HomeMy WebLinkAboutBLD2008-00221 Revised SFR - BLD Permit / Conditions - 10/26/2009 Inspection Line(360)127-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352
Mason County Bldg. III 426 W. Cedar P.O. Box 186
Shelton, WA 98584
PIN
�.eUl � ( On
RESIDENTIAL BUILDING PERMIT BLD2008-00221
OWNER: DAVID LUBETICH
CONTRACTOR: LICENSE: EXP: RECEIVED: 2/26/2008
SITE ADDRESS: 40 E MOUNTAIN DR GRAPEVIEW ISSUED: 5/16/2008
PARCEL NUMBER: 121185000038 EXPIRES: 8/10/2009
LEGAL DESCRIPTION: MOUNTAIN SHORES TR 38 & 1/80 INT TR 41
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
New SFR GRAPEVIEW LP RD TO E RAUSCHERT RD, FOLLOW TOWARD WATER TO
R ON E CREST LANE, 2ND LOT ON LEFT, SIGN "LEUBTICH". TES HOLES
ON LOWER SIDE OF LOT
General Information Construction &Occupancy Information Square Footage Information
No.of Bedrooms: 3 Type of Constr.: V-B
Type of Use: SF Insp.Area: No.of Bathrooms: 2 Occ. Group: R-3 U-1 Lot Size: Deck: 385
Type of Work: NEW Fire Dist.: No.of Stories: 3 Occ. Load: Building:2,180 Garage-Attached 432
Valuation: Building Height: Occ. Status: Basement:
Manufactured Home Information Setback Information Shoreline&Planning Information
Make: Length: Ft. Front: N 10.0 Ft. Shoreline: Ft. Water Body:
Rear: S 68.0 Ft. Slope: Ft. SEPA?: No
Model: Width: Ft. Shoreline Desig.: Not Applicable
Side 1: E 17.0 Ft. PP
Year: Serial No.: Side 2: W 8.0 Ft. Comp. Plan Desig.:
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Dishwasher 1 Exhaust Hood Plan Check Fee KKK 2/26/2008 $955.34 S22008000
Hosebibs 2 Furnace<100K 1 Planning Review Fee KKK 2/26/2008 $190.00 S22008000
Kitchen Sink 1 Gas Outlets 2 Building State Fee RTB 3/10/2008 $4.50 S22008000
Lavatories 2 Propane Tank 1 Building Permit Fee RTB 3/10/2008 $1,469.75 8 bbbbbb
Lavatories 1 Ventilation Fan 3 Mechanical Fee RTB 3/10/2008 $361.45 S22bb8bbb
Showers 2 Woodstove 2 Mechanical Base Fee RTB 3/10/2008 $26.60 S22008000
Water Closets (Toilets) 2 Heat Pump 1 Plumbing Base Fee RTB 3/10/2008 $23.10 S22008000
Water Closets (Toilets) 1 Dryer Vent 11 Plumbing Fee RTB 3/10/2008 $87.61 S22bb8bbb
Water Heaters 1 EH Plan Review TW 3/17/2008 $100.00 S22b08bbb
e Clothes Washer 1 Water Adequacy Plan Review TW 3/17/2008 $40.00 S22008000
Geotechnical Asses. Report SDP 5/6/2008 $320.00 S22008000
Plumbing Permit Fee CMH 2/27/2009 $17.40 S22009000
Plumbing Base Fee CMH 2/27/2009 $12.40 S22009000
Total $3,608.15
BLD2008-00221 Please referto the following pages for conditions of this permit. 1 of 5
Inspection Line(360)427-7262
MASUN COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)127-9670, ext. 352
Mason County Bldg. III 426 W. Cedar P.O. Box 186
Shelton, WA 98584
RESIDENTIAL BUILDING PERMIT BLD2008-00221
OWNER: DAVID LUBETICH RECEIVED: 2/26/2008
CONTRACTOR: LICENSE: EXP: ISSUED:
SITE ADDRESS: $- ,LN GRAPEVIEW EXPIRES:
PARCEL NUMBER: 121185000038
LEGAL DESCRIPTION: MOUNTAIN SHORES TR 38 & 1/80 INT TR 41
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
New SFR GRAPEVIEW LP RD TO E RAUSCHERT RD, FOLLOW TOWARD WATER TO
R ON E CREST LANE, 2ND LOT ON LEFT, SIGN "LEUBTICH". TES HOLES
ON LOWER SIDE OF LOT
General Information Construction &Occupancy Information Square Footage Information
No.of Bedrooms: Type of Constr.:
Type of Use: SF Insp.Area: No.of Bathrooms: Occ. Group: Lot Size: Deck:
Type of Work: NEW Fire Dist.: No.of Stories: Occ. Load: Building:
Valuation: Building Height: Occ. Status: Basement:
Manufactured Home Information Setback Information Shoreline&Planning Information
Make: Length: Ft. Front: N 10.0 Ft. Shoreline: Ft. Water Body:
Rear: S 68.0 Ft. Slope: Ft. SEPA?:
Model: Width: Ft. Side 1: E 17.0 Ft. Shoreline Desig.:
Year: Serial No.: ' I Side 2: W 8.0 Ft. IComp. Plan Desig.:
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Plan Check Fee KKK 2/26/2008 $955.34 S22008000
Planning Review Fee KKK 2/26/2008 $190.00 S22008000
Total $1,145.34
BLD2008-00221 Please refer to the following pages for conditions of this permit. 1 of 2
Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352
Mason County Bldg. III 426 W. Cedar P.O. Box 186
Shelton,WA 98584
RESIDENTIAL BUILDING PERMIT BLD2008-00221
OWNER: DAVID LUBETICH RECEIVED: 2/26/2008
CONTRACTOR: LICENSE: EXP: ISSUED: 5/16/2008
SITE ADDRESS: 61 E CREST LN GRAPEVIEW EXPIRES: 11/16/2008
PARCEL NUMBER: 121185000038
LEGAL DESCRIPTION: MOUNTAIN SHORES TR 38 & 1/80 INT TR 41
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
New SFR GRAPEVIEW LP RD TO E RAUSCHERT RD, FOLLOW TOWARD WATER TO
R ON E CREST LANE, 2ND LOT ON LEFT, SIGN "LEUBTICH". TES HOLES
ON LOWER SIDE OF LOT
General Information Construction&Occupancy Information Square Footage Information
No.of Bedrooms: 3 Type of Constr.: V-B
Type of Use: SF Insp.Area: No. of Bathrooms: 2 Occ. Group: R-3 U-1 Lot Size: Deck: 385
Type of Work: NEW Fire Dist.: No.of Stories: 3 Occ. Load: Building:2,180 Garage-Attached 432
Valuation: Building Height: Occ. Status: Basement:
Manufactured Home Information Setback Information Shoreline&Planning Information
Make: Length: Ft. Front: N 10.0 Ft. Shoreline: Ft. Water Body:
SEPA?: No
E 17
Model: Width: Ft. Rear: .0 Ft. Slope: Ft. Shoreline Desi
Side 1: E .0 Ft. 9.: Not Applicable
Year: Serial No.: Side 2: W 8.0 Ft. Comp. Plan Desig.:
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Dishwasher 1 Exhaust Hood Plan Check Fee KKK 2/26/2008 $955.34 S22008000
Hosebibs 2 Furnace<100K 1 Planning Review Fee KKK 2/26/2008 $190.00 S22008000
Kitchen Sink 1 Gas Outlets 2 Building State Fee RTB 3/10/2008 $4.50 S22008000
Lavatories 2 Propane Tank 1 Building Permit Fee RTB 3/10/2008 $1,469.75 S22008000
Showers 2 Ventilation Fan 3 Mechanical Fee RTB 3/10/2008 $361.45 S22008000
Water Closets (Toilets) 2 WOodstove 2 Mechanical Base Fee RTB 3/10/2008 $26.60 S22008000
Water Heaters 1 Heat Pump 1 Plumbing Base Fee RTB 3/10/2008 $23.10 522008000
Clothes Washer 1 Dryer Vent 11 Plumbing Fee RTB 3/10/2008 $87.61 §22008000
EH Plan Review TW 3/17/2008 $100.00 S22008000
Water Adequacy Plan Review TW 3/17/2008 $40.00 S22008000
Geotechnical Asses. Report SDP 5/6/2008 $320.00 S22008000
Total $3,578.35
1L:1 08-00221 Please referto the following pages for conditions of this permit. 1 Of 5
CASE NOTES FOR
BLD2008-00221
CONDITIONS FOR
BLD2008-00221
1) Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure.
X •�; ✓
2) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800-64J�09 2. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X
r
3) The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150' from an approved
access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where
such roads ponr�ect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road.
X 1 //
4) All other necessary permits from Mason County, Washington State and/or Federal Agencies that area ec fired f r this proposed development and
construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION. X '
5) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will
not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building
DepartTent prigLto any further inspections being performed or approvals granted.
x I �/
6) Owner/A ent esponsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28.
X���i
7) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the
corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building
Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of a -roved documents will result in failure of required building inspections.
X (/ ,
8) This structure is approved as un-heated space. If at any time this building is to be used for anything other than what it is approved for, a change of use
permit Shall be a plied for, reviewed and approved prior to the change. Garage portion only.
X d ✓'
9) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X
&6D:08-00221 Please referto the following pages for conditions of this permit. 2 of 5
16,) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely imp
adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the
stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further
• information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access
-connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which
is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may
affect your project,!
X
17) All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County
ordinal or ulation, must be reviewed and approved by Mason County prior to construction.
X
18) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED
BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
Inspector s I made prior to requesting additional inspections.
X
19) All propane tanks must be installed in accordance with the International Fire Code and all applicable Mason County ordinances. All propane tanks filled
on site must be located a minimum of 10' from any possible source of ignition (electrical outlets, electrical fixtures, compressors, etc), mechanical system
air intake (direct vent appliance, ventilation air intake, etc), and/or any weeds, grass, brush, trash or any other similar combustible materials. Propane
tanks less than 125 gallons must also be located a minimum of 5'from any building opening (foundation vents, windows, doors etc). Setback to the public
way, or access easements shall be the greater of 25-ft or as specified in the Mason County Development Regulations. Setback to property lines shall be
the greater of 5-ft or as specified in the Mason County Development Regulations. If a propane tank is exposed to probable vehicular damage, protective
bollar s us a installed.
X
20) All propane tanks must be installed in accordance with the International Fire Code and all applicable Mason County ordinances. All Propane tanks
between 125 and 500 gallons must be located a minimum of 10' from any building, possible source of ignition (electrical outlets, electrical fixtures,
compressors, etc), and/or any weeds, grass, brush, trash or any other similar combustible materials. Setback to the public way, or access easements
shall be the greater of 25-ft or as specified in the Mason County Development Regulations. Setback to property lines shall be the greater of 10-ft or as
specified in the Mason County Development Regulations. If a propane tank is exposed to probable vehicular damage, protective bollards must be
installed.X E rz_
21) All propane tanks must be installed in accordance with the International Fire Code and all applicable Mason County ordinances. All propane tanks must
meet tie i t
ation requirements and minimum setbacks as listed in the Mason County Fire Marshal's Standards for the Installation of Propane Tanks.
X
22) Fuel piping shall be inspected after the installation of fuel piping is complete, and before the attachment of fixtures, appliances, or shut-off valves. At the
time of inspection the test pressure shall be no less than 10 psi held for no less than 15 minutes. Appliances to be attached to the fuel piping system shall
not be used un�he final inspection has been performed and approved by a Mason County building inspector.
X W —
BLD2008-00221 Please referto the following pages for conditions of this permit. 4 of 5
10).,, .The"approved"site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" site plan is not on site, then
ILapproval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Build=pa ent prior to any further inspections being performed or approvals granted.
X
11) Washington State Energy Code Compliance has been approved using the following:
Heat Type: Electric or other fuels, Compliance Method: Prescriptive option IV, Window(Max U-Factor):0.35, Skylight(Max U-Factor):0.58, Doors
(Type/Max U-Factor):0.20 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation R-38, Vault Insulation R-38 (see exception), Slab
Insulation R-10.
Exception: R-30 insulation may be installed, up to 500 sq. ft., in single rafter or joist vaulted ceilings where the distance of the top of the ceiling and the
underside of the roof sheathing is less than 12-inches and there is 1-inch vented airspace above the insulation.
X
12) A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement,
inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the
owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel
prior to the commencement of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater
Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan" constitutes
an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are
responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system
of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of
the building permit the owner/agent/contract r is ack edging that all components of the stormwater management system have been installed as
approved on the stormwater site plan. X
13) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other
vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2).
X A/1
14) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building
Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached
thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be
charged,,an sha be collected by the Building Department prior to any further inspections being performed or approvals granted.
X
15) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
permi�r,Zcaiion.
r�toe
BLD2008-00221 Please referto the following pages for conditions of this permit. 3 of 5 Al
The placement of small propane tanks are not normally subject to a permit review by the Planning Department; however, propane tanks are subject to
Planning Department regulations. Such regulations primarily consist of setbacks from shorelines and features considered to be critical areas (streams,
'wetlands, slopes, etc.) If you think such fe ture xist on or nearby your property, please contact the Planning Department so that exact setback
IF. requirements can be determined. X
24) All property lines shall be clearly identified at the time of foundation inspection. X
25) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mas unty inances and building regulations.
X
26) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder n�d action from being taken. No more than one extension may be granted.
X
27) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners,
corm t s, lashing. Install metal connectors approved for contact with the new types of pressure treated material.
X
28) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to ensure
these structures meet the setback conditions listed.
X
29) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your
"App to ensure these structures are shown and meet the setback conditions listed.
X�.
30) All development is to follow recommendations made within the Geological Assessment prepared by LGL Geological Services, dated April 2, 2008. The
geotechnic I ass e ent shall remain attached to the approved building plans.
X
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at anytime after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to
the above described property d str cture for review and inspection.
OWNER OR AGENT: DATE:
NhL�
008-00221 Please referto the following pages for conditions of this permit. 5 of 5
L l
LL
N CONCRETE MEC ANICAL MANUFACTURED HOME C
o
!S Date l�-t>� By ------^----�-- .._..._..--
C) Footings Setbacks Ribbons M
Gas Piping /'
o Interior Date By Interior-Date1111CR ByL%O)L Date By
N Extenor Date og By Exterior-Date /G'7�Z B cst.up _
-
Point Load J isolated Footings INSULATION Date By 0
BG 1 SLAB INSULATION --- D
Date By Data By FIRE DEPARTMENT
Foundation Walls Floors Date By
Date 6 �Z •off e
Data _ By 'K DECKS
FRAMING .^4!9 walls Date By
Date By Data By PROPANE TANKS
PLUMBING vault Date By
Data By OTHER
Groundwork Attic
Date By Type
Date BY Date By
D.W.v DRYWALL rype-
Date By Int.Brace Wall Date _ By
l7! Date By FINAL INSPECTION
v Water Line Fire Separation N
Date - By Date y_ ' By Date /(� Z!r 06f E3y L0J[ p
co
Pass or Request Inspect. I c
s Type of Insp. Fail Date Dante Done By Comments — N
CD
-w��-rr�o� �o�ss
En r v -
°
° �'�lZ
CA
°
CD
a'z Z17 �Po! Lr -u- O bra c�►i
_3.0
/-4.; .we'd, - yw
AN&K 3 19 01 1311 VA
� 'at« Gss
a
J
tom.v%c I 7_4 4� 8107J ke- IA 1?L./A4 1,01L--
PERMIT NO.
MASON COUNTY
PLUMBING/MECHANICAL PERMIT APPLICATION
426 W.Cedar• P.O. Box 186, Shelton, WA 98584
Shelton (360) 427-9670• Belfair(360) 275-4467 • Elma (360) 482-5269
On the web www.co.mason.wa.us
APPLICANT INFORMATION CONTRACTOR INFORMATION
Owner 7gVJi7 1-- V6E-77C# Company Name
Mailing Address 1711 7`H, IE Mailing Address
City/17L14LE I S State_LLj_Zip Code City State Zip Code
Phone,-;?(-(& ,2 3,J-- 'f-3 o 3 Other Ph. -?cv 27& <-5 U 7 Phone Other Ph.
Lien/Title Holder / J/-} Contractor Reg. # Exp.
E mail address F/N�SI 6-n,S �J Cuti Lff i N�T E Mail Address
Drivers Lic.# DOB Drivers Lic.# DOB
SEPTIC INFORMATION - Connect to New Septic Existing Septic. Connect to Sewer System
Name of Sewer System
PARCEL INFORMATION - 12 Digit Parcel No. Fire District
Legal Description
Site Address (Please include street name, street number and city) E C(e S r- biw C Ty--cT'I E .) 1 rfi--
Directions to site Nw 3 4-r—daUILW L_oo p — Ai L llo2 r 9-D — c' PPS T- L-,-1 N
Is property within 200'of Saltwater Lake River/Creek Pond
Wetland Seasonal Runoff—Stream—Slopes or Bluffs > 15%
TYPE OF JOB - New ' Add Alt Repair Other Use of Building
Location of Fixtures/Units - 1st Floor 2nd Floor Basement Garage Closet
PLUMBING FIXTURES (Show Number of each) MECHANICAL UNITS
Type of Fixture No. of Fixtures Fees Fuel Type:Electric, _ LPC Natural Gas_ Heat Pump_
Toilets � Type of Unit No. of Units Fees
Bathroom Sink Furnace
Bath Tubs Heatpumps
Showers Spot Vent Fan
Water Heater Propane Tank
Clothes Washer Gas Outlets
Kithen Sinks Wood/Gas/Pellet Stove
Dishwasher Kitchen Exhaust Hood
Hosebibs Dryer Vent
Other Other
Base Fee Base Fee
TOTAL PLUMBING TOTAL MECHANICAL
OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of
such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this
permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties.If permission is
required from any easement holder or any other party in interest regarding this application or the work proposed in the application,I have obtained
permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information
provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection.
PROD INUATION OF VI(ORK IS BY MEANS OF A PROGRESS INSPECTION.
X Date:
�. 7
e /Owners Representative?Contractor (indicate which one)
FOR OFFICIAL USE BEYOND THIS POINT
Accepted by: Planning Pd Ck# Date Bld Pd Receipt No.
DEPARTMENTAL REVIEW APPROVED DENIED NOTES
Building Department
Occ Group—Type Constr.
Planning Department
Environmental Health Department
FEES
Plumbing & Base Fee Site Inspection
Mechanical & Base fee UFC Plan Review Fee
Wood/Gas/Pellet Stove Fee Other
Violation Fee TOTAL FEES