Loading...
HomeMy WebLinkAboutMEP2009-00003 Bulkhead - MEP Permit / Conditions - 2/18/2009 t PCZoN-srarFo� MASON COUNTY A o N DEPARTMENT OF COMMUNITY DEVELOPMENT o N Planning Division 7 N Y ti P O Box 279, Shelton, WA 98584 1864 (360)427-9670 MASON ENVIRONMENTAL PERMIT February 18, 2009 TO BE KEPT IN THE DONNA TODD PARCEL FILE 771 E WINDJAMMER SHELTON WA 98584 Parcel No.: 121195700044 Issued: 2/18/2009 Case No.: MEP2009-00003 Project Description: Construction of an erosion control rock bulkhead to be 110' long by approx. 5' tall. The following critical areas are present on this property: Long-Term Commercial Forest Ch! HCA Ch. 17.10.060; 17.01.110 Mineral Resource Lands Frequently Flooded Areas Ch. 17.01.066; Ch. 17.01.090; Inholding Lands Landslide Hazard Areas Ch. 17.01.062; Ch. 17.01.100; Wetlands Seismic Hazard Areas Ch. 17.01.070; Ch. 17.01.102; Critical Aquifer Recharge Erosion Hazard Areas Ch. 17.01.080; Ch. 17.01.104. This permit, with conditions, is granted pursuant to the Mason County Resource Ordinance (Chapter 17.01 MCC.) Nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project. This permit may be rescinded if the permitee fails to complete the project as proposed or fails to comply with the standards of this ordinance. Authorized Local Government Official Date Mason Environmental Permit 2/18/2009 Case No.: MEP2009-00003 Conditions: 1.) Subject to all best Management practices and Conservation Measures proposed within the Habitat Management Plan that was prepared by Kim Schaumberg of BioResources, LLC, dated 1/21/09. X 2.) A Hydraulic Project Approval from the Washington State Department of Fish Wildlife must be granted prior to construction. For more information contact Habitat Biologist Margie Schirato (Saltwater)at 427-2179. 3.) Proper erosion and sediment control practices must be used on the construction site and adjacent areas to prevent upland sediments from entering shoreline waters. Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent soil from being carried into surface water by stormwater runoff. Sand, silt, and soil will damage aquatic habitat and are considered pollutants. Any discharge of sediment-laden runoff or other pollutapollutants to waters of the state is in violation of Chapter 90.48 RCW, Water Pollution Control, and WAC 173-201A, Water Quality Standards for Surface Waters of the State of Washington, and is subject to enforcement action. Any work in or adjacent to waterways that will adversely affect water quality must receive specific prior authorization from the Department of Ecology pursuant to WAC 173-201A-110. A short-term water quality standards modification may be issued if the proponent agrees to a number of specific construction practices and techniques designed to minimize water quality impacts. All areas disturbed or newly created by construction activities must be revegetated using bioengineering techniques, clean durable riprap, or some other equivalent type of protection against erosion when other measures are not practical. 4.) Approved per dimensions and setbacks on submitted site plan. 5.) All upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). 2/18/2009 Page 2 of 2 MEP2009-00003 Pagel of 3 PERMIT NO.: DATE RECEIVED: MASON COUNTY �n f y�go oq , DEPARTMENT OF COMMUNITY DEVELOPMENT I�'I�Y RESOURCE ORDINANCE (Chapter 17.01 MCC) v UQ 411 N.5TH Street/P.O.Box 279,Shelton, WA 98584 ENVIRONMENTAL PERMIT APPLICATION MASON ENVIRONMENTAL PERMIT CONDITIONAL USE ❑ The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is under the authority of Chapters 36.32, 36.70A, 39.34, 58.17, 76.09, 84.33, 84.34 and 90.58 RCW. PLEASE PRINT L APPLICANT NAME: SIGNATURE: MAILING ADDRESS / 54J WORK PHONE E-MAIL ADDRESS HOME PHONE FAX# ]fan agent is acting for the applicant during the pernut process,complete Q. 2.AUTHORIZED AGENT ^�, NAME: M ph C„t�N 4A1s �,nC SIGNATURE: MAILING ADDRESS -3 (( (� ``f� 11����F�+`� p ,�� Ef�z-,h f 1/1/ f J`0�� WORK PHON 76 o :�S 6 _3 Sl E-MAIL ADDRESS HOME PHONE FAX# -7GG ; �_ 66 (/ 3.SITE ADDRESS e i rL s PARCEL NUMBER /2 /���000 / LEGAL DESCRIPTION llg f/is—v DIRECTIONS TO SITE: eC� 7� , T n V `e1q fll+rcY cy-e t�/lay. / l�o of /*Ls�rhe Hoc C/4hclnrf, C.4// f %� -- -�j CA- 4. State which section requires permit: ❑ Long Term Commercial Forest,Chapter 17.10.060 ❑ Wetlands,Chapter 17.01.070 ❑ Mineral Resource Lands,Chapter 17.01.066 ❑ Frequently Flooded Areas,Chapter 17.01.090 ❑ Aquifer Recharge Area,Chapter 17.01.080 ❑ Landslide Hazard Area,Chapter 17.01.100 ❑ Erosion Hazard Area,Chapter 17.01.104 ❑ Sei 'c Hazard Areas,Chapter 17.01.102 ❑ In-Holding Lands,Chapter 17.01.062 Fish&Wildlife Habitat Conservation Areas,Chapter 17.01.110 Page 2 of 3 5. Identify current use of the property with existing improvements: <> Z- 6. Identify and describe the proposed project,including the type of materials to be used,construction methods,principle dimensions, and other pertinent information(attach additional sheets,if ed): �C 7. Describe why the action requiring this p rmit cannot be av ided. 8. Will there be an alteration of a wetland and/or wetland vegetation area? Yes ❑ No LAY 9. IIddentii any surface water on or adjacent to property: C�F'Saltwater ❑ Lake ❑ Stream ❑ Pond ❑ Wetland ❑ Drainage Ditch 10. If septic is located on project site,include records. ❑ Connect to Septic ❑ Community Septic ❑ Public Water Supply ❑ Well 11. Type o New ❑ Add ❑ Alteration ❑ Repair ❑ Demolition ❑ Other: This permit is granted pursuant to the Resource Ordinance (Chapter 17.01 MCC) and nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project, but not inconsistent with the Resource Ordinance. The permit may be rescinded pursuant to the event the permittee fails to comply with the conditions of this ordinance. MASON ENVIRONMENTAL PERMIT: $590.00/$355.00(with another permit) MASON CONDITIONAL USE ENVIR.PERMIT: $1,420.00 HABITAT MANAGEMENT PLAN REVIEW: $415.00 IAPLANNINGTACTORMS REVISED July 2008