HomeMy WebLinkAboutMIS98-0409 Bulkhead Repairs - MIS Permit / Conditions - 9/2/1998 MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
M 1 �3 E:. P L 11__ A N E:_ C3 U!S PIE=' f2 M I T FOR INSPECTIONS CALL. 427--9670
MIS98--0409 PARCEI. � 1 2 1 1 9500020 1 PLAT ;HAPLO DI V x B!_K v LOT i201
JOB ADDRESS i 336 E POI NTE' (SITU 111 I OR E SHELTON O:Rj�`j Xp,Vkpj% 4
APPLICANT : HARTSTENF: POI NTE MA I NT 360-426+--2300 vO`D By �
OWNFR i HARTSTt Nf". POI NTE MA I N'i 360- 426a--2300
LEGAL i HAPSTEIlF POi@IT 911, I011 2Fi IC0110111 1AFA I F1 POA.
PROJECT DESCRIPTION
Two bulkhead repairs in two sepertate locations within Haarstene Pointe : Repair existing tilabor
bulkheads by replacing existing timber plies, tiebacks and planking, where necessary .
reconstruction is to take place in Brame location us original structure . Construction materials
wi I l consist o commercial grade preservative treated timber plies and planks and galvanized steel
rods, nuts and washers . etc . .
PROJECT LOCATION :
$1 336 F Po i ntes DR Fm%t i Walk to trail 'to grater access a t bottom of trail beta i nd 336 Po i ntes
DR E . t#2 -- 772. F Chesapeake DR : Follow road behind treatment plant to left to very rand of
point/ap i t . 14ARTST ENE: POI NTE OFFICE TO HAVE GATE OPENED . GO DIRECTLY TO OFFICE AT CLUBHOUSE: 10
ARRANGE FOR SOMEONE TO SHOW YOU THE PROJECT SITE .
PROJEC1 NOTES .
SEPA comment period ends 8/ 19/96
T Y P L :AMOONT BY 1)ATF IIECF.. i PT
SI'FF $ 4 .50 KS 08,/28/98 48147
PRMT f 1 1 .00 TMJ 08/03198 1 727 f,'
PICK t 35 ,00 1440 08/03/98 1 727 } ��
SF PA 1r 110 .00 KS
08/2 7/9 8 4 7903 ✓l''�-t �7. ��t.... C�. t� s" � � 1 '
TOTAL 320 . 34 j} OWNER AGENT) , DATE
....r3rr�^-s... :,xxsrz r...r.,�:sres:rMvui-.v::xrn... ,:�^. n ea.0:zz•..:.::sc:nx�se+.rrzur.c.1 ...-%',
rev, #4101192 COMPLIANCE TO ATTACHED CONDITIONS IS
.nE OUIRED
CO24CRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
Casa No . a M I S'98-0409
Fort 14ARTSTENF= POINTF NIA I NI
Page , 1
1 ) A Hydrau i to Project Approval from the Washington State Depaa taaelrt (J W I I d I i "fe must he
granted prior to construction .
2 ) Proper disposal of construction deer i ,, rmu at be on uplands , In such a manner that debr i a,
cannot enter wetlands or cause water quality degradation of adjacent waters .
3 ) PURSUANT TO 1994 UNIFORM BU I I.D I NG CODE- , ALL SITE MUST BE MARKED WI TH APPROVED NUMSFPS
OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE:
STREET OR ROAD FRONTING THE PEIOPERTY . MASON COUNTY BUILDING DEPARTMENT REGU I RES 7NAT
T141 S BE COMPLETED PRIOR 'TO CALLING FOR ANY SITE INSPECTIONS . A RE I NSPECT I ON FEE , BASED
&ONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BGISLAB Insulation Floors Final
date
tRAMING by date by date by
Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
MASON COUNTY
Mason County Bldg. 111 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
OWNER/,CgNTRACTOR • k"Ut.or VY I I. I b F A,"O V 0 0 U V
FAILS TO POST A
V-11 I Oil TO REQUEST I NG I NSPECT I ONS
X
4 ) A I I approved p lans are reqil i red to (-)W- site for inf pert ican pijrposes If inspection
is called for and plans are not on site, Approval WILL NOT be granted . n addition a
Re- Inf,pec,tion fee In the amount of 9;42 ,00 per hour- (M I n 1 miita I hour ) w i I I I tie charged , and
must be c011ected by this department prior to any further Inspections being performed or
approval granted .
X.
5 ) . ALL CONSTRUCTION MUS-f MEET OR FXrFFr) ALL LOCAL CODES AND line
RFGUIREMFNTp
X ,
6 ) This perm it if, If;sued for the r-epall,
new PT piles has ")f an existing wooden h(l I k head A limitation of 4
been 68t8blished and required to be tied back as proposed adjacent to
the existing pile . The planking will be r-eplaced as necessary however , the plans
submitted DO NOT Indicate a now construction profile and therefore, It Is expected not
each and every plank i !" to bey rePlaoed . New construction of this bulkhead, piles and
planks in entirety, the
require review and appr,oval by a WA state licensed engineer .
This perm ft,,�',Is for the COPair and Maintenance only .
X
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date b Set Up
date by INSULATION date by
iBG/SLAB Insulation Floors Final
date by date by date by
FIRE DEPT.
FRAMING Is date by
date by date by OTHER
PLUMBING Attic
Groundwork date by
date by WALLBOARD NAILING
D.W.V. date by
date by FINAL INSPECTION
Water Line date by date by
date by