Loading...
HomeMy WebLinkAboutPAR2016-00015 - PAR Application - 3/30/2016 MASON COUNTY (360)427-9670 Shelton ext.352 DEPARTMENT OF COMMUNITY DEVELOPMENT (360) 275-4467 Belfair ext. 352 � J (' BUILDING• PLANNING•FIRE MARSHAL (360)482-5269 Elma ext. 352 Mason County Bldg 8, 615 West Alder Street Shelton, WA 98584 www.co.masonma.us 1854 RE: Pre-Submission Conference PAR2016-00015 Parcel Number: 42002-24-90030 Dear Applicant, Please find enclosed a computer-generated report summarizing the results of your pre-submission conference on 3/30/2016 if you have questions regarding the summary report, please do not hesitate to call the appropriate staff member. The various staff members, the departments they represent and their telephone extensions are listed below: DEPARTMENT STAFF MEMBER EXTENTSION INITIALS Fire Inspector/Comm. Dev. Jeromy Hicks 282 JNH Building/Comm. Dev. Trish Woolett 281 TW Environ. Health Spec./Public Health Alex Paysse 279 ALP Eng. Tech/Public Works Fred Perryman 625 FJP Planner/Comm. Dev. Grace Miller 360 GBM Planner/Comm. Dev. Rebecca Hersha 287 RDH Planner/Comm. Dev. Kell McAboy 365 KJM Planner/Comm. Dev Michael MacSems 571 MMS Stormwater Eng./Public Works Loretta Swanson 769 LGS The comments are based on the project discussed during the pre-submission conference. Any changes or alterations to the original proposal may significantly change the permit requirements. In this case a second pre-submission conference will most likely be required to discuss the changes. Information provided to the prospective applicant during the pre-submission conference is based on Mason County regulations in effect at the time of the conference. Revised or new regulations could affect a future development application. A pre-submission conference does not vest a future development application. If further assistance is needed please contact us at 360.427.9670 ext. 352 or www.co.mason.wa.us. - cot '` MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Mason County Bldg. 8, 615 West Alder Street Shelton, WA 98584 1854 www.co.mason.wa.us (360)427-9670 Belfair(360)275-4467 Elma(360)482-5269 MASON COUNTY PRE-SUBMISSION CONFERENCE NOTES • BUILDING DEPARTMENT REPRESENTATIVE: (360) 427-9670 ext. 281 E-Mail: tw@co.mason.wa.us • DATE: March 30, 2016 • PROJECT/ PROJECT TRACKING NUMBER: PAR2016-00015 • PROJECT REPRESENTATIVE (S): Tricia Woolen • DESCRIPTION & SIZE OF PROJECT/OCCUPANCY CLASSIFICATION & USE: 2-400 sq ft. Pacifica job trailers for bathroom/office/fresh water. 8 feet high chain link fence with privacy screen to encompass 28,160 sq ft, of outdoor grow space 1502 producer/processor NOTE: The 2015 Building Codes go into effect July 1, 2016 GENERAL NOTES: Provide information and details showing how partition walls will be constructed including connection to the floor/foundation and roof framing. If extraction activities will take place in the structure, information will need to be provided with permit documents. Including a Mechanical Engineered design in accordance with WAC 314-55-104(See Attached). Identify where the work will take place and identify equipment that will be installed. If cooking will be done as part of the business identify location and provide cooking information. See handout from Mason County Fire Marshal. Separate Permit is required Identify storage locations and material that will be stored. See storage information in the document include MSDS sheets for fertilizers, identify packaging information, etc. OCCUPANCY CLASSIFICATION & USE: F1 Occupancy& B Occupancy Structure or areas used to process material onto a useable product. Includes packaging, labeling usable product for wholesale in retailers. Complete building permit applications will include the following information that is applicable to the project:: • SETBACKS TO PROPERTY LINES: Provide a site plan, drawn to scale. Clearly identify all structures, including fences, fuel tanks and other similar items, with setback dimensions on site the plan. Overhangs shall be limited in accordance with IBC 705 • DISTANCES TO OTHER STRUCTURES: Site plan, drawn to scale shall clearly identify distances, where required include fire-resistive details, including continuity, &tested assembly details. To be considered a separate structure each structure shall be located 20-ft from each other. Referencing IBC 705.3, buildings located on the same lot shall be assumed to have an imaginary line between the buildings, therefore to be considered a separate building a distance of 20-ft or more shall be provided. Overhangs hall be imitated in accordance with IBC Table 705.2. • FIRE RESISTANCE FOR EXTERIOR WALLS: When applicable include fire-resistive details, including continuity, &tested assembly details. When firewall are required to create a "separate" building the firewalls shall be constructed equal to 3- hours or better assembly constructed in accordance with IBC Section 706. • IDENTIFY TYPE OF CONSTRUCTION & PROVIDE ALLOWABLE AREA CALCULATIONS WHERE NEEDED. See Chapter 5, IBC. Type VB construction includes structures constructed with combustible construction such as wood framed structures. Type II construction includes steel structures constructed ENTIRELY by non-combustible construction. • FIRE-RESISTIVE RATED CONSTRUCTION &TYPE OF CONSTRUCTION : Where required demonstrate compliance. Identify the location of the assembly, compliance to continuity requirements and construction details: EXTERIOR WALL(IBC704), FIRE WALL(IBC705), FIRE BARRIER(IBC706), SHAFT ENCLOSURES (IBC 707), FIRE PARTITIONS(IBC 708), SMOKE BARRIERS(IBC 709), SMOKE PARTITIONS(IBC 710), HORIZONTAL ASSEMBLIES(IBC 711), PENETRATIONS(IBC 712), FIRE-RESISTANT JOINT SYSTEMS(IBC 713), FIRE-RESISTANCE RATING OF STRUCTUURAL MEMBERS(IBC 714), OPENING PROTECTION(IBC 715), DUCT&AIR TRANSFER OPENINGS(IBC 716), CONCEALED SPACES(IBC 717), ETC, • NUMBER OF EXITS REQUIRED/OCCUPANT LOAD:(IBC 1004): Table 1004 is used to determine occupant load used to evaluate the structure for exiting purposes, plumbing fixture requirements, and other code related concerns. Include design calculations, demonstrating how occupant loads were calculated, on building plans. F-1 & B Occupancies: 1:100 sq ft of the gross area. Occupant load is needed to verify that adequate exits are provided and to verify that adequate restrooms and other plumbing fixtures are provided in accordance with Chapter 29. • EXIT PLAN: Clearly identify the exit path and exit signage on construction plans. • ENGINEERING REQUIRED: Structures that do not comply with prescriptive specifications of the 2012 International Code (IBC) shall be designed in accordance with Chapter 16 of the IBC. These units require engineering for the pier system and tie down system. They must be stamped with detailed drawing from a Washington State Engineer. • ACCESSIBILITY REQUIRED: YES, include compliance information including design calculations demonstrating compliance to Chapter 11 and details demonstrating compliance to ANSI 117.1 in effect at the time of submittal. Include information demonstrating compliance for restrooms, employee work areas, parking spaces, accessibility to structure, drinking fountain, signage, etc. When required verify that building plans contain compliance information. • PLUMBING SYSTEMS (Chapter 29 Washington Amendment to IBC): Using IBC Chapter 10, determine occupant load. The number of plumbing fixtures is determined based upon the occupant load. Plumbing fixtures need not be provided for unoccupied buildings. Permitted building shall comply. On plans, include design calculations for the following: water closets(M/F), Lavatories, Drinking Fountains, etc. Occupancy dictates the structure shall provide restrooms in accordance with WAC Table 2902.1. When the total occupant load is 15 or less separate facilities for male and female need not be provided, but the fixtures and space must be accessible for persons with disabilities. Referencing IBC/WAC 2902.2 separate plumbing fixtures shall be required for each sex, except when the calculated occupancy load is 15 or less, then unisex fixtures shall be allowed. To calculate the number of fixtures and referencing Table 2902.1 the following fixtures shall be required: Plumbing fixture count can be for the entire facility, including all structures for compliance purposes. Provide design calculations demonstrating how the fixture count was determined on construction plans. • NON-RESIDENTIAL ENERGY CODE: ALL enclosed spaces require Non-Residential Energy Conservation Code (IECC/WSEC). Provide completed compliance forms (envelope & mechanical). Forms are available at: http://www.neec.net/resources/resources.html All heated OR cooled areas need to meet WSEC/IECC Regulations. Commissioning Reports required accordance with WSEC/IECC C408. • LIGHTING: All non-residential structures shall comply with IECC/WSEC lighting requirements. Complete compliance forms and provide a lighting plan that includes switching locations. WSEC forms and information can be accessed at: http://www.neec.net/resources/resources.html. Task lighting for plant growth and maintenance is exempt. (ref. 405.5.1 #6) In addition your local utility may have an incentive program, designed to help you lower energy consumption. To discuss incentive opportunities contact the Energy Services Department at PUD3 by calling (360) 426-0777 or PUD1 at(360) 877-5249. • Ventilation and Indoor Air Quality Code compliance: Provide calculations when required. • COMMERCIAL KITCHEN: Show compliance to Chapter 5 of the International Mechanical Code when a kitchen is included in the project. When the structure will be provided with a kitchen the kitchen must comply with specifications of the Mechanical Cove. When cooking produces grease or smoke a type 1 hood with fire suppression system is required. To properly evaluate provide information that clearly identifies what will be cooked and the type of cooking that will take place in the kitchen. • GEOTECH REPORT REQUIRED? YES NO X • PROVIDE A SPACE FOR STORAGE OF RECYCLED MATERIAL & SOLID WASTE (WAC51-50-009): Identify the location. • SPECIAL INSPECTION: Referencing IBC Chapter 17, Section 1704.2 Statement of special inspections prepared by registered design professional in responsible charge. Complete a Special Inspection authorization form as required by Chapter 17. • INTERIOR FINISHES: Include information demonstrating compliance to Interior finishes required in IBC Chapter 8. You must indicate finish material, including plastic please provide information about the material and submit with permit documents. Clearly identify finish material in cross section of construction plans. • STORAGE SPACES: Identify the space. Include material stored, anticipated quantities, height, and if hazardous such as solvents, fertilizers gases, etc. include MSDS sheets for each product. • STORAGE RACKS greater than 59" shall be permitted either with the proposed project or separate building permit. Where required documents shall include design information demonstrating stability for seismic conditions. Special inspection may be necessary, reference IBC Section 1707.6 and 1705.3 (4.5), storage racks, provide compliance information. • MECHANICAL EQUIPMENT: Identify the location and type of mechanical equipment located within, and outside the structure. Address foundation and support systems for equipment. Where new equipment will be placed on site provide UL listing information and/or construction details stamped by a Washington State licensed design professional. Where applicable include duct information and duct support compliance information. • SUSPENDED CEILING SYSTEMS: Provide details and specifications relating to suspended ceilings where applicable. Details shall be designed and approved for seismic loading in accordance to IBC Chapter 16. Where required designate special inspection plan. • FIRE MARSHAL REQUIREMENTS: Carefully review Fire Marshal comments requirements including fire protection requirements and identify compliance information on the proposed building plans. Show the location of fire extinguishers and identify type. The following items are required: See letter attached Referencing Washington State RCW 18.08.410 - Structures 4000 sq. ft or more shall have all plan pages reviewed and stamped by a Washington State licensed design professional. The review shall include a code evaluation addressing life-safety, plumbing & mechanical evaluation, and structural analysis. (ref. RCW 18.08.410) ALL PLAN PAGES SHALL BE STAMPED AND SIGNED BY THE DESIGN PROFESSIONAL, including plumbing and mechanical pages. • WATER SUPPLY& FIRE HYDRANT: Referencing IFC, Section 508; clearly identify fire hydrant location if one is located within 400 ft of the project. • FIRE FLOW: A copy of the approved method for determining fire flow is enclosed. Complete the Commercial fire-flow worksheet to identify fire flow and fire protection that may be necessary. Note that when fire flow is not available step 3 shall apply. See also requirements for IBC Table 503, allowable areas: 0-500 sq ft.: no protection (mitigation) needed. 501-5,999 sq ft.: Install a NFPA 72 addressable fire alarm system OR construct firewalls in accordance with IBC Section 706 to create maximum 2,000 sq ft fire areas. 6,000-12,000 sq ft.: Install NFPA 13 automatic fire sprinkler system OR install NFPA 72 addressable fire alarm system maximum 6,000 sq ft fire area with fire walls constructed in accordance with IBC Section 706, OR construct firewalls in accordance with IBC Section 706 to create maximum 2,000 ft fire areas. 12,000 sq ft. or more: Install NFPA 13 automatic fire sprinkler system. • EMERGENCY VEHICLE ACCESS: "Standards for Fire Apparatus Access Roads: adopted through Mason County Code Title 14 Section 14.17 is attached. Submit documents should clearly identify code compliance. • ADDRESSING: Referencing IFC, Section 505 and Mason County Code Chapter 14.28, all new buildings shall have an approved address. • AUTOMATIC FIRE ALARM: Referencing IFC, Section 907 and NFPA 72, when proposed provide information on plans that identifies your intent to install the alarm system. Automatic fire sprinkler system require a separate permit. • SPRINKLER SYSTEM: Referencing IFC, Section 903 and NFPA 13, when proposed provide information on plans that identifies your intent to install the NFPA 13 fire sprinkler system. • KNOX BOX: Referencing IFC, Section 506, access shall be required. Contact Your local Fire District PERMITS REQUIRED FOR PROJECT o BUILDING (For each Structure Modular) o PLUMBING/ MECHANICAL (submit to Labor and Industries) o FIRE SUPPRESSION, where required. See Fire Marshal comments o SIGN o FENCE (Greater than TO" above grade) o Extraction Permit WHEN YOU ARE READY, SUBMIT FOUR (4 SITE PLANS, DRAWN TO SCALE ALONG WITH THREE (3) COMPLETE SETS OF BUILDING PLANS INCLUDING THE FOLLOWING. (NOTE,ALL PLAN PAGES SHALL BE STAMPED BY THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHEN THE STRUCTURE EXCEEDS 4000 SQ. FT.): • BUILDING PERMIT APPLICATION (one for each structure) • ANY APPLICATIONS REQUIRED BY PUBLIC HEALTH • CONSTRUCTION PLANS, drawn to scale. Include floor plan, elevations, cross section, cross section, construction details and engineering with calculations. • NON-RESIDENTIAL ENERGY CODEIVENTILATION & INDOOR AIR QUALITY CODE INFORMATION. • DEFERRED SUBMITTAL WILL NOT BE ACCEPTED. • A PLAN REVIEW FEE WILL BE COLLECTED WHEN THE BUILDING PERMIT IS SUBMITTED. • ADDITIONAL SUBMITTALS AND REVIEW FEES FOR FIRE AND EXTRACTION AS DIRECTED ABOVE. DESIGN CRITERIA: SEISMIC ZONE: D2 WIND SPEED: 110 MPH, Exp B (Unless proven otherwise) GROUND SNOW LOAD: 25 PSF REFERENCE CODE EDITIONS: Effective July 1, 2013 (2015 IBC effective July 1, 2016) 2012 INTERNATIONAL BUILDING CODE(IBC), INCLUDING APPENDIX CHAPTERS C, E AND H, EXCLUDING H106; SECTIONS 101 THROUGH 107, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL,AND EXCLUDING APPENDIX CHAPTERS A, B, D, F, G, I, J AND K AND;ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51- 50,AND THE 2012 INTERNATIONAL EXISTING BUILDING CODE. 2012 UNIFORM PLUMBING CODE(UPC), PUBLISHED BY THE INTERNATIONAL ASSN. OF PLUMBING AND MECHANICAL OFFICIALS(IAPMO)AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-56 AND WAC 51-57, EXCLUDING SECTIONS 102.4 AND CHAPTERS 12, 15,AND 16, PART I. 2012 INTERNATIONAL MECHANICAL CODE(IMC), PUBLISHED BY THE INTERNATIONAL CODE COUNCIL,AND THE 2009 INTERNATIONAL FUEL GAS CODE AS ADOPTED THROUGH THE WASHINGTON STATE BUILDING CODE WAC 51-52. 2012 INTERNATIONAL FIRE CODE, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, EXCLUDING APPENDIX A, D, AND K AND ADOPTING APPENDICES B,C,E,F, G AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51- 54. 2012 INTERNATIONAL ENERGY CONSERVATION CODE(IECC), AS AMENDED BY WASHINGTON STATE BUILDING CODE WAC 51-11 To view the Mason County Building and Construction Code and adopted amendments go to the Mason County website at: www.co.mason.wa.us. NOTE: The 2015 Building Codes go into effect July 1, 2016 Q 3 cd o a O .ty C .O O O C O�A.� �•� � Cfn U R i U CCID U U y O tz ' Q U 'V U •_' Q cOC" i/) O E ° � U q � ❑ U plp U t O U U yviU❑ cd O O y � otl o a T a o a O o c o w o w ago z z z m ; s > C p p o a •- o w Q 3 c M M M y ^p R Q cd tocz U F+� 'O U a •C x c COC7 3 w o 0 .a i 3 O U O cC 3 G C U L1. U aCd V, d � N ° .D cC 00 a cC > O Q 0 Q 00 7 O O G. Q CQ cC E ❑ Q X � � O s.. U V] y � w •O cd txo oalCL ° Q •L � N � � � � y cd � � y � O O EO ca p n tlo > - 3 x > n ❑ n 3 Lt C TccaCko a i U p y cc x ^ry7� ° Le k X U X p0 W O ' U O i. y p- Qr O ❑ p O O Q¢-i O O. O O •m g 0 0 O fZ. LL Gz, � �. z z P. C%1 f••" O.'O Q 0U (=> � 4, s b b ❑ on N O by cd >, ° o •% o U � tw to O 0 p O p O U E'" bn pCWm Q L -0 ixn 0 3 U U d cu r- rn vUi U M cd bn p N E-• o .- •� o o y a a� T °> fl s s Cw cc coo son o .y w y b c 3 o Q Q a—ai w a� a3 a a kr) co cz a o c o > aoi a. L o tw a o o Cc w Cd o a�i CID Imt to Cj al CL U y 7 m m � C �y O. U c 5 o o •� N O o `cd n s on c ct v w •0 3 w cd c•i cc z VC� LLI 3 aci 3 a°i `o cc O o ° - o o U a o Z w L o fl a� o m a d o 3 o ? .n Q.= - n :3 son Q Es- ct ,c o cd cn � O .b y y Os, •�- N bn y 'Y O c�C m •y O p c'C IL N O U U 3 'C3 vUi N AJ = U m L1. c a� ro y Cl., al °' N N O U Q ,c, C w "T' a, ^C c�' �' 7 N w V] U p cn o v 'oo m a> - a� a� o s c>> o o oD U w d Ln ❑ U 00 wt8 Q w O U m O pp W U c > c v o y ro U ° p ccc C a> U 3 b w = - yams c - gs , ca`i ami -o ¢ E � a"i '�' o w m ° cc: tw NQ U ccz v cd p C .� y w G.w C o O cc �, .� 00 V N ¢' U O. ;- , '= C O a' 'Yd U 3 C •^ cd .'�.+ ti S]. E ¢ cd ao 00 m o o. o w a a>i o �; o ° c 8 ° o ° a ° U w c - w -, wr w Z b ca'i c u. o m o a °�' ° o Z to •� Bu obo O ° > on F E o a>i i o �> c ma c w 'ai ° U4. o � s o > x cZ ' m = Nvax o o m2 o o�nb � p¢ ro a o F •� ma y a� 3o w d aoi c y as � a a ¢ ¢ 04gL, — Es- u . •A as. °: ts- s �D o`n `o .� w a P. m � aa 3w N O a3 O O cr 41 O' Cd C r > O i ° • d O by p ct Cd ^a y 3 � " .On ^o a�i a0i oA y cz •0 3 a ° e a Cc o c a o 3 o c' czY � as Cl. ° a to a W p o CCI c edcz LZ o ao � cn a�i t p �o a¢i > M. cz o � -oCc Cc p p oCd l() O ^o o � ° ° 0 LZ L o N C a N N N O .T+ O � �4. al c� p„ o 0 on a o 06 ° 0 m 7; eS 0 3 2Q y• o o v w a; E y yCO o o .oH Cd U 30 b Y c w cli = ci d x a o •o b n bq ° ' a>i o eo E p U a a c > y U 3 ai a E .— 3 .c cd a Y ro w a. 3 4 °° v to ° p L ° L a pq '> U L N y. co C;3 w o .c 3 0 > o 6 c o d CL b y > > v 'o (1) 2 0 Cl 30 3 C v v as a n .� o °o o a = c o o > wCID b o o N •o au > o W o w c y o vO IV,72 s > W al cz LL 4 U N y d L z to bh •L cC c, b4 O ,^�, „O, G. ¢ C ^C N .- - N U NO '00 O C o ¢U •> O Q o Z 3 0 3 d o d a .k .o Q ai x a dd ° a b t 7s on a i� ai ° o a� o a d w w d a > p � Z oZ. a4 30 to > o z CO od c o W � can s ° F" 'w O - Q O a�i 3 yF" nbyW i Cd -: cSc• � riE 3 : avazUU vo Cx aL)i c.� c�i E� o ° va3 a, N 3 3 � N U O O N N M M M M a 3 w w z z Q Q o a M z z o 0 0 o 0 N °= w ' o W C = (nLLJ O v� a p. W o U � b p o 0 0 > a o N M = M W LU a > an o = D uD cu ._ 'a E G co O •L v. CL d > > 00 cd R _ �. cc� C O O bA a O o o kn Y coU.1 MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Mason County Bldg. 8, 615 West Alder Street Shelton, WA 98584 1854 www.co.mason.wa.us (360)427-9670 Belfair(360)275-4467 Elma (360)482-5269 MASON COUNTY PRE-SUBMISSION CONFERENCE NOTES • BUILDING DEPARTMENT REPRESENTATIVE: (360) 427-9670 ext. 281 E-Mail: tw@co.mason.wa.us • DATE: March 30, 2016 • PROJECT/ PROJECT TRACKING NUMBER: PAR2016-00015 • PROJECT REPRESENTATIVE (S): Tricia Woolett q,m" y) y" • DESCRIPTION & SIZE OF PROJECT/OCCUPANCY CLASSIFICATION & USE: 2-400 sq ft. Pacifica job trailers for bathroom/office/fresh water. 8 feet high chain link fence with privacy screen to encompass 28,160 sq ft, of outdoor grow space 1502 producer/processor NOTE: The 2015 Building Codes go into effect July 1, 2016 GENERAL NOTES: Provide information and details showing how partition walls will be constructed including connection to the floor/foundation and roof framing. If extraction activities will take place in the structure information will need to be provided with permit documents. Including a Mechanical Engineered design in accordance with WAC 314-55-104 (See Attached). Identify where the work will take place and identify equipment that will be installed. If cooking will be done as part of the business identify location and provide cooking information See handout from Mason County Fire Marshal. Separate Permit is required Identify storage locations and material that will be stored. See storage information in the document include MSDS sheets for fertilizers, identify packaging information, etc. OCCUPANCY CLASSIFICATION & USE: F1 Occupancy & B Occupancy Structure or areas used to process material onto a useable product. Includes packaging, labeling usable product for wholesale in retailers. Complete building permit applications will include the following information that is applicable to the project:: • SETBACKS TO PROPERTY LINES: Provide a site plan, drawn to scale. Clearly identify all structures, including fences, fuel tanks and other similar items, with setback dimensions on site the plan. Overhangs shall be limited in accordance with IBC 705 • DISTANCES TO OTHER STRUCTURES: Site plan, drawn to scale shall clearly identify distances, where required include fire-resistive details, including continuity, &tested assembly details. To be considered a separate structure each structure shall be located 20-ft from each other. Referencing IBC 705.3, buildings located on the same lot shall be assumed to have an imaginary line between the buildings, therefore to be considered a separate building a distance of 20-ft or more shall be provided. Overhangs hall be imitated in accordance with IBC Table 705.2. • FIRE RESISTANCE FOR EXTERIOR WALLS: When applicable include fire-resistive details, including continuity, &tested assembly details. When firewall are required to create a "separate" building the firewalls shall be constructed equal to 3- hours or better assembly constructed in accordance with IBC Section 706. • IDENTIFY TYPE OF CONSTRUCTION & PROVIDE ALLOWABLE AREA CALCULATIONS WHERE NEEDED. See Chapter 5, IBC. Type VB construction includes structures constructed with combustible construction such as wood framed structures. Type II construction includes steel structures constructed ENTIRELY by non-combustible construction. • FIRE-RESISTIVE RATED CONSTRUCTION &TYPE OF CONSTRUCTION : Where required demonstrate compliance. Identify the location of the assembly, compliance to continuity requirements and construction details: EXTERIOR WALL (IBC704), FIRE WALL (IBC705), FIRE BARRIER (IBC706), SHAFT ENCLOSURES (IBC 707), FIRE PARTITIONS (IBC 708), SMOKE BARRIERS (IBC 709), SMOKE PARTITIONS (IBC 710), HORIZONTAL ASSEMBLIES (IBC 711), PENETRATIONS (IBC 712), FIRE-RESISTANT JOINT SYSTEMS (IBC 713), FIRE-RESISTANCE RATING OF STRUCTUURAL MEMBERS (IBC 714), OPENING PROTECTION (IBC 715), DUCT&AIR TRANSFER OPENINGS (IBC 716), CONCEALED SPACES (IBC 717), ETC, • NUMBER OF EXITS REQUIRED/OCCUPANT LOAD:(IBC 1004): Table 1004 is used to determine occupant load used to evaluate the structure for exiting purposes, plumbing fixture requirements, and other code related concerns. Include design calculations, demonstrating how occupant loads were calculated, on building plans. F-1 & B Occupancies: 1:100 sq ft of the gross area. Occupant load is needed to verify that adequate exits are provided and to verify that adequate restrooms and other plumbing fixtures are provided in accordance with Chapter 29. • EXIT PLAN: Clearly identify the exit path and exit signage on construction plans. • ENGINEERING REQUIRED: Structures that do not comply with prescriptive specifications of the 2012 International Code (IBC) shall be designed in accordance with Chapter 16 of the IBC. These units require engineering for the pier system and tie down system. They must be stamped with detailed drawing from a Washington State Engineer. • ACCESSIBILITY REQUIRED: YES, include compliance information including design calculations demonstrating compliance to Chapter 11 and details demonstrating compliance to ANSI 117.1 in effect at the time of submittal. Include information demonstrating compliance for restrooms, employee work areas, parking spaces, accessibility to structure, drinking fountain, signage, etc. When required verify that building plans contain compliance information. • PLUMBING SYSTEMS (Chapter 29 Washington Amendment to IBC): Using IBC Chapter 10, determine occupant load. The number of plumbing fixtures is determined based upon the occupant load. Plumbing fixtures need not be provided for unoccupied buildings. Permitted building shall comply. On plans, include design calculations for the following: water closets (M/F), Lavatories, Drinking Fountains, etc. Occupancy dictates the structure shall provide restrooms in accordance with WAC Table 2902.1. When the total occupant load is 15 or less separate facilities for male and female need not be provided, but the fixtures and space must be accessible for persons with disabilities. Referencing IBC/WAC 2902.2 separate plumbing fixtures shall be required for each sex, except when the calculated occupancy load is 15 or less, then unisex fixtures shall be allowed. To calculate the number of fixtures and referencing Table 2902.1 the following fixtures shall be required: Plumbing fixture count can be for the entire facility, including all structures for compliance purposes. Provide design calculations demonstrating how the fixture count was determined on construction plans. • NON-RESIDENTIAL ENERGY CODE: ALL enclosed spaces require Non-Residential Energy Conservation Code (IECC/WSEC). Provide completed compliance forms (envelope & mechanical). Forms are available at: http•//www.neec.net/resources/resources.html All heated OR cooled areas need to meet WSEC/IECC Regulations. Commissioning Reports required accordance with WSEC/IECC C408. • LIGHTING: All non-residential structures shall comply with IECC/WSEC lighting requirements. Complete compliance forms and provide a lighting plan that includes switching locations. WSEC forms and information can be accessed at: http://www.neec.net/resources/resources.html. Task lighting for plant growth and maintenance is exempt. (ref. 405.5.1 #6) In addition your local utility may have an incentive program, designed to help you lower energy consumption. To discuss incentive opportunities contact the Energy Services Department at PUD3 by calling (360) 426-0777 or PUD1 at (360) 877-5249. • Ventilation and Indoor Air Quality Code compliance: Provide calculations when required. • COMMERCIAL KITCHEN: Show compliance to Chapter 5 of the International Mechanical Code when a kitchen is included in the project. When the structure will be provided with a kitchen the kitchen must comply with specifications of the Mechanical Cove. When cooking produces grease or smoke a type 1 hood with fire suppression system is required. To properly evaluate provide information that clearly identifies what will be cooked and the type of cooking that will take place in the kitchen. • GEOTECH REPORT REQUIRED? YES NO X • PROVIDE A SPACE FOR STORAGE OF RECYCLED MATERIAL & SOLID WASTE (WAC51-50-009): Identify the location. • SPECIAL INSPECTION: Referencing IBC Chapter 17, Section 1704.2 Statement of special inspections prepared by registered design professional in responsible charge. Complete a Special Inspection authorization form as required by Chapter 17. • INTERIOR FINISHES: Include information demonstrating compliance to Interior finishes required in IBC Chapter 8. You must indicate finish material, including plastic please provide information about the material and submit with permit documents. Clearly identify finish material in cross section of construction plans. • STORAGE SPACES: Identify the space. Include material stored, anticipated quantities, height, and if hazardous such as solvents, fertilizers gases, etc. include MSDS sheets for each product. • STORAGE RACKS greater than 59" shall be permitted either with the proposed project or separate building permit. Where required documents shall include design information demonstrating stability for seismic conditions. Special inspection may be necessary, reference IBC Section 1707.6 and 1705.3 (4.5), storage racks, provide compliance information. • MECHANICAL EQUIPMENT: Identify the location and type of mechanical equipment located within, and outside the structure. Address foundation and support systems for equipment. Where new equipment will be placed on site provide UL listing information and/or construction details stamped by a Washington State licensed design professional. Where applicable include duct information and duct support compliance information. • SUSPENDED CEILING SYSTEMS: Provide details and specifications relating to suspended ceilings where applicable. Details shall be designed and approved for seismic loading in accordance to IBC Chapter 16. Where required designate special inspection plan. • FIRE MARSHAL REQUIREMENTS: Carefully review Fire Marshal comments requirements including fire protection requirements and identify compliance information on the proposed building plans. Show the location of fire extinguishers and identify type. The following items are required: See letter attached Referencing Washington State RCW 18.08.410 -Structures 4000 sq. ft or more shall have all plan pages reviewed and stamped by a Washington State licensed design professional. The review shall include a code evaluation addressing life-safety plumbing &mechanical evaluation, and structural analysis (ref. RCW 18.08.410) ALL PLAN PAGES SHALL BE STAMPED AND SIGNED BY THE DESIGN PROFESSIONAL, including plumbing and mechanical pages. • WATER SUPPLY & FIRE HYDRANT: Referencing IFC, Section 508; clearly identify fire hydrant location if one is located within 400 ft of the project. • FIRE FLOW: A copy of the approved method for determining fire flow is enclosed. Complete the Commercial fire-flow worksheet to identify fire flow and fire protection that may be necessary. Note that when fire flow is not available step 3 shall apply. See also requirements for IBC Table 503, allowable areas: 0-500 sq ft.: no protection (mitigation) needed. 501-5,999 sq ft.: Install a NFPA 72 addressable fire alarm system OR construct firewalls in accordance with IBC Section 706 to create maximum 2,000 sq ft fire areas. 6,000-12,000 sq ft.: Install NFPA 13 automatic fire sprinkler system OR install NFPA 72 addressable fire alarm system maximum 6,000 sq ft fire area with fire walls constructed in accordance with IBC Section 706, OR construct firewalls in accordance with IBC Section 706 to create maximum 2,000 ft fire areas. 12,000 sq ft. or more: Install NFPA 13 automatic fire sprinkler system. • EMERGENCY VEHICLE ACCESS: "Standards for Fire Apparatus Access Roads: adopted through Mason County Code Title 14 Section 14.17 is attached. Submit documents should clearly identify code compliance. • ADDRESSING: Referencing IFC, Section 505 and Mason County Code Chapter 14.28, all new buildings shall have an approved address. • AUTOMATIC FIRE ALARM: Referencing IFC, Section 907 and NFPA 72, when proposed provide information on plans that identifies your intent to install the alarm system. Automatic fire sprinkler system require a separate permit. • SPRINKLER SYSTEM: Referencing IFC, Section 903 and NFPA 13, when proposed provide information on plans that identifies your intent to install the NFPA 13 fire sprinkler system. • KNOX BOX: Referencing IFC, Section 506, access shall be required. Contact Your local Fire District PERMITS REQUIRED FOR PROJECT o BUILDING (For each Structure Modular) o PLUMBING/MECHANICAL (submit to Labor and Industries) o FIRE SUPPRESSION, where required. See Fire Marshal comments o SIGN o FENCE (Greater than 7'0" above grade) o Extraction Permit WHEN YOU ARE READY, SUBMIT FOUR (4 SITE PLANS, DRAWN TO SCALE ALONG WITH THREE (3) COMPLETE SETS OF BUILDING PLANS INCLUDING THE FOLLOWING. (NOTE, ALL PLAN PAGES SHALL BE STAMPED BY THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHEN THE STRUCTURE EXCEEDS 4000 SQ. FT.): • BUILDING PERMIT APPLICATION (one for each structure) • ANY APPLICATIONS REQUIRED BY PUBLIC HEALTH • CONSTRUCTION PLANS, drawn to scale. Include floor plan, elevations, cross section, cross section, construction details and engineering with calculations. • NON-RESIDENTIAL ENERGY CODE/VENTILATION & INDOOR AIR QUALITY CODE INFORMATION. • DEFERRED SUBMITTAL WILL NOT BE ACCEPTED. • A PLAN REVIEW FEE WILL BE COLLECTED WHEN THE BUILDING PERMIT IS SUBMITTED. • ADDITIONAL SUBMITTALS AND REVIEW FEES FOR FIRE AND EXTRACTION AS DIRECTED ABOVE. DESIGN CRITERIA: SEISMIC ZONE: D2 WIND SPEED: 110 MPH, Exp B (Unless proven otherwise) GROUND SNOW LOAD: 25 PSF REFERENCE CODE EDITIONS: Effective July 1, 2013 (2015 IBC effective July 1, 20161 2012 INTERNATIONAL BUILDING CODE (IBC), INCLUDING APPENDIX CHAPTERS C, E AND H, EXCLUDING H106; SECTIONS 101 THROUGH 107, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, AND EXCLUDING APPENDIX CHAPTERS A, B, D, F, G, I, J AND K AND; ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51- 50, AND THE 2012 INTERNATIONAL EXISTING BUILDING CODE. 2012 UNIFORM PLUMBING CODE (UPC), PUBLISHED BY THE INTERNATIONAL ASSN. OF PLUMBING AND MECHANICAL OFFICIALS(IAPMO) AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-56 AND WAC 51-57, EXCLUDING SECTIONS 102.4 AND CHAPTERS 12, 15, AND 16, PART I. 2012 INTERNATIONAL MECHANICAL CODE (IMC), PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, AND THE 2009 INTERNATIONAL FUEL GAS CODE AS ADOPTED THROUGH THE WASHINGTON STATE BUILDING CODE WAC 51-52. 2012 INTERNATIONAL FIRE CODE, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, EXCLUDING APPENDIX A, D, AND K AND ADOPTING APPENDICES B,C,E,F, G AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51- 54. 2012 INTERNATIONAL ENERGY CONSERVATION CODE(IECC), AS AMENDED BY WASHINGTON STATE BUILDING CODE WAC 51-11 To view the Mason County Building and Construction Code and adopted amendments go to the Mason County website at: www.co.mason.wa.us. NOTE: The 2015 Building Codes go into effect July 1, 2016 P vpe4z-, I 0L'm MASON COUNTY DEPARTMEN O kwmwmm TY DEVELOPMENT b PA9 M104,, FIRE MARSHAL Mason County Bldg. III, COPY 426 West Cedar Street, Shelton, WA 98584 www.co.mason.wa.us Shelton (360)427-9670 Belfair(360)275-4467 Elma (360)482-5269 March 21,2016 Fire Marshal Notes: Permit:PAR2016-00015 Name: Mountain Medicine Clinic LLC Phone: 360-725-9754 • All exit doors must swing in the direction of travel to exit(outwards). • Post exit signs on all exits. • Fire extinguishers(minimum rating of 2A:1 OBC)shall be mounted not more than 5' above the ground. • Fire access provided as required in Mason County Title 14. • Knox box key access provided to local Fire District. Contact Jeromy Hicks @ 360-275-6711 to provide access keys. • Posted signs above doors "THIS DOOR TO REMAIN UNLOCKED WHILE THE BUILDING IS OCCUPIED". • No Extraction permitted without separate permit. • No Cooking perrqitted without commercial hood and cooking appliances. Separate permit required. Reviewed by: Jeromy Hick FIRE MARSHAL MASON COUNTY DEPARTMERMMUNITY DEVELOPMENT FIRE MARSHAL COPY TM 29 = Mason County Bldg. III, 426 West Cedar Street, Shelton, WA 98584 www.co.mason.wa.us Shelton (360)427-9670 Belfair(360)275-4467 Elma (360)482-5269 March 21,2016 Fire Marshal Notes: Permit:PAR2016-00015 Name: Mountain Medicine Clinic LLC Phone: 360-725-9754 • All exit doors must swing in the direction of travel to exit(outwards). • Post exit signs on all exits. • Fire extinguishers(minimum rating of 2A:1 OBC)shall be mounted not more than 5' above the ground. • Fire access provided as required in Mason County Title 14. • Knox box key access provided to local Fire District. Contact Jeromy Hicks @ 360-275-6711 to provide access keys. • Posted signs above doors "THIS DOOR TO REMAIN UNLOCKED WHILE THE BUILDING IS OCCUPIED". • No Extraction permitted without separate permit. • No Cooking permitted without commercial hood and cooking appliances. Separate permit required. Reviewed by: Jeromy Hic FIRE MARSHAL PAR Zoe Co -GCO t5 DATE - I(ri-Z0114 PRE-APPLICATION CONFERENCE REQUEST FORM The purpose of the pre-submission conference is to identify and/or eliminate as many potential problems as possible in order for the project to be processed without delay. Representatives for the Fire Marshal's Office, Building Department, Environmental Health, Planning, and Public Works Departments May attend the meeting to discuss rules and regulations applicable to the proposed project. Topics covered during the meeting will include the comprehensive plan, shoreline program, zoning, availability of sewer and potable water, development concepts, building construction, fire protection and life safety concerns of the proposed project. The pre-submission conference will be most informative when you provide accurate and detailed information on the Pre-Application Conference Application Form and the site plan.Applications will be accepted when all information is received and deemed complete. Pre-Application Conferences are held every Wednesday and last up to one hour. To schedule a meeting complete the applications and return with 6 copies of the detailed site plan;by 3:00 PM on the Wednesday two weeks prior to the proposed meeting. 1. Pre-Application/Community Services Dept. 2. Environmental Health 615 W. Alder St 415 N 5'}' Shelton, WA 98584 Shelton, WA 98584 360.427.9670 ext. 352 360.427.9670 ext. 400 Check amount: $255.00 Check amount: $205.00 BOTH CHECKS MADE PAYABLE: MASON COUNTY TREASURER Applicant: Site Plan Name: 1 1W ,t 1-1 if d, C t f h r\i C L L C_ Submit 6 copies Mailing Address: t�C� t %G �-u Am,'Ar r Include the following information Daytime Telephone: Q r - S!YD_Z��-j 3Fax: ❑ Indicate Scale and North Arrow Email address: ❑ Property line dimensions,easements, and right-of-ways. Representative: }c�t(y'�F'"� �r-`�-ir�'�l El The location of all existing and Name: proposed structures.Include square Mailing Address: 1 _-3t­�Inz) 7 4 I— (;f a he rn `y'A footage of existing and proposed r1 j c- - structures. Daytime Telephone: Q5�-3: -�JDff ax: i ❑ Setback distance,in feet from all Email address: )ckVN- e CtY E r�l 0 m G, I Coip property lines and structures. Parcel Number' (I2 digits) - - oo �o ❑ Existing and proposed road access to and from the site. Description of Project: Include: 1) Square footage of structure, 2)Use of building and rooms(i.e., El Parking sites office,warehouse, restaurant, storage, etc), 3)Occupancy classification per ❑ Location of on-site sewage tanks and drainfields. IBC, Section 302.1, and construction type. 4)Provide two sets of plans, if ❑ Location of drinking water supply. available. Use separate sheet if necessary _ Include location on the proposed site I ; and surrounding parcels. LC i Y Imo' CY1 �eii n t i C C r icr ),L!, ❑ Steep bluffs,paf-ams,and 'C bodies of wat n �} r �� �:}t 1 Y � �v .� J 1y5s ❑ Locati and r°cn C`' cc r q r n,a) -,Z)1S C_g emergency vehicle access o t 1 \ t .->�� �i'QC-,.�:)��,t•- �-i�,-���,r-,� including grade. ���6 ❑ Surface and storm a r - oLte . Processing Building Quarantine Work Area Dr Cure 1 Trim/ Package Administration Building z Office Security { i. E. ..,.._i... ..A_..... .. _.4.... r. ..._1.— '....._.,..-J. _ .#_.-.. .....L. _ d.._...... _.�..._._...i." __`—•---G._..._ Vx i T ix a ' s , I _r 7 1€ r_ t l 1 i 1 ' i ` t 1 , ? i fE-6 1 F r _ 1 `. � � , � ! � t � l t i � {....c3..� i.... L�i :'6i4"'-v^•�•, - -awk...saaur�..: f ; ' i 1 t , DATE ZO! Co - Ono�5 -Z-dtt4 PRE-APPLICATION CONFE ENCE REQUEST FORM The purpose of the pre-submission conference is to identify and/or eliminate as many potential problems as possible in order for the project to be processed without delay. Representatives for the Fire Marshal's Office, Building Department, Environmental Health, Planning, and Public Works Departments may attend the meeting to discuss rules and regulations applicable to the proposed project. Topics covered during the meeting will include the comprehensive plan, shoreline program, zoning, availability of sewer and potable water, development concepts, building construction, fire protection and life safety concerns of the proposed project. The pre-submission conference will be most informative when you provide accurate and detailed information on the Pre-Application Conference Application Form and the site plan.Applications will be accepted when all information is received and deemed complete. Pre-Application Conferences are held every Wednesday and last up to one hour. To schedule a meeting complete the applications and return with 6 copies of the detailed site plan;by 3:00 PM on the Wednesday two weeks prior to the proposed meeting. 1. Pre-Application/Community Services Dept. 2.Environmental Health 615 W. Alder St 415 N 56' Shelton, WA 98584 Shelton, WA 98584 360.427.9670 ext. 352 360.427.9670 ext. 400 Check amount: $255.00 Check amount: $205.00 BOTH CHECKS MADE PAYABLE: MASON COUNTY TREASURER Applicant: Site Plan Name: G.>`r,�n'i n 111 e r C` i f- f C h r\i C L L(L Submit 6 copies Mailing Address: t_�(D t "��r 7t ('G kwn,'y\ Include the following information Daytime Telephone: Q t;5- r-6�3 ❑ Indicate Scale and North Arrow Email address: 't nGt+ C ❑ Property line dimensions,easements, and right-of-ways. Representative: ❑ The location of all existing and _. Name: CiYYII'-` A cY'ty e_n proposed structures.Include square footage of existing and proposed Mailing Address: _.� �� 1 �-�t�-1-t3-, . � (_ �.��<ta�c=i rYl � g g p p c�j - -�- structures. Daytime Telephone: az �-3, -�-j�ax: ❑ Setback distance,in feet from all Email address: t property lines and structures. Parcel Number' (I2 digits) - � - ( X _ o ❑ Existing and proposed road access to and from the site. Description of Project: Include: 1) Square footage of structure, 2)Use of building and rooms(i.e., ❑ Parking sites office,warehouse,restaurant, storage, etc), 3)Occupancy classification per ❑ Location of on-site sewage tanks and drainfields. IBC, Section 302.1, and construction type.4)Provide two sets of plans, if ❑ Location of drinking water supply. available. Use separate sheet if necessary Include location on the proposed site and surrounding parcels. ���x C �� �C rr�t`��, EP � C� "�"k�C.�r 1•e.zF-� �t t r ��,�t1 h_ 1 ❑ Steep bluffs,wetlands, streams,and bodies of water ,r ❑ Location of fire hydrants and Cam`�A 6 C t,r f-cA-C emergency vehicle access roads, including grade. ❑ Surface and storm water run-off routes. t , ff + 4 , -71 , i 4 � { 3 i i t � 1 a . !..__.._t i i i �_ �f • , _ ....... sou{ r "_I �•• __k_ { 1 A tt 5� i t a A i + ) ! 1 i I t_.. 3 + x t l g . + ! i 3 t{ i Processing Building Quarantine Work Area { Dry/Cure Trim/ Package Administration Building Office Security � i F I� 4 41 i