HomeMy WebLinkAboutSEP2016-00053 Replace Bulkhead - SEP Determinations - 7/6/2016 oN_STA MASON COUNTY
c �� DEPARTMENT OF COMMUNITY DEVELOPMENT
O
o ^U �= Planning Division
° T �? 615 W Alder St, Shelton, WA 98584
�J } o~ (360)427-9670
1864
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-340)
SEP2016-00053
Description of Proposal: REPLACE FAILING PILING BULKHEAD WITH
ROCK,LANDWARD OF EXISTING PILING, APPROX. 76' LONG
7' TAL L
Proponent: JENSEN REPLACEMENT BULKHEAD
Location of Proposal: 263 E STRETCH ISLAND RD NORTH GRA
Parcel Number: 121087590012
Legal Description: TR 1-13 OF SURV 1/115 LOT: 2 OF SP #2075 (R)
Directions to Site: ST RT 3, R ON GRAPEVIEW LOOP RD, CROSS EKERT RD TO
THE ISLAND. TURN LEFT ON STRETCH ISLAND RD NORTH
TO SITE ADDRESS ON THE LEFT , SHARED DRIVEWAY WITH
Lead Agency: Mason County
The Lead Agency for this proposal has determined that it does not have a probable significant
adverse impact on the environment. An Environmental Impact Statement (EIS) is not required
under RCW 43.21 C.030(2)(c). This decision was made after review of a completed
Environmental Checklist and other information on file with the Lead Agency. This information is
available to the public upon request.
Please contact Kell McAboy at ext. 365 with any questions. This DNS is issued under WAC
197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown
below, when the determination is final. Comments must be submitted to Dept. of Community
Development, 615 W Alder St, Shelton WA 98584 by 7/20/2016. Appeal of this determination
must be filed within a 14-day period following this final determination date, per Mason County
Code Chapter 15.11 Appeals.
Authorized Local Go e�Mt Official Date
SEPA ENVIRONMENTAL CHECKLIST
Purpose of checklist:
Governmental agencies use this checklist to help determine whether the environmental impacts of your
proposal are significant. This information is also helpful to determine if available avoidance, minimization
or compensatory mitigation measures will address the probable significant impacts or if an environmental
impact statement will be prepared to further analyze the proposal.
Instructions for applicants:
This environmental checklist asks you to describe some basic information about your proposal. Please
answer each question accurately and carefully, to the best of your knowledge. You may need to consult
with an agency specialist or private consultant for some questions. You may use "not applicable" or
"does not apply" only when you can explain why it does not apply and not when the answer is unknown.
You may also attach or incorporate by reference additional studies reports. Complete and accurate
answers to these questions often avoid delays with the SEPA process as well as later in the decision-
making process.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of
time or on different parcels of land. Attach any additional information that will help describe your proposal
or its environmental effects. The agency to which you submit this checklist may ask you to explain your
answers or provide additional information reasonably related to determining if there may be significant
adverse impact.
Instructions for Lead Agencies:
Please adjust the format of this template as needed. Additional information may be necessary to
evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse
impacts. The checklist is considered the first but not necessarily the only source of information needed to
make an adequate threshold determination. Once a threshold determination is made, the lead agency is
responsible for the completeness and accuracy of the checklist and other supporting documents.
Use of checklist for nonproject proposals: hel
For nonproject proposals (such as ordinances, regulations, plans and programs), complete the applicable
parts of sections A and B plus the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). Please
completely answer all questions that apply and note that the words "project," "applicant," and "property or
site" should be read as "proposal," "proponent," and "affected geographic area," respectively. The lead
agency may exclude (for non-projects) questions in Part B - Environmental Elements —that do not
contribute meaningfully to the analysis of the proposal.
A. Background thel
1. Name of proposed project, if applicable: h( e
Eileen Jensen
2. Name of applicant: hel
Pacific Northwest Bulkhead
3. Address and phone number of applicant and contact person: hl elpl
P.O. Box 11477 Olympia WA 98508
4. Date checklist prepared: h( e
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 1 of 12
6/16/16
5. Agency requesting checklist: hL elpl
Mason county
6. Proposed timing or schedule (including phasing, if applicable): ltgm
As soon as all permits available.
7. Do you have any plans for future additions, expansion, or further activity related to or
connected with this proposal? If yes, explain. 1hel
No
8. List any environmental information you know about that has been prepared, or will be
prepared, directly related to this proposal. hel
Building permit, HPA
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes, explain. hf elpl
None
10. List any government approvals or permits that will be needed for your proposal, if known.
hf elpl
No
11. Give brief, complete description of your proposal, including the proposed uses and the size
of the project and site. There are several questions later in this checklist that ask you to
describe certain aspects of your proposal. You do not need to repeat those answers on this
page. (Lead agencies may modify this form to include additional specific information on project
description.) [hel
Approximately 76' long 7' tall replacement erosion control rock bulkhead. 190 ton of rock.The
replacement rock bulkhead is being used to protect the toe of the slope at the beach from erosion.
12. Location of the proposal. Give sufficient information for a person to understand the precise
location of your proposed project, including a street address, if any, and section, township, and
range, if known. If a proposal would occur over a range of area, provide the range or
boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic
map, if reasonably available. While you should submit any plans required by the agency, you
are not required to duplicate maps or detailed plans submitted with any permit applications
related to this checklist. 1hel
263 STRETCH ISLAND RD.N
GRAPEVIEW, WA 98546
B. ENVIRONMENTAL ELEMENTS hf eM
1. Earth hel
a. General description of the site: hel
(circle one): Flat, rolling, hilly, steep slopes, mountainous, other
See photos
b. What is the steepest slope on the site (approximate percent slope)?1hel
c. What general types of soils are found on the site (for example, clay, sand, gravel, peat,
muck)? If you know the classification of agricultural soils, specify them and note any
agricultural land of long-term commercial significance and whether the proposal results in
removing any of these soils. [hel
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 2 of 12
Sand, gravel,various size rocks
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so,
describe. 1hel
Yes, Failing timbers. see photos
e. Describe the purpose, type, total area, and approximate quantities and total affected area of
any filling, excavation, and grading proposed. Indicate source of fill. hf elpl
190 ton of rock from upland quarry
f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe.
h[ eM
no
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)? hf M
n/a
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: hI elpl
Erosion control rock bulkhead
2. Air hf elpl
a. What types of emissions to the air would result from the proposal during construction.,
operation, and maintenance when the project is completed? If any, generally describe and
give approximate quantities if known. hf elpl
n./a
b. Are there any off-site sources of emissions or odor that may affect your proposal? If so,
generally describe. hf elpl
n/a
c. Proposed measures to reduce or control emissions or other impacts to air, if any: hel
N/A
3. Water hf elpl
a. Surface Water:
1) Is there any surface water body on or in the immediate vicinity of the site (including
year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe
type and provide names. If appropriate, state what stream or river it flows into. hf elpl
Case Inlet+puget sound
2)Will the project require any work over, in, or adjacent to (within 200 feet) the described
waters? If yes, please describe and attach available plans. hf elpl
yes see site plan
3) Estimate the amount of fill and dredge material that would be placed in or removed
from surface water or wetlands and indicate the area of the site that would be affected.
Indicate the source of fill material. h( elpl
There will be no material removed.
4) Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities if known. h[ elpl
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 3 of 12
5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan.
hel
not to my knowledge
6) Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volume of discharge. hI elpl
b. Ground Water:
1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so,
give a general description of the well, proposed uses and approximate quantities
withdrawn from the well. Will water be discharged to groundwater? Give general
description, purpose, and approximate quantities if known. thel
2) Describe waste material that will be discharged into the ground from septic tanks or
other sources, if any (for example: Domestic sewage; industrial, containing the
following chemicals. . . ; agricultural; etc.). Describe the general size of the system, the
number of such systems, the number of houses to be served (if applicable), or the
number of animals or humans the system(s) are expected to serve. tteM
N/A
c. Water runoff(including stormwater):
1) Describe the source of runoff(including storm water) and method of collection
and disposal, if any (include quantities, if known). Where will this water flow?
Will this water flow into other waters? If so, describe. h
2) Could waste materials enter ground or surface waters? If so, generally describe. h( elp]
no
3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If
so, describe. hf elpl
n/a
d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage
pattern impacts, if any: hel
n/a
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 4 of 12
4. Plants hf g.!0
a. Check the types of vegetation found on the site: hf elM
_x_deciduous tree: alder, maple, aspen, other
_x_evergreen tree: fir, cedar, pine, other
_x_shrubs
_x_grass
pasture
crop or grain
Orchards, vineyards or other permanent crops.
wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
water plants: water lily, eelgrass, milfoil, other
_x_other types of vegetation typical shoreline
b. What kind and amount of vegetation will be removed or altered? h� elpl
none
c. List threatened and endangered species known to be on or near the site. hf elpl
Bull trout salmon and chinook
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance
vegetation on the site, if any: hf elpl
none
e. List all noxious weeds and invasive species known to be on or near the site. hI elpl
n/a
5. Animals hf elpl
a. List any birds and other animals which have been observed on or near the site or are known
to be on or near the site. hf elpl
Examples include:
birds: hawk, heron, eagle, songbirds, other:
mammals: deer, bear, elk, beaver, other:
fish: bass, salmon, trout, herring, shellfish, other
Birds, deer, fish
b. List any threatened and endangered species known to be on or near the site. ltpjpj
none
c. Is the site part of a migration route? If so, explain. hf elpl
not to my knowledge
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 5 of 12
d. Proposed measures to preserve or enhance wildlife, if any: 1hel
N/A
e. List any invasive animal species known to be on or near the site. h( elpl
none
6. Energy and Natural Resources h( elpl
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet
the completed project's energy needs? Describe whether it will be used for heating,
manufacturing, etc. hel
n/a
b. Would your project affect the potential use of solar energy by adjacent properties?
If so, generally describe. hf elpl
n/a
c. What kinds of energy conservation features are included in the plans of this proposal?
List other proposed measures to reduce or control energy impacts, if any: hf elpl
n/a
7. Environmental Health hf elpl
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk
of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal?
If so, describe. hf gM
no
1) Describe any known or possible contamination at the site from present or past uses.
hf elpl
none
2) Describe existing hazardous chemicals/conditions that might affect project development
and design. This includes underground hazardous liquid and gas transmission pipelines
located within the project area and in the vicinity. hf jpJ
n/a
3) Describe any toxic or hazardous chemicals that might be stored, used, or produced
during the project's development or construction, or at any time during the operating
life of the project. Jtp.!pJ
none
4) Describe special emergency services that might be required. hel
none
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 6 of 12
5) Proposed measures to reduce or control environmental health hazards, if any: hf elpl
n/a
b. Noise [hel
1) What types of noise exist in the area which may affect your project (for example:
traffic, equipment, operation, other)? hI e
All work done during daylight hours during low tides. All machinery mufflered.
2) What types and levels of noise would be created by or associated with the project on a
short-term or a long-term basis (for example: traffic, construction, operation, other)? Indi-
cate what hours noise would come from the site. hf elpl
none
3) Proposed measures to reduce or control noise impacts, if any: hf elpl
n/a
8. Land and Shoreline Use JtpjpJ
a. What is the current use of the site and adjacent properties?Will the proposal affect current
land uses on nearby or adjacent properties? If so, describe. hj elpl
single family residence
b. Has the project site been used as working farmlands or working forest lands? If so, describe.
How much agricultural or forest land of long-term commercial significance will be converted to
other uses as a result of the proposal, if any? If resource lands have not been designated,
how many acres in farmland or forest land tax status will be converted to nonfarm or
nonforest use? hf elpl
no
1)Will the proposal affect or be affected by surrounding working farm or forest land normal
business operations, such as oversize equipment access, the application of pesticides,
tilling, and harvesting? If so, how: hI eIM
no
c. Describe any structures on the site. h[ elpl
Total area 2,760 sq. ft. Built 1996,quality 3.0 avg. condition 3.0 avg. slab porch with roof, attached
garage,3 bedroom, 3 bathroom, single 2 story fireplace, frame siding.
d. Will any structures be demolished? If so, what? hf elpl
no
e. What is the current zoning classification of the site? hf elpl
rural C j
f. What is the current comprehensive plan designation of the site? hel
n/a f LAX"
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 7 of 12
g. If applicable, what is the current shoreline master program designation of the site? hf elpl
U'*- ram,
h. Has any part of the site been classified as a critical area by the city or county? If so, specify.
hf eM
-nu- v�
i. Approximately how many people would reside or work in the completed project? hf elpl
n/a
j. Approximately how many people would the completed project displace?1hel
n/a
k. Proposed measures to avoid or reduce displacement impacts, if any: hf elpl
N/A
L. Proposed measures to ensure the proposal is compatible with existing and projected land
uses and plans, if any: hf elpl
n/a
m. Proposed measures to ensure the proposal is compatible with nearby agricultural and forest
lands of long-term commercial significance, if any: hf elpl
n/a
9. Housing hf elpl
a. Approximately how many units would be provided, if any? Indicate whether high, mid-
dle, or low-income housing. JtpjpJ
n/a
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing. hf elpl
n/a
c. Proposed measures to reduce or control housing impacts, if any: h( elpl
n/a
10. Aesthetics hel
a. What is the tallest height of any proposed structure(s), not including antennas; what is
the principal exterior building material(s) proposed? hel
2 story house
b. What views in the immediate vicinity would be altered or obstructed? h� elpl
none
b. Proposed measures to reduce or control aesthetic impacts, if any: h[ elpl
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 8 of 12
none
11. Light and Glare hel
a. What type of light or glare will the proposal produce? What time of day would it mainly
occur? hf elpl
n/a
b. Could light or glare from the finished project be a safety hazard or interfere with views? thel
n/a
c. What existing off-site sources of light or glare may affect your proposal? hf e
n/a
d. Proposed measures to reduce or control light and glare impacts, if any: h( elM
n/a
12. Recreation hel
a. What designated and informal recreational opportunities are in the immediate vicinity? lteM
boatin.0
b. Would the proposed project displace any existing recreational uses? If so, describe. hf elpl
none
c. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any: h� elPl
n/a
13. Historic and cultural preservation h[ elpl
a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years
old listed in or eligible for listing in national, state, or local preservation registers located on or
near the site? If so, specifically describe. tLeM
I1O
b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation?
This may include human burials or old cemeteries. Are there any material evidence, artifacts,
or areas of cultural importance on or near the site? Please list any professional studies
conducted at the site to identify such resources. hL elpl
no
c. Describe the methods used to assess the potential impacts to cultural and historic resources
on or near the project site. Examples include consultation with tribes and the department of
archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc.
hel
n/a
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 9 of 12
d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance
to resources. Please include plans for the above and any permits that may be required. thel
n/a
14. Transportation hf elpl
a. Identify public streets and highways serving the site or affected geographic area and
describe proposed access to the existing street system. Show on site plans, if any. hj e
n/a
b. Is the site or affected geographic area currently served by public transit? If so, generally
describe. If not, what is the approximate distance to the nearest transit stop? hf elpl
n/a
c. How many additional parking spaces would the completed project or non-project proposal
have? How many would the project or proposal eliminate? hI e
n/a
d. Will the proposal require any new or improvements to existing roads, streets, pedestrian,
bicycle or state transportation facilities, not including driveways? If so, generally describe
(indicate whether public or private). hf elpl
N/A
e. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air
transportation? If so, generally describe. hf elpl
n/a
f. How many vehicular trips per day would be generated by the completed project or proposal?
If known, indicate when peak volumes would occur and what percentage of the volume would
be trucks (such as commercial and nonpassenger vehicles). What data or transportation
models were used to make these estimates? hel
n/a
g. Will the proposal interfere with, affect or be affected by the movement of agricultural and
forest products on roads or streets in the area? If so, generally describe. hf e
h. Proposed measures to reduce or control transportation impacts, if any: hf gm
n/a
15. Public Services JLeM
a. Would the project result in an increased need for public services (for example: fire protection,
police protection, public transit, health care, schools, other)? If so, generally describe. hf elpl
n/a
b. Proposed measures to reduce or control direct impacts on public services, if any. h[ elpl
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 10 of 12
n/a
16. Utilities hf elpl
a. Circle utilities currently available at the site: JtpjPJ
electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system,
other
electricity,water,telephone, septic system
c. Describe the utilities that are proposed for the project, the utility providing the service,
and the general construction activities on the site or in the immediate vicinity which might
be needed. lteLlo
None
C. Signature h[ qM
The above answers are true and complete to the best of my knowledge. I understand that the
lead agency is relying on them to make its decision.
Signature: S&e_ �a,t ll ' VYCUAU- .-c,r c,t-i'L
Name of signee
Position and Agency/Organization
Date Submitted:
D. supplemental sheet for nonproject actions hf elpl
(IT IS NOT NECESSARY to use this sheet for project actions)
Because these questions are very general, it may be helpful to read them in conjunction
with the list of the elements of the environment.
When answering these questions, be aware of the extent the proposal, or the types of
activities likely to result from the proposal, would affect the item at a greater intensity or
at a faster rate than if the proposal were not implemented. Respond briefly and in
general terms.
1. How would the proposal be likely to increase discharge to water; emissions to air; pro-
duction, storage, or release of toxic or hazardous substances; or production of noise?
Proposed measures to avoid or reduce such increases are:
2. How would the proposal be likely to affect plants, animals, fish, or marine life?
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 11 of 12
J1 1 Gu 2s15
N
EXISTING ROCKERY 615 W. nder Street
2v OQ �Rpp`.
O
W
ISINGLE FAMILY
RESIDENCE
REPLACE FAILING PILING
WITH ROCK(140 TON)
EXISTING CONCRETE STEPS:
AND RAMP TO REMAIN
MHHW 14.1' '
EXISTING PILING
SCALE 1"=20'
JENSEN NORMAN&EILEEN
263 STRETCH ISLAND RD N
GRAPEVIEW
4�
ft'flk
40
Ao
"YP
t irl� 1
rrr .•a r
P 7.•
tr F
S (P
J r d
r
e �
k
_ t
_ � � IE�nR y �}! '!•iF �_v j _` Yam_ •. `• � 3. 2�'.
r�•ram? �. ,>y' 1 �. '� ,e,r/