Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PAR2014-00010 Fire Station Use - PAR Letters / Memos - 3/18/2015
;till MASON p$oti COpN 'i f-. MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT i Mason County Bldg. III, 426 West Cedar Street Shelton,WA 98584 I www.co.mason.wa.us (360)427-9670 Belfair(360)275-4467 Elma(360)482-5269 MASON COUNTY PRE-SUBMISSION CONFERENCE NOTES • BUILDING DEPARTMENT REPRESENTATIVE: Rich Balderston (360)427-9670 x 285 E-Mail: rbalderston@co.mason.wa.us • DATE: March 18, 2015 • PROJECT/PROJECT TRACKING NUMBER: PAR2014-00010 • PROJECT REPRESENTATIVE(S): DESCRIPTION &SIZE OF PROJECT/OCCUPANCY CLASSIFICATION &USE: 384 sq. ft.addition to an existing fire station, addition will include 2 sleeping rooms, a hallway,and a foyer, occupancy classification R-3. Complete building permit applications will include the following information that is applicable to the project:: • SETBACKS TO PROPERTY LINES: Provide a site plan, drawn to scale. Clearly identify all structures, including fences,fuel tanks and other similar items, with setback dimensions on site the plan. • DISTANCES TO OTHER STRUCTURES: Site plan, drawn to scale shall clearly identify distances, where required include fire-resistive details, including continuity, &tested assembly details. • FIRE RESISTANCE FOR EXTERIOR WALLS: When applicable include fire-resistive details, including continuity, &tested assembly details. • IDENTIFY TYPE OF CONSTRUCTION & PROVIDE ALLOWABLE AREA CALCULATIONS WHERE NEEDED. See Chapter 5, IBC. Type VB construction includes structures constructed with combustible construction such as wood framed structures. Type II construction includes steel structures constructed ENTIRELY by non-combustible construction. VB construction. • FIRE-RESISTIVE RATED CONSTRUCTION &TYPE OF CONSTRUCTION : Where required demonstrate compliance. Identify the location of the assembly, compliance to continuity requirements and construction details: 2 hour separation walls required with sprinkler system meeting the requirements of NFPA 13D. EXTERIOR WALL(IBC704), FIRE WALL(IBC705), FIRE BARRIER(IBC706), SHAFT ENCLOSURES(IBC 707), FIRE PARTITIONS(IBC 708), SMOKE BARRIERS (IBC 709), SMOKE PARTITIONS(IBC 710), HORIZONTAL ASSEMBLIES (IBC 711), PENETRATIONS(IBC 712), FIRE- RESISTANT JOINT SYSTEMS (IBC 713), FIRE-RESISTANCE RATING OF STRUCTUURAL MEMBERS(IBC 714), OPENING PROTECTION (IBC 715), DUCT&AIR TRANSFER OPENINGS (IBC 716), CONCEALED SPACES(IBC 717), ETC, • NUMBER OF EXITS REQUIRED/OCCUPANT LOAD:(IBC 1004): Table 1004 is used to determine occupant load used to evaluate the structure for exiting purposes, plumbing fixture requirements, and other code related concerns. Include design calculations, demonstrating how occupant loads were calculated, on building plans. 1 exit required, occupant load 2. • EXIT PLAN: Clearly identify the exit path and exit signage on construction plans. 1 exit is provided at each end of the addition for a total of 2. V • ENGINEERING REQUIRED: Structures that do not comply with prescriptive specifications of the 2012 International Code(IBC)shall be designed in accordance with Chapter 16 of the IBC. An engineered design will be required due to the risk category IV, structural observation will be required. Referencing Washington State RCW 18.08.410-Structures 4000 sq. ft or more shall have all plan pages reviewed and stamped by a Washington State licensed design professional. The review shall include a code evaluation addressing life-safety, plumbing &mechanical evaluation, and structural analysis. (ref. RCW 18.08.410) ALL PLAN PAGES SHALL BE STAMPED AND SIGNED BY THE DESIGN PROFESSIONAL, including plumbing and mechanical pages. • ACCESSIBILITY REQUIRED: YES, include compliance information including design calculations demonstrating compliance to Chapter 11 and details demonstrating compliance to ANSI 117.1 in effect at the time of submittal. Include information demonstrating compliance for restrooms, employee work areas, parking spaces, accessibility to structure, drinking fountain, signage, etc. When required verify that building plans contain compliance information. Accessibility will be required. • PLUMBING SYSTEMS(Chapter 29 Washington Amendment to IBC): Using IBC Chapter 10, determine occupant load. The number of plumbing fixtures is determined based upon the occupant load. Plumbing fixtures need not be provided for unoccupied buildings. Permitted building shall comply. On plans, include design calculations for the following: water closets(M/F), Lavatories, Drinking Fountains, etc. • Referencing IBC/WAC 2902.2 separate plumbing fixtures shall be required for each sex, except when the calculated occupancy load is 15 or less,then unisex fixtures shall be allowed. To calculate the number of fixtures and referencing Table 2902.1 the following fixtures shall be required: Offices: 1 water closet per 25 for the first 50 and 1 per 50 for the remainder exceeding 50. 1 lavatory per 40 for the first 80. Storage(S1&S2): 1 water closet per 100 and 1 lavatory per 100. Plumbing fixture count can be for the entire facility, including all structures)for compliance purposes. Provide design calculations demonstrating how the fixture count was determined on construction plans. Plumbing fixtures are within the existing structure. • NON-RESIDENTIAL ENERGY CODE: ALL enclosed spaces require Non-Residential Energy Conservation Code(IECC/WSEC). Provide completed compliance forms(envelope& mechanical). Forms are available at: http://www.neec.neVresources/resources.htmi Structure will be required to meet the commercial provisions of the 2012 Washington State Energy Code(WSEC). Provide completed WSEC form at permit submittal • LIGHTING: All non-residential structures shall comply with IECC/WSEC lighting requirements. Complete compliance forms and provide a lighting plan that includes switching locations.WSEC forms and information can be accessed at: http://www.neec.net/resources/resources.html. --- - - In addition your local utility may have an incentive program, designed to help you lower energy consumption. To discuss incentive opportunities contact the Energy Services Department at PUD3 by calling (360)426-0777 or PUD1 at(360)877-5249. • Ventilation and Indoor Air Quality Code compliance: Provide calculations when required. • COMMERCIAL KITCHEN: Show compliance to Chapter 5 of the International Mechanical Code when a kitchen is included in the project. No Kitchen. • GEOTECH REPORT REQUIRED? YES / NO (Refer to planning requirements) • OIL SEPARATOR: REQUIRED when vehicle repair work is performed. Identify location and provide construction details. • PROVIDE A SPACE FOR STORAGE OF RECYCLED MATERIAL&SOLID WASTE (WAC51-50-009): Identify the location. • SPECIAL INSPECTION: Referencing IBC Chapter 17, Section 1704.1.1. Statement of special inspections prepared by registered design professional in responsible charge. Complete a Special Inspection authorization form. The addition will be classified as a risk category IV therefore a structural observation will be required for all structural elements. • INTERIOR FINISHES: Include information demonstrating compliance to Interior finishes required in IBC Chapter 8. • STORAGE SPACES: Identify material stored, anticipated quantities, height, and if hazardous, include MSDS sheets for each product. • STORAGE RACKS greater than 5'9" shall be permitted either with the proposed project or separate building permit. Where required documents shall include design information demonstrating stability for seismic conditions. Special inspection may be necessary, reference IBC Section 1707.6 and 1705.3 (4.5), storage racks, provide compliance information. • MECHANICAL EQUIPMENT: Identify the location and type of mechanical equipment located within, and outside the structure. Address foundation and support systems for equipment. Where new equipment will be placed on site provide UL listing information and/or construction details stamped by a Washington State licensed design professional. Where applicable include duct information and duct support compliance information. • FIRE MARSHAL REQUIREMENTS: Carefully review Fire Marshal comments requirements including fire protection requirements and identify compliance information on the proposed building plans. Show the location of fire extinguishers and identify type. • SPRINKLER SYSTEM: Verify that design calculations include additional load attributed to required fire sprinkler system. Sprinkler meeting the requirements of NFPA 13D will be required. • SUSPENDED CEILING SYSTEMS: Provide details and specifications relating to suspended ceilings where applicable. Details shall be designed and approved for seismic loading in accordance to IBC Chapter 16. Where required designate special inspection plan. • OTHER: PERMITS REQUIRED FOR PROJECT © BUILDING ® PLUMBING/MECHANICAL ® GRADING PERMIT(When greater than 200 cubic yards) ❑ CHANGE OF USE FIRE SUPPRESSION,where required. See Fire Marshal comments o SIGN FENCE(Greater than TO"above grade) a ADDITIONAL NOTES: WHEN YOU ARE READY, SUBMIT FOUR(4 SITE PLANS, DRAWN TO SCALE ALONG WITH THREE (3) COMPLETE SETS OF BUILDING PLANS INCLUDING THE FOLLOWING. (NOTE, ALL PLAN PAGES SHALL BE STAMPED BY THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHEN THE STRUCTURE EXCEEDS 4000 SQ. FT.): • CONSTRUCTION PLANS, drawn to scale. Include floor plan, elevations, cross section, cross section, construction details, etc. • MECHANICAL PLAN, • PLUMBING PLAN AND • NON-RESIDENTIAL ENERGY CODEIVENTILATION & INDOOR AIR QUALITY CODE INFORMATION. • DEFERRED SUBMITTAL WILL NOT BE ACCEPTED. • A PLAN REVIEW FEE WILL BE COLLECTED WHEN THE BUILDING PERMIT IS SUBMITTED. VALUATIONS ARE BASED UPON THE MOST RECENT BUILDING STANDARDS VALUATION DATA RECOMMENDATIONS AND THE PERMIT FEE WILL BE DETERMINED BASED UPON TABLE 1-A OF THE 1997 UBC. DESIGN CRITERIA: SEISMIC ZONE: D2 WIND SPEED: 85 MPH basic 110 ultimate, Exp B (Unless proven otherwise) GROUND SNOW LOAD: 25 psf REFERENCE CODE EDITIONS: Effective July 1, 2013 2012 INTERNATIONAL BUILDING CODE(IBC), INCLUDING APPENDIX CHAPTERS C, E AND H, EXCLUDING H106; SECTIONS 101 THROUGH 107, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, AND EXCLUDING APPENDIX CHAPTERS A, B, D, F, G, I, J AND K AND; ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51- 50, AND THE 2009 INTERNATIONAL EXISTING BUILDING CODE. 2012 UNIFORM PLUMBING CODE(UPC), PUBLISHED BY THE INTERNATIONAL ASSN. OF PLUMBING AND MECHANICAL OFFICIALS(IAPMO)AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-56 AND WAC 51-57, EXCLUDING SECTIONS 102.4 AND CHAPTERS 12, 15,AND 16, PART I. 2012 INTERNATIONAL MECHANICAL CODE(IMC), PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, AND THE 2009 INTERNATIONAL FUEL GAS CODE AS ADOPTED THROUGH THE WASHINGTON STATE BUILDING CODE WAC 51-52. 2012 INTERNATIONAL FIRE CODE, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, EXCLUDING APPENDIX A, D, AND K AND ADOPTING APPENDICES B,C,E,F, G AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51- 54. 2012 INTERNATIONAL ENERGY CONSERVATION CODE(IECC),AS AMENDED BY WASHINGTON STATE BUILDING CODE WAC 51-11 To view the Mason County Building and Construction Code and adopted amendments go to the Mason County website at: www.co.mason.wa.us. MEMORANDUM TO: Foster&Williams Attn: Grant Foster PO Box 102 Shelton, WA 98546 FROM: DEBBERA COKER Plans Examiner Mason County Department of Community Development (360)427-9670 ext. 510 E-mail:Dlc@co.mason.wa.us DATE: October 23,2002 RE: Pre-Submission Conference Meeting Remodel existing 2400-sf structure(B)occupancy,add 3000 sf meeting room and storage areas, construct breezeways connecting the existing apparatus structure, add shop/utility to existing apparatus building. Construct a separate 40' x 60'outdoor recreation building. Parcel Number: 12108-21-90043 PAR2002-00085 A copy of the"Pre-Submission Conference Notes,"prepared as result of the pre-submission meeting conducted on October 23,2002 is enclosed. A complete set of building plans will include and or identify the following information: • The proposed structure exceeds 4000 square feet therefore all building plans, including structural details, mechanical, plumbing, and calculations shall be stamped and signed by the architect and/or engineer of record. • On the building plans included calculations showing compliance to the allowable area(s),including allowable area increases. During the pre-submission meeting applicants stated that a sprinkler system is proposed in only a portion of the building. Referencing UBC section 505.3 area increases are allowed if the building is provided with an automatic sprinkler system throughout. Please keep this in mind when calculating allowable areas. • The proposed structure is considered an essential structure as defined in Table 16-K. Structural observations shall be provided and reported to the Mason County Building Department as specified in WAC 1702. Please include a completed Special Inspection Authorization Agreement with your building permit application. • On the building plans, identify occupancy classification(s)and include occupancy calculations for exiting purposes. Identify all proposed exits, exit lighting, etc. as required in UBC,chapter 10. • WAC 51-40, chapter 29 requires two water closet facilities for each male and each female. WAC 51-40, chapter 11 requires one water closet for each sex.Show all accessible fixtures,including showers and drinking fountains, on the floor plan. • Accessible parking shall be provided,complying with WAC Table 11-A. Show accessible parking spaces on the site plan. • All exit doors shall swing in the direction of exit travel and shall have hardware as required by the Uniform Building Code,Chapter 10. • Compliance to the 2001 Washington State Energy Code is required. Compliance forms are included. General Requirements: Building plans for each structure shall include a floor plan of the structure showing the use of each room and construction detail. Accessibility for persons with disabilities will also be required. Include detail showing that the bathroom is accessible, that there is accessible parking, and the entrance to the building meets accessible requirements. In addition building plans must include a complete mechanical,plumbing and lighting plan,signed and stamped by a Washington State licensed engineer or architect. Review information listed on the Pre-Submission Conference Notes and make sure that typical code compliance information is shown on the building plans;including occupancy classification,type of construction,occupancy calculations to determine exiting requirements,etc. Two sets of vertical and lateral engineered calculations, prepared by a Washington State licensed engineer or architect, addressing each structure and corresponding foundation, will be required with the building permit submittal. All holdowns and notes,required as a result of the engineered analysis,must be transferred onto the building plans. A building permit application package is enclosed. A separate permit application is required for each structure. The site plan must be drawn to scale with specific information shown. See the site plan application form for the list of required information. In addition,compliance to the Non-Residential Energy Code is required. When the building permit application is submitted a plan review fee will be collected. We will be happy to calculate the fee for you in advance when you are prepared to submit the building permit application. If you have any questions concerning the notes and requirements,please call me. Encl.: Pre-Submission Meeting Notes WAC section 1702 and UBC Table 16-K Special Inspection Authorization Agreement Non-Residential Energy Code compliance forms Building Permit Application Package � 1 PRE-SUBMISSION MEETING FOR WEDNESDAY MARCH 18TH, 2015 TO BE KEPT IN THE PAR2015-00010 APPLICANT: Mason County Fire District 3 PARCEL FILE MEETING DATE AND TIME: March 18th, 20151:15/1:30-2:30pm PARCEL NUMBER: 10 SITE ADDRESS: 4356 E Grapeview Loop Rd, Grapeview PROJECT DESCRIPTION: 384 sq ft(2416) addition sleeping quarters for volunteer fzrefighters/EMT's LOCATION: 426 W Cedar St, Bldg 3 Conference room PLANNER:Allan Borden Ext 365 PUBLIC HEALTH STAFF: Cindy Waite Ext 353 511KIIs 12�yv y ' w .-� 7i�1 PAR .(:iCj— OCX)I U DATE -76 PRE-APPLICATION CONFERENCE REQUEST FORM The purpose of the pre-submission conference is to identify and/or eliminate as many potential problems as possible in order for the project to be processed without delay. Representatives for the Fire Marshal's Office, Building Department, Environmental Health, Planning, and Public Works Departments may attend the meeting to discuss rules and regulations applicable to the proposed project. Topics covered during the meeting will include the comprehensive plan, shoreline program, zoning, availability of sewer and potable water, development concepts, building construction, fire protection and life safety concerns of the proposed project. The pre-submission conference will be most informative when you provide accurate and detailed information on the Pre-Application Conference Application Form and the site plan.Applications will be accepted when all information is received and deemed complete. Pre-Application Conferences are held every Wednesday and last up to one hour. To schedule a meeting complete the applications and return with 6 copies of the detailed site plan, by 3:00 PM on the Wednesday two weeks prior to the proposed meeting. 1. Pre-Application/Dept. of Community Dev. 2. Environmental Health 426 W Cedar Street 415 N 5`h /PO Box 1666 Shelton,WA 98584 Shelton,WA 98584 360.427.9670 ext. 352 360.427.9670 ext.400 Check amount: $255.00 Check amount: $1 2.65 BOTH CHECKS MADE PAYABLE: MASON COUNTY TREASURER Applicant: (( -- Site Plan Name: M a.5C►l (Dun t 1/e _�6S1"f I L� Submit 6 copies Mailing Address: V G Mx 12-9 Include the following information Daytime Telephone:3(pb- 2-1_- 4 q83 Fax: j�0 -Z `�-`3 51 j /Indicate Scale and North Arrow �?Email address: a\/V ' 1 e-, C�+ C�' Property line dimensions,easements, .J and right-of-ways. Representative: / r 5 The location of all existing and Name: L.4 6 E`T (�. L G:t^C-Le�2e' proposed structures.Include square Mailing Address: S n A footage of existing and proposed Daytime Tele hone:,� 27 S- �� 3 Fax: 360 � 27 j -8S I S structures. C� Setback distance,in feet from all Email address: property lines and structures. Parcel Number: (I2 digits) 2- La" Existing and proposed road access to and from the site. Description of Project: Include: 1) Square footage of structure,2)Use of building and rooms(i.e., C3�Parkmg sites office,warehouse,restaurant,storage,etc),3)Occupancy classification per ur Cation of on-site sewage tanks and drainfields. IBC, Section 302.1, and construction type.4)Provide two sets of plans,if O�Location of drinking water supply. available. Use separate sheet if necessary Include location on the proposed site ' t?p and surrounding parcels. l 3 ly X! :t SQe + Uar'IL eft -6- ,Va + er� 1 rc p5 —/1 ❑ Steep bluffs,wetlands,streams,and 3 • Z bodies of water c e V�7 Ff J r G t l e c j 1, ef"Location of fire hydrants and emergency vehicle access roads, including grade. m/ Surface and storm water run-off routes. Has the project been discussed during a previous Pre-Application Conference: If yes,please indicate date. /A/o Will the building have employees? If yes, how many? I e S VC lu-Jeor, S )f&ei;.I L�dr��J 4r y a Joe(- What is the water availabilityof the proposed project?If there is an existing well,what is the name of the system? eyCt S f 1-y L,re [( a What is planned for the on-site sewage system? If you are proposing a new on-site system provide detail on the required site plan. ex c,4 M.r ADDITIONAL INFORMATION: J'ha cLdd,4idM 4 add wo t3v-k roa;/-` S /ee i+• (1ar 4crl Vo I vft 4 ee✓ FYS !`1�` 1i� Ott hct 7 �OVeM APPLICABLE BUILDING CODES 2012 International Building Code/2009 International Residential Code 2012 International Fire Code-ANSI A117 2012 International Mechanical Code—WAC 5142 2012 Uniform Plumbing Code—WAC 51-56/5147 2012 International Energy Cons.Code/Washington State Energy Code—WAC 51-1IC&51-11R Mason County Ordinance Title 14 Code changes are on a 3 year cycle;effective in July of that particular year. Date of Conference: _ g_Z�i Time of Conference: l: 3o Location of Conference: 426 West Cedar Street,Shelton Planner: ( ext. 21 ,6 PAR2015-00010 APPLICANT: Mason Co. Fire District 3 / Patricia Graeber MEETING DATE/TIME: WEDNESDAY, MAR. 18, 2015, 1:30 pm PARCEL NUMBER: 12108-21-60041 SITE ADDRESS: 4350 E GRAPEVIEW LOOP RD. GRAPEVIEW PROJECT DESCRIPTION: CONSTRUCT NEW ADDITION TO EXISTING BLDG. FOR SLEEPING QUARTERS. PLANNER: ALLAN BORDEN ext. 365 (from Belfair 360.275-4467) Property is zoned Rural Residential 5 zone. This zone provides for the location of land uses listed under the Mason County Development Regulations (MCC 17.04.222). Fire stations, community centers, and parking areas are considered public facilities that serve the rural population. The proposed work to have additional building area for fire and emergency staff sleeping quarters is a legitimate use to provide within a proposed building on this property. The associated parking shall provide for ADA access adjacent to the proposed buildings. Front Yard Setback: 25 feet. Side and Rear Yard Setbacks: residential dwelling 20 feet; accessory buildings 20 feet; accessory structures used for agricultural purposes or home occupations 50 feet; buildings of nonresidential land uses 25 feet. Floor Area Ratio. 1:20, except for fire stations. Building Height limit of 35 feet. Building Size. 3,000 sq. feet maximum for non-agricultural and accessory buildings except for dwellings and agricultural buildings. Government operated day care centers, essential public facilities, churches, community centers, and schools may exceed 3,000 sq. feet as approved by a special use permit. A special use permit for a proposed community center proposal was approved in 2004 to permit the expansion of buildings to 4300 sq. ft. The present request calls for an area addition of 384 sq. ft. to be added at the south side (rear) of the building. Current information [accurate site plan and/or illustration of the building(s) being enlarged] provided for this meeting does not clearly indicate the building size, so that the determination on further permitting cannot be made for the proposal. Please submit this information for Community Development records review. PAR2015-00010 APPLICANT: Mason Co. Fire District 3 / Patricia Graeber MEETING DATEMME: WEDNESDAY, MAR. 18, 2015, 1:30 pm PARCEL NUMBER: 12108-21-60041 SITE ADDRESS: 4350 E GRAPEVIEW LOOP RD. GRAPEVIEW PROJECT DESCRIPTION: CONSTRUCT NEW ADDITION TO EXISTING BLDG. FOR SLEEPING QUARTERS. PLANNER: ALLAN BORDEN ext. 365 (from Belfair 360.275-4467) Property is zoned Rural Residential 5 zone. This zone provides for the location of land uses listed under the Mason County Development Regulations (MCC 17.04.222). Fire stations, community centers, and parking areas are considered public facilities that serve the rural population. The proposed work to have additional building area for fire and emergency staff sleeping quarters is a legitimate use to provide within a proposed building on this property. The associated parking shall provide for ADA access adjacent to the proposed buildings. Front Yard Setback: 25 feet. Side and Rear Yard Setbacks: residential dwelling 20 feet; accessory buildings 20 feet; accessory structures used for agricultural purposes or home occupations 50 feet; buildings of nonresidential land uses 25 feet. Floor Area Ratio. 1:20, except for fire stations. Building Height limit of 35 feet. Building Size. 3,000 sq. feet maximum for non-agricultural and accessory buildings except for dwellings and agricultural buildings. Government operated day care centers, essential public facilities, churches, community centers, and schools may exceed 3,000 sq. feet as approved by a special use permit. A special use permit for a proposed community center proposal was approved in 2004 to permit the expansion of buildings to 4300 sq. ft. The present request calls for an area addition of 384 sq. ft. to be added at the south side (rear) of the building. Current information [accurate site plan and/or illustration of the building(s) being enlarged] provided for this meeting does not clearly indicate the building size, so that the determination on further permitting cannot be made for the proposal. Please submit this information for Community Development records review. -IR - � C3 PiN - - 1TAT -Ions p _vw _ x I tout I ki ` t v1"at ►4• T wAsy, MOVE® y - 7,YYIRES 8 29 CC� � L 0 0 r +-- uL 5l t te ED AOOF- Mal • � �P�'� wAsya�,Q,, � Cr � I - -- =r - - -_- .. . _ 7�U. - ---- . . . _ _ 12 .. _ .4_:21a.. .� - {Z'•i�" :13'-Z° _ -. . .. _ .� �o G/STE �O " A ILL Nu n T,7yws 8-29-C� � J U -HINC, Kt tW . Qirf6411- W(z1 MU5 TOVAMPEk Exterior Light 0 l New 3'a' Exterior Door with 6x8 Header Clothes O Sink washer Cadet Brand Notes: Electric Wall Heater ri 1z Alteration of exsiting storage room to a sanitation center 8' 11" Additions: 150 CFM Exterior Door & Ceiling Vent fan Light ADA Shower Folding Sink Seat Clothes Washer 2-1500 watt Wall Heaters 150 cfm Ceiling Vent Fan Cadet Brand Electric Wall Heater ADA Shower x��i ��.N 3'4"E)asting Interior Door _ 11, 101, _ Mason County Fire District #3 LJ y {— Personnel / Equipment Sanatation Center - ADA Shower J �X, 1/4" = 6" 108 sq. ft. LA 11 4 --�.��_��____ —1`. ` [« �� —_ seat may be installed after the initial construction.Additional backing is required for the told- „o„ down seat;the backing may be added upon request during initial construction or reinforcement NlNra 1 OfTa4lNI ` I. E--=-�'�jT'. >✓,C1 1•tlo..4VirKi�17 Exterior Light New 3'0' Exterior Door with 6x8 Header Clothes Sink Washer t�f1Nb. � Cadet Brand NOteS: Electric wall Heater Lf z Alteration of exsiting storage room to a sanitation center 8' 11" Additions: 150 CFM Exterior Door & Ceiling Vent fan Light ADA Shower - Folding Sink Seat Clothes Washer 2-1500 watt wall Heaters -- 150 cfm Ceiling Vent Fan Cadet Brand + Electric wall Heater ADA Shower 4*V 3'4"Existing Interior Door -]! µ` _ 11, 101, `� l Mason CountyFire District #3 fir -� Li '1 4-- � Personnel / Equipment Sanatatlon Center ADA Shower rt _ tt 1/4 - 6 108 sq. ft. seat may be installed after the initial construction.Additional backing is required for the told- _; down seat;the backing may be added upon request during initial construction or reinforcement + 711" --