HomeMy WebLinkAboutMEP2009-00003 Bulkhead - MEP Permit / Conditions - 2/18/2009 t
PCZoN-srarFo� MASON COUNTY
A o N DEPARTMENT OF COMMUNITY DEVELOPMENT
o N Planning Division
7 N Y ti P O Box 279, Shelton, WA 98584
1864 (360)427-9670
MASON ENVIRONMENTAL PERMIT
February 18, 2009
TO BE KEPT IN THE
DONNA TODD PARCEL FILE
771 E WINDJAMMER
SHELTON WA 98584
Parcel No.: 121195700044
Issued: 2/18/2009
Case No.: MEP2009-00003
Project Description:
Construction of an erosion control rock bulkhead to be 110' long by approx. 5' tall.
The following critical areas are present on this property:
Long-Term Commercial Forest Ch!
HCA
Ch. 17.10.060; 17.01.110
Mineral Resource Lands Frequently Flooded Areas
Ch. 17.01.066; Ch. 17.01.090;
Inholding Lands Landslide Hazard Areas
Ch. 17.01.062; Ch. 17.01.100;
Wetlands Seismic Hazard Areas
Ch. 17.01.070; Ch. 17.01.102;
Critical Aquifer Recharge Erosion Hazard Areas
Ch. 17.01.080; Ch. 17.01.104.
This permit, with conditions, is granted pursuant to the Mason County Resource Ordinance
(Chapter 17.01 MCC.) Nothing in this permit shall excuse the applicant from compliance with
any other federal, state, or local statutes, ordinances, or regulations applicable to this project.
This permit may be rescinded if the permitee fails to complete the project as proposed or fails
to comply with the standards of this ordinance.
Authorized Local Government Official Date
Mason Environmental Permit
2/18/2009 Case No.: MEP2009-00003
Conditions:
1.) Subject to all best Management practices and Conservation Measures proposed within
the Habitat Management Plan that was prepared by Kim Schaumberg of BioResources,
LLC, dated 1/21/09.
X
2.) A Hydraulic Project Approval from the Washington State Department of Fish Wildlife
must be granted prior to construction. For more information contact Habitat Biologist
Margie Schirato (Saltwater)at 427-2179.
3.) Proper erosion and sediment control practices must be used on the construction site and
adjacent areas to prevent upland sediments from entering shoreline waters. Erosion
control measures must be in place prior to any clearing, grading, or construction. These
control measures must be effective to prevent soil from being carried into surface water by
stormwater runoff. Sand, silt, and soil will damage aquatic habitat and are considered
pollutants. Any discharge of sediment-laden runoff or other pollutapollutants to waters of
the state is in violation of Chapter 90.48 RCW, Water Pollution Control, and WAC
173-201A, Water Quality Standards for Surface Waters of the State of Washington, and
is subject to enforcement action. Any work in or adjacent to waterways that will adversely
affect water quality must receive specific prior authorization from the Department of
Ecology pursuant to WAC 173-201A-110. A short-term water quality standards
modification may be issued if the proponent agrees to a number of specific construction
practices and techniques designed to minimize water quality impacts. All areas disturbed
or newly created by construction activities must be revegetated using bioengineering
techniques, clean durable riprap, or some other equivalent type of protection against
erosion when other measures are not practical.
4.) Approved per dimensions and setbacks on submitted site plan.
5.) All upland areas disturbed or newly created by construction activities shall be seeded,
vegetated or given an equivalent type of erosion protection (silt fencing or straw matting).
2/18/2009 Page 2 of 2 MEP2009-00003
Pagel of 3
PERMIT NO.:
DATE RECEIVED:
MASON COUNTY �n f y�go oq ,
DEPARTMENT OF COMMUNITY DEVELOPMENT I�'I�Y
RESOURCE ORDINANCE (Chapter 17.01 MCC) v UQ
411 N.5TH Street/P.O.Box 279,Shelton, WA 98584
ENVIRONMENTAL PERMIT APPLICATION
MASON ENVIRONMENTAL PERMIT CONDITIONAL USE ❑
The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas
and is under the authority of Chapters 36.32, 36.70A, 39.34, 58.17, 76.09, 84.33, 84.34 and 90.58 RCW.
PLEASE PRINT
L APPLICANT
NAME: SIGNATURE:
MAILING ADDRESS / 54J
WORK PHONE E-MAIL ADDRESS
HOME PHONE FAX#
]fan agent is acting for the applicant during the pernut process,complete Q.
2.AUTHORIZED AGENT ^�,
NAME: M ph C„t�N 4A1s �,nC SIGNATURE:
MAILING ADDRESS -3 (( (� ``f� 11����F�+`� p ,�� Ef�z-,h f 1/1/ f J`0��
WORK PHON 76 o :�S 6 _3 Sl E-MAIL ADDRESS
HOME PHONE FAX# -7GG ; �_ 66 (/
3.SITE ADDRESS e i rL s
PARCEL NUMBER /2 /���000 / LEGAL DESCRIPTION llg f/is—v
DIRECTIONS TO SITE: eC� 7� , T n V `e1q
fll+rcY cy-e t�/lay. / l�o of /*Ls�rhe Hoc C/4hclnrf, C.4//
f %� -- -�j CA-
4. State which section requires permit:
❑ Long Term Commercial Forest,Chapter 17.10.060 ❑ Wetlands,Chapter 17.01.070
❑ Mineral Resource Lands,Chapter 17.01.066 ❑ Frequently Flooded Areas,Chapter 17.01.090
❑ Aquifer Recharge Area,Chapter 17.01.080 ❑ Landslide Hazard Area,Chapter 17.01.100
❑ Erosion Hazard Area,Chapter 17.01.104 ❑ Sei 'c Hazard Areas,Chapter 17.01.102
❑ In-Holding Lands,Chapter 17.01.062 Fish&Wildlife Habitat Conservation Areas,Chapter 17.01.110
Page 2 of 3
5. Identify current use of the property with existing improvements:
<> Z-
6. Identify and describe the proposed project,including the type of materials to be used,construction methods,principle dimensions,
and other pertinent information(attach additional sheets,if ed):
�C
7. Describe why the action requiring this p rmit cannot be av ided.
8. Will there be an alteration of a wetland and/or wetland vegetation area? Yes ❑ No LAY
9. IIddentii any surface water on or adjacent to property:
C�F'Saltwater ❑ Lake ❑ Stream ❑ Pond ❑ Wetland ❑ Drainage Ditch
10. If septic is located on project site,include records.
❑ Connect to Septic ❑ Community Septic ❑ Public Water Supply ❑ Well
11. Type o
New ❑ Add ❑ Alteration ❑ Repair ❑ Demolition ❑ Other:
This permit is granted pursuant to the Resource Ordinance (Chapter 17.01 MCC) and nothing in this permit
shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or
regulations applicable to this project, but not inconsistent with the Resource Ordinance. The permit may be
rescinded pursuant to the event the permittee fails to comply with the conditions of this ordinance.
MASON ENVIRONMENTAL PERMIT: $590.00/$355.00(with another permit)
MASON CONDITIONAL USE ENVIR.PERMIT: $1,420.00
HABITAT MANAGEMENT PLAN REVIEW: $415.00
IAPLANNINGTACTORMS REVISED July 2008