HomeMy WebLinkAboutBLD2007-02091 Addition, Remodel - BLD Permit / Conditions - 12/2/2008 of �' V4 Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352
Mason County Bldg. III 426 W. Cedar P.O. Box 186
Shelton, WA 98584
RESIDENTIAL BUILDING PERMIT BLD2007-02091
OWNER: PAYSEN JOHNSON RECEIVED: 12/31/2007
CONTRACTOR: HIGHLAND HOME BUILDERS 427-6723 490-3295 LICENSE: HIGHLHB9440K EXP: 9/5/20 ISSUED: 12/31/20
SITE ADDRESS: 336 E POINTES DR EAST SHELTON EXPIRES: 8/5/2008
2/5/2008
PARCEL NUMBER: 121195200022
LEGAL DESCRIPTION: HARTSTENE POINTE#3 LOT: 22
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
Addition and Remodel. Harstene Pointes.
General Information Construction &Occupancy Information Square Footage Information
No.of Bedrooms: Type ofConstr.:
Type of Use: SF Insp.Area: No.of Bathrooms: Occ. Group: Lot Size: Deck:
Type of Work: ADD Fire Dist.: 5 No. of Stories: Occ. Load: Building:
Valuation: Building Height: Occ. Status: Basement:
Manufactured Home Information Setback Information Shoreline&Planning Information
Make: Length: Ft. Front: N 200.0 Ft. Shoreline: Ft. WaterBody:
SEPA?:
Model: Width: Ft. Rear: S Ft. Slope: Ft. Shoreline Di
Side 1: E 45.0 Ft. g"
Year: Serial No.: Side 2: W Ft. Comp. Plan Desig.:
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Lavatories 2 Ventilation Fan 4 Plan Check Fee KKK 12/31/200 $163.31 S22007000
Showers 2 Dryer Vent 1 Planning Review Fee KKK 12/31/200 $170.00 S22007000
Water Closets (Toilets) 2 EH Plan Review ADR 1/9/2008 $35.00 S22008000
Clothes Washer 1 Building State Fee ARC 2/4/2008 $4.50 s2 bbbboo
Building Permit Fee ARC 2/4/2008 $251.25 S22008000
Mechanical Fee ARC 2/4/2008 $42.00 S22008000
Mechanical Base Fee ARC 2/4/2008 $26.60 S22008000
Plumbing Fee ARC 2/4/2008 $56.70 S22008000
Plumbing Base Fee ARC 2/4/2008 $23.10 S22008000
Total $772.46
BLD2007-02091 Please referto the following pages for conditions of this permit. 1 of 5
W
o CONCRETE MECHANICAL MANUFACTURED HOME Q
C) Footings lSetbacks Date By FootingsZ
Gas Piping
N Intenor Date By Interior-Date By Date By O
m Extera(Date3_f`.x;IF By 7 Exterior-bate By _ �t-� Z
Point Load I Isolated Footings INSULATION Date By D
BG 1 SLAB INSULATION �
Date By Data By FIRE DEPARTMENT Cl)
Foundation Walls Floors Date By Z
Date By Data (z 2 d fS By DECKS
FRAMING Walls Date By
Date By Data - (`� 'O� By PROPANE TANKS
PLUMBING Vault Date By
Date By OTHER
Groundwork Attic
Date By Date By Type.
Date By
D.W.v DRYWALL Type-
Int Brace Wail Date By W
Date BY Date By FINAL INSP CTIC� 0
CD Water Line Fire Separation By CD
Date By Date By Date %Z Z V
CD
Pass or Request Inspect. N
s Type of Insp. Fail Date Date Done By Comments
1 ,,w �r �.y z,-vW
- - �
i�S u a�o►� � Ss �( ,ram -� � ��' �� I
g �;,rb.► .�c.-t ► J S-o8 s--�-� � --+,� v 'ths� ,�►1 -� r1 -;��i
a —
{� s5
0
CD
0
h