Loading...
HomeMy WebLinkAboutDRAINAGE REPORT - PLN General - 1/14/2020 Verizon WA4 Speedways REDI DrainageReport D A 2 2 zo2q 615 PROJECT LOCATION : Street 100 W PUBLIC WORKS DRIVE Engineer: Duncanson Company 145 SW 1551h Street, # 102 Seattle, WA 98166 Contact: Harold Duncanson P: 206-244-4141 e: haroldd@duncansonco.com Date: 1/14/2020 DCI Project: 99544.1786 pk1S 4, rt r 29647 0 DUNCANSON Company, Inc. Section A—Introduction This drainage report evaluates the Project in relation to the applicable Minimum Requirements of the 2005 Stormwater Management Manual for Western Washington (SWMMWW). The Project involves a 40-foot square wireless telecommunication equipment compound and associated access road and utility improvements. The Site is located on a small knoll to the west of the Mason County Public Works yard at 100 W Public Works Drive on tax parcel 420022190010. The proposed access route follows an existing road bed extending from the Public Works yard below. The equipment compound is located on a previously cleared and partially graded/benched area. New and/or replaced impervious surface is approximately 6,700 SF (0.15 acres). Section B—Minimum Requirement Evaluation Minimum Requirement 1—Preparation of Stormwater Site Plan This report and associated plans constitute the Stormwater Site Plan Minimum Requirement 2—Construction Stormwater Pollution Prevention Element 1—Mark Clearing Limits Clearing Limits can be designated in the field with flagging. Most work is proposed in areas that are already cleared and partially revegetated with scotch broom and other small brush. Element 2—Establish Construction Access A stabilized construction entrance is shown on the TESC/SWPPP plan. Element 3—Control Flow Rates This project is below the thresholds for requiring flow control. Flow rates will be mitigated by dispersal into the surrounding forested vegetation. Element 4—Install Sediment Controls Vegetated buffers consisting of the forested and brushy areas downslope from the project are proposed for sediment control. There are no natural or constructed surface water bodies, collection or conveyance systems within at least several hundred feet of the project area. Element 5—Stabilize Soils Soil stabilization for stockpiles and disturbed areas is identified on the TESC/SWPPP plans. Element 6—Protect Slopes Project grading will involve only minor slopes of 2 to 4 feet. Typical cover practices discussed under soil stabilization are anticipated to be sufficient. The larger natural slope to the east will not be disturbed and preserving existing vegetation will provide protection. Element 7—Protect Drain Inlets No existing catch basins or drain inlets are near the Project and none are proposed. Element 8—Stabilize Channels and Outlets No channels or outlets are proposed. Element 9—Control Pollutants Notes for controlling pollutants are included on the TESC/SWPPP plans. Element 10—Control Dewatering A note for managing dewatering discharge is included on the plans. Element 11—Maintain BMPs Implementation and maintenance of the TESC/SWPPP BMPs will be the responsibility of the Contractor. Element 12—Manage the Project The Project is below the threshold for requiring a CESCL; however, the Contractor shall designate an Erosion and Sediment Control Supervisor at the pre-construction meeting to act as a point of contact and who is knowledgeable and experienced with erosion and sedimentation control practices. Minimum Requirement 3—Source Control of Pollution Several typical source control practices are included as SWPPP notes on the plans. A lined concrete washout area is also specified on the plans. Minimum Requirement 4--Preservation of Natural Drainage Systems and Outfalls The natural drainage pattern is sheet flow through vegetation to the southeast of the Project area. This pattern will be maintained. Minimum Requirement 5—On-Site Stormwate Management On-Site Stormwater Management BMPs include Sheet Flow Dispersal for the access drive and Permeable Pavement for the equipment compound. The access drive is outsloped so that existing and proposed runoff from the road sheet flows into the forested slope to the southeast. The 12-foot wide road requires at least a 10-foot vegetated flow path. The available vegetated flow path is between 30 and nearly 200 feet. The equipment compound/lease area is proposed to be surfaced with open graded crushed rock over a permeable ballast base material. This effectively acts as a permeable pavement surface. Minimum Requirement 6—Runoff Treatment This Project does not propose any pollution generating impervious surface (PGIS). The access drive is an "infrequently used maintenance access road", which by definition is non-PGIS surface. The Project is below the threshold for requiring treatment facilities. Runoff treatment is limited to the On-Site Stormwater BMPs discussed above. Minimum Requirement 7—Flow Control The Project is below the 10,000 SF impervious surface threshold for requiring flow control facilities. Flow control is limited to the On-Site Stormwater BMPs discussed above. Minimum Requirement 8—Wetlands Protection Project runoff does not contribute to a wetland either directly or indirectly through a conveyance system. This requirement does not apply to this Project. Minimum Requirement 9—Basin/Watershed Planning This Project does not meet the threshold for requiring Basin/Watershed Planning. Minimum Requirement 10—Operation and Maintenance Operation and maintenance of the On-Site Stormwater BMPs will be the owner/manager of the wireless facility. n,. m �r- i 0 t o 0 1 Ox J D � O Om D m C). 11111 'O ` p mo-O oID 0, os p o0 �1 m [mil m rn n zm MC J � � n � 11 � � O N m V �i�.'r' Al 0 bMIT '� N �spy:;-�*`!i 1^: ,�,.•,:,. /\ \O SSA\•� m m\ L ron' m��tn r J46 z �` 611 o A {O 01 n ccDic�� z 10,m o J_ Vml D X .(�. a U 0 D to()?m / `r l A mA67 I� Z p o A C) fTl(Nil Avm � Nm>- OMN \ �AZ2 N c TOM r A p -'1oo C, AT � Ln � �.r (r A zs X m 0 x \ �c o 3 \ �( o v mo ( 00 A m p \ { \ o�n .,..... S m ,N N � 4 Z�z o 0 0 � CANJ mz A CIDo �► o m D ry o o o y 6 6 o Z Z m n £ss n m ri n x 2 �A^ ld a �I-I�� ---u �1,! � z m A _ R e cz: _ �j �i 8f* m =z D 6' — IV o S�2 7o V A70 i O co N a A 6' CO T Z