Loading...
HomeMy WebLinkAboutSEP2007-00012 - SEP Determinations - 2/27/2007 P�oN.SrgTFo� MASON COUNTY � M C �t DEPARTMENT F COMMUNITY DEVELOPMENT o A° = tanning Division r o T z PO ox 279, Shelton,WA 98584 N �oJ Y boy (360)427-9670 1864 MITIGATE DETERMINATION OF NON SIGNIFICANCE (WAC 197-11- 50) SEP2007-00012 Description of Proposal: Mason County PublicWorks: This SEPA determination (Phase 1 of 2) is associated wit i a logging permit (FPA 2007-00002)for two units totaling 13.5 acres of an approximately 70-acre site. The purpose of the logging is for the construction of a new Public Works facility for which a separate SEPA determination (phase 2 of 2) shall follow within 14 days. The site was reviewed for Pileated Woodpecker and Shelton Pocket Gopher habitat. No Pocket Gopher habitat was found but one Pileated forge tree was found as well as two additional snags with forage potential. The snags will be left intact, except for the active forage snag, which may or may not have to be relocated to a green buffer on the edge of the cutting unit. A slope between 15 and 40% is located within 300 feet of the.northern most cut and a geo-technical assessment was reviewed and approved by Robert Tauscher, P.E. of City of Shelton Public Works. A temporary stormwater plan for the logging phase was reviewed and approved by Aspect Consulting. Both the development and the final stormwater plan will be reviewed through the Phase 2 SEPA determination." Proponent: MASON COUNTY PUBLIC WORKS Site Address (If Assigned): ............... Directions to Site: NORTH ON US 101 TO SR 102, SITE ENTRANCE +/- 1600FEET NORTH OF SR 102 DN WEST SIDE OF US 101 Parcel Number: 420022100000 Legal Description: NE NW PCL 1 OF B A #01-75 Lead Agency: Mason County The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21 C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. MITIGATED MEASURES ARE ATTACHED. Please contact Michael MacSems at ext. 571 with any questions. This DNS is issued under WAC 197-11-340(2). The Lead Agency will not act o this proposal for 14 days from the date shown below, when the determination is final. Comments must be submitted to Dept. of Community Development, P.O. Box 279, Shelton WA 98584 by 3/13/2007. Appeal of this determination must be filed within a 14-day period following this final determination date, per Mason County Code Chapter 15.11 Appeals. Authorized Local Government Official Date MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2007-00012 CONDITIONS OF THIS DE ERMINATION 1) Pileated Woodpecker Snag Management Three snags that are potential Pileated woodpecker forage habitat have been identified on this site. Two are large remnants of the previous stand of timber that grew in the area and one is a small tree approximately 12" DBH and 70' tall. The small tree shows evidence of recent woodpecker foraging. The other two do not. Absent any safety issues identified by the Washington Department of Labor and Industries, all three will be left standing following logging. Of the three snags, the small tree has the most likely potential for generating a safety issue. If it needs to be cut, it will be bucked to a length of 20-24 feet and relocated to the edge of the logging unit. A hole would then be dug in the ground and the snag segment would be placed in the hole and left in a standing position. If the tree is too decayed to remain intact when it is felled, a similar size stem would be selected from the logging area and relocated on the edge of the logging unit to replace the original snag. X 2) STORMWATER & EROSION CONTROL MEAOURES Escape of silty water or mud from the timber harvest area shall be considered a violation of County and State stormwater management regulations, and could subject the applicant(s) to civil fines or penalties. X _.......... ..._ ... l .:.................. .,,..�,.. 1 7sEj 4 Zool - c u lZ Unit #1 -Parcel #420022100000 1 � � � Jr fit I t C p ( .. O lj 1 O N O m l 1 t ni� R M Section 2, Twp. 20 north, Rge. 4 west, WM Scale: 1"=240 feet X----X---X = Cutting boundary Contour Interval = 1 foot TO BE COMPLETED BY APPLICANT: EVALUATION FOR AGENCY USE ONLY A. BACKGROUND 1. Name of proposed project, if applicable: Mason County Public Works Office Site Logging. 2. Name of applicant: Mason County Department of Public Works. 3.Address and phone number of applicant and contact person: Attn: Rick Hirschberg Mason County Department of Public Works P.O. Box 1850 Shelton,WA 98584 Telephone: (360)427-9670 ext.748 4. Date checklist prepared: January 9, 2007 5.Agency requesting checklist: Mason County Department of Community Development. 6. Proposed timing or schedule (including phasing, if applicable): Logging is proposed for early spring, 2007. 7. Do you have any plans for future expansion, or further activity related to or connected with this proposal? If yes explain. The new Public Works office complex will be constructed on the site following logging and clearing. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. A SEPA checklist was prepared for the construction of the new office complex. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. None known. 10. List any government approvals or permits that will be needed for your proposal, if known. Mason County®Building permit, Mason Environmental permit. 1111 TO BE COMPLETED BY APPLICANT: EVALUATION FOR AGENCY USE ONLY 11.Give a brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) Clearcut all merchantable timber on office site as shown on attached exhibit. 12.What is the location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section,township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan,vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency,you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. From Shelton,travel north on State Highway 101 2 1/4 miles to the intersection with a previously constructed logging road on the left. The old logging road enters the southern 1/3 of the logging unit. B. ENVIRONMENTAL ELEMENTS: 1. EARTH: a. General description of the site (circle one : flat. olling, hilly, steep slopes, mountainous, other b. What is the steepest slope on the site (approximate percent slope)? 2%. r�S-p ;( zCcjf wzr 1� C4 c. What general types of soils are found on the site(for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. The Mason County soil survey lists these soils as Grove, gravelly,sandy loam. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. No. e. Describe the purpose,type, and approximate quantities of any filling or grading proposed. Indicate source of fill. f. None proposed. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. None likely. The area is flat with an extremely permeable soil. g. About what percent of the site will be covered with impervious surfaces after project constructions (for example, asphalt or buildings)? No new impermeable surfaces will be created. 2222 TO BE COMPLETED BY APPLICANT : EVALUATION FOR AGENCY USE ONLY h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: Nees one✓e c;� ►�S Compliance with BMPs as prescribed in Forest Practice Rules. 1��e 1 �Prr'_�4 0_519-�07_4 CCAAstJ�t 2.AIR: a. What types of emissions to the air would result from the proposal (i.e.dust,automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities, if known. The primary emission would be equipment exhaust. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. None known. c. Proposed measures to reduce or control emissions or other impacts to air, if any: None proposed. 3.WATER: a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site(including year-round and seasonal streams, saltwater, lakes, ponds,wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. No surface waters exist in the immediate vicinity. 2)Will the project require any work over, in, or adjacent to(within 200 feet)the described waters? If yes, please describe and attach available plans. No. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. NA 4)Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. No. 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan No. 3333 TO BE COMPLETED BY APPLICANT: EVALUATION FOR AGENCY USE ONLY 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No. b. Ground: 1)Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities, if known. No. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any(for example, Domestic sewage: industrial, agricultural, etc.). Describe the general size of the system,the number of such systems,the number of houses to be served (if applicable), or the number of animals or humans the system(s)are expected to serve. Not applicable. c. Water Runoff(including storm water): 1) Describe the source of runoff(including storm water)and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. Rain/storm water is, in general, the only source of runoff. It will infiltrate into the ground on-site. 2) Could waste materials enter ground or surface waters? If so, generally describe. Possible gas, oil or diesel spillage during equipment maintenance and operation. d. Proposed measures to reduce or control surface,ground, and runoff water impacts, if any: Contractor will be required to have a spill containment kit on-site. 4. PLANTS: a. Check or circle types of vegetation found on the site: _deciduous tree: alder, maple, aspen,other ✓evergreen tree: fir, cedar, pine, other ,(shrubs ✓ grass pasture crop or grain _wet soil plants: cattail, buttercup, bulrush, skunk cabbage, others _water plants: water lily, eelgrass, milfoil, other ®other types of vegetation: b. What kind and amount of vegetation will be removed or altered? Approximately 12 acres of second-growth timber will be clearcut. 4444 TO BE COMPLETED BY APPLICANT: EVALUATION FOR AGENCY USE ONLY c. List threatened or endangered species known to be on or near the site. None known. -� d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: None proposed. 5.ANIMALS a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: birds: hawk, heron, eagle, songbirds, other: All are possible mammals: deer, bear, elk, beaver, other All possible except elk and beaver fish: bass, salmon,trout, herring, shellfish, other No fish are present y b. List any threatened or endangered species known to be on or near the site. None. c. Is the site part of a migration route? If so, explain Highly unlikely. d. Proposed measures to preserved or enhance wildlife, if any: None proposed. 6. ENERGY AND NATURAL RESOURCES: a. What kinds of energy(electric, natural gas, oil,wood stove, solar)will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. None required. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. No. c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: None . 7. ENVIRONMENTAL HEALTH: 5555 TO BE COMPLETED BY APPLICANT : EVALUATION FOR AGENCY USE ONLY a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill,or hazardous waste,that could occur as a result of this proposal? If so, describe. Only those associated with refueling operating and servicing the logging equipment. 1) Describe special emergency services that might be required. Emergency medical in case of an accident. 2) Proposed measures to reduce or control environmental health hazards, if any: Normal logging safety practices as prescribed by the Department of Labor and Industries. b. Noise. 1)What types of noise exist in the area which may affect your project(for example: traffic, equipment operation, other)? None. 2)What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis(for example: traffic, construction, and operation, other)? Indicate what hours noise would come from the site Normal noise from logging equipment. Logging activity will be restricted to daylight hours. 3) Proposed measures to reduce or control noise impacts, if any: Mufflers standard on equipment. Restrict work to daylight hours only. 8. LAND AND SHORELINE USE: a. What is the current use of the site and adjacent properties? Timber production. b. Has the site been used for agriculture? If so, describe. No. c. Describe any structures on the site. None. d. Will any structures be demolished? If so,what? No. e. What is the current zoning classification of the site? 6666 TO BE COMPLETED BY APPLICANT: EVALUATION FOR AGENCY USE ONLY No county zoning. f. What is the current comprehensive plan designation of the site? GMA g. If applicable,what is the current shoreline master program designation of the site? NA h. Has any part of the site been classified as an"environmentally sensitive"area? If so, specify. No. i. Approximately how many people would reside or work in the completed project? r+ ' None. j. Approximately how many people would the completed project displace? None. k. Proposed measures to avoid or reduce displacement impacts, if any: None applicable. I. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: Project is in preparation for construction of an office and shop complex. 9. HOUSING: a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low- income housing. None. b. Approximately how many units, if any,would be eliminated? Indicate whether high, middle,or low- income housing. None. c. Proposed measures to reduce or control housing impacts, if any: None. 10.AESTHETICS: 7777 TO BE COMPLETED BY APPLICANT : EVALUATION FOR AGENCY USE ONLY a. What is the tallest height of any proposed structure(s), not including antennas;what is the principal exterior building material(s) proposed? None proposed. b. What views in the immediate vicinity would be altered or obstructed? They will be improved by removing the existing timber. c. Proposed measures to reduce or control aesthetic impacts, if any: Several areas will be left uncut. Refer to attached map. 11. LIGHT AND GLARE a. What type of light or glare will the proposal produce? What time of day would it mainly occur? None. b. Could light or glare from the finished project be a safety hazard or interfere with views? No. c. What existing off-site sources of light or glare may affect your proposal: None. d. Proposed measures to reduce or control light and glare impacts, if any: None. a. What designated and informal recreational opportunities are in the immediate vicinity? None. b. Would the proposed project displace any existing recreational uses? If so, describe. No. c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: None applicable. 13. HISTORIC AND CULTURAL PRESERVATION: a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. None are known. 8888 TO BE COMPLETED BY APPLICANT: EVALUATION FOR AGENCY USE ONLY b. Generally describe any landmarks or evidence of historic, archaeological, scientific,or cultural importance known to be on or next to the site. None known. c. Proposed measures to reduce or control impacts, if any: None. 14.TRANSPORTATION: a. Identify public streets and highways serving the site and describe proposed access to the existing street system. Show on site plans, if any. State Highway 101. I� I u b. Is site currently served by public transit? If not,what is the approximate distance to the existing street system. Show on site plans, if any. ��ti,SO� Cv 1Uw,�t 1 • � No. c. How many parking spaces would the completed project have? How many would the project eliminate? None. d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). No. e. Will the project use (or occur in the immediate vicinity of)water, rail, or air transportation? If so, generally describe. No. f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. The project would not change the existing level of vehicular traffic. g. Proposed measures to reduce or control transportation impacts, if any: None. 15. PUBLIC SERVICES: a. Would the project result in an increased need for public service(for example: fire protection, police protection, health care, schools, other)? If so, generally describe: No 9999 TO BE COMPLETED BY APPLICANT : EVALUATION FOR AGENCY USE ONLY b. Proposed measures to reduce or control direct impacts on public services, if any: None. 16. UTILITIES: a. Circle utilities currently available at the site: electricity, natural gas,water, refuse service,telephone, sanitary sewer, septic system, other: Telephone and electricity. b. Describe the utilities that are proposed for the project,th utility providing the service, and the general construction activities on the site or in the immediate vici�ity which might be needed: None. 17.SIGNATURE: The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying^on them to make its decision. Signature: ' Da t Submitted r /'7 I7 10101010 ESA LISTED SALMONIDS CHECKLIST Applicant Information Proiect Information Date: January 17,2007 Name: Mason County Department of Public Works Name: Public Works Office Site Logging Phone: (360)427-9670 ext.748 Location: Sec. 2,Twp.20 north,Rge. 4 west WM Attn: Rick Hirschberg Description: Log approximately 12 acres This worksheet was designed to help project proponents and government agencies identify when a project needs further analysis regarding adverse effects on ESA(Endangered Species Act) listed salmonids are salmon,trout and chars, e.g. bull trout. For our purposes,"ESA listed salmonids" is defined as fish species listed as endangered,threatened or being considered for listing. If ESA listed species are present or ever were present in the watershed where your project will be located,your project has the potential for affecting them,and you need to comply with the ESA. The question in this section will help determine if the ESA listings will impact your project. The Fish Program Manager at the appropriate Department of Fish and Wildlife(DFW)regional office can provide information for the following two questions 1. Are ESA listed salmonids currently present in the watershed in which your project will be located? Yes-No X Please describe: 2. Has there ever been an ESA listed salmonid stock present in this watershed? Yes No X Uncertain Please describe: If you answered "yes"to either of the above questions,you should complete the remainder of this checklist. PROJECT SPECIFICS: The questions in this section are specific to the project and vicinity. 1. Name of Watershed: 2.Name of nearest waterbody: 3. What is the distance from this project to the nearest body of water? Often a buffer between the project and a stream can reduce the chance of a negative impact to fish. Mason County Shoreline Permit Supplement Page 1 4. What is the current land use between the project and the potentially affected waterbody(parking lots, farmland, etc.)? The current use at the project site is a county road and bridge. 5. Is the project above a: • natural permanent barrier(waterfall)? Yes No • natural temporary barrier(beaver pond)? Yes No • man-made barrier(culvert, dam)? Yes No • other(explain) : 6. If yes to any of the above, are there any resident salmonid populations above the blockage? 7. What percentage of the project will be impervious surface(including pavement&roof area)? The project will increase the impervious surface by 42%. This is due to increasing the paved running surface of the road five feet on each side for a distance of 800 feet. FISH MIGRATION° The following questions will help determine if this project could interfere with migration of adult and juvenile fish. Both increases and decreases in water flows can affect fish migration. 1. Does the project require the withdrawal of: i. Surface water? Yes No _ Amount Name of surface waterbody. it. Ground water: Yes No _ Amount From where Depth of well 2. Will any water be rerouted? Yes No If yes, will this require a channel change? 3. Will there be retention or detention ponds? Yes No If yes,will this be an infiltration pond or a surface discharge to either a municipal storm water system or a surface waterbody? If to a surface water discharge, please give the name of the waterbody: Mason County Shoreline Permit Supplement Page 2 4. Will this project require the building of new roads? Yes No . Increased road mileage may affect the timing of water reaching a stream and may impact fish habitat. The only road construction will be that needed to widen the existing road to meet current County design standards. 5. Are culverts proposed as part of this project? Yes No 6. Will topography changes affect the duration/direction of runoff flows? Yes No If yes, describe the changes. 7. Will the project involve any reduction of the floodway or floodplain by filling or other partial blockage of flows? Yes No If yes, how will the loss of flood storage be mitigated by your project? WATER QUALITY: The following questions will help determine if this project could adversely affect water quality. Such adverse affects can cause problems for listed species. Water quality can be made worse by runoff from impervious surfaces,altering water temperature,discharging contaminants,etc. 1. Do you know of any problems with water quality in any of the streams within this watershed? Yes No— If yes, describe: 2. Will your project either reduce or increase shade along or over a waterbody? Removal of shading vegetation or the building of structures such as docks or floats often result in a change in shade. Yes No There will be a slight increase in shade over the stream because the new bridge is ten feet wider than the old one and is oriented east-west. 3. Will the project increase nutrient loading or have the potential to increase nutrient loading or contaminants(fertilizers, other waste discharges, or runoff)to the waterbody? Yes No— 4. Will turbidity be increased because of construction of the project or during operation of the project? In-water or near water work will often increase turbidity. Yes No . The only in-water work is removal of two existing piers. This will be done during low tide periods when there is no water in the work area.. 5. Will your project require ling-term maintenance, i.e.,bridge cleaning, highway salting, chemical sprays for vegetation management, clearing of parking lots? Yes_ No . Likely only de-icing chemicals on the road and bridge deck.. Mason County Shoreline Permit Supplement Page 3 If yes,please describe: VEGETATION: The following questions are designed to determine is the project will affect riparian vegetation,thereby,adversely impacting salmon. 1. Will the project involve the removal of any vegetation from the stream banks? Yes_ No If yes,please describe the existing conditions, and the amount and type of vegetation to be removed. Widening of the road approaches to the new bridge will remove several conifers. 2. If any vegetation is removed, do you plan to re-plant? Yes No If yes,what types of plants will you use? Mason County Shoreline Permit Supplement Page 4 Aspectconsulting IN-DEPTH PERSPECTIVE January 22, 2007 Mason County Department of Public Works 415 N 6th Street Shelton, Washington 98584 Attention: Bob Thuring Re: Geological Assessment Proposed Public Works Facility U.S. 101 & State Road 102 Mason County, Washington Project No. 060159-005-01 Reference: Subsurface Exploration, Geolog c Hazard and Geotechnical Engineering Report, Proposed Mason County Public Works Facility, Highway 101, Mason County, Washington, Aspect Consulting, January 22,2007 Dear Mr. Thuring: This letter summarizes our field notes and conclusions regarding the nature of the site slopes with respect to the proposed development. Geotec ical design recommendations for the proposed development are'shown separately in our above-referenced geotechnical report. A geologic slope reconnaissance of the site slopes and subsurface exploration in the proposed i construction areas were performed. Project Understanding The project site consists of an undeveloped lot no th of the intersection of State Road 102 and U.S.Route 101 in Mason County. The project consists of construction of a new Mason County Department of Public Word s(MCDPW)maintenance and office facility with a fueling station and associated parking areas at the site. The locati n of the site is presented on Figure 1,Site Location Map. Observations Site Conditions and Topography The site is essentially flat,with a slope at the northwest corner of the property. The slope is approximately 50 feet in height. Overall the slope angle was on the order of 4H:1 V (Horizontal:Vertical), or 25 percent steepness. Mid-slope was a 20 foot high steeper zone that was at approximately 2.5H':IV, or 40 percent steepness. The south face of the slope to the west of the project area was reportedly the excavated face of a relict gravel pit. The site area is shown on Figure 2,Site and Exploration Plan. The slopes at the site are approximately 40 percent steepness and have greater than 10 feet of vertical relief,thus meeting the Landslide Hazard Area criteria as defined in the Mason County Mason County Department of Public Works January 22, 2007 Project No. 060159-005-01 Resource Ordinance. As a result,the restrictions aid requirements as outlined by the code apply to development of the site. Drainage Drainage on the property was generally diffuse, with no evidence of concentrated flow. We observed no evidence of groundwater seepage in the site slopes or in the exploration pits performed for the geotechnical evaluation of the site. Vegetation Vegetation on the slopes consisted primarily of small fir trees and a heavy understory of salal, berry bushes and small shrubs. Geology Subsurface conditions on the slope were inferred from a visual reconnaissance of the site and review of applicable geologic literature. Soil exposed in the excavated face consisted of dense to very dense, reddish-brown to brown, slightly silty sand, gravel and cobbles, interpreted as intact glacial till deposits. Soils exposed in the subsurface exploration consisted primarily of clean,sandy gravel, interpreted as glacial outwash deposits. The soils observed at the site match the strata mapped as Pleistocene glacial till nd proglacial outwash on the Washington State DNR Geologic Map of the Shelton 1:100,00 Quadrangle, Washington. These strata were deposited during the most recent glaciation, which locally occurred between about 13,000 and 16,000 years ago and were subsequently overridden by the glacial ice sheet. These strata have been compressed by thousands of feet of glacial ice. As a result of this compression, the soil exhibits low compressibility and high strength characteristics. These strata are suitable for any required foundation or retaining wall support, provided the recommendations in the above- referenced geotechnical report are properly followed and implemented. Hydrology No groundwater seepage or, groundwater was observed within the slope or within the exploration pits at the subject property. It should be noted that fluctuations in the level of groundwater may occur due.to time of year, variations in site usage,rainfall, irrigation, and other factors. Slope Stability Three types of slope failures are prevalent on slop s in the Puget Sound area. Shallow debris or colluvial landslides usually involve failure of a thi skin of loose and weathered soil and vegetation that mantles steep slopes. Failure usually consists of the colluvial layers sliding or flowing over the dense or hard,undisturbed soils.Tbe region's second most common type of landslide failure is a rotational or deep-seated Ian Tide failure. This type involves rotation of a mass of soils along a bowl-shaped or curved failure plane. This type of failure often results in movement of large blocks of relatively intact soils The third type of failure consists of toppling or spalling of blocks of relatively intact soils from a bluff that has been undermined by erosion. These blocks typically fail along high angle (typically near vertical) fractures present in the soil units. Page 2 Mason County Department of Public Works January 22, 2007 Project No. 060159-005-01 We observed no evidence of active, recent or incipient slope instability of any of these types on the site slope. If slope and runoff conditions change (i.e., extensive clearing of vegetation at the site or concentration of stormwater) in an adverse mannel during or after construction, the potential for slope erosion and slide activity could increase. Seismic Design Considerations The nearest known active fault to the project site is the Tacoma fault. The western end of this fault lies about 10 miles to the northeast of the site This recently identified fault zone extends at least 30 miles from near the southeastern tip of Ilood Canal to the Tacoma and Federal Way area. The U.S. Geological Survey reports that the Tacoma Fault may have caused a shallow earthquake of 7 to 7.5 magnitude 1,100 years ago nd caused about 12 feet of uplift along areas of the Tacoma Fault(Sherrod, B.L, and others, 2003, The Catfish Lake Scarp,Allyn, Washington: Preliminary Field Data and Implicat ons for Earthquake Hazards Posed by the Tacoma Fault,U.S. Geological Survey Open-File Report 03-0455). The U.S. Geological Survey believes that the Tacoma fault may be a no h-dipping back-thrust to the Seattle fault (discussed below), so that slip on a master thrust fault at depth could result in movement on the Seattle fault,the Tacoma fault, or both. Informatio ri on potential seismicity associated with the Tacoma fault has not been published in agency documents. It is not possible to fully evaluate the hazards from this structure until a code-based rsource of potential earthquake information is available.As research continues regarding the seismic hazards in the Puget Sound region, other suspected fault systems will likely be identified. We presume that any future proposed structures at the site would be constructed under the provisions of the 2003 International Building Cod (IBC). For seismic site design purposes, the soil classification for this site would be Site Class , and a peak ground acceleration of 0.33g may be used as determined by Chapters 16 and 18 of the 2003 IBC. Conclusions and Recommendations From a geotechnical perspective, the site slopes dc not present a landslide hazard to the proposed development. The nearest proposed structure is approximately 150 feet away from the toe of the slope. The slopes have sufficient run ut space that surficial slide debris, if it were to occur,would not reach the proposed structures. The site slopes and proposed structure locations are shown on Figure 2. Soils in the site slope consist of very dense, slightly silty, sand, gravel and cobbles.The site topographic, soil, and surface and groundwater characteristics suggest that,under existing conditions,the site has a low potential for additional slope instability. If seepage,runoff,or stormwater flow were to increase significantly,erosion of the soils on the slope and the chance of landslides could increase. Similarly, improper hillside grading, extensive upland clearing, or poor stormwater handling practices could increase the risk of slope instability. Based on the general slope configuration, deep-seated seismic sliding under this design basis is considered a low risk. The most likely impact tot e property from a slope stability perspective would be shallow debris landslides as a result of saturation of the near-surface,weathered soils on the slope. Slides of this type are typically limited to the weathered soil unit within the upper Page 3 Mason County Department of Public Works January 22, 2007 Project No. 060159-005-01 2 to 3 feet and typically do not have a significant effect on the underlying geologic units. Factors that affect slope instability within the near-surface, weathered soil layer include the following(D.H. Gray and A.T. Leiser, Biotechnical Slope Protection and Erosion Control: Van Nostrand Reinhold,New York, 1982): Root Reinforcement: Roots mechanically reinforce a soil by transfer of shear stresses in the soil to tensile resistance in the roots. Soil Moisture Modification: Evapotranspiration and interception in the foliage limit build-up of soil moisture. Buttressing and Arching: Anchored and embedded stems can act as buttress piles or arch abutments in a slope, counteracting shear stresses. Surcharge: Weight of vegetation on a slope exerts both a downslope (destabilizing) stress and a stress component perpendicular to the slope, which tends to increase resistance to sliding. Root Wedging: Tendency of roots to invade cracks, fissures, and channels in a soil or rock mass and thereby cause local instability by a wedging or prying action. Windthrowing: Destabilizing influences from turning moment exerted on a slope as a result of strong winds blowing downslope through trees. Root reinforcement, soil moisture modification (reduction), and buttressing and arching have a net enhancing effect on slope stability at the site. Surcharge, root wedging and windthrowing will have a net destabilizing effect. Other sources of surficial slope instability include improperly managed storm and surface water runoff flowing near or over the top of the slope. Surface vegetation should not be removed on the steep slopes. The intact slopes should not only remain substantially covered with native vegetation, can be enhanced by planting on any bared slope faces. Proper long-term management of sloped areas will reduce the risk of possible future landslide activity. Consequently, we recommend considering implementation of a long-term vegetation management plan for the site.Excellent information on this subject is available in Washington State Department of Ecology publications,Slope Stabilization and Erosion Control Using Vegetation (publication 93-30) and Vegetation Management:A Guide for Puget Sound Slope Property Owners (publication 93-3 1). Page 4 Mason County Department of Public Works January 22, 2007 Project No. 060159-005-01 Limitations This letter has been prepared for the exclusive use of Mason County Department of Public Works and their agents for specific application to this project. Within the limitations of scope, schedule and budget, our services have been performed in accordance with generally accepted geotechnical engineering and engineering geology practices in effect in this area at the time our letter was prepared. This report is not a legal opinion and there is no other warranty, expressed or implied. Our observations, findings, and opinions are a means to identify and reduce inherent risks to the owner. Thank you for the opportunity to provide these services to you. If you have any questions, please do not hesitate to call Andy at (206) 780-7717 or John at (206) 780-7720. Sincerely, Aspect consulting, LLC P�^� � o Rwc)�' 7 p ,la+ Mass q�' 18802 rs�4 NAL � Sf�N4L�`�'lY /o, IXPRRES4/3/Q`� �� EXPIRES 6/22/() —� James A. Peterson, PE John L. Peterson, PE Project Geotechnical Engineer Associate Geotechnical Engineer apeterson@aspectconsulting.com jpeterson@aspectconsulting.com Attachments: Figure 1 —Site Location Map Figure 2— Site and Exploration Plan W:\_GEOTECH\060159 Mason County\Public Works Facility-005\Hwy 101 Facility Geologic Assessment.doc Page 5 8rockda{le� rrD ;P f 067 16 .\ t + x`Borrow i %' 26 - — •� �2j.,Z, _ \ `FJt �{ BM273.6 r / M 1 ' ram- 28 } ErCenA Lake",,( � � ti 24BT Al: zz O CIC / t .'\ yam. t i t r E \1 3-4 \ . -fi ,I C'(ear 41/ N\ �, ji v = ';__ ti t` Site Locationif - F !- I L t FI t I JO - •'2,90 91 _ t L 9 �uy Wash State Pa nc•aa-, vET `\ 01 ;, 'T6149Lakez- r Wane --goat Rol L .. '••A Island 96 Rifle Ra = �'♦ � • BM coBM 83.7 84.4 / SAN ERSON cw F E L D t _ 1 .2 BM -------- a fpg I' Lv. t 0 f'• C' - +:Feet N Site Location Map mE Jan2007 PROJECT NO. CO Aspectconsulting ' 1. 060159-005 L IN-DEPTH PERSPECTIVE y Proposed Public Works FacilityeYPMg FIGURE NO. 179 ~o MaNam Lane NoN, 911 Flret Avenue M/80 � N BNnbridp•I 'WASM10 Seattle,WA9B10/ rseoer (, (206)TBO.9370 (2,32a-T•+3 Mason County, Washington _ a of SHF� O U z IN 'Building A Stronger Community TOGETHER' February 15, 2007 Mr. Michael MacSems, FPA Planner Mason County, Department of Community Development Mason County Bldg. 1, 411 N. 5" Street P.O. Box 279 Shelton,WA 98584 Dear Mr. MacSems: Subject: Mason County Proposed Public Works Facility, Geo-technical Review Comments Per your request to review the geo-technical assessme t and supporting documents provide for the referenced project, received February 14, 2006, the following are my comments: Mason County Ordinance Reference 1. Mason County Resource Ordinance, 17.01.100.A.1. Site Description 2. The site is essentially flat, with a slope at the northwest corner of the property. The northwest corner of property has a mid slope, 20 feet high which is approximately 2.5H:IV, or 40 percent steepness. 3. The nearest proposed structure is approximately 150 feet from the toe of the slope. 4. There is no evidence of any concentrated drainage flow on the site. 5. No groundwater was observed in the exploration pits or on the property. Comments 6. Per Mason County Resource Ordinance, 17.01.10 .E.1, Category a, the development proposed is within 300 feet pf slopes greater than 0 percent and requires a Geotechnical Report. 7. The Geotechnical Assessment submitted January 2, 2007 does not provide recommendations whether a Geotechnical Report 3hould be required to further evaluate the site; and does not provide delineation of the buffers and setbacks per section 17.01.100.E.4. (7) &(8). Recommendation: I recommend you request supplemental information to address the above listed items#7 and require a Geotechnical Report. The Subsurface Explo ation, Geologic Hazard and Geotechnical 525 W. Cota St. • Shel on, WA 98584 (360) 426-4491 *FAX (360) 426-1338 • -Mail: cityhall@ci.shelton.wa.us Web Site: www.ci.shelton.wa.us Engineering Report, Highway 101 Facility, dated January 22, 2007 has some of the required information for a Geotechnical Deport,but does not include all thirteen elements. As requested, attached is a breakdown of associated costs for the review. If you have any questions,please feel free to contact me at (360) 432-5127. Sincerely, Robert E. Tauscher, P.E. Project Engineer RET:cr F:\Engineering\Bob\Development\Mason County ProjectsWason County PW Sh p\0215077 Geotechnical Assessment Review.doc �6°N oO°� MASON COUNTY � ap DEPARTMENT OF COMMUNITY DEVELOPMENT Shelton (360) 427-9670 Belfair (360) 275-4467 Planning _ Mason County Bldg. 1 411 N.5th Elma (360) 482-5269 P.O.Box 279 Shelton,WA 98584 >85A Rick Hirschberg Mason County Public Works P.O. Box 1850 Shelton, WA 98584 January 25, 2007 Re: 42002-10-00010, 00020 &21-00000 Dear Mr. Hirschberg, Today I visited the above referenced property to inspect it for your forest practice application. While the site at first appears to be an easy review, there are a couple of critical area issues that need to be dealt with before I can issue a SEPA DNS or MDNS. These are Pileated Woodpecker habitat and steep slopes. I will address these topics in more detail below: Woodpeckers: The Fish&Wildlife Habitat section(17.01.110) of the County's Critical Areas Ordinance protects Pileated Woodpeckers. On site I observed a number of snags that showing evidence of woodpecker foraging. Of these snags, I noted two (both south of the existing road but most likely within the cutting unit) that showed evidence of recent Pileated Woodpecker foraging. These snags, and any others like them, need to be protected or their habitat value mitigated for if protection is not possible. Dealing with protected snags can be perplexing as our code tells us to protect the habitat and the Department of Labor & Industries tells us not to create hazardous situations for the logging crew. One possible way to meet both requirements is to leave a stand of healthy trees around the snag. However, when removal of such snags is unavoidable, such snags can be removed with a Mason Environmental Permit (MEP) and a Habitat Management Plan (HMP). While I did not see any indications of Shelton Pocket Gophers on site, you should be aware that they are on the list of protected species and are known to dwell within a mile or so of this property. One of the parcels adjacent to this property is currently under review for a commercial short subdivision. One of the SEPA comments I received after I issued their MDNS was concern that the project would impact the pocket gophers. The applicant is now having a study done, but I have not received it yet. You should be prepared for the possibility that when SEPA is issued for this project that same issue may be raised again. If you would like contact information for the adjacent property owner's agent, I can provide it. Slopes: Your site plan shows that steep slopes exist as close as 200 feet from the western edge of the cutting unit. The Landslide Hazard chapter of the Mason County Critical Areas Ordinance (available on line) requires a geo-technical assessment, consistent with section 17.01.100, for logging on or within 300 feet of slopes over 15% and a geo-technical report for slopes of 40% or more. This FPA will require the virtually the same geo- technical assessment or report as the site development building permit will require. I am under the impression that such a document has already been written and will be distributed to the Planning Department this week. (An alternative is to pull the boundaries of the cut back to the 300-foot setback line). Normally geo-technical documents, like stormwater site plans, are reviewed by Mason County Public Works. However in this case the review will be contracted out to Berryman & Henigar with their hours billed to Public Works. I look forward to receiving the geo-technical document in the near future; hopefully your stormwater plan will also be available to forward to Berryman &Henigar at the same time. Let me know how Public Works wishes to approach the Pileated Woodpecker habitat situation. Please feel free to call me at ext. 571 or e-mail me at mms a,co.mason.wa.us with any questions. Thank you. e Sincerely, . , ` Michael MacSems FPA Planner cc: Barbara Robinson