STr MASON COUNTY
o n° i PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER
Y O N Shelton,Washington 98594
Y NT Z
Y DATE: June 28 h, 2005
INTER-DEPARTMENTAL COMMUNICATIONS
TO: Tami Griffey, PAC—Bldg Inspector
FROM: Alan A. Tahja, P/W- Co. Hydr. Engr. WO#BLD-05
SUBJ: Grading Reviews NAME: Port of Shelton k Sanderson Field
GRD2004-00017
Public Works has received and reviewed the materials relating to the Port of Shelton(Port)
development and grading activities located on the Port property at the northerly end of Sanderson
Field.
The field reports submitted by Mr. David Spiller, P.E., indicate that the majority of the grading is
complete and acceptable,but that the stormwater pond proposed in the plans is not intended to be
constructed until some later date. It appears that the Port may be exploring relocating the
stormwater plan to a different location. Relocation of the pond is an option which will be
reviewed if and when such a plan is delivered to the County for review and comments.
Attached please find a copy of a Performance Bond/Frozen Fund account the Port has delivered
to the County to provide for approval of the grading,though it has not actually been 100%
completed. The reports submitted by Mr. Spiller indicate that for the temporary time the Frozen
Fund account will be in effect, stormwater runoff will be accommodated in the undeveloped
areas of the construction area(s). Given the extent of the Port property, I do not see any potential
for stormwater runoff to leave the Port property and adversely impact any neighboring properties,
and recommend acceptance of the bond for the purpose of considering the grading complete..
Mr. William Tabor, the County Engineer has reviewed the Frozen Fund Account and signified
his acceptance with his signature. The original frozen fund document will be retained by Public
Works until the grading/stormwater pond is complete.
The Port should notify Public Works when the pond has been completed, at which time an
inspection will be performed by Public Works, and a letter releasing the frozen funds will be
dispensed.
Please feel free to contact me at County extension 461 if you have any questions regarding these
comments, or if you feel any features need further discussion or attention.
Si cerely,
J__/;��
v.
A an A. Tahja
Attached: copy Performance Bond-Frozen Fund
File: H:\WP\Grading\Port-Frzn Fund.doc
HATTON GODAT PANTIE R
May 20, 2005
Ms. Tami Griffey
Mason County Building Department, Building III
426 W Cedar
Shelton, WA 98584
RE: Grading Permit GRD2004-00017 Port of Shelton
HGP# 04-118
Dear Ms. Griffey:
Attached are copies of my two visits to the site. In addition to the site visits, I have been
in contact with the contractor, survey crew and the Port of Shelton Capital Improvement
Staff throughout construction. Based on my site visits, contact with those involved, the
grade, surface drainage and infiltration system were constructed in general accordance
with the plans.
The only exception is the proposed storm pond located on the southern portion of the
site. Correspondence with the Port of Shelton, indicates that this portion of the project
will be constructed this summer.
If you have questions or need additional information regarding this project, please
contact me at (360) 943-1599 or daves(a)hattonpantier.com. Thank you for your
assistance with this project.
Sincerely,
H ON GODAT P TIER
David W Spiller, P.E.
Senior Project Engineer
DWS:dsh
Enclosures: As-builts dated 4/7/05
Copies of field reports
cc: Fred Cool, Port of Shelton
Terra Norris, Port of Shelton
Hatton Godat Pantier, Inc.
1840 Barnes Blvd SW
Tumwater WA 98512
T 360.943.1599
F 360.357.6299
EAoffice\J0BS\2004\04-118 Port of Shelton NBP 2\LTR-Griffey 5.20.05.doc 800.700.1693
ENGINEERS AND SURVEYORS hattonpantier.com
f '
MASON COUNTY
DEPARTMENT OF PUBLIC WORKS
P.O.Box 1850-Shelton,Washington 98584
PERFORMANCE BOND - FROZEN FUND ACCOUNT
Mason County Road Name/Number: Permit #GRD2004.00017
Permit Date: December 16, 2004
Type of Permit: Grading
(road access/utility/plat development/etc.)
Owner/Developer/Contractor: Port of Shelton. W21 Sanderson Way Shelton, WA 98584
(name and address)
Type of Improvement: Infiltration pond construction
Project Location: West end of Development Rd within Business Park North at Sanderson Field.
Legal Description of Property: Parcel#420020062000
With reference to the above-identified matter, this will certify that this institution has a savings account
(or loan) for the above-referenced owner/developer/contractor for the project so identified. In
consideration of the permitted improvement, and in lieu of a performance bond, this institution hereby
agrees that it will freeze the following sums of money for the indicated improvement pending written
authorization for release of said funds by the County of Mason in the amount
of$4,800.00 (four thousand eight hundred dollars and 00/100).
The total sum indicated will be withheld by this institution from any disbursements of any kind until
written authorization has been received by the institution for the County of Mason to release the sum of
money indicated by the written authorization from the County.
The design, location, materials and other specifications for the indicated improvement are those required
by the County of Mason as appears in the above-referenced document/permit, and shall be in
compliance with Mason County Title 16 and/or Ordinance No. 3-93, Accommodation of Utilities on
County Road Right-of-Way.
These funds shall be held by the institution for a period of 12 months/ 1 year(s). In the event the
Contractor does not comply to the aforementioned requirements, the County of Mason may demand,
and the institution shall make, payment to the County of Mason of said funds so that the necessary
repairs can be performed immediately to Mason County standards. The institution shall not be liable to
the owner for any disbursement of said funds to the County of Mason.
- Page 1 of 2 Pages-
It is hereby specifically agreed by and between the parties hereto that in the event that any legal action
must be taken to enforce the provisions of this bond or to collect said bond, that the prevailing party
shall be entitled to collect its cost and reasonable attorneys'fees as a part of the reasonable costs of
securing the obligation hereunder. In the event of settlement or resolution of these issues, prior to the
filing of any suit, the actual costs incurred by the County, including reasonable attorneys'fees, shall be
considered a part of the obligation hereunder secured. Said costs and reasonable legal fees shall be
recoverable by the prevailing party, not only from the proceeds of this bond, but also over and above
said body as a part of any recovery in any judicial proceeding, in addition to recovery on the bond.
L 5L60-Lt26-t- 3( APPROVED: l�
NAME O ANK/PHONE NO. OWNER/CONTRA R
pkV-Q I rit ACCEPTED:
OFFICR/TITLE MASON COUNTY ENGINEER
KAL�W)A ELVA DATE: 05
BANK ADDRESS SkkZ3�r1
D2-0�ZSI�_D
ACCOUNT NUMBER
STATE OF WASI- NGTON,
County of M&S6y-) (INDIVIDUAL ACKNOWLEDGEMENT)
I, q�\.k?-kf ,Notary Public in and for the State of Washington, residing
at Sht_i h! n ,do hereby certify that on this day of , 20co,personally
appeared before me Le..)o+- - L +�-A'A-rA to me known to be the
individual_ described in and who executed the within instrument and acknowledged that-ILt
signed and sealed the same aster free and voluntary act and deed for the uses and purposes herein
mentioned.
GIVEN UNDER MY HAND AND OFFICIAL SEAL this Flay of3u-Rt, 206S .
Not Pub is i r the State of
Washington, residing at in sae County.
My Commission expires Z
SCHN/T
V 9�oN EXPuizo
/RFS• ,t�
a
scv hAxNp\text\frozen.acc �����0 Co.0
O•
-Page 2 of 2 Pages - •. 10-4 °•°��
•so+°
HATTON GOD GODAT PANTIE R
1840 Barnes Blvd SW
Tumwater,WA 98512
(360)943-1599 FAX(360)357-6299
FIELD REPORT
DATE: 1 12/16/04 HGP NO. 04-11'8 PROJECT: North Business Park Extension
CONTRACTOR: I Huston Construction WEATHER: _Partly Cloudy TEMP: 50
ARRIVED ON SITE: AM LEFT SITE: AM
2:00 PM 3:00 PM
PRESENT AT SITE: Jack Huston, Huston Construction Fred Cool, Port of Shelton
Erosion control fencing was installed per plan.
Contractor was rough grading site and installing underground utilities including storms stem. Jack pointed out two conflicts
On-site.
1 The existin2 under ground power was much shallower than originally anticipated. Fred Cool'said-that he had contacted the
PUD. The port and the-PUD were working on'a relocation of the existing power.,
2)The existing piping was found on the site in several locations. The pipes appeared to be parts of the old sewer and water
System installed by the air force. Fred directed the contractor to remove all portions found. The existing sewer was found in
Two locations centered on the proposed new road,and drive access for the back of the buildings.
The contractor had on site a bulldozer,vibrating compactor,and a'backhoe. In addition dump trucks were haulin2 material from
The site.
Soils on-site were consistent with other soils found in the larea. Very gravelly.
PAGE 1 OF 1
COPIES TO:
SIGNED: David W S,piller
Document4
HATTON GODAT PANTIER
1840 Barnes Blvd SW
Tumwater,WA 98512
(360)943-1599 FAX(360)357-6299
FIELD REPORT
DATE: 1 1112/05 HGP NO. 04-118 PROJECT: North Business Park Extension
CONTRACTOR: Huston Construction WEATHER: Sunny TEMP: 50
ARRIVED ON SITE: AM LEFT SITE: AM
1:00 PM 1 2:00 PM
PRESENT AT SITE: Jack Huston, Huston Construction Fred Cool, Port of Shelton
Storm and waters stems installed. The utility trench for the power was open. According to Fred Cool,the PUD was considering
Other options for relocating the under ground ower.
Contractor was fine grading site,and installing the septic system. Jack asked if a drain field bed was-okay. I stated that an
Additional cost with county would be his responsibility, but would be acceptable.
I discussed the compaction of the native soils with both Fred and Jack. Jack stated that he had been compacting the fill
To a non-yielding state, Fred agreed.
Fred and Jack stated that the contract had been revised to leave the existing building. Fred stated that the port had found a
Temporary use for the building. We discussed the grading around the building. Some storm water could be directed to the
The filter strip and the remainder to the future building ads. I pointed out that the access adjacent to the building would
Have steep grades. Fred said that he was aware of the potential grade issue.
The contractor had on site a bulldozer,vibrating compactor,and a backhoe. In addition dump'trucks were hauling material from
The site.
PAGE 1 OF 1
COPIES TO:
SIGNED: David W Spiller
Document4
HATTON OI ,sr PANTI ER
1840 Barnes Blvd SW
Tumwater,WA 98512
(360)943-1599 FAX(360)357-6299
FIELD REPORT
DATE: 1 2110105 HGP NO. 04-118 PROJECT: North Business Park Extension
CONTRACTOR: Huston Construction WEATHER: Sunny TEMP: 45
ARRIVED ON SITE: AM LEFT SITE: AM
3:00 PM 4:00 PM
PRESENT AT SITE: Fred Cool, Port of Shelton
Project construction was complete for the grading portion of the project. No equipment was on site.
Fred and I met on-site to perform a punch list. The site appeared to be constructed to grade,except the future building pads and
the area around the existing building. We checked the drainage and grades around the existing building. A ditch had been
constructed on the south side of the building to direct runoff to the future building pads.
A small pile of construction debris had been piled up near the south entrance to the service area. Fred stated that the port
agreed to haul off the pile.
The top soil had not been placed and the site appeared not to have been seeded. Fred said that the port would be installing the
top soil and seeding the ditches per the plan. The top soil and seeding were not made part the contract with the contractor.
The storm ponds were also removed from the contract. The Port plans to construct the pond in the near future. I pointed out
that the service area will ultimately drain into the ponds. Fred explained that the port does not plan to pave the service area for
sometime. Fred asked if the area remains unpaved, could the construction of the ponds be delayed. I stated that the sub grade
could infiltrate the storm water, but the county expects a completed storm pond. Fred and l also discussed the possibility of
relocating the pond,the port is interested in moving the pond farther south and placing building in the area of the ponds.
PAGE 1 OF 1
COPIES TO: rl/
SIGNED: David W Spiller
Document4
i
. b7 c<o 00
Oo
O � O
co
o• � N (� o � g� o
n N O a.
o °.,
° o co r, cD
OL ON
N
O1*01"
C7
` o a
CD
�. /0 , o
,5 ///{dt7
00
CD
c3 �' O O
CD v O v,
O h
n
p� O OCD
On
CA
(D N pr
W
M �
W
w o ok-A C
oQ tjff
O
Do`o� a. CCD a o
CD
g t7 $ t7 ,
z °zx�
ITI
0 y�
43
0000
a o o
N N
O �• OCD
O
Yl
#t
C
w N
O
Y CD \O
o c r r r-r to
y C
Co No
CD O
.. Uh