Loading...
HomeMy WebLinkAboutBLD2013-00415 Cancelled Reroof - BLD Permit / Conditions - 6/6/2013 Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone. (360)427-9670, ext. 352 Mason County Bldg. III 426 W. Cedar P.O. Box 279 Shelton, WA 98584 too RESIDENTIAL BUILDING PERMIT BLD2013-00415 OWNER: RICHARD CHILDS CONTRACTOR: THE ROOF DOCTOR (360)427-8611 LICENSE: ROOFDI*168N8 EXP.- 5/10/2015 RECEIVED: 6/6/2013 ISSUED: 6/6/2013 SITEADDRESS: 577 E POINTES DR WEST SHELTON EXPIRES: 12/6/2013 PARCEL NUMBE%iiiij,21195300151, LEGAL DESCRIPTION: HARTSTENE POINTE#4 LOT: 151 PROJECT DESCRIPTION: DIRECTIONS TO SITE: RE-ROOF HARSTENE POINTE General Information Construction &Occupancy Informatiol ISquare Footage Information No. of Bedrooms: Type of Constr.: Type of Use: SF Insp.Area: No. of Bathrooms: Occ. Group. Lo S Deck: Type of Work: RR Fire D' t.: 5 No. of Stories: Lo g: Valuation: Building Height: (Oo cc. tat s: Prim Basement: Manufactured Home Inforliation Se ack nfor ation Shoreline& Planning Information Make: Length: Ft. (Fro t: Ft. S Ine: Ft. Water Body: Rea � Ft. Slope: Ft. SEPA?: Model: Width: Ft. de Ft. Shoreline Desig.: Year: Serial No.: de Ft. Comp. Plan Desig.: Plumbing Fixtures Mechanical Fixtures FEES Type Type Qty. Type By Date Amount Receipt Building State Fee TW 6/6/2013 $4.50 S2201300000001 Re-Roof Fee TW 6/6/2013 $ 117.50 S2201300000001 Total $ 122.00 BLD2013-00415 Please refer to the following pages for conditions of this permit. Page 1 of 4 g) Un-vented roof assemblies are approved provided installation conforms with the Washington State Amendment to the International Building Code, Section 1203.2 and the International Residential Code, Section R806.4 In addition Mason County shall require proof that manufacturer specifications for the roofing material verifying that the manufacturer's warranty is approved for an un-vented attic assembly. Minimum required R-Values shall be maintained as required by the applicable energy code. If spray foam insulation is proposed Mason County shall require a site inspection, review of proposed material, and approval of the application prior to installation. Provide manufacturer specifications and identify the certified installer for review and approval. WSEC Section 502.1.6.3 Roof/Ceilings: Roof/ceiling assemblies where the ventilation space above the insulation is less than an average of 12 inches shall be provided with a vapor retarder. Faced batt insulation where used as a vapor retarder shall be face stapled. Single rafter joist vaulted ceiling cavities shall be of sufficient depth to allow a minimum one-inch vented air space above the insulation. EXCEPTION: Un-vented attic assemblies (spaces between the ceiling joists of the top story and the roof rafters) shall be permitted if all the following conditions are met: 1. The un-vented attic space is completely contained within the building thermal envelope. 2. No interior vapor retarders are installed on the ceiling side (attic floor) of the un-vented attic assembly. 3. Where wood shingles or shakes are used, a minimum 1/4 inch (6 mm)vented air space separates the shingles or shakes and the roofing underlayment above the structural sheathing. 4. Any air-impermeable insulation shall be a vapor retarder, or shall have a vapor retarder coating or covering in direct contact with the underside of the insulation. 5. Either Items a, b or c shall be met, depending on the air permeability of the insulation directly under the structural roof sheathing. a. Air-impermeable insulation only. Insulation shall be applied in direct contact to the underside of the structural roof sheathing. b. Air-permeable insulation only. In addition to the air-permeable insulation installed directly below the structural sheathing, R-10 rigid board or R-10 sheet insulation shall be installed directly above the structural roof sheathing for condensation control. c. Air-imper eable and air-permeable insulation. Minimum R-10 air-impermeable insulation shall be applied in direct contact to the underside of the structural r sheathing for condensation control. The air-permeable insulation shall be installed directly under the impermeable insulation. X 9) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a fin i spection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County lordinances and building regulations. x n VV --- 10) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period no a eeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevente n from being taken. No more than one extension may be granted. io X V-1- BLD2013-00415 Please refer to the following pages for conditions of this permit. Page 3 of 4 CASE NOTES FOR BLD2013-00415 CONDITIONS FOR BLD2013-00415 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-61 7-09.82. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 2) Owner/Agei t i responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X 3) Single rafter joist roof r la ern all be insulated to a minimum of R-38 allowing for a minimum of one-inch continuous vented airspace above the level of insulation. X - 4) Existing r09f deck shall be insulated to a minimum of R-38 if: The roof is un-insulated or existing insulation is removed to the level of the sheathing, OR All insulatiA i the roof/ceiling was previously installed exterior to the sheathing or non-existent. X 5) WIND LOADS - Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind speed for Mason County is 85 MPH. X C� 6) REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer' i stallation instructions. X 7) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. cupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. X BLD2013-00415 Please refer to the following pages for conditions of this permit. Page 2 of 4 This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees Mason County access to the above described property and structure for review and inspection. OWNER OR AGENT: O� � DATE: BLD2013-00415 Please refer to the following pages for conditions of this permit. Page 4 of 4 o CONCRETE MECHANICAL MANUFACTURED HOME n 2 CD Footings By r w Footings!Setbacks Gas Piping Ribbons 0 o Intenor Date By Interior-Date By Date By Exterw Date BY Exterior-Date Set-up X INSULATION n Point Load!isolated Footings Date By BG 1 SLAB INSULATION - - - Date By Date By FIRE DEPARTMENT ;>J Foundation Walls Floors Date By 0 Date By Date By DECKS FRAMING walls Date By Date By Data By PROPANE TANKS PLUMBING vault Date By Date By OTHER Groundwork Attic Date By Type- Date By Data By D.w.v DRYWALL Type- Int.Brace Wall Date ; T Date By Data BY ____ ._ r CDFINAL INSPECTION N y Water Line Firs Saperation N m Date By Date By Data By m W g Pass or Request Inspect. c s Type of Insp. Fail Date Date Done By Comments CD o v, 0 f0 N CD fD V1 O n O 7 a o' rn 0 (A a m 3 N CD 0 MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT _ Mason County Bldg. III, 426 West Cedar Street — PO Box 186, Shelton, WA 98584 1854 www.co.masonma.us (360)427-9670 Belfair(360)275-4467 Elma (360)482-5269 NON-STRUCTURAL RE-ROOF APPLICATION Roof Slope: _ �c Old Roof Material: C +Z.Nj�1 New Roofing Material: b'sr) C i_��71-\ Sheathing. ; Underlayment: Existing Insulation:_ h New Insulation: Use of Structure(s) - (i.e. garage, dwelling, etc.): `Roof Slope: IRC section R904.1 Roof slope must be indicated to ensure selected roof covering is allowed on designed pitch. Roof Covering IRC section R905 Selected roof covering must be installed in accordance with manufacturer's specifications and IRC requirements. Insulation: WSEC 101.3.2.5 exception 2a & 2b Existing roofs shall be insulated to the requirements of this Code if: a) The roof is not insulated or insulation is removed to the level of the sheathing or, b) All insulation in the roof/ceiling was previously installed exterior to the sheathing or non-existent. Attic Ventilation: IRC section 806 Enclosed attic and rafter area shall be supplied with cross-ventilation.The net area shall not be less than 1/150 of the area of the space to be ventilated. If 50% and not more than 80% of the ventilating area is provided from the upper portion of the space to be ventilated, then 1/300 is allowed. Applicant/Owner: ; 1 C c<<cA lt �� S Contractor. Parcel No �- — �3 - 4O Permit No.: Signature: (Z"_, Date: DCDBuilding re-roof application (revised 7.2012)