HomeMy WebLinkAboutBLD2022-00534 - BLD Plot / Site Plans - 9/7/2022 m
z Z �
2l'-0"
® oE
M5TA30 STRAP
6
W/ 22 0.148x2%2" NAILS ® ® m
� n
S
6x6 to
PR TR
POS75
I I Lu °
® � Q
/s"xl2" GLB z F n
µ 4"xb" P05T TO Simeon Strong Tie O
d
BEAM ABOVE � 2"xl2" RAFTERS ® 24"
KQ
51 MP50N HUTGF _ Z m
TOP FLANGE HNGR O (2) LOCATIONS _
USE 114"xb" STRONG DRIVE 1 I m
SCREWS INTO END OF EXI5TG m CD � s
4 %4"x2" INTO NEW BEAM
u,
END BEAM HNGR x
m
00❑0 ❑❑
0E1-3— — — — — — I � 2"xl2" RAFTERS ® 24" o.c\ 1
0 f END HNGR I
Lw n O
W, CD
REAR ELEVATION _ 19 o
,,e" = I'-O" I w
F�
— — I EXI57`65 3/axV/2 GLB
RIDGE BEAM <O
i w "
� �
tj its -o1
°
° ftop
g . °zO
�e ;
to
NO
In
T T—I T �I s� �� - H
Ism < is
RIGHT ELEVATION o o
n o in
O L__ 00
1L ~ N
o ® IU
HWT I I I o a
NOTE: ALL DESIGNS, DW65 4 DETAILS REPRESENT I _ L——_J
COMPLETED IN-PLACE WORK. ARCHITECT HAS NO00
CONTROL OR CHARGE OF 4 SHALL NOT BE RESPONSIBLE RE1l I S I ON5
FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, uI
SEQUENCES OR PROCEDURES OR SAFETY PRECAUTIONS -13-2022
PROGRAM5 IN CONNECTION WITH THE WORK. cl-7-2022
M5TA24 STRAP
EA RAFTER
H I OA-2
BEAM
APA4 ANGLE
COMP ROOFING
15# FELT
1/16" 055 SHEATHING
2"x 12" RAFTERS ® 24" O.G.
51/exb GLU L OLUMN 51MP50N P05T GAP C,
z
�OT (2) H-I CLIP 1
(GLASS I C)
PR TR bx6 P05T
DOWN HOL 5x8x4 PLINTH
CGT (MIN 5000 # UPLIFT)
6x6 DIAG FIR5T FLOOR PLAN ]
K E2 t BRACE o — — ,4" = 1'-O" 1018 50. FT. OWNER/APPL I CANT O
4 LAG BOLT -�
" — DE516N DATA:
KELLY WETLAND 1L
(2) #4 BAR EN 2063 6TH AVE SW
® (2) LCNS ciODE 2015 - I Rai NORMANDY PARK, WA q81 b6 Lu
2'-0" WIND SPEED 110 MPH PHONE: 425-457-6358
SE I SM I G ZONE 0-2 51 TE ADDRE55
POST 4 FOOTING SNOW LOAD 30 PSF
all E. SALLANTRAE DR
SOIL BRCS 1 500 FSF SHELTON, WA g8584
FROST DEPTH 12
SCOPE PARCEL NUMBER w
TO BUILD A WOOD FRAMED ROOF TO COVER FUTURE PATIO
0000 �