Loading...
HomeMy WebLinkAboutBLD2006-01890 SFR - BLD Permit / Conditions - 6/25/2008 Line 360)427262 ection MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phonpe: 160)427(9611,ext 352 Sr Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton,WA 98584 �a�L�.. r RESIDENTIAL BUILDING PERMIT BLD2006-01890 OWNER: RICARDO GARCIA CONTRACTOR: RON PHIPPS CONSTRUCTION 360-275-014 LICENSE: RONPHPC956K7 EXP: 6/15/2009 RECEIVED: 10/23/2006 SITE ADDRESS: 4147 E GRAPEVIEW LOOP RD GRAPEVIEW ISSUED: 6/25/2007 PARCEL NUMBER: 121082290093 EXPIRES: 12/25/2007 LEGAL DESCRIPTION: TR 3 OF SP# 1803, PTN TR 9 OF NW NW PROJECT DESCRIPTION: DIRECTIONS TO SITE: NEW SFR HWY 3 TO GRAPEVIEW LP RD TO CORNER RIGHT BEFORE FIRE STATION TURN UP HILL TO ADDRESS General Information Construction &Occupancy Information Square Footage Information No. of Bedrooms: 3 Type of Constr.: V-B Type of Use: SF Insp.Area: No.of Bathrooms: 2 Occ. Group: R-3, U Lot Size: Deck: Type of Work: NEW Fire Dist.: 3 No. of Stories: 1 Occ. Load: Building:3,212 Garage-Attached 623 Valuation: Building Height: Occ. Status: Primary Basement: Cov. Porch 36 Manufactured Home Information Setback Information Shoreline&Planning Information Make: Length: Ft. Front: E 48.0 Ft. Shoreline: Ft. Water Body: NONE Rear: W 50.0 Ft. Slope: 30.0 Ft. SEPA?: No Model: Width: Ft. Side 1: N 130.0 Ft. Shoreline Desig.: Not Applicable Year: Serial No.: Side 2: S 80.0 Ft. Comp. Plan Desig.: Rural Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Dishwasher 1 Exhaust Hood 1 Plan Check Fee KS 10/23/200 $1,097.30 S12006000 Hosebibs 4 Furnace<100K 1 Planning Review Fee KS 10/23/200 $155.00 S12006000 Kitchen Sink 1 Gas Outlets 3 Building Permit Fee JRN 10/25/200 $1,716.15 S12007000 Laundry Tray 1 Propane Tank 1 Building State Fee JRN 10/25/200 $4.50 S1200700b Lavatories 3 Ventilation Fan 4 Plumbing Fee JRN 10/25/200 $96.00 S12007000 Showers 1 Heat Pump 1 Plumbing Base Fee JRN 10/25/200 $20.00 S12007000 Water Closets (Toilets) 2 Propane Stove 1 Mechanical Base Fee JRN 10/25/200 $23.50 S12007000 Water Heaters 1 Dryer Vent 1 Mechanical Fee AN 10/25/200 $145.95 s12oo5000 Bath Tubs 2 Address Fee BLJ 10/27/200 $140.00 S12007000 Clothes Washer 1 EH Plan Review TW 2/9/2007 $75.00 S12007000 Public Works Review JES 6/6/2007 $73.10 S12007000 Total $3,546.50 BLD2006-01890 Please referto the following pares for conditions of this permit. 1 of 5 CASE NOTES FOR BLD20 0 6-01 890 CONDITIONS FOR BLD2006-01890 1) Beca a rade up to and including this driveway rs must be installed.Also the drivewa surfa m roved with large crush r urn out to access r roadnv r e o a low or urn. r 2) PLR TITLE 14 MASON COUNTY BUILDING CODE - CHAPTER 14.17, STANDARDS FOR FIRE APPARATUS ACCESS ROADS - 14.17.110: A fire a er system installed. d more than 150'to new residential or commercial structures will require an automatic fire x 3) This parcel is"ed in a smoke management zone. Please contact a fire warden at (360)427-9670 ext. 459 for further information. X OL 4) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, a faphing. Install metal connectors approved for contact with the new types of pressure treated material. X / I 5) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have pre t�' action from being taken. No more than one extension may be granted. X / 6) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordin Cues and building regulations. X / ' 7) All property lines shall be clearly identified at the time of foundation inspection. X__ � 8) The placement of small propane tanks are not normally subject to a permit review by the Planning Department; however, propane tanks are subject to Planning Department regulations. Such regulations primarily consist of setbacks from shorelines and features considered to be critical areas (streams, wetlands, slopes, etc.) If you think such:ffeatureZsl�ton or nearby your property, please contact the Planning Department so that exact setback requirements can be determined. X BLD2006-01890 Please refer to the following pages for conditions of this permit. 2 of 5 9)' Fuel Oiping shall be inspected after the installation of fuel piping is complete, and before the attachment of fixtures, appliances, or shut-off valves. At the time of inspection the test pressure shall be no less than 10 psi held for no less than 15 minutes. Appliances to be attached to the fuel piping system shall not be used until the final.inspection has been performed and approved by a Mason County building inspector. X h 61..E 10) All propane tanks must be installed in accordance with the International Fire Code and all applicable Mason County ordinances. All propane tanks must meet the installation requirerppnts X T-1 and minimum setbacks as listed in the Mason County Fire Marshal's Standards for the Installation of Propane Tanks. � 11) All propane tanks must be installed in accordance with the International Fire Code and all applicable Mason County ordinances. All Propane tanks between 125 and 500 gallons must be located a minimum of 10'from any building, property line, public way, possible source of ignition (electrical outlets, electrical fixtures, compressors, etc), and/or any weeds, grass, brush, trash or any other similar combustible materials. If a propane tank is exposed to probable vehicular damage, otpctive bollards must be installed. XJ,.. 12) All propane tanks must be installed in accordance with the International Fire Code and all applicable Mason County ordinances. All propane tanks filled on site must be located a minimum of 10'from any possible source of ignition (electrical outlets, electrical fixtures, compressors, etc), mechanical system air intake (direct vent appliance, ventilation air intake, etc), and/or any weeds, grass, brush, trash or any other similar combustible materials. Propane tanks less than 125 gallons must also be located a minimum of 5'from any building opening (foundation vents, windows, doors etc), property line or X easement. If a prop"a.tpnk is exposed to probable vehicular damage, protective bollards must be installed. 13) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made ppripr,>o requesting additional inspections. ir 0 14) All changes to "approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulati must be reviewed and approved by Mason County prior to construction. X r . 15) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. X i.. y; BLD2006-01890 Please referto the following pages for conditions of this permit. 3 of 5 16) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State'of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. X • 17) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2). X :: 18) Per 2003 IRC - SECTION R905 - REQUIREMENTS FOR ROOF COVERINGS - R905.1 Roof covering application. Roof coverings shall be applied in accordance with the LISP! ble provisions of this section and the manufacturer's installation instructions. XJr 19) Per 2003 IRC - SECTION 1609 -WIND LOADS - 1609.1 Applications. Buildings, structures and parts thereof shall be designed to withstand the minimum wind loads prescribed herein. Decreases in wind load shall not be made for the effect of shielding by other structures. Per FIGURE 1609 BASIC WIN _tS EED (3-SECOND GUST)the wind speed for Mason County is 85 MPH. X / 20) Washington State Energy Code Compliance has been approved using the following: Heat Type: Electric or other fuels, Compliance Method: IV, Window(Max U-Factor):0.40, Skylight(Max U-Factor):0.58, Doors (Type Mgx.U�Factor):0.40 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation R-38, Vault Insulation R-30, Slab Insulation R-10. 21) The "approved"site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved"site plan is not on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Depa_r"egt prior to any further inspections being performed or approvals granted. 22) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X 23) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved,,d 4-5uments will result in failure of required building inspections. X 4 /k 24) In accordance with international codes and Title 14, Mason County Building Code, "Standards for Fire Apparatus Access Roads," all new structures that require an address shall have approved numbers or addresses located at the beginning of long driveways when the address is not clearly visible from the access road. The numbers shall also be plainly visible and legible from the street or road fronting the property and shall contrast with their background. Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the international codes will be assessed if the owner and/or contractor fail to post the address on site prior to requesting inspections. �tz X BLD2006-01890 Please referto the following pages for conditions of this permit. 4 of 5 25 All a roved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will PP P q P P P P P PP not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to;apy further inspections being performed or approvals granted. x 26) The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect,Aith a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. X 4 � 27) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982.The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 28) Approved per dim Signs and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. x tri 29) The approval of this project is subject to the recommendations and specifications outlined in the attached geotechnical report or assessment. Structures and /or land modifications (grading, cuts, fills, etc.) required in the geotechnical report.assessment, may require a seperate permit. The geotechincal report/assessment shall remain attached to the approved building plans. X. �,� 30) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your "Approved Site Plan"tq� nsure these structures are shown and meet the setback conditions listed. Xf 31) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to ensure these structures meet the setback conditions listed. x f/'-') This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. OWN ER OR AGENT: :;�C �1� a� DATE: `> Cl_ BLD2006-01890 Please refer to the following pages for conditions of this permit. 5 of 5 W , o �'.ONCRETE MECHANICAL MANUFACTURED HOME •D Footi ticks Date ,`?�o� BY�Gas Piping Ribbons - - ~(Aj / c� O Interior Date By Interior-Date j/l l O15 By u Date By o &�� Exterior Date?�f�-(�j BY/�J q Exterior-Date B C�i Setup Point Load J isolated Footings INSULATION Date By D BG f SLAB INSULATION ------ > Date By Data By FIRE DEPARTMENT Foundation Walls Floors Date By O Date By Data ` Q•(2 BKM& DECKS FRAMING walls Date By Date B Data l ( I By l / PROPANE TANKS PLUMBING vault f Date _p e Data \ By OTHER Grnundwark Attic Type_ ✓�����' �� Date By Date By DRYWALL Date O.W.v Type: Int.Brace Wall Date By W Date ex%jT Date gY FINAL INSPECTION 10 Water Line [Date" eparation N Date - B By Date,� ' ZJ� B p m � Pass or Request Inspect. c Type of Insp. Fail Date Date Done By Comments co a �CD CD55 - ?-07 -Z9 Ai CD CD .6P-0 )9ydRa 135 8y c e- 1hdc 8 /X Q�G �i4'�5 al-03- o M ek T4r.,- � (y b _t23- a5 T S 61 a SE1J�Q�Q! �Ii2D % O1L L77 w avPs. �~ V 1 C�? -rtc�/ Ei -o lv Fosq-7L� _ie,� C,.�, OK 46�0 4P ✓yw- /tip 4 , 0 MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT FIRE MARSHAL Mason County Bldg. III,426 West Cedar Street PO Box 186, Shelton, WA 98584 Shelton (360) 427-9670 Belfair(360) 275-4467 Elma (360) 482-5269 On the web: http://www.co.mason.wa.us September 13, 2007 RICARDO GARCIA 2231 JOSLIN ST PORT ORCHARD WA 98366 Permit Number: BLD2006-01890 Parcel No.: 121082290093 Dear Applicant, A representative of the Mason County Fire Marshal's office conducted an inspection of the parcel referenced above to verify compliance to Mason County Building Code, Chapter 14.17 Standards for Fire Apparatus Access Roads. A copy of the standards and addressing guidelines referenced in the standards are enclosed PLAN REVIEW REQUIREMENT COMMENTS: 1. During the inspection the Fire Warden found that the access road does not comply with Section 14.17.110 that reads as follows: "A fire apparatus access road which is newly constructed or existing, and which is in excess of 14% grade, and which is greater than 150-ft from a primary access point intersecting with a County or State road right of way, to new residential or commercial construction will require an automatic fire sprinkler to be installed." A condition concerning the required fire sprinkler system will be placed on the building permit referenced above. A separate permit shall be required and approved. In addition the Fire Marshal's office shall complete the fire sprinkler inspection prior to the framing inspection request. If you have questions please contact the Mason County Fire Warden's office at (360) 427-9670 ext. 459. Denny Skinner Fire Warden Mason County Department of Community Development Encl.: Title 14 Mason County Building Code, Chapter 14.17 Standards for Fire Apparatus Access Roads Address Posting Requirements Guidelines for Private Road Signing 9/13/2007 1 of 2 BLD2006-01890 ACCESS & GRADE WORKSHEET DATE: ADDRESS INSPECTOR 70P- S LD DRIVEWAY ACCESS Length: Width: Surface: L�L�a r- Size of turn-around: D Condition of shoulders: Vertical clearance: ( ) need post at end of driveway with reflective address numbers GRADE,OF DRIVEWAY % OF ROAD % ROAD ACCESS Length: Width: Surface: Condition: Vertical clearance: ( ) BURN PERMIT REQUIRED FOR LAND CLEARING FIRE. ( ) LOT INSIDE SMZ, 4X4 FIRES ONLY. ( ) LOT INSIDE UGA, NO OUTDOOR BURNING PERMITTED. LOT TOO SMALL FOR: BURN PERMITS 4X4 FIRES. REMARKS (continue remarks on back)