HomeMy WebLinkAboutBLD2005-01952 Garage Storage - BLD Permit / Conditions - 4/16/2021 • Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext. 352
r Mason County Bldg. III 426 W. Cedar P.O. Box 186
Shelton, WA 98584
IrP14
RESIDENTIAL BUILDING PERMIT BLD2005-01952
OWNER: TIM GARRETT RECEIVED: 11/10/2005
CONTRACTOR: LICENSE: EXP: ISSUED: 3/16/2006
SITE ADDRESS: 4060 E GRAPEVIEW LOOP RD GRAPEVIEW EXPIRES: 9/16/2006
PARCEL NUMBER: 121082200050
LEGAL DESCRIPTION: PCL 2 OF BLA#90-46 PTN TR 5 OF NW NW
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
CONSTRUCT GARAGE WITH CARPORT AND UNFINISHED STORAGE 5 MILES SOUTH ON GRAPEVIEW LOOP ROAD.
UPSTAIRS.
General Information Construction &Occupancy Information Square Footage Information
No. of Bedrooms: Type of Constr.:
Type of Use: SF Insp.Area: No. of Bathrooms: Occ. Group: Lot Size: Deck:
Type of Work: ACC Fire Dist.: 3 No. of Stories: Occ. Loa Building:
Valuation: Building Height: Occ. Stqtuj Basement:\
Manufactured Home Information Setback Infor o Shoreline & Planning Information
Make: Length: Ft. Front: W 199.0 Ft. c reline: 100.0 Ft. Water Body: Pirates Cove
-
Rear: E 135.0 FY
Slope: Ft. SEPA?: Ur
No
Model: Width: Ft. r Shoreline Desig.: Urban
Side 1: W 65.0 �
Year: Serial No.: Side 2: E 140.0 Ft. Comp. Plan Desig.: Rural
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Plan Check Fee CMH 11/10/200 $559.49 B12005000
Planning Review Fee CMH 11/10/200 $155.00 612005000
EH Plan Review TW 11/17/200 $35.00 612006000
ADJUST--Plan Check Fee RTB 3/13/2006 $4.55 612006000
Building State Fee RTB 3/14/2006 $4.50 612006000
Building Permit Fee RTB 3/14/2006 $867.75 612006000
Total $1,626.29
BLD2005-01952 Please refer to the following pages for conditions of this permit 1 of 4
CASE NOTES FOR
BLD2065-01952
CONDITIONS FOR
BLD2005-01952
1) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered. X
2) Water quality is to be degraded to the detriment of the aquatic environment as a result of this project.
X
3) The proposed project must be consistent with I licable policies and other provisions of the Shoreline Management Act, its rules, and the Mason
County Shoreline Master Program.X
4) Approved per ensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure.
X
5) Application acI owledges that the structure is only permitted for a use consistent with the current zoning of the parcel. Zoning is RR5.
X
6) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will
not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building
Department prior t6gy further inspections being performed or approvals granted.
X
T•'
7) In accordance with international codes and Title 14, Mason County Building Code, "Standards for Fire Apparatus Access Roads,"all new structures that
require an address shall have approved numbers or addresses located at the beginning of long driveways when the address is not clearly visible from the
access road. The numbers shall also be plainly visible and legible from the street or road fronting the property and shall contrast with their background.
Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted
by the jurisdiction the international codes will be assessed if the owner and/or contractor fail to post the address on site prior to requesting
inspections.
X
8) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the
corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building
Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of apprp�d documents will result in failure of required building inspections.
X
BLD2005-01952 Please referto the following pages for conditions of this permit. 2 of 4
91 This structure is approved as un-heated space. If at any time this building is to be used for anything other than what it is approved for, a change of use
permit shall be as ed for, reviewed and approved prior to the change.
X
10) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other
vertical concrete r* exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2).
X /�
11) This structure is limi,�ecito U-occupancy use only (private garages, carports, sheds, and agricultural buildings.) Any other use will be in violation of the
international cod 9' nd Mason County Regulations unless a "Change of Use" permit is applied for, reviewed and approved.
X
12) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building
Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached
thereto. If docu ents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be
charged and _ all be collected by the Building Department prior to any further inspections being performed or approvals granted.
X -
13) All construction must meet or eed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occ ancylis limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
permit revocation.
X
14) All changes to 'ap loved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County
ordinance or re 111"Pn, must be reviewed and approved by Mason County prior to construction.
X
V
15) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED
BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the interna oval codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
Inspectors e made prior to requesting additional inspections.
X
16) All property lines shall be clearly identified at the time of foundation inspection. X
17) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason County ord +des and building regulations.
X
BLD2005-01952 Please refer to the following pages for conditions of this permit. 3 of 4
8) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a pe—rLod not exceeding 180 days, upon the receipt of;�written rextension request indicating that circumstances beyond the control of the permit
holder hav Tey7nted action from being taken. No more than one extension may be granted.
X
19) Pressure treated d manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners,
connectors, an I ing. Install metal connectors approved for contact with the new types of pressure treated material.
X
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuation of work is a progress i spection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a progress inspection. a owner or the gent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to
the above described property and st for re vie an¢'n pection.
�7
OWNER OR AGENT' i% / . i' DATE: -�
BLD2005-01952 Please refer to the following pages for conditions of this permit. 4 of 4
o CONCRETE MECHANICAL MANUFACTURED HOME
0 Date
o Footings I Setbacks Gas Piping By Ribbons Gas
cn
0 Interior Date � 3 BY Interior-Date By pate By m
t
N Exterior Date By Exterior-Date By
Set-up i
Point Load I Isolated Footings INSULATION Date By
BG I SLAB INSULATION ic
Date By Data By FIRE DEPARTMENT
Foundation Walls Floors Date By
Date By Data By DECKS
FRAMING Walls Date By
Date By Data By PROPANE TANKS
PLUMBING vault Date By
Date By OTHER
Groundwork Attic
Dale By Date By Type:
Date By
D.w.v DRYWALL Type.
Int Brace Wall Date By W
Date By Date By FINAL INSPECTION p
ni Water Line Fin Seperation C
Date By Date By Data By p
CA
Pass or Request Inspect. c
Type of Insp. Fail Date Date Done By Comments to
xi 1L�� (o t tee l � OFf- �3A� N
5-4 kkl
� 1=Dvn1p�
o
a
0
s
El
0
IP10Mason County Dept. of Community Development
Mason County Bldg. 3
426 W. Cedar
P.O. Box 186 (360)427-9670 Local (360) 482-5269 Elma
Shelton, WA 98584 (360) 275-4467 Belfair
Notice to Obtain Final Inspection
November 15, 2007
TIM GARRETT
PO BOX 2209
BELFAIR WA 98528
Case No.: BLD2005-01952
Parcel No.: 121082200050
Protect Description: CONSTRUCT GARAGE WITH CARPORT AND
UNFINISHED STORAGE UPSTAIRS.
The Mason County Department of Community Development is currently reviewing all
permits that are expired and have not been approved for occupancy and use.
Pursuant to Mason County Code, Title 14 Building and Construction, a permit and
final inspection for this type of activity is required under the 2006 International
Building Code and your property is currently in violation status of occupancy and use.
Please contact our office to make the necessary arrangements 21 days from
the date of this letter. Failure to contact our office to make the necessary scheduled
inspections will result in enforcement actions.
To bring your site into compliance, you must schedule an inspection. One (1) $64.00
site investigation fee will need to be paid prior to inspection along with any
outstanding fees currently due on your building permit. For every inspection required
after that, you will be charged $64.00 again, per inspection until final inspection and
conditions are met.
To schedule an inspection, please call (360) 427-9670 ext. 262.
If you should have any questions regarding this notification, please contact me at
(360) 427-9670 ext 359.
Sincerely,
Terry Ryan
Mason County Department of Community Development
Cc: Property File
November 15, 2007 BLD2005-01952
°N Cot, MASON COUNTY
w,
DEPARTMENT OF COMMUNITY DEVELOPMENT
- - Mason County Bldg. III, 426 West Cedar Street, PO Box 186, Shelton, WA 98584
uw www.co.masonma.us (360)427-9670 Belfair(360)275-4467 Elma (360)482-5269
FINAL NOTICE TO COMPLY
Name: CURRENT OWNER or rvj
Site Address: 40 0() C (��rz �1` �•; t
Building Permit: �'v1�ZC�C'a tctSZ Parcel No.: i ZkO8 --Zz - 00050
Description: (jc -�l F,c3 CCU-,,i 5 ,-I
On 7 you were sent a Notice of Mason County Code Violation. This
notice out fined the necessary steps to remedy the violation that is contained on this parcel and
specified a timeframe in which you were to submit the necessary compliance documentation.
This due date is now past due and compliance has not been achieved.
If the work was completed in absence of the required permits and inspections, either by
you or the former owner, the construction would be deemed to be in violation of Mason
County Codes. This notice is to inform you that your property is in violation status for the work
performed. Mason County holds the current legal owner responsible for any violations that exist
on site and would direct all enforcement notices to you for compliance action if a violation of the
building codes has occurred.
IN ORDER TO CLEAR THESE VIOLATIONS, IT WILL BE NECESSARY TO MAKE THE
NECESSARY ARRANGEMENT WITHIN 21 DAYS FROM THE DATE OF THIS NOTICE:
Obtain a "final on expired" inspection for $68.00 until final pass and occupancy and use has
been granted. $68.00 fee is required on EACH inspection until final pass.
❑ Your permit was cancelled due to expiration, please submit half the permit cost to reinstate
your permit. Once permit is reinstated, please schedule the necessary inspections until final
pass and occupancy and use has been granted. Fee's due:
Fee's must be paid prior to scheduling inspection. To schedule an inspection, call
(360) 427-9670 ext. 262. Bring payment to Building III or mail to P.O. Box 186, Shelton, WA
98584. Please make checks payable to Mason County Treasurer.
Failure to make the necessary arrangements within 21 days of the date of this notice will
result in enforcement actions as allowed per Chapter 15.13 of the Mason County Code.
If you should have any questions regarding this notification please call Bryan Adams at
(360) 427-9670 ext. 280.
Date Posted: !;--21 -(J& Inspector: �, -