Loading...
HomeMy WebLinkAboutSEP2006-00142 - SEP Determinations - 4/30/2007 ON_STA MASON COUNTY C ° DEPARTMENT OF COMMUNITY DEVELOPMENT M s° = Planning Division ~ o T �? P 0 Box 279, Shelton,WA 98584 Y (360)427-9670 1864 M L'LD i i=DIED MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2006-00142 Description of Proposal: THIS SEPA IS BEING AMENDED TO ADD DETAILS AND PLANS ON THE PROPOSED GRADING ON-SITE (SEE (F1 Eb ATTACHED GRADING PLAN) THIS AMENDED SEPA APPLIES ONLY TO THE GRADING, THE PREVIOUS SEPA ISSUANCE COVERS THE 9-LOT SUBDIVISION. DAPBP LLC: 9-lot commercial/industrial short subdivision. The site is situated over a Type II Critical Aquifer Recharge Area. Use of the resulting lots will be conditioned to comply with the CARA chapter of the Mason County Critical Areas Ordinance. Prior to final county approval the project will require Dept of Transportation approval for access and Dept of Health approval for a Group A water system. MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2006-00142 Proponent: DAPBP, LLC Site Address (If Assigned): Directions to Site: NORTH SIDE OF DAYTON AIRPORT RD, WHERE SANDERSON WAY INTERSECTS Parcel Number: 420022400000 Legal Description: SE NW EX SE PCL 2 OF BLA #01-75 Lead Agency: Mason County The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21 C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. MITIGATED MEASURES ARE ATTACHED. Please contact Pam Bennett-Cumming at ext. 287 with any questions. This DNS is issued under WAC 197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown below, when the determination is final. Comments must be submitted to Dept. of Community Development, P.O. Box 279, Shelton WA 98584 by 5/14/2007. Appeal of this determination must be filed within a 14-day period following this final determination date, per Mason County Code Chapter 15.11 Appeals. � - _07 Authorized Local Government Official Date MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2006-00142 CONDITIONS OF THIS DETERMINATION �) TYPE II CRITICAL AQUIFER RECHARGE AREA This short subdivision is located over a Type II Aquifer Recharge Area. Future use of these parcels is subject to the requirements and restrictions of chapter 17.01.080 of the Mason County Resource Lands and Critical Areas Ordinance. X 2) WATER USE This application for short subdivision will not be approved until either a Group A or Group B water system (consistent with RCW 90.44.050 and WAC 246-290-020) has been approved and installed to service the resulting lots. Total daily water usage shall not exceed 5,000 gallons per day unless a water right has been obtained from the Washington State Department of Ecology. Group A systems are reviewed and approved by the Washington State Department of Health. Group B systems are reviewed by Mason County. If the applicant claims a water rights exemption, whether a Group A or a Group B system, Mason County shall require metering, restrictive convents or other appropriate measures to ensure that total water usage does not exceed 5,000 gallons per day. X 3) HIGHWAY ACCESS Approval of this project is dependent upon an Access Permit from the Washington State Department of Transportation. X 4/30/2007 Conditions Associated With 11:49:45AM Case#: GRD2007-00008 Permit Condition .. - 4; 0 7 u. =IIP.. IllNill�N = status U""dated It l(iii � I ii E' H ltle tus � ;` �it klAr = ll do at + m . � i ii �..iy WTI iii 1) 1 CRITICAL AQUIFER RECHARGE AREA NOT MET 4/30/2007 PBC Site is located in portion of Mason County identified as Critical Aquifer Recharge Area. Practices on site are subject to Mason county Resource Ordinance Critical Aquifer Recharge Area chapter 17.01.080. x 2) 70 Erosion Protection NOT MET 4/30/2007 PBC All upland areas disturbed or newly created by construction activities shall be seeded,vegetated or given some other equivalent type of protection against erosion. X 3) 140 Temporary Erosion Control NOT MET 4/30/2007 PBC Temporary Erosion control measures must be implemented to prevent water quality degradation of adjacent waters or wetlands. X 4) 150 Site Plan and Topographic Section NOT MET 4/30/2007 PBC Approved per site plan and topographic cross-section. X Page 1 of] CaseConditions..rpt MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2006-00142 CONDITIONS OF THIS DETERMINATION 1) TYPE II CRITICAL AQUIFER RECHARGE AREA This short subdivision is located over a Type II Aquifer Recharge Area. Future use of these parcels is subject to the requirements and restrictions of chapter 17.01.080 of the Mason County Resource Lands and Critical Areas Ordinance. X 2) WATER USE This application for short subdivision will not be approved until either a Group A or Group B water system (consistent with RCW 90.44.050 and WAC 246-290-020) has been approved and installed to service the resulting lots. Total daily water usage shall not exceed 5,000 gallons per day unless a water right has been obtained from the Washington State Department of Ecology. Group A systems are reviewed and approved by the Washington State Department of Health. Group B systems are reviewed by Mason County. If the applicant claims a water rights exemption, whether a Group A or a Group B system, Mason County shall require metering, restrictive convents or other appropriate measures to ensure that total water usage does not exceed 5,000 gallons per day. X 3) HIGHWAY ACCESS Approval of this project is dependent upon an Access Permit from the Washington State Department of Transportation. X to I"Z ' L(.C_ Al xc�0�1% • � Ord V 1� 10 — —— —— — 5 J81551" E 659.06 306.42 352 63 WATER `�~�0 00'� � �.O- A � SYSTEM---�; :o Ij-- EASEMENT �I W I, 1"=200 FEET T'H cT 100, _ 100, 200 400 )UNTY RECORD OF SURVEY wl I E 94, AF N0. 1745912 —————— C14 LOT10I i� LET M U ;fit Imo; to `o 001 (� PARCEL NO. to 420022400000 zt I PARCEL 6 BLA 01-75 I I 518" REBAR & CAP TPµCT 20' WATER AF N0. 1745913 - PED LS #27194) 4 to & POWER oo EASEMENT 60' ACCESS oi UTILITIES II 518" REBAR & CAP I I &EASEMENT PED HOLMAN LS #15653) to _— 82.63' ----"—"'— >SED WELL —— 306.42 1 353.27 2.4 S 88"15'51" E /� ��S 8875'S1' E o LINE00 ' R=25' / Iw I R=25' 0; ACREAGES ?� -u�,,,- 0) cor �° �j LOT 0 w 3 F. ACRES r0?`7'S 3 !io 381 2.18 z I i rn T03 2.18 a,;3' 12 I o 550 2.29 2.4' - I I o -- S 88'15 51 E S 88'15'51' E z 347 4.61 306.42 344 5.31 ( I 353.59 521 2.64 �w Ir-- 60 ACCESS 558 2.52 LOT r� a I & UTILITIES ,� 301 1.26 TRACT o Z �� �t EASEMENT 525 1.26 2 n (a Ml LOT lz I RMWATER 2,4' S 88'1551" E I I S 88'15 51 E ACREAGES ' F. ACRES —————— 306.42 1 �1 353.89 �r 321 0.35 I 0�1 LOT 00 711 0.41 c^o LOT I^ !'1 8 t, 0) 1 (� S 88'15'51` E Tr?ACT ►� (0 t 354.05 1 I 001 LOT 00 .* o S 88'15'51' E I S 88 551' E to PUMP HOUSE 306.42 354.20 — — —t321.34 — 2'6� TRACT A R=25' — — — — — — -, (f R=25' TRACT 9 n 306.42 J � •5--5 — - - DA YTON—MA TLOCK ROAD (SR 102) on'aeara mWoad 0 7j WVMVaa ONioa NIA ` l� bIEMZ-foLI09f) 'w ig (��. )IHVd 883NISn6 nrE1 u " S Mw KKiOL fHHF7 iaodalV aoL.ra FF - In E a N k O 00 O O O 00 � 41 ..... " $� 'HHtll VIS : I 1 -- vIMo4D IAi 1Nf: s b�5's'( Mdros£D Loi tME i : : I I M � I I +pN 1 I O I W II II IG o�o 11 II ' I �` fsl I I 11 `� M4 EH'HHE s �49 � o Ez 6 l sa'eaz 1, ! w+urc aa"z I.I f'1 wioasn wi w( i I 11g . II I1- i i - 11 I I I I eassz II II � I +fI I T i 0 1 i zaZ6 I sx� ' .SIN 905aL Eel : • - 3Hn M/a . '.F "L�6L3$1(la 1H6f�Y1tCS�VQ' — 1 NOLL335a31N13NIla3LN3J ^�.. SF m ..;3n off., >;E _ « =c m «o o r gyaE o o € go ;4B >Eo TY o w o my �E m" ag^ S °c $ o $ «« is«a �$ ;o x ; o na «oo o EaL zc Ea=o. o s3 S?g`oo in< o.f. agao=��s. >•v aoo �o c =ET « <onuEt°Y�s f yb5 <n4 o. of EEa� T °£E « 5 auea=: mo -= i o yo _ a««3a,£o-eon o. " a nc oovu _£` _o�moo c «o co 3c > o Eo ocv« Eo'3c$v` ° ^ £ =n£S =o8op $ _g�o> $o�ooYo$4 �� �a _$.�«$ too ooi«$qo�s S. `+"«°,z�v` Eamon.°-o£ _ Y< «tlV °_ o.mo _ - �J�.'.£'md€se" `3' goa Emarn€v _ t.sop£ o o£ o «o E�o�o$za on"'� ��o °sac m�. 3 °..o« ° m" «`akSm o S< Sa-�== o€$ c v.g�"= a�ao �Wa .- ST omto- ni=`oo9 :a " .n�°"'�Er£ moq���.£ xo� °cg°a2 ««.°ac°`w.«coTng-nn Na�£o�cc co per° _£ =-crnam Waato v5� vc a tsv n og m ogE v'_m«� Y�o rt .$ep't"'_ oQ« Hy -_ °�o ` £$i^$°" no >.«a�5 �xE E ��sgEa .«mco Egg- u.- mo. -go SEE. o �$S�-o �S£o °o - c43oo E�am£c g '•`i.'�•.. 61E.1 :ESE£ ��So<.. £ 0�°�3$�0� 8���."�mn�m��=of m °oo i�EsF E mo•° nnain £ .3 �vSY na _. Now - & Ex! .s,N nw�a oa$U` Y t •,' ri ni Y's iviro ..a o.-as. t .9 .,4rio « x�o c oc Seri�°,roE in�v �i�aond a=oN 3$rii6 Sui'mro F j ; w� Z d Qwo to£ v vo a.Y�Y s` - - _ §'�" c moo°' 2s ri aMa / �Z o G E o f E So $o D ; 3ov $ o s oa E� now$ u o£c£ q.�a«gpo E. :a v £ �--"�= rnoea s$ J o¢ox r•i o: c n Ss oa•_ oaf °mg £ `o S - n$o«" «€««+.nE aka Ec J J zaZw o iBa m«ao- N« ~€=_ag -• s 2�o aY``z €v = cOo iaE w o 7cn�c� Z a ' -may u o - nE° ur a. o _S.E�%£�, -`E°a to vai Jvi - p w j +so Ye o p E. aE=o - € �$oo �8moW �-o- oho g "Ey _ Z>W T}. n W ai p< - `o� nmgEo £ty o« Do a €om go = •-o.c_ avo 00 G; °c�c aa1;,.wo tag^ uZ�go qv mo 3"mmn� cu �N Q Om., +8 cooko~nvu E°c nLEc�`ncm "w Pa° ooE"tb «€=c o om o<£c3€�rx`p asoa < °« orS o««' E iiP p u o�ToEan&c� $ m E«o=E _m,t o 'nn ot4o =2 a o:F- vt' ayy Eko cc �toEv 2 ° c oEovI r So o oeoov ` a 000a� cEg M 30 Sf£3 F05do 2 9 «a a$c .So$mti.'5« na-lig $'^a`.i«nG cLo"£�iSc«v Qoa"'9to�,o" o °.t - " £" fl wsom�!iZwn v°vak�a1�6nE eE U W N � �J Q ^s _ LLI N N O � y W �d� � S � z Q Ixo-• �` cyi o � a LiJ rn d $ E LL in N 3 W2 o m Q a w w b s 3�g � ��Yf m� i J o i•h . Q rri � : I m � „�a � � •� 3 � _� X o' L I S W � W � w U Z ty V 2 Fes-• 00 LLJ W yWU�ap � = I Q iVN 3 EQ'. �V� x I hk� ~ W 4 N f i R�I�I�1 n M w Z �I�Id 3 I+ En Z ~ Ut=1 W Z u WWI OJ � ••Zp n0 u I poi W o a C U We e U w MASON CO. ENVIROMENTAL CHECKLIST REVISED 5fp Z ZO 0 6 _ Oa A. BACKGROUND 1. Name of proposed project, if applicable: Dayton Airport Business Park 2. Name of applicant: DAPBP, LLC 3. Address and phone number of applicant and contact person: Doug Bloom DAPBP, LLC P O Box 627 Rainier, WA 98576 (360) 951-7868 4. Date checklist prepared: September 27, 2006 5. Agency requesting checklist: Mason County 6. Proposed timing or schedule (including phasing, if applicable): Short Plat Subdivision approval in November 2006; construction December 2006 — February 2007. 7. Do you have any plans for future expansion, or further activity related to or connected with this proposal: If yes, explain. Following final subdivision approval, structures will be constructed (by others) on each of the new 9 lots. Sanitary sewer is not currently available to serve the project site so individual septic systems will be utilized in the interim. Dry sewer lines will be installed during construction to provide for future connection to the public sewer system. Water will be provided by a Group A water system constructed on the project site. Mason County Environmental Checklist Page 1 of 15 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. Preliminary Drainage Plan by Olympic Engineering, Soils Report for Drainage Purposes and soil logs (septic system suitability) by Parnell Engineering. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. None to our knowledge. 10.List any government approvals or permits that will be needed for your proposal, if known. SEPA approval, Short Plat Subdivision approval, Group A Water System Design approval (by Washington State Department of Health), Septic System Design approval, Final Construction Plan approval, Grading Permit, Encroachment Permit, building permits (by others for future structures). 11.Give a brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) Subdivide 24.99 acres into 9 lots, ranging between 1.26 and 5.31 acres in size, for commercial and/or industrial use. Following Short Plat Subdivision approval, the internal private roadway, storm water facilities (for private roadway), and utilities will be constructed. A dry sanitary sewer main and laterals will be installed for connection to a future public sewer system. A Group A water system will serve potable water to the 9 lots. Following construction completion, the lots will be sold and future buildings will be constructed by others. Based upon the allowable floor area ratio in the Shelton Urban Growth Area (1:1.5), the total combined footprint of the future buildings will not exceed 704,220 square feet. As each lot is developed, an onsite sewage disposal system and storm water facilities for the associated parking areas will be designed, approved and constructed through the land use/building permit process. Buffer yards and landscaping will also be addressed at the time of individual lot development. 12.What is the location of the proposal? Give sufficient information for a person to understand the precise location of your proposed project including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. Mason County Environmental Checklist Page 2 of 15 While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. The project site is located on the north side of Dayton - Airport Road (State Route 102), at the intersection of SR102 and Sanderson Way. Legal Description: THE SOUTH 24.99 ACRES OF THE WEST HALF (W 1/2) OF THE EAST (E %) OF THE NORTHWEST QUARTER (NW '/4) OF SECTION 2, TOWNSHIP 20 NORTH, RANGE 4 WEST, W.M., MASON COUNTY, WASHINGTON. SAID LAND BEING ALSO KNOWN AND DESCRIBED AS THE RESULTING PARCEL 2 OF BOUNDARY LINE ADJUSTMENT NO. 01-75, RECORDED DECEMBER 21, 2001, AUDITOR'S FILE NUMBER 1745913 AND APPEARING ON THE MAP OF SAID BOUNDARYLINE ADJUSTMENT AS THE RESULTING PARCEL 6. Assessor Tax Parcel Number: 420022400000, Section 02, Township 20N, Range 4W B. ENVIRONMENTAL ELEMENTS: 1. EARTH: a. General description of the site (circle one) Flat rolling, hilly, steep slopes, mountainous, other b. What is the steepest slope on the site (approximate percent slope)? Project site is nearly level, 2 — 3 percent slope over the entire 24.99 acres. c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. Grove Gravelly Sandy Loam. Refer to soil logs prepared by Parnell Engineering for further information. d. Are there surface indications or history of unstable soils in the immediate vicinity: If so, describe. No. Mason County Environmental Checklist Page 3 of 15 e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. Approximately 1,700 Cubic Yards of cut and 1,200 Cubic Yards of clean material (crushed, asphalt) will be imported from an approved source. f. Could erosion occur as a result of clearing, construction, or use: If so, generally describe. Temporary erosion control facilities will be in place prior to construction. Following construction, all disturbed pervious areas will be stabilized with hydroseed. g. About what percent of the site will be covered with impervious surfaces after project constructions (for example, asphalt or buildings)? Because the future buildings and associated parking for each of the 9 new lots will be constructed by others, the percent of impervious surface is unknown. However, it will not exceed the maximum amount allowed by Mason County development regulations. h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: Temporary erosion control measures will be implemented to reduce the potential for erosion during construction. Following construction, disturbed pervious areas will be stabilized with hydroseed. 2. AIR: a. What types of emissions to the air would result from the proposal (i.e. dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities, if known. The future use of these lots is unknown but will however be identified during the development permit process by others. Uses that produce emissions that would adversely affect visibility at the nearby airport would likely not be permitted. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. None known. Mason County Environmental Checklist Page 4 of 15 c. Proposed measures to reduce or control emissions or other impacts to air, if any: None proposed. 3. WATER: a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. No. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. Not applicable. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. Not applicable. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. No. 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. No. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No. Mason County Environmental Checklist Page 5 of 15 b. Ground: e CC°V\CA 2 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities, if known. A Group A water system will serve the 9 future lots. This water system will not withdrawal more than 5,000 gallons of water per day. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example; domestic sewage, industrial, containing the following chemicals..., agricultural, etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. A septic system will be designed and installed on each of the 9 lots in conjunction with construction of the future buildings (by others). c. Water runoff(including storm water).- 1 Describe the source of runoff(including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this flow into other waters? If so, describe. The future road has been design so that the resulting storm water will flow to the west end of the site where it will be captured by catch basins, conveyed to the wetponds for treatment, and then infiltrated back into the ground in ponds. Roof runoff from future buildings (by others) will be infiltrated on each individual lot in roof drain drywells, sized appropriately for the square footage of the building. As each lot is developed (by others), a storm water system will need to be designed, approved and constructed to capture, treat, and infiltrated the storm water resulting from additional impervious surfaces (parking). 2) Could waste materials enter ground or surface waters: If so, generally describe. Storm water resulting from the new private road will be treated (wetpond) prior to infiltration so it is unlikely that waste materials could enter ground or surface waters. Mason County Environmental Checklist Page 6 of 15 d. Proposed measures to reduce or control surface, ground, and runoff water impacts,if any: The storm drainage system has been designed in accordance with the requirements of the Washington State Department of Ecology and Mason County. 4. PLANTS: a. Check or circle types of vegetation found on the site: deciduous tree: alder, maple, aspen, other evergreen tree: fir, cedar, pine, other X shrubs : scotch bloom X grass pasture crop or grain wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? Existing vegetation consisting of scotch bloom and grasstweeds will be removed during the grading process. All disturbed pervious areas will be hydroseeded following construction. c. List threatened or endangered species known to be on or near the site. None known. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: Landscaping will be installed on each of the 9 lots as it is developed. 5. ANIMALS a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: Birds: hawk r gbird on, eagle, son other Mammals. deer bear, elk, beaver, other Fish: bass, salmon, trout, herring, shellfish, other Mason County Environmental Checklist Page 7 of 15 b. List any threatened or endangered species known to be on or near the site. None known. c. Is the site part of a migration route? If so, explain. Not to our knowledge. d. Proposed measures to preserve or enhance wildlife, if any: None proposed. 6. ENERGY AND NATURAL RESOURCES: a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. Electricity will be used for lighting. Electricity, natural gas, or propane will be used for heating. As part of the future building permit process (by others), requirements of the Energy Code will be observed. b. Would your project affect the potential use of solar energy by adjacent properties: If so, generally describe. No. c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: Energy efficiency and conservation will be addressed as part of the future building permit process (by others). 7. ENVIRONMENTAL HEALTH: a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. None known. 1) Describe special emergency services that might be required. None known. Mason County Environmental Checklist Page 8 of 15 2) Proposed measures to reduce or control environmental health hazards, if any: None proposed. Sk �0 1 e S c(f O b. Noise. Cyr 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? Noise resulting from the nearby airport is not expected to affect this project. 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hour's noise would come from the site. During site construction (short-term) noise will result from the operation of equipment. Construction activity will occur during daylight hours. Because the future use of the individual lots is unknown, we are not able to address the type of noise and hours of operation. This matter will be addressed through the land use and building permit process at the time of development. 3) Proposed measures to reduce or control noise impacts, if any: Because the impacts associated with this development proposal are temporary, no measures are proposed. 8. LAND AND SHORELINE USE: a. What is the current use of the site and adjacent properties? The project site is currently undeveloped. Commercial development exists to the east and west. Parcels to the north and northeast are undeveloped. Dayton Airport Road (SR102) is located to the south. b. Has the site been used for agriculture? If so, describe. No. c. Describe any structures on the site. None. Mason County Environmental Checklist Page 9 of 15 d. Will any structures be demolished? If so, what? No. e. What is the current zoning classification of the site? Shelton Urban Growth Area. f. What is the current comprehensive plan designation of the site? Shelton Urban Growth Area. g. If applicable, what is the current Shoreline Master Program designation of the site? Not applicable. h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. No. i. Approximately how many people would reside or work in the completed project? Because the future use of each of the 9 lots is unknown, the number of people that will work in the completed project is unknown. j. Approximately how many people would the completed project displace? None. k. Proposed measures to avoid or reduce displacement impacts, if any: None proposed. I. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: The future use of the lots will be commercial and/or industrial in nature, as allowed by zoning. Mason County Environmental Checklist Page 10 of 15 9. HOUSING: a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. Not applicable. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. Not applicable. c. Proposed measures to reduce or control housing impacts, if any: Not applicable. 10. AESTHETICS: a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? The future buildings (constructed by others) will not exceed 35 feet, unless a variance is granted by Mason County. Exterior building materials will be finishes that are commonly used in commercial/industrial construction. b. What views in the immediate vicinity would be altered or obstructed? None. c. Proposed measures to reduce or control aesthetic impacts, if any: None proposed. 11. LIGHT AND GLARE a. What type of light or glare will the proposal produce? What time of day would it mainly occur? Street lights will be installed in conjunction with road construction. Exterior lighting of future buildings and associated parking areas will be proposed through the individual lot development process. Illumination will occur during non-daylight hours. Mason County Environmental Checklist Page 11 of 15 b. Could light or glare from the finished project be a safety hazard or interfere with views? Street lighs and exterior building lighting will be designed so that it does not result in hazardous glare or spill onto adjacent properties. c. What existing off-site sources of light or glare may affect your proposal: None known. d. Proposed measures to reduce or control light and glare impacts, if any: None proposed for the initial phase of construction (infrastructure). If required, this issue will be addressed at the time of individual lot development. 12. RECREATION: a. What designated and informal recreational opportunities are in the immediate vicinity? None known. b. Would the proposed project displace any existing recreational uses? If so, describe. No. c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: None proposed. 13. HISTORIC AND CULTURAL PRESERVATION: a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. No. b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. None known. Mason County Environmental Checklist Page 12 of 15 c. Proposed measures to reduce or control impacts, if any: None proposed. 14. TRANSPORTATION: a. Identify public streets and highways serving the site and describe proposed access to the existing street system. Show on site plans, if any. The project site is served by Dayton Airport Road (State Route 102). A private internal roadway will be constructed by the applicant to serve the 9 new lots. b. Is site currently served by public transit? If not, what is the approximate distance to the existing street system? Show on site plans, if any. Unknown. c. How many parking spaces would the completed project have? How many would the project eliminate? The number of parking spaces that will be constructed on each lot is dependent upon the square footage and use of each future building d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). A new private road will be constructed through the parcel to serve the 9 new lots. e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. Sanderson Field is located very near the project site. However, the future use of each lot (to be determined) will likely rely upon ground transportation. f. How many vehicular trips per day would be generated by the completed project: If known, indicate when peak volumes would occur. Until the use has been identified for each of the future buildings (by others) the number of vehicular trips per day generated by this project is unknown. It is anticipated that this issue will be addresses at the time of individual lot development. Mason County Environmental Checklist Page 13 of 15 g. Proposed measures to reduce or control transportation impacts, if any: Traffic impacts are dependent upon the type of use of the future buildings and therefore will be evaluated at the time of land uselbuilding permit application. 15. PUBLIC SERVICES: a. Would the project result in an increased need for public service (for example: fire protection, police protection, health care, schools, other)? If so, generally describe: No. b. Proposed measures to reduce or control direct impacts on public services, if any: None proposed. 16. UTILITIES: a. ntly available at the sitl ectricit atural gas water, refus elephone, anitary sewer, septic sys em, otner: 'riign speed Fiber b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. Potable water will be provided a Group A water system, owned and operated by Arcadia .Well Drilling. Individual lot septic drainfield systems will provide sewage disposal. A dry line sanitary sewer main and laterals will be installed for connection to a future public sewer system. Signature: The ove answers are true an omplete to the best of my knowledge. I understand tha the lead agency is relying them to make its decision. Signa e: t Kessell, S m and PXnnning Services, LLC O Box 34, Olympia, WA 98570771--6234 Date subm Mason County Environmental Checklist Page 14 of 15 ESA LISTED SALMONIDS CHECKLIST Applicant Information Proiect Information Name: Doug Bloom, DAPBP, LLC Name: Dayton Airport Business Park Phone: (360) 951-7868 Location: North side of Dayton Airport Road, approximately % mile west of Hwy 101, at the intersection of Sanderson Way Description: 9 lot Short Subdivision This worksheet was designed to help project proponents, and government agencies, identify when a project needs further analysis regarding adverse effects on ESA (Endangered Species Act) listed salmonids. Salmonids are salmon, trout and chars, e.g. bull trout. For our purposes, "ESA Listed Salmonids" is defined as fish species listed as endangered, threatened or being considered for listing. If ESA listed species are present or ever were present in the water shed where your project will be located, your project has the potential for affecting them, and you need to comply with the ESA. The questions in this section will help determine if the ESA listings will impact your project. The Fish Program Manager at the appropriate Department of Fish and Wildlife(DFW)regional office can provide information for the following two questions. 1. Are ESA listed salmonids currently present in the watershed in which your project will be located? YES NO X Please describe. 2. Has there ever been an ESA listed salmonid stock present in this watershed? YES NO X Uncertain Please describe. If you answered "yes" to either of the above questions, you should complete the remainder of this checklist. April 2003 Mason County Environmental Checklist Page 15 of 15 , MASON COUNTY DCD r o 401 t } Sent SEPA z7C' to(check all that apply)one ) Skokomish Tribal Nation WA Dept. of Ecology(saltwater) Natural Resources Dept. ATTN: Shoreline Permit Reviewer ATTN: Marty Ereth Southwest Regional Office N 541 Tribal Center Rd. PO Box 47775 Shelton, WA 98584 Olympia,WA 98504-7775 Quinault Indian Nation WA Department of Ecology(freshwater) ATTN: Mark Mobbs Environmental Review Section PO Box 189 PO BOX 47703 Tahola,WA 98587 Olympia,WA 98504-7703 Squaxin Tribal Nation a U.S.Army Corps of Engineers Natural Resources Dept. SEPA Reviewer 2952 SE Old Olympic Highway PO Box C-3755 Shelton, WA 98584 Seattle,WA 98124 The Confederated Tribe of the Chehalis WA Dept. of Fish and Wildlite ATTN: SEPA Reviewer ATTN: Margie Schirato(saltwater) 420 Howanut Rd. 2391 W Deegan Rd. Oakville,WA 98568 Shelton, WA 98584 �< Courtney Wasson WA Dept. of Fish&Wildlife WA DNR, South Puget Sound Region ATTN: Gloria Rogers(freshwater) 950 Farman Avenue North PO Box 695 Enumclaw,WA 98022-9282 Elma, WA 98541 Boyd Powers , WA Dept. of Transportation WA DNR, SEPA Center Environmental Policy&Coord. PO BOX 47027 HWY Administration Bldg. Olympia, WA 98504-7027 Olympia,WA 98504 Olympic Region Clean Air Agency City of Shelton 2940-B Limited Ln. NW 525 West Cota St. Olympia,WA 98502 Shelton, WA 98584 Mason County Transit Office of Archeaology& Historic Preservation PO Box 1880 ATTN: Stephanie Kramer Shelton, WA 98584 P.O. Box 48343 Agent Olympia, WA 98504-8343 r7 School District ® Applicant Ca, Mason Cty Public Works ATTN:John Sliva M Mason Cty Env. Health ATTN: