HomeMy WebLinkAboutBLD92-1429 MOBILE - BLD Permit / Conditions - 1/4/1993 Ii
-�.
tiro
OQ
X /1
� cQ
� = C
N z
0o drn _E
tea
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date A/t7' by
Foundation Walls date by Set Up
date by INSULATION date by %i l6''
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING
Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Attic
Groundwork date by - c�
date b / �' �/% / 1/ 7
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
Oo
0o O
O(j)
x n
OO0
0- : z
cQ
� = C
cn
O n
10a
00
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date by
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING
Walls FIRE DEPT.
date PLUMBING by date by date by
Attic
OTHER
Groundwork date by
date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
it