Loading...
HomeMy WebLinkAboutBLD2007-02091 Addition, Remodel - BLD Permit / Conditions - 12/2/2008 of �' V4 Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, WA 98584 RESIDENTIAL BUILDING PERMIT BLD2007-02091 OWNER: PAYSEN JOHNSON RECEIVED: 12/31/2007 CONTRACTOR: HIGHLAND HOME BUILDERS 427-6723 490-3295 LICENSE: HIGHLHB9440K EXP: 9/5/20 ISSUED: 12/31/20 SITE ADDRESS: 336 E POINTES DR EAST SHELTON EXPIRES: 8/5/2008 2/5/2008 PARCEL NUMBER: 121195200022 LEGAL DESCRIPTION: HARTSTENE POINTE#3 LOT: 22 PROJECT DESCRIPTION: DIRECTIONS TO SITE: Addition and Remodel. Harstene Pointes. General Information Construction &Occupancy Information Square Footage Information No.of Bedrooms: Type ofConstr.: Type of Use: SF Insp.Area: No.of Bathrooms: Occ. Group: Lot Size: Deck: Type of Work: ADD Fire Dist.: 5 No. of Stories: Occ. Load: Building: Valuation: Building Height: Occ. Status: Basement: Manufactured Home Information Setback Information Shoreline&Planning Information Make: Length: Ft. Front: N 200.0 Ft. Shoreline: Ft. WaterBody: SEPA?: Model: Width: Ft. Rear: S Ft. Slope: Ft. Shoreline Di Side 1: E 45.0 Ft. g" Year: Serial No.: Side 2: W Ft. Comp. Plan Desig.: Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Lavatories 2 Ventilation Fan 4 Plan Check Fee KKK 12/31/200 $163.31 S22007000 Showers 2 Dryer Vent 1 Planning Review Fee KKK 12/31/200 $170.00 S22007000 Water Closets (Toilets) 2 EH Plan Review ADR 1/9/2008 $35.00 S22008000 Clothes Washer 1 Building State Fee ARC 2/4/2008 $4.50 s2 bbbboo Building Permit Fee ARC 2/4/2008 $251.25 S22008000 Mechanical Fee ARC 2/4/2008 $42.00 S22008000 Mechanical Base Fee ARC 2/4/2008 $26.60 S22008000 Plumbing Fee ARC 2/4/2008 $56.70 S22008000 Plumbing Base Fee ARC 2/4/2008 $23.10 S22008000 Total $772.46 BLD2007-02091 Please referto the following pages for conditions of this permit. 1 of 5 W o CONCRETE MECHANICAL MANUFACTURED HOME Q C) Footings lSetbacks Date By FootingsZ Gas Piping N Intenor Date By Interior-Date By Date By O m Extera(Date3_f`.x;IF By 7 Exterior-bate By _ �t-� Z Point Load I Isolated Footings INSULATION Date By D BG 1 SLAB INSULATION � Date By Data By FIRE DEPARTMENT Cl) Foundation Walls Floors Date By Z Date By Data (z 2 d fS By DECKS FRAMING Walls Date By Date By Data - (`� 'O� By PROPANE TANKS PLUMBING Vault Date By Date By OTHER Groundwork Attic Date By Date By Type. Date By D.W.v DRYWALL Type- Int Brace Wail Date By W Date BY Date By FINAL INSP CTIC� 0 CD Water Line Fire Separation By CD Date By Date By Date %Z Z V CD Pass or Request Inspect. N s Type of Insp. Fail Date Date Done By Comments 1 ,,w �r �.y z,-vW - - � i�S u a�o►� � Ss �( ,ram -� � ��' �� I g �;,rb.► .�c.-t ► J S-o8 s--�-� � --+,� v 'ths� ,�►1 -� r1 -;��i a — {� s5 0 CD 0 h