HomeMy WebLinkAboutBLD2007-01483 Mechanical - BLD Permit / Conditions - 8/24/2007 N—' Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352
Mason County Bldg. 3 426 W. Cedar P.O. Box 186
Shelton, WA 98584
1
MECHANICAL PERMIT BLD2007-01483
OWNER: LON, STAMPER RECEIVED: 8/16/2007
CONTRACTOR: QUALITY APPLIANCE (360)427-1202 LICENSE: QUALIA"98400 EXP: 8/11/2009
ISSUED: 12/9/2008
SITE ADDRESS: 325 E POINTES DR EAST SHELTON EXPIRES: 6/9/2009
PARCEL NUMBER: 121195000069
LEGAL DESCRIPTION: HARTSTENE POINTE LOT: 69 S 28/168
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
GAS OUTLET HARSTINE ISLAND GATE. TURN RIGHT AT'T'. POINTES DRIVE. GO TO
325
General Information Setback Information
Type of Use: SF Insp.Area: Front: Ft. Shoreline: Ft.
Type of Work: MEC Fire Dist.: 5 Rear: Ft. Slope: Ft.
Valuation: Side 1: Ft.
Side 2: Ft.
Mechanical Fixtures FEES
Type Qty. Type By Date Amount Receipt
Gas Outlets 1 Mechanical Fee KS 8/16/2007 $5.50 S120070000
Mechanical Base Fee KS 8/16/2007 $25.30 S120070t)00
Total $30.80
BLD2007-01483 Please refer to the following pages for conditions of this permit. Page 1 of 2
ti
CASE NOTES FOR
BLD2007-01483
CONDITIONS FOR
BLD2007-01483
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance
Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X
2) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28.
X
3) Fuel piping shall be inspected after the installation of fuel piping is complete, and before the attachment of fixtures, appliances, or shut-off valves. At the
time of inspection the test pressure shall be no less than 10 psi held for no less than 15 minutes. Appliances to be attached to the fuel piping system
shall not be used until the final inspection has been performed and approved by a Mason County building inspector.
X
4) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason County ordinances and building regulations.
X
5) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan" to ensure
these structures meet the setback conditions listed.
X
This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any
time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be
occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate
and grants employees of Mason County access to the above described property and structure for review and inspection.
OWNER OR AGENT: DATE:
BLD2007-01483 Please refer to the following pages for conditions of this permit. Page 2 of 2
Case Activity Listing 12/10:05:47AM47AM
Case #: BLD2007-01483
iT
Assigned Done
Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By
BLDA010 Application Received 8/16/2007 8/16/2007 None DONE KS 8/16/2007 KS
BLDA100 Approved for Issuance 8/16/2007 None DONE KS 8/16/2007 KS
BLDA530 Issue Mechanical Permit 12/9/2008 None DONE RTB 12/9/2008 RTB
this action was entered under bld2003-00920
BLDC 100 Inspection 12/9/2008 None DONE RTB 12/9/2008 RTB
KITCH fl1}TtETthi""i was ente�tre �mdK bId2003-00920
LDC155 Final Inspection-Passed 12/9/2008 None DONE RTB 12/9/2008 RTB
passed based on outlet inspection 12-9-08 RTB
Page 1 of 1 CaseActivity..rpt
00
o CONCRETE � �'�"� MANUFACTURED HOME �
o Interior-Date 2 V'-02 BY0WV D
o Footings/Setbacks By Ribbons
0 Data ey INSULATION Date ' m
o Foundation Walls BG!SLAB INSULATION Set-up
r
Date ai Date !ry a;a By O
FRAMING Floors FIRE DEPARTMENT Z
Date By Date By
Data By watts DECKS
PLUMBING Date By Date By
Groundwork pf TANKS
Date By ate BY date By
Attic
DAN Date By OTHER
Date By DRYWALL Date
BY
Water Line Date Sy Type;
Date By tnt.Brans Wan Date By
MECHANICAL FINAL INSPECTION
cn Fire Separation
CD
Date By Date By Date By
m '
s Pass or Request Inspect.
Type of Insp. Fall Date Date Done By Comments
CD
v
0
8 �
a
9
o
0
U
CD
Q
0