Loading...
HomeMy WebLinkAboutGRD2004-00017 - GRD Inspections - 6/28/2005 P STr MASON COUNTY o n° i PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Y O N Shelton,Washington 98594 Y NT Z Y DATE: June 28 h, 2005 INTER-DEPARTMENTAL COMMUNICATIONS TO: Tami Griffey, PAC—Bldg Inspector FROM: Alan A. Tahja, P/W- Co. Hydr. Engr. WO#BLD-05 SUBJ: Grading Reviews NAME: Port of Shelton k Sanderson Field GRD2004-00017 Public Works has received and reviewed the materials relating to the Port of Shelton(Port) development and grading activities located on the Port property at the northerly end of Sanderson Field. The field reports submitted by Mr. David Spiller, P.E., indicate that the majority of the grading is complete and acceptable,but that the stormwater pond proposed in the plans is not intended to be constructed until some later date. It appears that the Port may be exploring relocating the stormwater plan to a different location. Relocation of the pond is an option which will be reviewed if and when such a plan is delivered to the County for review and comments. Attached please find a copy of a Performance Bond/Frozen Fund account the Port has delivered to the County to provide for approval of the grading,though it has not actually been 100% completed. The reports submitted by Mr. Spiller indicate that for the temporary time the Frozen Fund account will be in effect, stormwater runoff will be accommodated in the undeveloped areas of the construction area(s). Given the extent of the Port property, I do not see any potential for stormwater runoff to leave the Port property and adversely impact any neighboring properties, and recommend acceptance of the bond for the purpose of considering the grading complete.. Mr. William Tabor, the County Engineer has reviewed the Frozen Fund Account and signified his acceptance with his signature. The original frozen fund document will be retained by Public Works until the grading/stormwater pond is complete. The Port should notify Public Works when the pond has been completed, at which time an inspection will be performed by Public Works, and a letter releasing the frozen funds will be dispensed. Please feel free to contact me at County extension 461 if you have any questions regarding these comments, or if you feel any features need further discussion or attention. Si cerely, J__/;�� v. A an A. Tahja Attached: copy Performance Bond-Frozen Fund File: H:\WP\Grading\Port-Frzn Fund.doc HATTON GODAT PANTIE R May 20, 2005 Ms. Tami Griffey Mason County Building Department, Building III 426 W Cedar Shelton, WA 98584 RE: Grading Permit GRD2004-00017 Port of Shelton HGP# 04-118 Dear Ms. Griffey: Attached are copies of my two visits to the site. In addition to the site visits, I have been in contact with the contractor, survey crew and the Port of Shelton Capital Improvement Staff throughout construction. Based on my site visits, contact with those involved, the grade, surface drainage and infiltration system were constructed in general accordance with the plans. The only exception is the proposed storm pond located on the southern portion of the site. Correspondence with the Port of Shelton, indicates that this portion of the project will be constructed this summer. If you have questions or need additional information regarding this project, please contact me at (360) 943-1599 or daves(a)hattonpantier.com. Thank you for your assistance with this project. Sincerely, H ON GODAT P TIER David W Spiller, P.E. Senior Project Engineer DWS:dsh Enclosures: As-builts dated 4/7/05 Copies of field reports cc: Fred Cool, Port of Shelton Terra Norris, Port of Shelton Hatton Godat Pantier, Inc. 1840 Barnes Blvd SW Tumwater WA 98512 T 360.943.1599 F 360.357.6299 EAoffice\J0BS\2004\04-118 Port of Shelton NBP 2\LTR-Griffey 5.20.05.doc 800.700.1693 ENGINEERS AND SURVEYORS hattonpantier.com f ' MASON COUNTY DEPARTMENT OF PUBLIC WORKS P.O.Box 1850-Shelton,Washington 98584 PERFORMANCE BOND - FROZEN FUND ACCOUNT Mason County Road Name/Number: Permit #GRD2004.00017 Permit Date: December 16, 2004 Type of Permit: Grading (road access/utility/plat development/etc.) Owner/Developer/Contractor: Port of Shelton. W21 Sanderson Way Shelton, WA 98584 (name and address) Type of Improvement: Infiltration pond construction Project Location: West end of Development Rd within Business Park North at Sanderson Field. Legal Description of Property: Parcel#420020062000 With reference to the above-identified matter, this will certify that this institution has a savings account (or loan) for the above-referenced owner/developer/contractor for the project so identified. In consideration of the permitted improvement, and in lieu of a performance bond, this institution hereby agrees that it will freeze the following sums of money for the indicated improvement pending written authorization for release of said funds by the County of Mason in the amount of$4,800.00 (four thousand eight hundred dollars and 00/100). The total sum indicated will be withheld by this institution from any disbursements of any kind until written authorization has been received by the institution for the County of Mason to release the sum of money indicated by the written authorization from the County. The design, location, materials and other specifications for the indicated improvement are those required by the County of Mason as appears in the above-referenced document/permit, and shall be in compliance with Mason County Title 16 and/or Ordinance No. 3-93, Accommodation of Utilities on County Road Right-of-Way. These funds shall be held by the institution for a period of 12 months/ 1 year(s). In the event the Contractor does not comply to the aforementioned requirements, the County of Mason may demand, and the institution shall make, payment to the County of Mason of said funds so that the necessary repairs can be performed immediately to Mason County standards. The institution shall not be liable to the owner for any disbursement of said funds to the County of Mason. - Page 1 of 2 Pages- It is hereby specifically agreed by and between the parties hereto that in the event that any legal action must be taken to enforce the provisions of this bond or to collect said bond, that the prevailing party shall be entitled to collect its cost and reasonable attorneys'fees as a part of the reasonable costs of securing the obligation hereunder. In the event of settlement or resolution of these issues, prior to the filing of any suit, the actual costs incurred by the County, including reasonable attorneys'fees, shall be considered a part of the obligation hereunder secured. Said costs and reasonable legal fees shall be recoverable by the prevailing party, not only from the proceeds of this bond, but also over and above said body as a part of any recovery in any judicial proceeding, in addition to recovery on the bond. L 5L60-Lt26-t- 3( APPROVED: l� NAME O ANK/PHONE NO. OWNER/CONTRA R pkV-Q I rit ACCEPTED: OFFICR/TITLE MASON COUNTY ENGINEER KAL�W)A ELVA DATE: 05 BANK ADDRESS SkkZ3�r1 D2-0�ZSI�_D ACCOUNT NUMBER STATE OF WASI- NGTON, County of M&S6y-) (INDIVIDUAL ACKNOWLEDGEMENT) I, q�\.k?-kf ,Notary Public in and for the State of Washington, residing at Sht_i h! n ,do hereby certify that on this day of , 20co,personally appeared before me Le..)o+- - L +�-A'A-rA to me known to be the individual_ described in and who executed the within instrument and acknowledged that-ILt signed and sealed the same aster free and voluntary act and deed for the uses and purposes herein mentioned. GIVEN UNDER MY HAND AND OFFICIAL SEAL this Flay of3u-Rt, 206S . Not Pub is i r the State of Washington, residing at in sae County. My Commission expires Z SCHN/T V 9�oN EXPuizo /RFS• ,t� a scv hAxNp\text\frozen.acc �����0 Co.0 O• -Page 2 of 2 Pages - •. 10-4 °•°�� •so+° HATTON GOD GODAT PANTIE R 1840 Barnes Blvd SW Tumwater,WA 98512 (360)943-1599 FAX(360)357-6299 FIELD REPORT DATE: 1 12/16/04 HGP NO. 04-11'8 PROJECT: North Business Park Extension CONTRACTOR: I Huston Construction WEATHER: _Partly Cloudy TEMP: 50 ARRIVED ON SITE: AM LEFT SITE: AM 2:00 PM 3:00 PM PRESENT AT SITE: Jack Huston, Huston Construction Fred Cool, Port of Shelton Erosion control fencing was installed per plan. Contractor was rough grading site and installing underground utilities including storms stem. Jack pointed out two conflicts On-site. 1 The existin2 under ground power was much shallower than originally anticipated. Fred Cool'said-that he had contacted the PUD. The port and the-PUD were working on'a relocation of the existing power., 2)The existing piping was found on the site in several locations. The pipes appeared to be parts of the old sewer and water System installed by the air force. Fred directed the contractor to remove all portions found. The existing sewer was found in Two locations centered on the proposed new road,and drive access for the back of the buildings. The contractor had on site a bulldozer,vibrating compactor,and a'backhoe. In addition dump trucks were haulin2 material from The site. Soils on-site were consistent with other soils found in the larea. Very gravelly. PAGE 1 OF 1 COPIES TO: SIGNED: David W S,piller Document4 HATTON GODAT PANTIER 1840 Barnes Blvd SW Tumwater,WA 98512 (360)943-1599 FAX(360)357-6299 FIELD REPORT DATE: 1 1112/05 HGP NO. 04-118 PROJECT: North Business Park Extension CONTRACTOR: Huston Construction WEATHER: Sunny TEMP: 50 ARRIVED ON SITE: AM LEFT SITE: AM 1:00 PM 1 2:00 PM PRESENT AT SITE: Jack Huston, Huston Construction Fred Cool, Port of Shelton Storm and waters stems installed. The utility trench for the power was open. According to Fred Cool,the PUD was considering Other options for relocating the under ground ower. Contractor was fine grading site,and installing the septic system. Jack asked if a drain field bed was-okay. I stated that an Additional cost with county would be his responsibility, but would be acceptable. I discussed the compaction of the native soils with both Fred and Jack. Jack stated that he had been compacting the fill To a non-yielding state, Fred agreed. Fred and Jack stated that the contract had been revised to leave the existing building. Fred stated that the port had found a Temporary use for the building. We discussed the grading around the building. Some storm water could be directed to the The filter strip and the remainder to the future building ads. I pointed out that the access adjacent to the building would Have steep grades. Fred said that he was aware of the potential grade issue. The contractor had on site a bulldozer,vibrating compactor,and a backhoe. In addition dump'trucks were hauling material from The site. PAGE 1 OF 1 COPIES TO: SIGNED: David W Spiller Document4 HATTON OI ,sr PANTI ER 1840 Barnes Blvd SW Tumwater,WA 98512 (360)943-1599 FAX(360)357-6299 FIELD REPORT DATE: 1 2110105 HGP NO. 04-118 PROJECT: North Business Park Extension CONTRACTOR: Huston Construction WEATHER: Sunny TEMP: 45 ARRIVED ON SITE: AM LEFT SITE: AM 3:00 PM 4:00 PM PRESENT AT SITE: Fred Cool, Port of Shelton Project construction was complete for the grading portion of the project. No equipment was on site. Fred and I met on-site to perform a punch list. The site appeared to be constructed to grade,except the future building pads and the area around the existing building. We checked the drainage and grades around the existing building. A ditch had been constructed on the south side of the building to direct runoff to the future building pads. A small pile of construction debris had been piled up near the south entrance to the service area. Fred stated that the port agreed to haul off the pile. The top soil had not been placed and the site appeared not to have been seeded. Fred said that the port would be installing the top soil and seeding the ditches per the plan. The top soil and seeding were not made part the contract with the contractor. The storm ponds were also removed from the contract. The Port plans to construct the pond in the near future. I pointed out that the service area will ultimately drain into the ponds. Fred explained that the port does not plan to pave the service area for sometime. Fred asked if the area remains unpaved, could the construction of the ponds be delayed. I stated that the sub grade could infiltrate the storm water, but the county expects a completed storm pond. Fred and l also discussed the possibility of relocating the pond,the port is interested in moving the pond farther south and placing building in the area of the ponds. PAGE 1 OF 1 COPIES TO: rl/ SIGNED: David W Spiller Document4 i . b7 c<o 00 Oo O � O co o• � N (� o � g� o n N O a. o °., ° o co r, cD OL ON N O1*01" C7 ` o a CD �. /0 , o ,5 ///{dt7 00 CD c3 �' O O CD v O v, O h n p� O OCD On CA (D N pr W M � W w o ok-A C oQ tjff O Do`o� a. CCD a o CD g t7 $ t7 , z °zx� ITI 0 y� 43 0000 a o o N N O �• OCD O Yl #t C w N O Y CD \O o c r r r-r to y C Co No CD O .. Uh