Loading...
HomeMy WebLinkAboutFIR2007-00028 Sprinkler - FIR - 6/3/2008 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670,ext. 352 Shelton, WA 98584 FIRE PROTECTION PERMIT FIR2007-00028 APPLICANT: MARTHA ROBBINS RECEIVED: 7/27/2007 CONTRACTOR: LICENSE: EXP: ISSUED: 9/13/2007 SITE ADDRESS: 3750 E GRAPEVIEW LOOP RD GRAPEVIEW EXPIRES: 3/13/2008 PARCEL NUMBER: 121082302020 LEGAL DESCRIPTION: S 1/2 SW NW E OF R/W &W OF COVE PROJECT DESCRIPTION: SPRINKLER SYSTEM GENERAL INFORMATION System Information Type of Use: RES Fire District: Sprinkler Heads: Audible Switches: Pull Stations: Hood & Duct?: ? Flow Switches: Visual Devices: Door Releases: Dry Chemical?: ? Pressure Switches:: Smoke Detectors: Duct Detectors: Wet Chemical?: ? Zones: Heat Detectors: Sprinkler?: Y Standpipe?: ? SQUARE FOOTAGE FEES Monitoring Company: First Floor: Type Amount Due Amount Paid Monitoring Phone No.:0 - Second Floor: Auto Fire Alarm?: Third Floor;: Sprinkler System Plan $125.63 $125.63 Sprinkler System Permit $24.37 $24.37 Sprinkler System Permit $226.88 $226.88 Total: $376.88 $376.88 FIR2007-00028 Please refer to the following pages for conditions of this permit. 1 of 4 CASE NOTES FIR2007-00028 CONDITIONS FOR FIR2007-00028 1.) The fire sprinkler system is approved as submit ubject to inspection and field correction as deemed necessary by the installer and or the Mason County Fire Marshals Office. X A witnessed bucket test is req d to ensureadequate pressure and volume. Contact Fire Marshals Office @ 360-427-9670 ext 273 or ext 285 to schedule the test. X A sprinkler in a t ting inspection is required and can be performed simultaneously with the bucket test. X A final cover aAZj1ar1T1 to will complete the inspection process. Please contact and schedule with the MCFMO @ 360-427-9670 ext 273 or ext 285. X This permit becomes null and vo d'ifwdrk orconstruction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a protn pedtion within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is �r�by means of a progress inspection.The owrgrthe aghe owners behalf, r resents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for revi wan /insp cf 0'7 OWNER OR AGENT: DATE: FIR2007-00028 Please refer to the following pages for conditions of this permit. 2 of 4 -n X CONCRETE MECHANICAL MANUFACTURED HOME O CDFootings/Setbacks Date By Ribbons - IOUGas Piping Z GInterior Date By Interior-Date By Date By O Exterior Date By Exterior-Date B Set-up 00 Point Load 1 Isolated Footings INSULATION Date By X Date a SLAB INSULATION By FIRE DEPARTMENT = Date B y Foundation Walls Floors Date By n Date By Date By DECKS - FRAMING walls Date By Date By Da1e By PROPANE TANKS PLUMBING vault Date By Da1e By OTHER Groundwork Attic Date By Date By Type.Date By D.w.w DRYWALL Typie Int.Brace wall Date By -I co Date By Date By X FINAL INSPECTION c cc water Line Fire Seperation O Date gy Date By Date By V O o Pass or Request Inspect. o Type of Insp. Fail Date Date D By Comments co o d'i /kwlrlfin�� ✓ B Li_ LyN�lf FAR !NS Inc a>tl 1r�w,vs6�R FINK L- y�,Q��✓K�k'72 EScUTCY0ZW 1 -T > �t�Vrt'io Bra 7@ IV I A iNs dx/ 4.),9T- oA) S)� 06-63-o$ GSA A/cp_ -s% �5 B,t�v >{ �✓ NS44)61 0. 0 N O S N 3 w 0 Mason County Dept. of Community Development Mason County Bldg. III, 426 W. Cedar, P.O. Box 186, Shelton, WA 98584 Shelton: (360) 427-9670 Belfair: (360) 275-4467 Elma: (360) 482-5269 NP14 Web: http://www.co.mason.wa.us ENFORCEMENT ACTIONS PENDING May 16, 2008 MARTHA ROBBINS 404 23RD AVE SE PUYALLUP WA 98372 Case Number: FIR2007-00028 Parcel Number: 121082302020 The Mason County Department of Community Development is currently reviewing all permits that are expired and have not been approved for occupancy and use. Pursuant to Mason County Code, Title 14 Building and Construction, a permit and final inspection for this type of activity is required under the 2006 International Fire Code or the code your permit was issued. Your property is currently in violation status of occupancy and use and is pending enforcement actions. You have been made aware of these requirements and to date, have not made the necessary arrangements. Current violations consist of the followina: 9-13-07 Permit was issued for a fire alarm. 1-10-08 Notice was sent requesting final inspection. To date there has been no response and enforcement actions are pending. To brina vour site into compliance, you must: Schedule the necessary inspection(s). A $68 inspection fee will be due prior to each inspection. Please call (360) 427-9670 ext.262 to schedule inspections. Please contact our office to make the necessary arrangements 10 days from the date of this letter. Failure to contact our office to make the necessary arrangements will result in enforcement actions. In the event that you feel you have received this notice in error or that the facts are inaccurate, strongly encourage you to contact me immediately to discuss your concerns. If not, I will expect these issues to be resolved within 10 days from the date of this letter. If you should have any questions, I can be reached by phone at (360) 427-9670 ext. 285. Sincerely, Larry Waters Mason County Building Department FIR2007-00028 1 of 1 IP14Mason County Dept. of Community Development Mason County Bldg. 3 426 W. Cedar P.O. Box 186 (360) 427-9670 Local (360) 482-5269 Elma Shelton, WA 98584 (360) 275-4467 Belfair Notice to Obtain Final Inspection January 10, 2008 MARTHA ROBBINS 404 23RD AVE SE PUYALLUP WA 98372 Case No.: FIR2007-00028 Parcel No.: 121082302020 Proiect Description: SPRINKLER SYSTEM The Mason County Department of Community Development is currently reviewing all permits that are expired and have not been approved for occupancy and use. Pursuant to Mason County Code, Title 14 Building and Construction, a permit and final inspection for this type of activity is required under the 2006 International Fire Code or the code your permit was issued and your property is currently in violation status of occupancy and use. Please contact our office to make the necessary arrangements 21 days from the date of this letter. Failure to contact our office to make the necessary scheduled inspections will result in enforcement actions. To bring your site into compliance, you must schedule an inspection. One (1) $68.00 site investigation fee will need to be paid prior to inspection along with any outstanding fees currently due on your building permit. For every inspection required after that, you will be charged $68.00 again, per inspection until final inspection and conditions are met. To schedule an inspection, please call (360) 427-9670 ext. 262. If you should have any questions regarding this notification, please contact me at (360) 427-9670 ext 285. Sincerely, Larry Waters Mason County Department of Community Development Cc: Property File January 10, 2008 FIR2007-00028 IP10Mason County Dept. of Community Development Mason County Bldg. 3 426 W. Cedar P.O. Box 186 (360) 427-9670 Local (360) 482-5269 Elma Shelton, WA 98584 (360) 275-4467 Belfair Notice to Obtain Final Inspection January 10, 2008 MARTHA ROBBINS 404 23RD AVE SE PUYALLUP WA 98372 Case No.: FIR2007-00028 Parcel No.: 121082302020 Protect Description: SPRINKLER SYSTEM The Mason County Department of Community Development is currently reviewing all permits that are expired and have not been approved for occupancy and use. Pursuant to Mason County Code, Title 14 Building and Construction, a permit and final inspection for this type of activity is required under the 2006 International Fire Code or the code your permit was issued and your property is currently in violation status of occupancy and use. Please contact our office to make the necessary arrangements 21 days from the date of this letter. Failure to contact our office to make the necessary scheduled inspections will result in enforcement actions. To bring your site into compliance, you must schedule an inspection. One (1) $68.00 site investigation fee will need to be paid prior to inspection along with any outstanding fees currently due on your building permit. For every inspection required after that, you will be charged $68.00 again, per inspection until final inspection and conditions are met. To schedule an inspection, please call (360) 427-9670 ext. 262. If you should have any questions regarding this notification, please contact me at (360) 427-9670 ext 285. Sincerely, Larry Waters Mason County Department of Community Development Cc: Property File January 10, 2008 FIR2007-00028 FIRE & LIFE SAFETY INSPECTION: STATEMENT OF DEFICIENCY & CORRECTIVE ACTION • FACILITY /elf} 1 DR r CITYZIP PHO E NAME � � E Lb � 14 $1)lt�Jt/ 8 a INSPECTOR AGENCY DAVE SALZER 360-427-9670 X-273 MASON COUNTY FIRE MARSHAL FD og o ITEM STATEMENT OF CODE OR WAC CORRECTIVE ACTION CORRECTION NO. DEFICIENCY REFERENCE REQUIRED REQUIRED BY /h DATE 46*" v� 3 a W � �j�1�111�.�f c>�i ► S �-� G�s'vl U �— c H 3 °i L11 Z '0L > S N w On Vv� cN m t W �. Z ?N O n O U xN Q C O pa0 .. THE DEFICIENCIES DESCRIBED ABOVE HAVE BEEN RE REINSPECTION DATE EXPLAINED TO ME, AND I AGREE TO MAKE CORRECTIONS 2J NO LATER THAN THE DATES INDICAT PAGE OF PAGES White Copy: Occupant— Yellow Copy: Fire Marshal— Pink Copy: Fire District MASON COUNTY Department of Community Development FIRE PROTECTION SYSTEMS INSPECTION CARD* PO BOX 186, 426 W Cedar ST, Shelton WA 98584 General Questions: (360) 427-9670 ext 352 Inspection Requests: (360) 427-72E2 Permit Number FIR2007-00028 Date 09/13/2007 Issued By ' Project SPRINKLER SYSTEM Site Address 3750 E GRAPEVIEW LOOP RD GRAPEVIEW Applicant MARTHA ROBBINS Contractor License Number Con. Phone Expiration Date Primary Code 2004 IFC Wet Chem ? Sprinkler Y Use RES Dry Chem ? Standpipe ? Hod and Duct ? Public Works Access/Driveway Other Health Dept Septic Well Planning Dept Site Inspection c� - Fire Marshal Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Dept Building Official. Barbara Robinson Concrete Setbacks Slab Footing Perimeter Ret. Wall / Bulkhead Footing Interior Footing Decks/ Porches Foundation Stem Other Rough-In Groundwork Plumbing Plumbing Groundwork Mechanical Other Groundwork Gas Pipe Gas Piping Framing Mechanical Insulation Slab Ceiling Floor Vaulted Ceiling Walls Vapor Barrier Other Wallboard Nailing Interior Wall Brace Panels Fire walls Other Final Building Manuf. Home Setbacks Setup Concrete Foot/ Runners Final Other APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS *THIS STRUCTURE MAY NOT BE USED FOR OCCUPANCY UNITL ALL APPLICABLE FINAL INSPECTIONS ARE COMPLETED DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVALS ARE GIVEN. POST THIS CARD IN A CONSPICUOUS PLACE ON THE FRONT OF THE PREMISES CONVENIENT FOR MAKING REQUIRED ENTRIES. ALL PERMITS EXPIRE 180 DAYS AFTER PERMIT ISSUANCE OR 180 DAYS AFTER LAST INSPECTION ACTIVITY IS PERFORMED. OWNER/AGENT IS RESPONSIBLE FOR CALLING FOR ALL INSPECTIONS PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET. MASON COUNTY Department of Community Development RESIDENTIAL INSPECTION CARD and CERTIFICATE OF OCCUPANCY* PO BOX 186, 426 W Cedar ST, Shelton WA 98584 General Questions: (360) 427-9670 ext 352 Inspection Requests: (360) 427-7262 Permit Number BLD2006-01926 Date 12/06/20GG Issued By Project New SFR ` Site Address 3750 E GRAPEVIEW LOOP RD GRAPEVIEW Applicant MARTHA ROBBINS Contractor RICK STEVENS License Number RMSTEC1011 LT Con. Phone 360-490-1013 Expiration Date 11/09/2008 Primary Code 20031RC Occupancy R-3U Division Use Single Family Type of Construction VB Occ. Load Public Works Access/Driveway Other Health Dept Septic Well Planning Dept Site Inspection ,terSY W Fire Marshal Fire Apparatus Access Fire Sprinkler rtY T�sT G s �`I-af-off Auto Fire Alarm Hood and Duct Other Final _ Building Dept Building Official: Emmett Dobey Concrete Setbacks Slab CY44 Footing Perimeter' Ret. Wall /Bulkhead ��✓ It Z Footing Interior Footing Decks/Porches L i1,S Foundation Stem Other jt jrkT - " 5 . FJY4)Vr" Rough-In Groundwork Plumbing Plumbing �: Z 7-0-7 Groundwork Mechanical Other Groundwork Gas Pipe Gas Piping Framing Mechanical Insulation Slab Ceiling Floor Vaulted Ceiling Pu0;Vz'-*alls Z7 ter, a or Barrier Other Wallboard Nailing Interior Wall Brace Panels Fire walls Other Final Building Manuf. Home Setbacks Setup Concrete Foot/Runners Final Other APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS *THIS STRUCTURE MAY NOT BE USED FOR OCCUPANCY UNTTL ALL APPLICABLE FINAL INSPECTIONS ARE COMPLETED DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVALS ARE GIVEN. POST THIS CARD IN A CONSPICUOUS PLACE ON THE FRONT OF THE PREMISES CONVENIENT FOR MAKING REQUIRED ENTRIES. ALL PERMITS EXPIRE 180 DAYS AFTER PERMIT ISSUANCE OR 180 DAYS AFTER LAST INSPECTION ACTIVITY IS PERFORMED. OWNER/AGENT IS RESPONSIBLE FOR CALLING FOR ALL INSPECTIONS PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET.