RE: Pre-Submission Conference
PAR2014-00016
Parcel Number: 42002-24-90010
Dear Applicant,
Please find enclosed a computer-generated report summarizing the results of your pre-submission
conference on 3/26/2014 if you have questions regarding the summary report, please do not hesitate to
call the appropriate staff member.
The various staff members, the departments they represent and their telephone extensions are listed
below:
DEPARTMENT STAFF MEMBER EXTENTSION INITIALS
Fire Inspector/Comm. Dev. Jeromy Hicks 282 JNH
Building/Comm. Dev. Debbera Coker - DLC
Environ. Health Spec./Public Health Cindy Waite 353 CEW
Eng. Tech/Public Works Fred Perryman 625 FJP
Planner/Comm. Dev. Grace Miller 360 GBM
Planner/Comm. Dev. Rebecca Hersha 287 RDH
Planner/Comm. Dev. Allan Borden 365 AHB
Planner/Comm. Dev Michael MacSems 571 MMS
Stormwater Eng./Public Works Loretta Swanson 769 LGS
The comments are based on the project discussed during the pre-submission conference. Any changes or
alterations to the original proposal may significantly change the permit requirements. In this case a
second pre-submission conference will most likely be required to discuss the changes.
Information provided to the prospective applicant during the pre-submission conference is based on
Mason County regulations in effect at the time of the conference. Revised or new regulations could affect
a future development application. A pre-submission conference does not vest a future development
application.
If further assistance is needed please contact us at 360.427.9670 ext. 352 or www.co.mason.wa.us.
CD d TJ (D
0 - CD a coil Y Y 0 CD n
o ac v w co co Y
T7tj
CD
CD n
w CD N b A S CT G
rr CD
P CD CD
*.
(� CD CD o ?• ° b o
�
CD- a C, voo CDw P CD p' o
x 0 n r? CD o o Co 5' 7 CD;s co
UQ
CD
2s < o_ CD CD
@ CD
< CD
a °�<°. n < ° o
co � o 0 0 =.
CD a CL aq
CD y o o a C. a P 7
� CD ,n � �n � C. CDam PO
m
o� CL
v�q C7 g CD Q
CD c bo d° w w 71
CD t:l al
y a w c m
0
K —0
'RD CD N G N CD N a1 Q- N o N
CD Q" N n N CD N N N CD
1
CD N
� trq� O `� O m O O �•
v m qq w
aq (D A A A A E' A N A D
M. CD N in• cD O1
CD m
CD o C7 CD o
F c' = ( CD O
CD
¢: CD G��O C
5
aq w N r�i1
CD n
CD a. °c m CD
a
<' UQ
q o
co ..
It
CAD 0 .. b n
t3 ° S A A N rD
N N N r
NJ �' cD �• N N N N N N O QcCi
„'b�
�• a o � A A o � � A N o r
o v
� C7 C7 CJ C7 � C
o• a O Czr] h tZz7 n tz
o N
a rLI
RL
CD
c 'B
0
CD A A w w w w w
�• � N N N N N N
= c�•D O_ O N N N N N
N CD A A A A A
I vi
n
O p,
p. cD
CDCD
_ o
o zro � � v � � a a
'�rr " zdo � a
� z � r CD
nk n '_ ode
zWdma �� z 0
> z
x C4
CD fmTl
C4p
m a O
on -n
-Ti
ZDO w n
gZz o m
yr D
z z
0
� z o
� n y
m
o =
ro o
c
m b n
c n
z b
CD
a
a C7
O
z
N
O_
� O
J
a b o w
a o
� � rn
MASON COUNTY FIRE MARSHAL
PRE-SUBMISSION CONFERENCE NOTES
FIRE MARSHAL REPRESENTATIVE:
Debbera Coker(360)427-9670 EXT 510, E-Mail: DLC@co.mason.wa.us
or Larry Waters (360) 427-9670 EXT 285, E-Mail: LAWa-co.mason.wa.us
DATE: March 26, 2014
PROJECT/ PROJECT TRACKING NUMBER : PAR2014-00016
PROJECT REPRESENTATIVE(S) or APPLICANT: Arcadia Drilling, Inc. Jason Zack
PROJECT DESCRIPTION & SIZE: New facility including 3 structures used for office, warehouse and equipment
storage, and a covered parking area.
The following information is essential to perform a plan review by the Fire Marshal's office. Proposed construction
plans and documents should include all applicable information listed below. Please note that the Fire Marshal
representative has made every attempt to identify all critical information that will be needed based upon the
information provided in the pre-application documents. Additional information may be necessary when the Fire
Marshal is presented with proposed plans for the project. The information provided below references the current
adopted codes. A complete list is provided at the end of this document.
• OCCUPANCY CLASSIFICATION & USE : Identify the occupancy classification(s) and specify use as
defined and specified in accordance to the current International Building Code (IBC), Chapter 3 and
International Fire Code (IFC), Chapter 2.
• CONSTRUCTION TYPE: Referencing IBC, Chapter 6 clearly identify the type of construction.
• WATER SUPPLY& FIRE HYDRANT: Referencing IFC, Section 508; clearly identify intended code
compliance, including type of water supply.
• FIRE FLOW: A copy of the approved method for determining fire flow is enclosed. Please provide a copy
of the completed worksheet with proposed construction documents.
• EMERGENCY VEHICLE ACCESS: A copy of the "Standards for Fire Apparatus Access Roads"
adopted through Mason County Building Code, Section 14.17 is attached. Verify that documents
clearly identify code compliance.
• ADDRESSING: Referencing IFC, Section 505 and Mason County Code Chapter 14.28, all new buildings
shall have an approved address. Applications for an approved address can be obtained on the Mason
County website at: www.co.mason.wa.us, Forms and Brochures, Community Development, the address
to the referenced web page is: http://www.co.mason.wa.us/forms✓Community_Deu/index.php. Each
building within the facility shall be distinguished with a separate identification so that emergency personnel
can find the building in the event of an emergency.
• EXITS: Verify that construction plans comply with IBC and IFC Chapter 10. Provide a code evaluation
that includes calculations demonstrating compliance to Section 1004. Construction plans must clearly
identify all exits, exit paths, length, signage information, etc.
• AUTOMATIC FIRE ALARM: Based upon information provided an automatic monitored fire alarm shall be
required. The alarm system shall comply with IFC, Section 907 and NFPA 72. Provide information on
construction plans demonstrating intent to comply. Note that automatic fire alarm systems shall require a
separate"Mason County Fire Protection System Permit Application". The application can be obtained by
going to same website and page referenced above.
• SPRINKLER SYSTEM: When fire flow is not available, when fire areas exceed 6000 sq. ft each structure
shall be provided with an automatic fire sprinkler system. When required, or proposed, provide information
demonstrating compliance IFC, Section 903 and NFPA 13. Note that automatic fire sprinkler systems shall
require a separate"Mason County Fire Protection System Permit Application". The application can be
obtained by going to same website and page referenced above.
• FIXED FIRE SUPPRESSION SYSTEM: Referencing IFC, Sections 904 and 905, provide information as
needed on construction plans demonstrating compliance. Note that fire suppression systems shall require
a separate"Mason County Fire Protection System Permit Application". The application can be obtained by
going to same website and page referenced above. Standpipe systems, where required, need to be
clearly identified on construction plans.
• KNOX BOX: Referencing IFC, Section 506, access shall be required, typically through use of a knox box.
Provide compliance information with construction documents. Contact the local fire district to make
arrangements for an approved key box, location, etc. The local fire district for your project is Fire District
Number: 11 and can be reached as follows (360)426-1822:
• GAS METERS/TANKS: Referencing The International Fuel Gas Code (IFGC) and NFPA 58 provide
compliance information as required within the referenced codes.
• STORAGE(TYPE, HEIGHT, ETC.) Referencing IFC, Chapter 19 (Lumber yards and wood working
facilities), Chapter 23 (High-piled combustible storage), Chapter 27 (Hazardous Materials), etc.
o Identify all materials to be stored, Identify anticipated quantities, location, material type (gas, solid,
liquid, etc.) and provide MSDS sheets for the material. Hazardous material information shall include
commodity classification (see IFC2303 and Table 2306.2), and type of plastics when applicable.
Include anticipated quantities, loose or baled, anticipated height,
o Identify hazardous materials classified as a physical or health hazard, include MSDS sheets as
specified in IFC Section 2703.4. Referencing Table 2703.1.1(1), identify proposed control areas and
method of protection. Referencing IFC Section 2704, identify spill control and proposed secondary
containment, see also IFC Table 2704.2.2
o Identify method of storage (i.e. racks, shelves, pallets and what storage method is constructed of such
as plastic, wood, metal, etc.) If pallets will be used , identify location of unused pallets and anticipated
quantity
o Identify flammable and combustible liquids, flammable gases, and flammable solids regulated under
IFC Chapters 34, 35 and 36. Include information demonstrating compliance, including proposed
storage, classification of flammable material and/or combustible liquid.
• OTHER:
REFERENCE CODE EDITIONS: Effective July 1, 2013
2012 INTERNATIONAL BUILDING CODE(IBC), INCLUDING APPENDIX CHAPTERS C, E;SECTION 101 THROUGH 106,AND H;
EXCLUDING SECTION H106, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL,AND EXCLUDING APPENDIX CHAPTERS A, B, D, F,
G, I,J AND K AND'ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-50, INCLUDING AS APPENDIX M,2006
INTERNATIONAL EXISTING BUILDING CODE.
2012 INTERNATIONAL RESIDENTIAL CODE FOR ONE-AND TWO-FAMILY DWELLINGS(IRC), Including Appendix Chapter G,
as published by the International Code Council Excluding Part IV Energy, Part VII Plumbing, Part VIII Electrical and
Appendix Chapters A, B, C, D, E, F, H, I, J, K, L, M, N, O, P, and Q; and adopting the Washington State Building
Code WAC 51-51.
2012 INTERNATIONAL FIRE CODE, published by the International Code Council, excluding Appendix A, and adopting
Appendices B, C, D, E, F, G and adopting the Washington State Building Code WAC 51-54.
2012 UNIFORM PLUMBING CODE(UPC), PUBLISHED BY THE INTERNATIONAL ASSN. OF PLUMBING AND MECHANICAL
OFFICIALS(IAPMO)AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-56 AND WAC 51-57.
2012 INTERNATIONAL MECHANICAL CODE(IMC), PUBLISHED BY THE INTERNATIONAL CODE COUNCIL,AND
ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-52.
2012 INTERNATIONAL ENERGY CONSERVATION CODE( IECC),AS AMENDED BY WASHINGTON STATE BUILDING CODE WAC 51-11
MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
Mason County Bldg. III, 426 West Cedar Street
PO Box 186, Shelton, WA 98584
www.co.mason.wa.us (360)427-9670 Belfair(360)275-4467 Elma(360)482-5269
MASON COUNTY PRE-SUBMISSION CONFERENCE NOTES
• BUILDING DEPARTMENT REPRESENTATIVE: Debbera Coker(360) 427-9670 EXT 510
E-Mail: DLC@co.mason.wa.us
• DATE: March 26, 2014
• PROJECT/ PROJECT TRACKING NUMBER: PAR2014-00016
• PROJECT REPRESENTATIVE (S): Arcadia Drilling, Inc., Jason Zack
• DESCRIPTION & SIZE OF PROJECT/OCCUPANCY CLASSIFICATION & USE: Construct 3 structures:
36'x60' office/lab building, 2160 sq. ft. —Occupancy classification B
60'x80'Warehouse & Equipment shop, 4800 sq. ft - Occupancy classification S-2 vehicle parking & repair,
S-1 Storage, Office space
Covered parking area, area unknown - S-2
Separate building permits shall be required for each structure. Complete applications will include the following
information applicable to the project with each building permit:
• SETBACKS TO PROPERTY LINES: Provide a site plan, drawn to scale. Clearly identify all structures,
including fences, fuel tanks and other similar items, with setback dimensions on site the plan.
• DISTANCES TO OTHER STRUCTURES: Site plan, drawn to scale shall clearly identify distances, where
required include fire-resistive details, including continuity, &tested assembly details.
• FIRE RESISTANCE FOR EXTERIOR WALLS: When applicable include fire-resistive details, including
continuity, &tested assembly details.
• IDENTIFY TYPE OF CONSTRUCTION & PROVIDE ALLOWABLE AREA CALCULATIONS WHERE
NEEDED. See Chapter 5, IBC. Type VB construction includes structures constructed with combustible
construction such as wood framed structures. Type II construction includes steel structures constructed
ENTIRELY by non-combustible construction.
• FIRE-RESISTIVE RATED CONSTRUCTION &TYPE OF CONSTRUCTION :
Where required demonstrate compliance. Identify the location of the assembly, compliance to
continuity requirements and construction details:
EXTERIOR WALL(IBC704), FIRE WALL(IBC705), FIRE BARRIER(IBC706), SHAFT ENCLOSURES
(IBC 707), FIRE PARTITIONS(IBC 708), SMOKE BARRIERS(IBC 709), SMOKE PARTITIONS(IBC
710), HORIZONTAL ASSEMBLIES(IBC 711), PENETRATIONS(IBC 712), FIRE-RESISTANT JOINT
SYSTEMS(IBC 713), FIRE-RESISTANCE RATING OF STRUCTUURAL MEMBERS(IBC 714),
OPENING PROTECTION(IBC 715), DUCT&AIR TRANSFER OPENINGS(IBC 716), CONCEALED
SPACES(IBC 717), ETC,
• NUMBER OF EXITS REQUIRED/OCCUPANT LOAD:(IBC 1004): Table 1004 is used to determine
occupant load used to evaluate the structure for exiting purposes, plumbing fixture requirements, and other
code related concerns. Include design calculations, demonstrating how occupant loads were calculated,
on building plans.
• EXIT PLAN: Clearly identify the exit path and exit signage on construction plans.
• ENGINEERING REQUIRED: Pole style structures shall be designed for lateral and wind as specified in
Chapter 16 of the IBC.
Referencing Washington State RCW 18.08.410 - Structures 4000 sq. ft or more shall have all plan
pages reviewed and stamped by a Washington State licensed design professional. The review shall
include a code evaluation addressing life-safety, plumbing & mechanical evaluation, and structural
analysis. (ref. RCW 18.08.410) ALL PLAN PAGES SHALL BE STAMPED AND SIGNED BY THE
DESIGN PROFESSIONAL, including plumbing and mechanical pages.
• ACCESSIBILITY REQUIRED: YES, include compliance information including design calculations
demonstrating compliance to Chapter 11 and details demonstrating compliance to ANSI 117.1 in effect at
the time of submittal. Include information demonstrating compliance for restrooms, employee work areas,
parking spaces, accessibility to structure, drinking fountain, signage, etc. When required verify that
building plans contain compliance information.
• PLUMBING SYSTEMS (Chapter 29 Washington Amendment to IBC): Using IBC Chapter 10, determine
occupant load. The number of plumbing fixtures is determined based upon the occupant load. Plumbing
fixtures need not be provided for unoccupied buildings. Permitted building shall comply. On plans, include
design calculations for the following: water closets (M/F), Lavatories, Drinking Fountains, etc.
Referencing IBC/WAC 2902.2 separate plumbing fixtures shall be required for each sex, except when the
calculated occupancy load is 15 or less, then unisex fixtures shall be allowed. To calculate the number of
fixtures and referencing Table 2902.1 the following fixtures shall be required:
Offices: 1 water closet per 25 for the first 50 and 1 per 50 for the remainder exceeding 50. 1
lavatory per 40 for the first 80.
Storage(S1&S2): 1 water closet per 100 and 1 lavatory per 100.
Plumbing fixture count can be for the entire facility, including all structures)for compliance purposes.
Provide design calculations demonstrating how the fixture count was determined on construction plans.
• NON-RESIDENTIAL ENERGY CODE: ALL enclosed spaces require Non-Residential Energy
Conservation Code (IECC/WSEC). Provide completed compliance forms (envelope & mechanical).
Forms are available at: http://www.neec.net/resources/resources.html
• LIGHTING: All non-residential structures shall comply with IECC/WSEC lighting requirements. Complete
compliance forms and provide a lighting plan that includes switching locations. WSEC forms and
information can be accessed at: http://www.neec.net/resources/resources.htmi.
In addition your local utility may have an incentive program, designed to help you lower energy
consumption. To discuss incentive opportunities contact the Energy Services Department at PUD3 by
calling (360) 426-0777 or PUD1 at(360) 877-5249.
• Ventilation and Indoor Air Quality Code compliance: Provide calculations when required.
• COMMERCIAL KITCHEN: Show compliance to Chapter 5 of the International Mechanical Code when a
kitchen is included in the project.
• GEOTECH REPORT REQUIRED? YES / NO (Refer to planning requirements)
• OIL SEPARATOR: REQUIRED when vehicle repair work is performed. Identify location and provide
construction details.
• PROVIDE A SPACE FOR STORAGE OF RECYCLED MATERIAL & SOLID WASTE (WAC51-50-009):
Identify the location.
• SPECIAL INSPECTION: Referencing IBC Chapter 17, Section 1704.1.1. Statement of special inspections
prepared by registered design professional in responsible charge. Complete a Special Inspection
authorization form.
• INTERIOR FINISHES: Include information demonstrating compliance to Interior finishes required in IBC
Chapter 8.
• STORAGE SPACES: Identify material stored, anticipated quantities, height, and if hazardous, include
MSDS sheets for each product.
• STORAGE RACKS greater than 5'9" shall be permitted either with the proposed project or separate
building permit. Where required documents shall include design information demonstrating stability for
seismic conditions. Special inspection may be necessary, reference IBC Section 1707.6 and 1705.3 (4.5),
storage racks, provide compliance information.
• MECHANICAL EQUIPMENT: Identify the location and type of mechanical equipment located within, and
outside the structure. Address foundation and support systems for equipment. Where new equipment will
be placed on site provide UL listing information and/or construction details stamped by a Washington State
licensed design professional. Where applicable include duct information and duct support compliance
information.
• FIRE MARSHAL REQUIREMENTS: Carefully review Fire Marshal comments requirements including fire
protection requirements and identify compliance information on the proposed building plans. Show the
location of fire extinguishers and identify type.
• SPRINKLER SYSTEM: Verify that design calculations include additional load attributed to required fire
sprinkler system.
• SUSPENDED CEILING SYSTEMS: Provide details and specifications relating to suspended ceilings
where applicable. Details shall be designed and approved for seismic loading in accordance to IBC
Chapter 16. Where required designate special inspection plan.
• OTHER:
PERMITS REQUIRED FOR PROJECT
o BUILDING
o PLUMBING/ MECHANICAL
o GRADING PERMIT(When greater than 200 cubic yards)
❑ CHANGE OF USE
o FIRE SUPPRESSION, where required. See Fire Marshal comments
o SIGN
o FENCE (Greater than 6'0" above grade)
Ll
ADDITIONAL NOTES:
WHEN YOU ARE READY, SUBMIT FOUR(4 SITE PLANS, DRAWN TO SCALE ALONG WITH THREE (3)
COMPLETE SETS OF BUILDING PLANS INCLUDING THE FOLLOWING. (NOTE,ALL PLAN PAGES SHALL
BE STAMPED BY THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHEN THE STRUCTURE
EXCEEDS 4000 SQ. FT.):
• CONSTRUCTION PLANS, drawn to scale. Include floor plan, elevations, cross section, cross section,
construction details, etc.
• MECHANICAL PLAN,
• PLUMBING PLAN AND
• NON-RESIDENTIAL ENERGY CODE/VENTILATION & INDOOR AIR QUALITY CODE INFORMATION.
• DEFERRED SUBMITTAL WILL NOT BE ACCEPTED.
• A PLAN REVIEW FEE WILL BE COLLECTED WHEN THE BUILDING PERMIT IS SUBMITTED.
VALUATIONS ARE BASED UPON THE MOST RECENT BUILDING STANDARDS VALUATION DATA
RECOMMENDATIONS AND THE PERMIT FEE WILL BE DETERMINED BASED UPON TABLE 1-A OF
THE 1997 UBC.
DESIGN CRITERIA:
SEISMIC ZONE: D2
WIND LOAD: 85 MPH, Exp B (Unless proven otherwise)
SNOW LOAD: 25 psf
REFERENCE CODE EDITIONS: Effective July 1 2013
2012 INTERNATIONAL BUILDING CODE(IBC), INCLUDING APPENDIX CHAPTERS C, E AND H, EXCLUDING
H106; SECTIONS 101 THROUGH 107, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL,AND EXCLUDING
APPENDIX CHAPTERS A, B, D, F, G, I, J AND KAND;ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-
50,AND THE 2009 INTERNATIONAL EXISTING BUILDING CODE.
2012 UNIFORM PLUMBING CODE(UPC), PUBLISHED BY THE INTERNATIONAL ASSN. OF PLUMBING AND
MECHANICAL OFFICIALS(IAPMO)AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-56 AND WAC
51-57, EXCLUDING SECTIONS 102.4 AND CHAPTERS 12, 15,AND 16, PART I.
2012 INTERNATIONAL MECHANICAL CODE(IMC), PUBLISHED BY THE INTERNATIONAL CODE COUNCIL,AND
THE 2009 INTERNATIONAL FUEL GAS CODE AS ADOPTED THROUGH THE WASHINGTON STATE BUILDING CODE WAC
51-52.
2012 INTERNATIONAL FIRE CODE, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, EXCLUDING APPENDIX A, D,
AND K AND ADOPTING APPENDICES B,C,E,F, G AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-
54.
2012 INTERNATIONAL ENERGY CONSERVATION CODE(IECC), AS AMENDED BY WASHINGTON STATE BUILDING
CODE WAC 51-11
To view the Mason County Building and Construction Code and adopted amendments go to the Mason
County website at: www.co.mason.wa.us.
t
1��� r oa:)) `fJ
DATE 3 - i 2,- i
PRE-APPLICATION CONFERENCE REQUEST FORM
The purpose of the pre-submission conference is to identify and/or eliminate as many potential problems as
possible in order for the project to be processed without delay. Representatives for the Fire Marshal's Office, Building
Department, Environmental Health, Planning, and Public Works Departments may attend the meeting to discuss rules
and regulations applicable to the proposed project. Topics covered during the meeting will include the comprehensive
plan, shoreline program, zoning, availability of sewer and potable water, development concepts, building construction,
fire protection and life safety concerns of the proposed project. The pre-submission conference will be most informative
when you provide accurate and detailed information on the Pre-Application Conference Application Form and the site
plan. Applications will be accepted when all information is received and deemed complete.
Pre-Application Conferences are held every Wednesday and last up to one hour. To schedule a meeting
complete the applications and return with 10 copies of the detailed site plan, by 3:00 PM on the Wednesday two weeks
prior to the proposed meetinE.
1.Pre-Application/Dept. of Community Dev. 2.Environmental Health
426 W Cedar Street/PO Box 279 415 N 5t' /PO Box 1666
Shelton,WA 98584 Shelton,WA 98584
360.427.9670 ext.352 360.427.9670 ext. 400
Check amount: $255.00 Check amount: $150.00
BOTH CHECKS MADE PAYABLE: MASON COUNTY TREASURER
Applicant: Site Plan
Name: rtYCc c�;� ® 'W'y , mac. 3o.,SoV. �ac-�- Submit 6 copies
Mailing Address: go go t--1 a O S1ne lko, q.$S F� Include the following information
Daytime Telephone: 36 o -�{`10— (cn t t Fax: 31ec-q Z fo- t 14 SS ❑ Indicate Scale and North Arrow
C
Email address: Com k. V�e.l` ❑ Property line dimensions,easements, �1
and right-of-ways. �J
Representative: •
Name: 'S�vv+,F, ❑ The location of all existing and `
proposed structures.Include square
Mailing Address: footage of existing and proposed
structures.
Daytime Telephone: Fax:
❑ Setback distance,in feet from all
Email address: property lines and structures. O
Parcel Number: (12 digits)y ZOO Z- 2y - ot O O t(3 ❑ Existing and proposed road access to
and from the site.
Description of Project:
Include: 1) Square footage of structure,2)Use of building and rooms(i.e., ❑ Parking sites
office,warehouse,restaurant,storage, etc), 3)Occupancy classification per ❑ Location of on-site sewage tanks and
drainfields.
IBC, Section 302.1, and construction type. 4)Provide two sets of plans, if
❑ Location of drinking water supply.
available.Use separate sheet if necessary Include location on the proposed site
and surrounding parcels.
o� O4"'c-2 �o��\d;+„Q 3tc x too o11Coo
❑ Steepbluffs wetlands,streams and
ONQ. M,0.�� �.a-tee d-�9N+ S"ta SOX gU� >
bodies of water
o V,0_ co Do-��"� &ram ❑ Location of fire hydrants and
�--
emergency vehicle access roads,
0 0 i cJ! r VXV including grade.
r 0itx U C to S (f- 5 ❑ Surface and storm water run-off routes.
A;, ��7
CV
P t
Has the project been discussed during a previous Pre-Application Conference: If yes,please indicate date.
Will the building have employees? If yes, how many?l P_s �D
What is the water availability of the proposed project? If there is an existing well, what is the name of the
system? Gy'av��S� 4 b!"h" kjvS;v.eSS QarL Toa 148lal? 9
What is planned for the on-site sewage system? If you are proposing a new on-site system provide detail on the
required site plan. 9fk•1 5�S�t�
ADDITIONAL INFORMATION.•
APPLICABLE BUILDING CODES
2012 International Building Code/2009 International Residential Code
2012 International Fire Code-ANSI Al17
2012 International Mechanical Code—WAC 51-42
2012 Uniform Plumbing Code—WAC 51-56/51-47
2012 International Energy Cons. Code/Washington State Energy Code—WAC 51-11C&51-11R
Mason County Ordinance Title 14
Code changes are on a 3 year cycle; effective in July of that par al y
Date of Conference: J _ Time of Conference: C3:J
Location of Conference: 426 West Cedar Street,Shelton Planner: ext. �
r
336'--5"
I
SHOP ENTRANCE
i I I
I � I
i
lQf= I
I
I FVWILE
SHOP ' 1 I I
4�00 Sni OFFICE ENTRANCE
I
I I
M I I M
RE 2 GG S 7"
FOf �cE I z
I w
wl
W
v
.l
— ._-- - - - -- - - - ----
O to STORMWATER SfORMWATER
POND
POND I
336, 5"
DAYTON-AIRPORT ROAD 60'
PIONEER DIGGING INC. �a '�SEPTIC DESIGNS DRAWING: PWT PLAN R W'ttar1S '-- 0•s6�Rar15 '-- •
3083E MASON Be,wN RA aLm Evmw WA 985% DESIGNER: ROBFR.T PAYM
Mr.E-36"2MM FAX-36"272M DATEDRAWM MARCH 6,20I4
a a MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
Mason County Bldg. III, 426 West Cedar Street
PO Box 186, Shelton, WA 98584
1854 www.co.mason.wa.us (360)427-9670 Belfair(360)275-4467 Elma (360)482-5269
MASON COUNTY PRE-SUBMISSION CONFERENCE NOTES
• BUILDING DEPARTMENT REPRESENTATIVE: Debbera Coker(360)427-9670 EXT 510
E-Mail: DLC@co.mason.wa.us
• DATE: March 26, 2014
D0 PROJECT/ PROJECT TRACKING NUMBER: PAR2014-00016
• PROJECT REPRESENTATIVE (S): Arcadia Drilling, Inc., Jason Zack
• DESCRIPTION & SIZE OF PROJECT/OCCUPANCY CLASSIFICATION & USE: Construct 3 structures:
36'x60' office/lab building, 2160 sq. ft. —Occupancy classification B
60'x80'Warehouse & Equipment shop, 4800 sq. ft - Occupancy classification S-2 vehicle parking & repair,
S-1 Storage, Office space
Covered parking area, area unknown - S-2
Separate building permits shall be required for each structure. Complete applications will include the following
information applicable to the project with each building permit:
• SETBACKS TO PROPERTY LINES: Provide a site plan, drawn to scale. Clearly identify all structures,
including fences, fuel tanks and other similar items, with setback dimensions on site the plan.
• DISTANCES TO OTHER STRUCTURES: Site plan, drawn to scale shall clearly identify distances, where
required include fire-resistive details, including continuity, &tested assembly details.
• FIRE RESISTANCE FOR EXTERIOR WALLS: When applicable include fire-resistive details, including
continuity, &tested assembly details.
• IDENTIFY TYPE OF CONSTRUCTION & PROVIDE ALLOWABLE AREA CALCULATIONS WHERE
NEEDED. See Chapter 5, IBC. Type VB construction includes structures constructed with combustible
construction such as wood framed structures. Type II construction includes steel structures constructed
ENTIRELY by non-combustible construction.
• FIRE-RESISTIVE RATED CONSTRUCTION &TYPE OF CONSTRUCTION :
Where required demonstrate compliance. Identify the location of the assembly, compliance to
continuity requirements and construction details:
EXTERIOR WALL (IBC704), FIRE WALL (IBC705), FIRE BARRIER (IBC706), SHAFT
ENCLOSURES (IBC 707), FIRE PARTITIONS (IBC 708), SMOKE BARRIERS (IBC 709), SMOKE
PARTITIONS (IBC 710), HORIZONTAL ASSEMBLIES (IBC 711), PENETRATIONS (IBC 712), FIRE-
RESISTANT JOINT SYSTEMS (IBC 713), FIRE-RESISTANCE RATING OF STRUCTUURAL
MEMBERS (IBC 714), OPENING PROTECTION (IBC 715), DUCT &AIR TRANSFER OPENINGS
(IBC 716), CONCEALED SPACES (IBC 717), ETC,
• NUMBER OF EXITS REQUIRED/OCCUPANT LOAD:(IBC 1004): Table 1004 is used to determine
occupant load used to evaluate the structure for exiting purposes, plumbing fixture requirements, and other
code related concerns. Include design calculations, demonstrating how occupant loads were calculated,
on building plans.
• EXIT PLAN: Clearly identify the exit path and exit signage on construction plans.
• ENGINEERING REQUIRED: Pole style structures shall be designed for lateral and wind as specified in
Chapter 16 of the IBC.
Referencing Washington State RCW 18.08.410 - Structures 4000 sq. ft or more shall have all plan
pages reviewed and stamped by a Washington State licensed design professional. The review shall
include a code evaluation addressing life-safety, plumbing & mechanical evaluation, and structural
analysis. (ref. RCW 18.08.410) ALL PLAN PAGES SHALL BE STAMPED AND SIGNED BY THE
DESIGN PROFESSIONAL, including plumbing and mechanical pages.
• ACCESSIBILITY REQUIRED: YES, include compliance information including design calculations
demonstrating compliance to Chapter 11 and details demonstrating compliance to ANSI 117.1 in effect at
the time of submittal. Include information demonstrating compliance for restrooms, employee work areas,
parking spaces, accessibility to structure, drinking fountain, signage, etc. When required verify that
building plans contain compliance information.
• PLUMBING SYSTEMS (Chapter 29 Washington Amendment to IBC): Using IBC Chapter 10, determine
occupant load. The number of plumbing fixtures is determined based upon the occupant load. Plumbing
fixtures need not be provided for unoccupied buildings. Permitted building shall comply. On plans, include
design calculations for the following: water closets (M/F), Lavatories, Drinking Fountains, etc.
Referencing IBC/WAC 2902.2 separate plumbing fixtures shall be required for each sex, except when the
calculated occupancy load is 15 or less, then unisex fixtures shall be allowed. To calculate the number of
fixtures and referencing Table 2902.1 the following fixtures shall be required:
Offices: 1 water closet per 25 for the first 50 and 1 per 50 for the remainder exceeding 50. 1
lavatory per 40 for the first 80.
Storage(S1&S2): 1 water closet per 100 and 1 lavatory per 100.
Plumbing fixture count can be for the entire facility, including all structures)for compliance purposes.
Provide design calculations demonstrating how the fixture count was determined on construction plans.
• NON-RESIDENTIAL ENERGY CODE: ALL enclosed spaces require Non-Residential Energy
Conservation Code (IECC/WSEC). Provide completed compliance forms (envelope & mechanical).
Forms are available at: http://www.neec.net/resources/resources.html
• LIGHTING: All non-residential structures shall comply with IECC/WSEC lighting requirements. Complete
compliance forms and provide a lighting plan that includes switching locations. WSEC forms and
information can be accessed at: http://www.neec.net/resources/resources.html.
In addition your local utility may have an incentive program, designed to help you lower energy
consumption. To discuss incentive opportunities contact the Energy Services Department at PUD3 by
calling (360) 426-0777 or PUD1 at (360) 877-5249.
• Ventilation and Indoor Air Quality Code compliance: Provide calculations when required.
• COMMERCIAL KITCHEN: Show compliance to Chapter 5 of the International Mechanical Code when a
kitchen is included in the project.
• GEOTECH REPORT REQUIRED? YES / NO (Refer to planning requirements)
• OIL SEPARATOR: REQUIRED when vehicle repair work is performed. Identify location and provide
construction details.
• PROVIDE A SPACE FOR STORAGE OF RECYCLED MATERIAL & SOLID WASTE (WAC51-50-009):
Identify the location.
• SPECIAL INSPECTION: Referencing IBC Chapter 17, Section 1704.1.1. Statement of special inspections
prepared by registered design professional in responsible charge. Complete a Special Inspection
authorization form.
• INTERIOR FINISHES: Include information demonstrating compliance to Interior finishes required in IBC
Chapter 8.
• STORAGE SPACES: Identify material stored, anticipated quantities, height, and if hazardous, include
MSDS sheets for each product.
• STORAGE RACKS greater than 5'9" shall be permitted either with the proposed project or separate
building permit. Where required documents shall include design information demonstrating stability for
seismic conditions. Special inspection may be necessary, reference IBC Section 1707.6 and 1705.3 (4.5),
storage racks, provide compliance information.
• MECHANICAL EQUIPMENT: Identify the location and type of mechanical equipment located within, and
outside the structure. Address foundation and support systems for equipment. Where new equipment will
be placed on site provide UL listing information and/or construction details stamped by a Washington State
licensed design professional. Where applicable include duct information and duct support compliance
information.
• FIRE MARSHAL REQUIREMENTS: Carefully review Fire Marshal comments requirements including fire
protection requirements and identify compliance information on the proposed building plans. Show the
location of fire extinguishers and identify type.
• SPRINKLER SYSTEM: Verify that design calculations include additional load attributed to required fire
sprinkler system.
• SUSPENDED CEILING SYSTEMS: Provide details and specifications relating to suspended ceilings
where applicable. Details shall be designed and approved for seismic loading in accordance to IBC
Chapter 16. Where required designate special inspection plan.
• OTHER:
PERMITS REQUIRED FOR PROJECT
o BUILDING
o PLUMBING/MECHANICAL
o GRADING PERMIT (When greater than 200 cubic yards)
❑ CHANGE OF USE
o FIRE SUPPRESSION, where required. See Fire Marshal comments
o SIGN
o FENCE (Greater than �10" above grade)
LJ
Ll
ADDITIONAL NOTES:
f
WHEN YOU ARE READY, SUBMIT FOUR (4 SITE PLANS, DRAWN TO SCALE ALONG WITH THREE (3)
COMPLETE SETS OF BUILDING PLANS INCLUDING THE FOLLOWING. (NOTE, ALL PLAN PAGES SHALL
BE STAMPED BY THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHEN THE STRUCTURE
EXCEEDS 4000 SQ. FT.):
• CONSTRUCTION PLANS, drawn to scale. Include floor plan, elevations, cross section, cross section,
construction details, etc.
• MECHANICAL PLAN,
• PLUMBING PLAN AND
• NON-RESIDENTIAL ENERGY CODE/VENTILATION & INDOOR AIR QUALITY CODE INFORMATION.
• DEFERRED SUBMITTAL WILL NOT BE ACCEPTED.
• A PLAN REVIEW FEE WILL BE COLLECTED WHEN THE BUILDING PERMIT IS SUBMITTED.
VALUATIONS ARE BASED UPON THE MOST RECENT BUILDING STANDARDS VALUATION DATA
RECOMMENDATIONS AND THE PERMIT FEE WILL BE DETERMINED BASED UPON TABLE 1-A OF
THE 1997 UBC.
DESIGN CRITERIA:
SEISMIC ZONE: D2
WIND LOAD: 85 MPH, Exp B (Unless proven otherwise)
SNOW LOAD: 25 psf
REFERENCE CODE EDITIONS: Effective July 1, 2013
2012 INTERNATIONAL BUILDING CODE (IBC), INCLUDING APPENDIX CHAPTERS C, E AND H, EXCLUDING
H106; SECTIONS 101 THROUGH 107, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, AND EXCLUDING
APPENDIX CHAPTERS A, B, D, F, G, I, J AND K AND; ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-
50, AND THE 2009 INTERNATIONAL EXISTING BUILDING CODE.
2012 UNIFORM PLUMBING CODE (UPC), PUBLISHED BY THE INTERNATIONAL ASSN. OF PLUMBING AND
MECHANICAL OFFICIALS(IAPMO)AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-56 AND WAC
51-57, EXCLUDING SECTIONS 102.4 AND CHAPTERS 12, 15, AND 16, PART I.
2012 INTERNATIONAL MECHANICAL CODE (IMC), PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, AND
THE 2009 INTERNATIONAL FUEL GAS CODE AS ADOPTED THROUGH THE WASHINGTON STATE BUILDING CODE WAC
51-52.
2012 INTERNATIONAL FIRE CODE, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, EXCLUDING APPENDIX A, D,
AND K AND ADOPTING APPENDICES B,C,E,F, G AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-
54.
2012 INTERNATIONAL ENERGY CONSERVATION CODE(IECC), AS AMENDED BY WASHINGTON STATE BUILDING
CODE WAC 51-11
To view the Mason County Building and Construction Code and adopted amendments go to the Mason
County website at: www.co.mason.wa.us.
MASON COUNTY FIRE MARSHAL
PRE-SUBMISSION CONFERENCE NOTES 16Q
67N,
FIRE MARSHAL REPRESENTATIVE:
Debbera Coker(360)427-9670 EXT 510, E-Mail: DLC@co.mason.wa.us
or Larry Waters (360) 427-9670 EXT 285, E-Mail: LAW(u)co.mason.wa.us rq
DATE: March 26, 2014
PROJECT/ PROJECT TRACKING NUMBER : PAR2014-00016
PROJECT REPRESENTATIVE(S) or APPLICANT: Arcadia Drilling, Inc. Jason Zack
PROJECT DESCRIPTION & SIZE: New facility including 3 structures used for office, warehouse and equipment
storage, and a covered parking area.
The following information is essential to perform a plan review by the Fire Marshal's office. Proposed construction
plans and documents should include all applicable information listed below. Please note that the Fire Marshal
representative has made every attempt to identify all critical information that will be needed based upon the
information provided in the pre-application documents. Additional information may be necessary when the Fire
Marshal is presented with proposed plans for the project. The information provided below references the current
adopted codes. A complete list is provided at the end of this document.
• OCCUPANCY CLASSIFICATION & USE : Identify the occupancy classification(s) and specify use as
defined and specified in accordance to the current International Building Code (IBC), Chapter 3 and
International Fire Code (IFC), Chapter 2.
• CONSTRUCTION TYPE: Referencing IBC, Chapter 6 clearly identify the type of construction.
• WATER SUPPLY & FIRE HYDRANT: Referencing IFC, Section 508; clearly identify intended code
compliance, including type of water supply.
• FIRE FLOW: A copy of the approved method for determining fire flow is enclosed. Please provide a copy
of the completed worksheet with proposed construction documents.
• EMERGENCY VEHICLE ACCESS: A copy of the "Standards for Fire Apparatus Access Roads"
adopted through Mason County Building Code, Section 14.17 is attached. Verify that documents
clearly identify code compliance.
• ADDRESSING: Referencing IFC, Section 505 and Mason County Code Chapter 14.28, all new buildings
shall have an approved address. Applications for an approved address can be obtained on the Mason
County website at: www.co.mason.wa.us, Forms and Brochures, Community Development, the address
to the referenced web page is: http://www.co.mason.wa.us/forms/Community_Dev/index.php. Each
building within the facility shall be distinguished with a separate identification so that emergency personnel
can find the building in the event of an emergency.
• EXITS: Verify that construction plans comply with IBC and IFC Chapter,1,0. Provide a code evaluation
that includes calculations demonstrating compliance to Section 1004. Construction plans must clearly
identify all exits, exit paths, length, signage information, etc.
• AUTOMATIC FIRE ALARM: Based upon information provided an automatic monitored fire alarm shall be
required. The alarm system shall comply with IFC, Section 907 and NFPA 72. Provide information on
construction plans demonstrating intent to comply. Note that automatic fire alarm systems shall require a
separate "Mason County Fire Protection System Permit Application". The application can be obtained by
going to same website and page referenced above.
• SPRINKLER SYSTEM: When fire flow is not available, when fire areas exceed 6000 sq. ft each struture
shall be provided with an automatic fire sprinkler system. When required, or proposed, provide infor ation
demonstrating compliance IFC, Section 903 and NFPA 13. Note that automatic fire sprinkler system shall
require a separate "Mason County Fire Protection System Permit Application". The application can
lop-
obtained by going to same website and page referenced above.
• FIXED FIRE SUPPRESSION SYSTEM: Referencing IFC, Sections 904 and 905, provide information as
needed on construction plans demonstrating compliance. Note that fire suppression systems shall require
a separate "Mason County Fire Protection System Permit Application". The application can be obtained by
going to same website and page referenced above. Standpipe systems, where required, need to be
clearly identified on construction plans.
• KNOX BOX: Referencing IFC, Section 506, access shall be required, typically through use of a knox ox.
Provide compliance information with construction documents. Contact the local fire district to make
arrangements for an approved key box, location, etc. The local fire district for your project is Fire Dist ict
Number: 11 and can be reached as follows (360)426-1822:
• GAS METERS/TANKS: Referencing The International Fuel Gas Code (IFGC) and NFPA 58 provide
compliance information as required within the referenced codes.
• STORAGE (TYPE, HEIGHT, ETC.) Referencing IFC, Chapter 19 (Lumber yards and wood working
facilities), Chapter 23 (High-piled combustible storage), Chapter 27 (Hazardous Materials), etc.
o Identify all materials to be stored, Identify anticipated quantities, location, material type (gas, solid,
liquid, etc.) and provide MSDS sheets for the material. Hazardous material information shall include
commodity classification (see IFC2303 and Table 2306.2), and type of plastics when applicable.
Include anticipated quantities, loose or baled, anticipated height,
o Identify hazardous materials classified as a physical or health hazard, include MSDS sheets as
specified in IFC Section 2703.4. Referencing Table 2703.1.1(1), identify proposed control areas a nd
method of protection. Referencing IFC Section 2704, identify spill control and proposed seconda
containment, see also IFC Table 2704.2.2
o Identify method of storage (i.e. racks, shelves, pallets and what storage method is constructed of s ch
as plastic, wood, metal, etc.) If pallets will be used , identify location of unused pallets and anticipated
quantity
. v i
o Identify flammable and combustible liquids, flammable gases, and flammable solids regulated under
IFC Chapters 34, 35 and 36. Include information demonstrating compliance, including proposed
storage, classification of flammable material and/or combustible liquid.
• OTHER:
REFERENCE CODE EDITIONS: Effective July 1, 2013
2012 INTERNATIONAL BUILDING CODE (IBC), INCLUDING APPENDIX CHAPTERS C, E; SECTION 101 THROUGH 106, AND
H; EXCLUDING SECTION H 106, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL,AND EXCLUDING APPENDIX CHAPTERS A, B,
D, F, G, I, J AND K AND'ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-50, INCLUDING AS APPENDIX M, 2006
INTERNATIONAL EXISTING BUILDING CODE.
2012 INTERNATIONAL RESIDENTIAL CODE FOR ONE-AND TWO-FAMILY DWELLINGS(IRC), Including Appendix Chapter G,
as published by the International Code Council Excluding Part IV Energy, Part VII Plumbing, Part VIII Electrical and
Appendix Chapters A, B, C, D, E, F, H, I, J, K, L, M, N, O, P, and Q; and adopting the Washington State Building
Code WAC 51-51.
2012 INTERNATIONAL FIRE CODE, published by the International Code Council, excluding Appendix A, and adopting
Appendices B, C, D, E, F, G and adopting the Washington State Building Code WAC 51-54.
2012 UNIFORM PLUMBING CODE (UPC), PUBLISHED BY THE INTERNATIONAL ASSN. OF PLUMBING AND MECHANICAL
OFFICIALS(IAPMO)AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-56 AND WAC 51-57.
2012 INTERNATIONAL MECHANICAL CODE(IMC), PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, AND
ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-52.
2012 INTERNATIONAL ENERGY CONSERVATION CODE( IECC),AS AMENDED BY WASHINGTON STATE BUILDING CODE WAC 51-1 1
PRE-SUBMISSION MEETING
FOR WEDNESDAY, MARCH 26th 2014
5-11 N,i��uacd oav 4k M-4A s:
Me,-flu e� Eu p"w ( IV
V
/PAR2014-00016 n l�
APPLICANT: ARCADIA DRILLING INC/JASON ZACK
MEETING DATE & TIME: WEDS,MAR 26th,2014 9:15/9:30 - 10:30 am
PARCEL NUMBER: 42002-24-90010
SITE ADDRESS: 450 E DAYTON AIRPORT ROAD, SHELTON WA
PROJECT DESCRIPTION: OFFICE BLDG 2160 SQ FT,MAINTENANCE
SHOP 4800 SQ FT, ONE COVERED PARKING AREA M.
426 W. CEDAR STREET, SHELTON WA 98584 ` .
LOCATION: BLDG III, Q s
PLANNER: GRACE MILLER, ext 360
ENVIRONMENTAL HEALTH: CINDY WAITE, ext. 353
PAR2014-00015 a6�a-a ydoro
APPLICANT: AQUA VIVA ASAMBLEA DE DIOS INT'L
MEETING DATE & TIME: WEDS,MAR 26th,2014 1:1511:30 -2:30 pm
PARCEL NUMBER: 12331-32-00040 `f12-11S/
SITE ADDRESS: 2221 NE STATE ROUTE 300,BELFAIR WA
PROJECT DESCRIPTION: 12,186 SQ FT NEW CHURCH,FIRE SPRINKLED;
8100 SQ FT FINISHED (PARTIALLY UNFINISHED BASEMENT)
LOCATION: BLDG III, 426 W. CEDAR STREET, SHELTON WA 98584
PLANNER: ALLAN BORDEN, ext 353 ,
ENVIRONMENTAL HEALTH: CI1� DY AITE, ext 353 "
�
v
lk
( R Adel ¢ ` /� /�
o 1
Raz
4,uA)kz7-- - +e-,�-otkxZ4 i
(RNvA aun7 �d 7 wvna 4w�i T1 D WsJu� dtiKW�i l�t{��{LLtee Q�1 C
i�
r -*t
UU�1atz UAW
PA_k-JXq- 1(C
DATE 3 - j 2,-
PRE-APPLICATION CONFERENCE REQUEST FORM
The purpose of the pre-submission conference is to identify and/or eliminate as many potential problems as
possible in order for the project to be processed without delay. Representatives for the Fire Marshal's Office, Building
Department, Environmental Health, Planning, and Public Works Departments may attend the meeting to discuss rules
and regulations applicable to the proposed project. Topics covered during the meeting will include the comprehensive
plan, shoreline program, zoning, availability of sewer and potable water, development concepts, building construction,
fire protection and life safety concerns of the proposed project. The pre-submission conference will be most informative
when you provide accurate and detailed information on the Pre-Application Conference Application Form and the site
plan.Applications will be accepted when all information is received and deemed complete.
Pre-Application Conferences are held every Wednesday and last up to one hour. To schedule a meeting
complete the applications and return with 10 copies of the detailed site plan, by 3:00 PM on the Wednesday two weeks
prior to the proposed meeting.
1. Pre-Application/Dept. of Community Dev. 2.Environmental Health
426 W Cedar Street/PO Box 279 415 N 5 b /PO Box 1666
Shelton,WA 98584 Shelton,WA 98584
360.427.9670 ext.352 360.427.9670 ext. 400
Check amount: $255.00 Check amount: $150.00
BOTH CHECKS MADE PAYABLE: MASON COUNTY TREASURER
Applicant: Site Plan
Name: (Pr'c.c&(, �r►1\:�.� mac. �,�r�Sov` 1_0_ - Submit 6 copies
Mailing Address: go go r l-1 a O She lkt y. q$5�� Include the following information
Daytime Telephone: 36o -q l 0— (0 l i Fax: l q SS ❑ Indicate Scale and North Arrow
Email address: � A$c;n ZaC.k @ Com k. V�e�- ❑ Property line dimensions,easements,
and right-of-ways.
Representative: ❑ The location of all existing and
Name: 15F1oly%.E. proposed structures.Include square
Mailing Address: footage of existing and proposed
structures.
Daytime Telephone: Fax:
❑ Setback distance,in feet from all
Email address: property lines and structures.
Parcel Number: (12 digits)y ZOO Z- ?_q - 0100 \o ❑ Existing and proposed road access to
and from the site.
Description of Project:
Include: 1) Square footage of structure,2)Use of building and rooms(i.e., :2 Parking sites
office,warehouse,restaurant, storage, etc), 3)Occupancy classification per ❑ Location of on-site sewage tanks and
drainfields.
IBC, Section 302.1, and construction type. 4)Provide two sets of plans, if
❑ Location of drinking water supply.
available.Use separate sheet if necessary Include location on the proposed site
and surrounding parcels.
d-�N+ S"D (DOK� ❑ Steep bluffs,wetlands,streams,and
bodies of water
01r2_ C.OV'�-K� Q a(k.�yo, 0•-roc`
❑ Location of fire hydrants and
emergency vehicle access roads,
SlAQV et r including grade.
5 ❑ Surface and storm water run-off routes.
C ►'GUI cn��tL jw /lvtw+e fKG(vcQt �,'r of
Drclo Gc►1 r ,
lIas,the project been discussed during a previous Pre-Application Conference: If yes, please indicate date.
Will the building have employees? If yes, how many? )e S �0
What is the water availability of the proposed project? If there is an existing well, what is the name of the
system? G'rovq 11SyS -� f �a4-�a� 1'��roor� bvS;".eSs Qa,(L TIDA 146$1'99
What is planned for the on-site sewage system? If you are proposing a new on-site system provide detail on the
required site plan. Ntt,.5
--r
ADDITIONAL INFORMATION.•
APPLICABLE BUILDING CODES
2012 International Building Code/2009 International Residential Code
2012 International Fire Code-ANSI A117
2012 International Mechanical Code—WAC 51-42
2012 Uniform Plumbing Code—WAC 51-56/51-47
2012 International Energy Cons. Code/Washington State Energy Code—WAC 51-11C& 51-11R
Mason County Ordinance Title 14
Code changes are on a 3 year cycle; effective in July of that part' L y
Date of Conference: _ Time of Conference: 11 ,
Location of Conference: 426 west Cedar Street,Shelton Planner: (16�0
ext. �;
33b'--5"
I
SHOP ENTRANCE
I I
I I I
I
I
F' r
I
I
I I I
I FUTURE
SHOP
�,�oo Sri OFFICE ENTRANCE
I
Q; I I rn
M
Rti 2 f S q'
FOf �cE 1 I z
I w
- - i wl
I
------------- - - 'd _
o
Ln STORMWATER STORMWATER
POND POND
I
— — — — DAYTON-AIRPORT ROAD b0'
PIONEER DICr-xING, INC. CusroMER: ARc"'A D" udG SG rya
PARCEL It 42002 24'(1010 7F51'HOLE t '1FSl'HOtE 2
SEPTIC DESIGNS DRAWING: PLAT PLAN R.RO��l71S-36' ROC7 R-Cr�
1&3@'
3083 E MASON BD4SON RD C RAPEVIEW,WA 98546 DESIGNER: ROBERT PAYSSE
OFFICE-360-426,18M FAX-360427--2353 DATE DRAWhE MARCH 4 2014
336'--5" -
„ I
SHOP ENTRANCE I
I o I
<- I
I � I
I
N I
Oe I
e-
206' —
FUTURE
SHOP
OFFICE ENTRANCE
00 60' l�uc
Or, I M
cn PARKING
I
M m
142
' ll
POSSIBLE 60 9 0,11 move c.tow-h/}act,{
STORMWATER FUTURE I �
GRAVEL PITS OFFICE 95' z
(2)6X6-1S-DEEP �I w
�❑ F❑ _ DRAINFIELD
coo I w l
EQUIPMENT I �
PARKING 1500 S/T t-i
1500 P/T 0%SLOPE
- - - - - - - - - -- - - - - - - - - - -
MO STORMWA TR
Wj
STOI
POND
POND
—
DAYTON—AIRPORT ROAD 60'
G, INC. CLISTOMlx ARCS M DRUM s�
PIONEER DIGGIN �
PARCEL.#:42=-24.9(= 'JE51'HOLE t 7'E9l'HOLE 2
SEPTIC DESIGNS DRAWING: PLOT PLAN KOO'`�15-36' ROO R. �1S-36 •
'
3M E.MASON BENSON RD. CRAPEVIEW,WA 9&W DESIGNER ROBE LT PAYSSE
OFFICE-360426-1SM FAX-360 42 7 2353 DATE DRAWN: MARCH42014
70
000
rR
ell-
4 ! E t
4
•�'• jE Y 1
f
i
s
""
fi
_
:�m'n�mm+:nr��Jnnr+�ro.'•.n��.�:+mnnr+mn /�/ -
i R
�} 7
14,
.
t �
re q
N
r
E
i
c�
r
F
yn