Loading...
HomeMy WebLinkAboutMIS98-0409 Bulkhead Repairs - MIS Permit / Conditions - 9/2/1998 MASON COUNTY Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 M 1 �3 E:. P L 11__ A N E:_ C3 U!S PIE=' f2 M I T FOR INSPECTIONS CALL. 427--9670 MIS98--0409 PARCEI. � 1 2 1 1 9500020 1 PLAT ;HAPLO DI V x B!_K v LOT i201 JOB ADDRESS i 336 E POI NTE' (SITU 111 I OR E SHELTON O:Rj�`j Xp,Vkpj% 4 APPLICANT : HARTSTENF: POI NTE MA I NT 360-426+--2300 vO`D By � OWNFR i HARTSTt Nf". POI NTE MA I N'i 360- 426a--2300 LEGAL i HAPSTEIlF POi@IT 911, I011 2Fi IC0110111 1AFA I F1 POA. PROJECT DESCRIPTION Two bulkhead repairs in two sepertate locations within Haarstene Pointe : Repair existing tilabor bulkheads by replacing existing timber plies, tiebacks and planking, where necessary . reconstruction is to take place in Brame location us original structure . Construction materials wi I l consist o commercial grade preservative treated timber plies and planks and galvanized steel rods, nuts and washers . etc . . PROJECT LOCATION : $1 336 F Po i ntes DR Fm%t i Walk to trail 'to grater access a t bottom of trail beta i nd 336 Po i ntes DR E . t#2 -- 772. F Chesapeake DR : Follow road behind treatment plant to left to very rand of point/ap i t . 14ARTST ENE: POI NTE OFFICE TO HAVE GATE OPENED . GO DIRECTLY TO OFFICE AT CLUBHOUSE: 10 ARRANGE FOR SOMEONE TO SHOW YOU THE PROJECT SITE . PROJEC1 NOTES . SEPA comment period ends 8/ 19/96 T Y P L :AMOONT BY 1)ATF IIECF.. i PT SI'FF $ 4 .50 KS 08,/28/98 48147 PRMT f 1 1 .00 TMJ 08/03198 1 727 f,' PICK t 35 ,00 1440 08/03/98 1 727 } �� SF PA 1r 110 .00 KS 08/2 7/9 8 4 7903 ✓l''�-t �7. ��t.... C�. t� s" � � 1 ' TOTAL 320 . 34 j} OWNER AGENT) , DATE ....r3rr�^-s... :,xxsrz r...r.,�:sres:rMvui-.v::xrn... ,:�^. n ea.0:zz•..:.::sc:nx�se+.rrzur.c.1 ...-%', rev, #4101192 COMPLIANCE TO ATTACHED CONDITIONS IS .nE OUIRED CO24CRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date by date by date by PLUMBING OTHER Groundwork Attic date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by MASON COUNTY Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 Casa No . a M I S'98-0409 Fort 14ARTSTENF= POINTF NIA I NI Page , 1 1 ) A Hydrau i to Project Approval from the Washington State Depaa taaelrt (J W I I d I i "fe must he granted prior to construction . 2 ) Proper disposal of construction deer i ,, rmu at be on uplands , In such a manner that debr i a, cannot enter wetlands or cause water quality degradation of adjacent waters . 3 ) PURSUANT TO 1994 UNIFORM BU I I.D I NG CODE- , ALL SITE MUST BE MARKED WI TH APPROVED NUMSFPS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE: STREET OR ROAD FRONTING THE PEIOPERTY . MASON COUNTY BUILDING DEPARTMENT REGU I RES 7NAT T141 S BE COMPLETED PRIOR 'TO CALLING FOR ANY SITE INSPECTIONS . A RE I NSPECT I ON FEE , BASED &ONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BGISLAB Insulation Floors Final date tRAMING by date by date by Walls FIRE DEPT. date by date by date by PLUMBING OTHER Groundwork Attic date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by MASON COUNTY Mason County Bldg. 111 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 OWNER/,CgNTRACTOR • k"Ut.or VY I I. I b F A,"O V 0 0 U V FAILS TO POST A V-11 I Oil TO REQUEST I NG I NSPECT I ONS X 4 ) A I I approved p lans are reqil i red to (-)W- site for inf pert ican pijrposes If inspection is called for and plans are not on site, Approval WILL NOT be granted . n addition a Re- Inf,pec,tion fee In the amount of 9;42 ,00 per hour- (M I n 1 miita I hour ) w i I I I tie charged , and must be c011ected by this department prior to any further Inspections being performed or approval granted . X. 5 ) . ALL CONSTRUCTION MUS-f MEET OR FXrFFr) ALL LOCAL CODES AND line RFGUIREMFNTp X , 6 ) This perm it if, If;sued for the r-epall, new PT piles has ")f an existing wooden h(l I k head A limitation of 4 been 68t8blished and required to be tied back as proposed adjacent to the existing pile . The planking will be r-eplaced as necessary however , the plans submitted DO NOT Indicate a now construction profile and therefore, It Is expected not each and every plank i !" to bey rePlaoed . New construction of this bulkhead, piles and planks in entirety, the require review and appr,oval by a WA state licensed engineer . This perm ft,,�',Is for the COPair and Maintenance only . X CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date b Set Up date by INSULATION date by iBG/SLAB Insulation Floors Final date by date by date by FIRE DEPT. FRAMING Is date by date by date by OTHER PLUMBING Attic Groundwork date by date by WALLBOARD NAILING D.W.V. date by date by FINAL INSPECTION Water Line date by date by date by