of the sheathing or,
b) All insulation in the roof/ceiling was previously installed exterior to the sheathing or non-existent.
Attic Ventilation: IRC section 806
Enclosed attic and rafter area shall be supplied with cross-ventilation.The net area shall not be less than 1/150
of the area of the space to be ventilated. If 50% and not more than 80% of the ventilating area is provided
from the upper portion of the space to be ventilated, then 1/300 is allowed.
Applicant/Owner: ; 1 C c<<cA lt �� S Contractor.
Parcel No �- — �3 - 4O Permit No.:
Signature: (Z"_, Date:
DCDBuilding re-roof application (revised 7.2012)