Loading...
HomeMy WebLinkAboutBLD2005-00397 Ramp, Float - BLD Permit / Conditions - 2/12/2008 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)<327-7262 Phone: (360)427-9670,ext.352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, WA 98584 RESIDENTIAL BUILDING PERMIT BLD2005-00397 OWNER: JIM SLAKEY CONTRACTOR: LICENSE: EXP: RECEIVED: 3/11/2005 SITE ADDRESS: 120 E BAHAMA DR GRAPEVIEW ISSUED: 10/29/2007 PARCEL NUMBER: 121085001021 EXPIRES: 4/29/2008 LEGAL DESCRIPTION: PIRATE'S COVE BLK: 1 LOT: 21 PROJECT DESCRIPTION: DIRECTIONS TO SITE: Ramp and Float. Grapeview Loop RD. to Lombard St. turn right on E Pirates Dr. Left on Treasure Ln. Lefton Bahama Dr. General Information Construction &Occupancy Information Square Footage Information No. of Bedrooms: Type of Constr.: vb Type of Use: SF Insp.Area: No. of Bathrooms: Occ. Group: u Lot Size: Deck: Type of Work: ACC Fire Dist.: 3 No. of Stories: Occ. Load: Building: Valuation: Building Height: Occ. Status: Basement: float 320 Manufactured Home Information Setback Information Shoreline&Planning Information Make: Length: Ft. Front: Ft. Shoreline: Ft. Water Body: Pirates Cove Rear: Ft. Slope: Ft. SEPA?: Yes Model: Width: Ft. Side 1: Ft. Shoreline Desig.: Urban Year: Serial No.: Side 2: Ft. Comp. Plan Desig.: Rural Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Plan Check Fee KKK 3/11/2005 $63.21 S22005000 Planning Review Fee KKK 3/11/2005 $155.00 S22005000 Building State Fee MAL 10/26/200 $4.50 S22007000 Building Permit Fee MAL 10/26/200 $97.25 S22007000 Total $319.96 BLD2005-00397 Please referto the following pages for conditions of this permit. 1 of 4 12/2/2008 Case Activity Listing 11:45:16AM5:16AM Case #: BLD2005-00397 Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By BLDB110 Building Plan Review 3/11/2005 10/26/2007 None DONE MAL 10/26/2007 MA1, Done and sent to case manager,MAL 10/26/2007 Received fax from contractor. Unable to analyze dock connection using chains. Asked for engineering on the landing of the ramp on this type of system(lateral/vertical movement due to wind and tide is a concern) MAL 10/25/2007 Applicant returned call. Discussed the dock anchorage and the relationship to ramp. He said he will get info from the anchorage contractor and submit it. MAL 09/18/2007 Engineering rec.for gang way,questions to be answered about dock anchorage(no pilings). Phoned applicant and left message.MAL 09/17/2007 4:10 PM No engineering for gang way ramp and no connection detail at land called customer and left message 11:10 am BLDA100 Approved for Issuance 10/29/2007 None DONE CMH 10/29/2007 CMH LMOR for applicant. BLDA500 Issue Building Permit 10/29/2007 None DONE KKK 10/29/2007 KKK BLDA540 Print Inspection Card 10/29/2007 None DONE KKK 10/29/2007 KKK BLDA540 Print Inspection Card 11/28/2007 None DONE KKK 11/28/2007 KKK Duplicate at applicants request. BLDA510 Reprint Building Permit 2/7/2008 None DONE PIB 2/7/2008 PIB Reprinted-not finding inspection card. BLDC157 Final Inspection-Failed 2/1/2008 2/8/2008 None FAIL BTA 2/11/2008 KDM 1)APPROVED PLANS ONSITE 2)PROVIDE GUARDRAIL AT L ING BEFORE DOCK. BLDC155 Final Inspection-Passed 2/12/2008 2/15/2008 None PASS MAU 2/19/2008 KDM Page 2 of 2 CaseActivity..rpt co o Cn CONCRETE MECHANICAL MANUFACTURED HOME C) Date By D T Footings 1 Setbacks Ribbons X Gas Piping m o Interior Date By interior-Date By Date By < V Exterior Date By Exterior-Date B� Sot-up L Point Load I Isolated Footings INSULATION pate By BG I SLAB INSULATION Date By Data By FIRE DEPARTMENT Foundation Walls Floors Date By Date By Data By DECKS FRAMING Walls Date By Date By Data By PROPANE TANKS PLUMBING vault Date By Date By OTHER Groundwork Attic Type. Date By Date By Date 6y D.W.v DRYWALL Type- Date Brace Wall Date By ate By pate By FINAL INSPECTION p w Water Line Fire Seperation NC 2 Dale By Date By Date By O m tr `D Pass or Request Inspect. Type of Insp. Fail Date Date Done By Comments w CD V 0 0 70 e...,.....,w.. m to m U) 0 8 a 0 U 0 s N 70 CD 0