Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
FPA2007-00002 - FPA Application - 1/17/2007
FINDINGS OF FACT FPA Case# 2007-00002 APPLICANT: Mason County Public Works APPLICATION DATE: January 17, 2007 Mason County has reviewed the above referenced application for Class IV General Forest Practices and finds it in conformance with all applicable County land use regulations in effect at the time of application. FINDINGS The proposed FPA is compliant with the following conditions: The proponent has paid the prescribed fees. The proponent has filed a complete, signed application. A map has been received that complies with the requirements of 11.05.120: (1) Harvest boundaries and tree retention areas. (I1) The approximate location of any structures. (III) The location of all existing and proposed streets, right-of-ways, easements, skid roads, haul roads, and landings within the proposal. (IV) The location of future land development including stormwater management facilities and vegetation to be retained for site landscaping, open space,wildlife habitat, screening, and/or buffers. (V) Site topography at contour intervals of 40 feet. (VI) Critical areas and critical area buffers regulated pursuant to the Critical Areas Ordinance. (VII) Drainage ways and culverts. (VIII) Site area targeted for further harvest including proposed timing. (IX) North arrow and scale shall be shown on all site plans. The scale shall be no smaller than one inch to 200 feet. That this FPA is in conformance with the following Mason County ordinances: 11.05 That the proposed FPA involves 13.5 acres. That the notifications required by 11.05.060 have been made if applicable. Note: Not applicable in this case. 1 Mason County Resource Ordinance That at the issuance of this permit will not result in a violation of the Mason County Resource Lands and Critical Areas Ordinance. The site was inspected by Michael MacSems of the Mason County Planning Department who determined that any critical area buffer and/or steep slope issues have been resolved. A geo-technical assessment was reviewed and approved by Bob Tauscher of the City of Shelton and an agreement to protect a Pileated Woodpecker forage snag was formalized as a SEPA condition. Geo-Technical Report/Assessment Review A Geo-Technical _X_ Assessment_Report (check one)was written by Aspect Consulting and approved by Bob Tauscher of the City of Shelton on February 15, 2007. Washington State Department of Transportation X A DOT Access Permit is not required for this proposal. A DOT Access Permit is required for this proposal. Date Approved by DOT: 3113107 NOTE: WSDOT SEPA comments incorporated as conditions of approval. Shoreline Master Program That, if applicable, all activity under this application are in conformance with the Mason County Shoreline Master Program and has a shore line designation of N/A. State Environmental Policy Act This application for FPA# 2007-00002: Has been reviewed for SEPA compliance under case#: SEP 2007-00012. Is SEPA exempt. _DNS X MDNS Stormwater Management This application was reviewed for stormwater and erosion control by John Sliva Rick Hirschberg of Mason County Public Works and approved by Aspect Consulting on 2/12/07. 2 CONCLUSION In conclusion, this application for Class IV General Forest Practices is consistent with the above criteria and that the public uses and Mason County has fulfilled its statutory obligations. RECOMMENDATIONS I,being the Manager of the Mason County Planning Department,hereby attest to and certify that appropriate provisions have been made for this Class IV General Forest Practices Application and hereby recommend approval. In addition these facts evidenced by the contents of the file for this Forest Practice Application. Signed, Robert Fink,Planning Manager Date n�4 V�1- � .�o)� %11n:�-- / I Michael MacSems, Subdivision Planner Date 3 n RECEIVED MASON COUNTY JAN 17 A DEPARTMENT OF COMMUNITY DEVELOPMENT < kr Mason County Bldg. III, 426 West Cedar Street - PO Box 186, Shelton,WA 98584 I854 www.co.masonma.us (360)427-9670 Belfair(360)275-4467 Elma (360)482-5269 FOREST PRACTICES APPLICATION/NOTIFICATION Type IV General This application should be accompanied with an Environmental Checklist (SEPA) as well as an activity map/site plan which addresses items listed below. TYPE OR PRINT IN INK: 1. Landowner,Timber Owner and Operator information. Legal Name of LANDOWNER Leal Name of TIMBER OWNER Legal Name of OPERATOR 44�11(moo , G C e- CC, )( .Mailing Address: Mailing Address: Mailing Address: 'Vd eo 8sitn 6)ve - City, State,Zip City, State,Zip City, State,Zip MOV7W.4� 98.58�f S PS 5 ' Phone 74D Phone( ) Phone u0 '{2 C. - 3 Email: Email: Email: 2. Contact person information. Contact Person Phone#" 4J 7, 74 70� '>r� !/'"SG Email: r(` eio. A4Q aO 3. If you are harvesting timber,enter the Forest Tax Reporting Account Number of the Timber Owner: /1 A For tax reporting information or to receive a tax number,call the Department of Revenue at(800)548-8829. 4. Legal description where the forest practices will occur. Parcel Number Sub Division '/<'/, Section Township Range E/W 4ZooL��mamoo N'�r/V Z Zoon* GtJe a 9000 s is A 2 zo 44 Go ac+a Ada©otC ri✓ � �E' � a � 5. Answer each question as it applies to your proposed forest practice. a. []No. Yes. Is the activity within an urban growth area? b. No. [] Yes. Is the activity within a public park? C. No. [I Yes. Is the activity within 500 feet of a public park? Park name: d. No. [J Yes. Is the activity located on lands platted after January 1, 1960? e. No. [] Yes. Is the activity within 200 feet of saltwater lake river/creek/stream pond wetland seasonal runoff slopes which exceed 15%? f. What is the expected duration of FPA? teal Proposed start date: ,, /O 7 Proposed end date: Z 2!g o Page 1 of 4 e � 6. Are you cutting or removing timber? [] No. Yes. Complete the table below and identify all timber harvest and salvage activity boundaries on the activity map. Acres Volume to be Steepest Slope in Unit# Harvest Type arding Method net Harvested mb Harvest Unit ou .SG1 A 2 l�i'Cv 7. Are you constructing or abandoning roads? XNo. [] Yes. Complete the table below. Show locations and identify all road activities on the activity map. Total Length Steepest Side Slope Abandonment Date Type of Activity (feet) (% (Mo/Yr Road Construction Does Not A 1 Temporary Road Construction Road Abandonment Work in or over typed water may require a Hydraulic Project Approval(HPA)from the Washington Department of Fish and Wildlife (WDFW). If you have questions concerning the HPA,visit the WDFW website at N4tivw.wdfw.wa.gov%habitat.htrn. 8. Are you installing or replacing water-crossings? No. [] Yes. Complete the table below. Show locations and identify all proposed water-crossings on the activity map. Crossing Crossing Dimensions Crossing Crossing Dimensions Identifier Type (width x length) Identifier Type width x length) 9. Mark the following activities that will be done in or over typed water. /Ilonc. Activi in or over: Type I Stream Type II Stream Type III Stream Type IV Stream Type V Stream Removing culverts of bridges Equipment crossing Ground skidding Suspending cables Cable yarding Falling and bucking Other 10. Is any activity in a wetland or wetland buffer? Jl No. [] Yes. Complete the table below. Show locations and identify all wetlands and buffers on the activity map. Wetland Wetland Type Activity Type in Activity Type in Total Wetland Total Area Total Area Identifier (I,II,I11,IV, Wetland Buffer Area(acres) Drained(acres) Filled(acres) other 11. Describe how the following are identified on the ground. • Harvest boundaries/unitcomers: Flag�ling 4/! drQ�'1c7e. ,O4in _ • Right-of-way limits and centerlines for roaMork,everts and bridges: v • Critical areas and critical area buffer boundaries: N�Q Page 2 of 4 12. Have you reviewed this forest practices activity area to determine whether it may involve historic sites and/or Native American cultural resources? KNo. [I Yes. 13. We affirm that the information contained herein is true, and understand that this proposed forest practice is subject to the Forest Practices Act and Rules and Mason County Forest Practices Conversion Ordinance as well as all other federal, state or local regulations. Compliance with the Forest Practices Act and Rules and the Mason County Forest Practices Conversion Ordinance does not ensure compliance with the Endangered Species Act or other federal state or local laws. Signature of LANDO R Signature of TIMBER OWNER Signature of OPERATOR (if d'fferent Than la er) (If t.lkji tk ;),. Print name:A7s' Gf����� Print name:. Pit name: Jv Date: t / Ey'7 Date: r !7 ®7 Date: 1 A—o 7 Additional information: (Optional) Per Mason County Ordinance 11.05, Section 11.05.120,a site map shall accompany this application which includes the following information. I Harvest boundaries and tree retention areas. II The approximate location of any structures. III The location of all existing and proposed streets,right-of-ways,easements, skid roads,haul roads,and landings within the proposal. IV The location of future land development including stormwater management facilities and vegetation to be retain( for site landscaping, open space, wildlife habitat, screening, and/or buffers. V Site topography at contour intervals of 40 feet. VI Critical areas and critical area buffers regulated pursuant to the Critical Areas Ordinance. VII Drainage ways and culverts. VIII Site area targeted for further harvest including proposed timing. IX North arrow and scale shall be shown on all site plans. The scale shall be no smaller than one inch to 2 100 feet. Staff asks that, at a minimum, the corners of the harvest unit(s)be flagged for clear identification. FPA FEE: $220.00 with SEPA SEPA FEE: 0-9.99 Acres$560 } $330.00 without SEPA 10 to 20 Acres$670 Over 20 Acres$840 EIS(DS)$2,245+62/hr Departmental Review (For Office Use Only) Site visit: Date approved: Mason County Community Development CA�) 4 C-IkC" I:PLANNINGTACTPA.DOC V tv' 4 1/�V( S _ 1/25/2007 Page 4 of 4 3/14/2007 Conditions Associa ed With 8:21:36AM Case#: FPA2007- 0002 r act �iop iert#1 t o ride .PWN 0� le 4a py��i T #e p !NO RN 1) 1 STATE HIGHWAY ACCESS NOT MET 3/13/2007 MMS Per the Washington State Department of Transportaion: (1)Prior to starting work orange-flagged'trucks entering the highway warning signs must be placed approximately 500 feet north and 500 feet south of the US 101 site access and maintained until the work is completed. (2)The haul route access must be maintained and no tracking of sediments or gravel from the site onto 101 may occur. (3)Applicant shall provide a schedule for this work to W DOT. (4)Applicant shall contact Mr.Brent Schiller,WSDOTArea Supervisor,at 360-427-2110 prior to starting work for review of state right-of-way and cutting plans and location for placement of warning signs. (5)No runoff from this site may enter state right-of-way. 2) 1 PILEATED WOODPECKER SNAG MANA( NOT MET 3/13/2007 MMS Pileated Woodpecker Snag Management Three snags that are potential Pileated woodpecker forage habitat have been identified on this site. Two are large remnants of the previous stand of timber that grew in the area and one is a small tree approximately 12" DBH and 70'tall. The small tree shows evidence of recent woodpecker foraging. The other two do not. Absent any safety issues identified by the Washington Department of Labor and Industries,all three will be left standing following logging. Of the three snags,the small tree has the most likely potential for generating a safety issue. If it needs to be cut,it will be bucked to a length of 20-24 feet and relocated to the edge of the logging unit. A hole would then be dug in the ground and the snag segment would be placed in the hole and left in a standing position. If the tree is too decayed to re in intact when it is felled,a similar size stem would be selected from the logging area and relocated on the ed a of the logging unit to replace the original snag. X 3) 1 STORMWATER&EROSION CONTROL N NOT MET 3/13/2007 MMS STORMWATER&EROSION CONTROL MEASURE Escape of silty water or mud from the timber harvest area shall be considered a violation of County and State stormwater management regulations,and could subject the applicant(s)to civil fines or penalties. X 4t'/H Page 1 of 1 CaseConditions..ipt N � r 01 o , u mz � ° co CD aM C w ti Q v 4 �L ti ♦vim - r—� x x_.x-_x x—x—x (37 Ica Z DI p n c I --,1. 1 td I � 45, r-,l_ I--- - t► j rn L '_'.' U7 Aspedconsulting IN-DEPTH PERSPECTIVE -.-• n February 12, 2007 Mr. Michael MacSems, FPA Planner Mason County Department of Community Devel pment Post Office Box 279 Shelton,Washington 98584 Subject: Mason County Public Works O rrice FPA Stormwater Plan Review- Tree Harvest(Logging)Phase Project No.: 060159-006-01 Reference: Subsurface Exploration, Geologi Hazard And Geotechnical Engineering Report, Highway 101 Facility, Mason County, Washington, dated January 22, 2007,by Aspect Consulting, LLC Dear Mr. MacSems: Aspect Consulting has received the Stormwater Management Plan (SMP),Pubic Works Office Site, Logging Plan from the Mason County Department of Community Development. Review and comment on this plan was authorized by the ask 6 amendment to our existing multi- project contract. Aspect Consulting has gained e tensive knowledge of the site through our exploration and preparation of the referenced rep art for the proposed facility. Plan Review The SMP was prepared by Mason County Public Works for the timber harvest at the proposed Highway 101 facility. The report provided a drawing indicating the two proposed cut areas, existing roadways, and the site topography. Based on our previous site observation,we concur there is no indication of concentrated drainage across the site.The flat topography allows diffuse infiltration into the highly drainable site ands and gravels, described in detail in the referenced report. The narrative plan noted that only the harvestable timber will be taken, leaving as much existing vegetation as possible. Also, zones of buffer trees were planned along the property lines in certain locations for screening. Best Management Practices (BMP) items were detailed with the plan which provided for dispersed activity and yarding practices to minimize intense impact to any one area. Summary of Findings The abbreviated SMP should be considered adeq ate,providing spot erosion control for BMP are implemented, if necessary, in disturbed areas near the property boundaries. Stormwater and Erosion Control measures should follow BMP for controlling construction/logging runoff. Hay/straw, silt fences, etc. should be implemented,if necessary. In general, standard erosion control and stormwater techniques should be implemented where sufficient volume of water does collect and needs to be directed to a safe discharge point. Given the infiltration capacity of the site, very limited control measures would be expected to have to be used. Mason County Department of Community Development February 12, 2007 Project No. 060159-006-01 Adequate erosion and sedimentation control feat res need to be implemented during the logging operations to protect neighboring properties ropert es and State waters from adverse stormwater runoff impacts. Please do not hesitate to call me at(206) 780-772 ,if you have questions regarding these comments or need further information. A copy of our billing to public works for Task 6 will be forwarded to you at the same time our normal invoice is issued after the end of the month. Sincerely, Aspect consulting, LLC i �,. PET o�was O `sfcNAL�c4 EXPIRES b�22,("j�—� John L. Peterson,PE Associate Geotechnical Engineer jpeterson@aspectconsulting.com Attachment: Draft Invoice cc: Rick Hirschberg, Mason County Public Works W:\_GEOTECH\Mason County Public Works\Public Works Facility-005\ arvest-006\Review Letter Draft rev.doc Page 2 �oN 000� MASON COUNTY � Shelton (360) 427-9670 DEPARTMENT OF COMMUNITY DEVELOPMENT Belfair (360) 275-4467 Planning Elma (360) 482-5269 Mason County Bldg.1 411 N.5th P.O.Box 279 Shelton,WA 98584 Jay Ebbeson City of Shelton Public Works Shelton, WA 98584 February 13, 2007 Re: Geo-technical Review Request Dear Mr. Ebbeson, Per your earlier conversation with Mason Count DCD Deputy Director Barb Robinson, please find enclosed a geo-technical assessment 1br the site of the future Mason County Public Works facility on SR 101 in Shelton. Normally Mason County Public Works would review such plans for applications from the general public. However in this case, since the applicant is Mason County Public Wor s we need to contract the review out to a qualified third party. This geo-technical assessment is meant to cover both the initial logging of the site (which I am reviewing) and the eventual site development. Per the agreement with the City of Shelton work d out by Barb Robinson, I am forwarding these documents to you for review. P ease review the enclosed geo-technical assessment and supporting documents,prepared y Aspect Consulting, for consistency with the Landslide Hazard chapter(17.01.100) o the Mason County Critical Areas Ordinance (also enclosed). Upon completion of your review,please forward the approved documents and any comments back to my attention at Mason County, along with a breakdown of associated cost for this review. If you have any questions, please contact me ate t. 571 or by e-mail at: mms(c�r�,co.mason.wa.us. Thank you. Sincerely, Michael MacSems FPA Planner ��QON CO MASON COUNTY Shelton (360) 427-9670 DEPARTMENT OF COMMUNITY DEVELOPMENT Belfair (360) 275-4467 Planning Elma (360) 482-5269 Mason County Bldg.1 411 N.5th P.O.Box 279 Shelton,WA 98584 1 54 MEMO To: Rick Hirschberg From: Michael MacSems11V1 5 Date: 2/8/07 Re: Wildlife Habitat and FPA I have reviewed your memo of 1/30 concerning wildlife habitat issues concerning the FPA for the site of the new Public Works facility. Pileated Woodpecker Habitat By offering to leave not only the two Pileated forage snags that I identified in my site visit, but all the snags over 20" dbh you have satisfied the concerns of my 1/25 letter. These snags will need to be flagged in the field, please let mew know when the flagging is complete so that I may inspect them. You do not need to modify your site plan other than to add a note in the margin that such snags are to be preserved. These leave snags will become a condition of your SEPA determination. Pocket Gophers Thank you for addressing the possibility of Pocket Gopher habitat on site. I accept your findings as adequate for this proposal (unless other information is presented by a third party). Thank you for your cooperation. ¢�ov cot, MASON COUNTY Shelton (360) 427-9670 DEPARTMENT OF COMMUNITY DEVELOPMENT Belfair (360) 275-4467 Planning Elma (360) 482-5269 Mason County Bldg. 1 411 N.5th P.O.Box 279 Shelton,WA 98584 1854 John Peterson, P.E. Aspect Consulting 811 First Avenue, Suite 480 Seattle, WA 98104 January 30, 2007 Re: Mason County Public Works Dear Mr. Peterson, Please find enclosed a stormwater and erosion control plan for the site of the future Mason County Public Works facility on SR 101 in Shelton. I understand that you are already familiar with the site and are expecting to received this document. Normally Mason County Public Works would review such plans for applications from the general public. However in this case, since the applicant is a County department we need to contract the review out to a qualified third party. Please review the enclosed plan, prepared by Rick Hirschberg for consistency with the Mason County Stormwater Management Ordinance (also enclosed). Please bill Public Works directly for your time but enclose a copy of your billing statement with your conclusions, which should be sent to my attention. If you have any questions, please contact me at ext. 571 or by e-mail at: n2msgco.mason.wa.us. Thank you. Sincerely, Michael MacSems FPA Planner r Stormwater Management Plan Public Works Office Site Logging Phase In a report dated January 22, 2007, Aspect Consulting presented conclusions regarding the geological and hydrological conditions at the new Public Works office site. It was written in order to analyze the feasibility of constructing the new office/shop complex on the site. It also provides basic geological and hydrological information, which can be used to evaluate appropriate stormwater management BMPs during the logging phase of site development. The following information pertains to approximately 14 acres of land, which will be logged as a preliminary land clearing step for the new office site. Site Conditions The harvest units are on very flat ground. Other than one minor depression on the west side of Unit 2,the maximum slope is 1-2%. There are no signs of surface erosion near either harvest unit. The existing road, which enters Unit 1 from the east, would be the most likely place to find evidence of storm water run-off. None was found. There are no surface waters within 1/4 mile of the harvest units. The site is extremely well-drained as referenced in the geological report. The soil parent material is sandy gravel. Numerous site visits have been made over the last one and one-half years during all seasons. At no time was surface water ever observed on the site. The geological report also states that no ground water was observed in the soil pits, which were examined. They were dug to a minimum depth of 10 feet. Harvest Unit Lavout The attached map shows the location of the proposed logging. Unit 1 is approximately 12 acres while Unit 2 is approximately two acres. Both will have all the merchantable timber removed during the logging operation. Generally, this would result in any tree capable of producing a 6" diameter (on the small end) by 32 foot log to be cut and removed. In both cutting units, this standard will result in a considerable amount of tree cover remaining after the logging. The merchantable timber in the logging units tends to be concentrated in pockets. Logging will therefore harvest all trees in some areas and in others result in no trees being removed. The logging plan also shows three leave areas along the edges of the timbered portions of the site, which will be left in their entirety. No equipment will enter these areas. With the exception of the south and west boundaries of Unit 2, which border Highway 102 and an existing gravel road respectively, all of the borders of the harvest units will be buffered iby intact vegetation. This vegetation ranges from grass buffers on the west side Of Unit 1 to intact timber and ground cover on the north, south and east sides of Unit 1 and the east and north sides of Unit 2. F Best Management Practices During Harvest A number of steps will be taken to control/eliminate potential damage from storm water run-off. They include all requirements of the Washington Forest Practice rules and specifically include: • No new permanent road construction. The main access road is already constructed and will not need any reconstruction in order to accommodate truck traffic. One additional temporary road may be constructed to the northeast corner of Unit 1. If built, it would be kept to a minimum width to accommodate truck traffic. • The existing access road has a ditch along a portion of its length. It will be kept functional by keeping logging debris out in order to drain water from the running surface. Any part of the running surface, where water accumulates, will have relief drainage installed to drain the water off the running surface. This would most likely be in the form of a ditch diversion, which would run water into the area adjacent to the road. • The area will be harvested will a ground yarding system. Possible types of equipment include feller-buncher, skidder or logging shovel. All will allow logs to be yarded to the edge of the road with at least one end suspended in the air. • Logs will be yarded to the edge of the existing road with the need to construct landings. This will disperse the yarding activity and eliminate the need to construct landings. • Logs will be yarded in the direction in which they are felled. This will eliminate ground disturbance because the logs will not be swung around to align with the yarding direction. • If necessary for harvest, skidder trails will be kept to a minimum number and will only be wide enough to accommodate the log removal operation. • Any mud or debris carried onto Highway 101 or 102 as a part of the harvesting operation will be promptly removed and disposed of in an approved site. Ak ... .......,_.... _, 1 Unit #1 j ... 1 )arcel #420022100000 I x� o c o -�• c d � rq N 1 a � a N I .z I Section 2, Twp. 20 north, Rge. 4 west, WM Scale: 1"=240 feet X----X---X = Cutting boundary Contour Interval = 1 foot P6ox oo& MASON COUNTY Shelton (360) 427-9670 DEPARTMENT OF COMMUNITY DEVELOPMENT Belfair (360) 275-4467 Planning Elma (360) 482-5269 Mason County Bldg. 1 411 N.5th P.O.Box 279 Shelton,WA 98584 1854 William Hill Berryman &'Henigar 720 Third Ave, Suite 1200 Seattle, WA 98104 January 31, 2007 Re: Geo-technical Review Request Dear Mr. Hill, Please find enclosed a geo-technical assessment for the site of the future Mason County Public Works facility on SR 101 in Shelton. Normally Mason County Public Works would review such plans for applications from the general public. However in this case, since the applicant is Mason County Public Works we need to contract the review out to a qualified third party. This geo-technical assessment is meant to cover both the initial logging of the site (which I am reviewing) and the eventual site development. Per the professional services contract between Berryman &Henigar and Mason County, I am forwarding these documents to you for review. Please review the enclosed geo- technical assessment and supporting documents, prepared by Aspect Consulting, for consistency with the Landslide Hazard chapter(17.01.100) of the Mason County Critical Areas Ordinance (also enclosed). Upon completion of your review,please forward the approved documents and any comments back to my attention at Mason County, along with a breakdown of associated cost for this review. Payment will be made per our signed agreement for professional services. If you have any questions, please contact me at ext. 571 or by e-mail at: mmsnco.mason.wa.us. Thank you. Sincerely, Michael MacSems FPA Planner cc: Pam Bennett-Cumming 1 Y i(� O X g � v � X 0 r- 314 2 ML 0 O N O O V1 N CD p � h > / i _ - 0 d c I C P/ � N-. 1 AHO O oa U I � � ` I I �• .1 l I n 0 �? U) WnS rn m° ----- ----- --L ��- - L o o -I �•o `� = v R' �° 0 �, 1 'J :a . o =a o n p - -a C c x g co c0i � P? k 0 z a �n `> m a o a) A c) O O N m � rp O M Q:\GeoTech\060159 Highway 101 Facility\2007-01\060159-02.dwg DWGr).Figure2--Traffic Plondwg 11/13/06 14:08 shouno >' / m m� No N N r SR-10 ----- --- C b 'o n D ➢ M T n— n z `u� N c N N o A VI I a Z qq pVOb 553�� 711a75 -z m aavl snoina d—x---x- --` casoacaa J ^�. 6 -_ _I jlll Ire Iaarivd a� oad / I r I a Mn IiilillH1li�uul --- MUIJ +/ -G co ca / 70 G•> ®® rrt n�F- o r t cn m to -n z o c m �Jm n D r_ ~n"n -� O rTm O C N A U m