Loading...
HomeMy WebLinkAboutBLD94-1340 Gas Electrical Meters Shelter - COM Plot / Site Plans - 7/8/1994NE 1/4, SW 1/4, SEC. 25, T-20—N, R-4—W, WM ROAD R/W LINE POWER METER & BREAKEP U) 10'-0' • CATHODIC PROTECTION BOX • 0 O❑ 9'-5' 20'-0° STA. 649+34.5 VALVE 64.3 w z J I Z O J W S N 0 GE 0 ME r J O Q O • Ill 00 (ALIGNMENT) STATION DRIVEWAY STATION ENTRANCE 24'- HEATER DEEGAN ROAD 4 S36°56'W 100.0' 90'-0' N36°56'E 100.0' PLOT PLAN POWER CABLE 58'-0' NORTHWEST PIPELINE CORPORATION SITE 2' STATIF]N RY-PAJS 0 CO 3' x 5' EFM ENCLOSURE 5'-0' 8'-4 1/2' O x x ROAD R/W LINE CASCADE NATURAL GAS CO. 4-1 :1 cu APPROVED FOR CONSTRUCTON BY B. TODD STUBBS DRAFTING 4 3 8/29/94 7/8/94 KAA DVS REVISED METER BUILDING DIMENSIONS APPROVED FOR CONSTRUCTION 32946 32946 BTS BTS PM5-SHL-P4 PIPING BILL OF MATERIAL 2 2/10/94 CDI REVISED PER AS -BUILT 32636 PM5-SHL-P2 PIPING PLAN 6/14/93 JLS REDRAWN ON CAD, CHANGED DRAWING NO. FROM 32636 2433.9-X-3 SITE DRAWING PM5-SHL-1, ADDED PROPOSED HEATER VALVING DRAWN CHECKED APPROVED 2433.0-10 ALIGNMENT SHEET AND ISSUED FOR CONSTRUCTION ENGINEERING BY DVS DA BTS BY DATE DATE 7/8/94 7/11/94 7/11/94 DATE 7/11/94 NORTHWEST PIPELINE CORPORATION ONE OF THE WILUIMS COMPANIES:1I) SHELTON DELIVERY METER STATION PLOT PLAN MASON COUNTY, WASHINGTON DRAWING NO. TIRE DRAWING NO. TITLE NO. DATE BY DESCRIPTION W.O. No APP. NO. DATE BY DESCRIPTION W.O. NO. APP. LEGEND REFERENCE DRAWINGS REVISIONS C&SREVIEW PROJECT APPROVED BTS SCALE 3/16'=1'-0' 7/11/94 W.O. NO. 32946 DWG. \O. PM5-SHL-P1 REVISION 4 10'-0' .01 90'-0' DEEGAN ROAD NE 1/4, SW 1/4, SEC. 25, T-20-N, R-4-W, WM ROAD R/W LINE POWER METER & BREAKER STATION DRIVEWAY DRAWING NO. LEGEND Cr) TITLE c CATHODIC PROTECTION BOX 0 20'-0' 9'-5' S36°56'W 100.0' POWER CABLE STATION ENTRANCE 24'-0' 12'-0' STA. 649+34.5 HEATER 0=1 VALVE 64.3 M 0 PM5-SHL-P4 PM5-SHL-P2 2433.9-X-3 2433.0-10 DRAWING NO. REFERENCE DRAWINGS TO SHELTON LINE (ALIGNMENT) PIPING BILL OF MATERIAL PIPING PLAN SITE DRAWING ALIGNMENT SHEET TITLE NO. DATE BY 8 J ° 8' 6' 58'-0' NORTHWEST PIPELINE CORPORATION SITE 8 ° No- N36°56'E 100.0' PLOT PLAN DESCRIPTION 6' 6' riae- Lit W.O. NO. 2° STATION BY-PASS Z 4' BYPASS C) 5'-0' 3' x 5' EFM ENCLOSURE 6° ter' 4' — TEC 8'-4 1/2' 8' 8' II/ n I \ III o -/T-/-!/\1--\\ 18'-6' APP. 4 3 2 1 NO. REVISIONS 8/29/94 7/8/94 2/10/94 6/14/93 DATE KAA DVS CDI JLS BY REVISED METER BUILDING DIMENSIONS APPROVED FOR CONSTRUCTION REVISED PER AS -BUILT REDRAWN ON CAD, CHANGED DRAWING NO. FROM PM5-SHL-1, ADDED PROPOSED HEATER VALVING AND ISSUED FOR CONSTRUCTION DESCRIPTION 8' X 8' STEEL BLDG. X d ROAD R/W LINE _ -I • CASCADE NATURAL GAS CO. cu APPR VED FOR CONSTRUCT 32946 32946 32636 32636 W.O. NO. BY BTS BTS APP. B. TODD STUBBS DRAFTING BY DATE 7/11/94 DATE DRAWN CHECKED DVS DA 7/8/94 7/11/94 APPROVED BTS 7/11/94 ENGINEERING BY DATE ON \O3THWEST PIPELI\E CO3PORATION ONE OF THE VALLIAMS COMPANIES111) SHELTON DELIVERY METER STATION PLOT PLAN MASON COUNTY, WASHINGTON C&SREVIEW PROJECT APPROVED BTS 7/11/94 w.o. No. - 32946 SCALE 3/16'=1'-0' I DWG. \O. PM5-SHL-P 1 I REVISION 4