HomeMy WebLinkAboutBLD94-1340 Gas Electrical Meters Shelter - COM Plot / Site Plans - 7/8/1994NE 1/4, SW 1/4, SEC. 25, T-20—N, R-4—W, WM
ROAD R/W LINE
POWER METER
& BREAKEP
U)
10'-0'
•
CATHODIC
PROTECTION BOX
•
0
O❑
9'-5'
20'-0°
STA. 649+34.5
VALVE 64.3
w
z
J I
Z
O
J
W
S
N
0
GE
0
ME
r
J
O
Q
O
•
Ill
00
(ALIGNMENT)
STATION DRIVEWAY
STATION ENTRANCE
24'-
HEATER
DEEGAN ROAD
4
S36°56'W 100.0'
90'-0'
N36°56'E 100.0'
PLOT PLAN
POWER CABLE
58'-0'
NORTHWEST PIPELINE
CORPORATION SITE
2' STATIF]N RY-PAJS
0
CO
3' x 5'
EFM
ENCLOSURE
5'-0'
8'-4 1/2'
O
x
x
ROAD R/W LINE
CASCADE
NATURAL
GAS CO.
4-1
:1
cu
APPROVED FOR CONSTRUCTON
BY
B. TODD STUBBS
DRAFTING
4
3
8/29/94
7/8/94
KAA
DVS
REVISED METER BUILDING DIMENSIONS
APPROVED FOR CONSTRUCTION
32946
32946
BTS
BTS
PM5-SHL-P4
PIPING BILL OF MATERIAL
2
2/10/94
CDI
REVISED PER AS -BUILT
32636
PM5-SHL-P2
PIPING PLAN
6/14/93
JLS
REDRAWN ON CAD, CHANGED DRAWING NO. FROM
32636
2433.9-X-3
SITE DRAWING
PM5-SHL-1, ADDED PROPOSED HEATER VALVING
DRAWN
CHECKED
APPROVED
2433.0-10
ALIGNMENT SHEET
AND ISSUED FOR CONSTRUCTION
ENGINEERING
BY
DVS
DA
BTS
BY
DATE
DATE
7/8/94
7/11/94
7/11/94
DATE
7/11/94
NORTHWEST PIPELINE CORPORATION
ONE OF THE WILUIMS COMPANIES:1I)
SHELTON DELIVERY METER STATION
PLOT PLAN
MASON COUNTY, WASHINGTON
DRAWING NO.
TIRE
DRAWING NO.
TITLE
NO.
DATE
BY
DESCRIPTION
W.O. No
APP. NO. DATE BY
DESCRIPTION
W.O. NO.
APP.
LEGEND
REFERENCE DRAWINGS
REVISIONS
C&SREVIEW
PROJECT APPROVED
BTS
SCALE 3/16'=1'-0'
7/11/94 W.O. NO. 32946
DWG. \O. PM5-SHL-P1
REVISION
4
10'-0'
.01
90'-0'
DEEGAN ROAD
NE 1/4, SW 1/4, SEC. 25, T-20-N, R-4-W, WM
ROAD R/W LINE
POWER METER
& BREAKER
STATION DRIVEWAY
DRAWING NO.
LEGEND
Cr)
TITLE
c
CATHODIC
PROTECTION BOX
0
20'-0'
9'-5'
S36°56'W 100.0'
POWER CABLE
STATION ENTRANCE
24'-0'
12'-0'
STA. 649+34.5
HEATER
0=1
VALVE 64.3
M
0
PM5-SHL-P4
PM5-SHL-P2
2433.9-X-3
2433.0-10
DRAWING NO.
REFERENCE DRAWINGS
TO SHELTON LINE
(ALIGNMENT)
PIPING BILL OF MATERIAL
PIPING PLAN
SITE DRAWING
ALIGNMENT SHEET
TITLE
NO.
DATE
BY
8
J
°
8'
6'
58'-0'
NORTHWEST PIPELINE
CORPORATION SITE
8
°
No-
N36°56'E 100.0'
PLOT PLAN
DESCRIPTION
6'
6'
riae-
Lit
W.O. NO.
2° STATION BY-PASS
Z
4' BYPASS
C)
5'-0'
3' x 5'
EFM
ENCLOSURE
6°
ter'
4' —
TEC
8'-4 1/2'
8' 8'
II/ n
I \
III o
-/T-/-!/\1--\\
18'-6'
APP.
4
3
2
1
NO.
REVISIONS
8/29/94
7/8/94
2/10/94
6/14/93
DATE
KAA
DVS
CDI
JLS
BY
REVISED METER BUILDING DIMENSIONS
APPROVED FOR CONSTRUCTION
REVISED PER AS -BUILT
REDRAWN ON CAD, CHANGED DRAWING NO. FROM
PM5-SHL-1, ADDED PROPOSED HEATER VALVING
AND ISSUED FOR CONSTRUCTION
DESCRIPTION
8' X 8'
STEEL
BLDG.
X
d
ROAD R/W LINE
_ -I
•
CASCADE
NATURAL
GAS CO.
cu
APPR VED FOR CONSTRUCT
32946
32946
32636
32636
W.O. NO.
BY
BTS
BTS
APP.
B. TODD STUBBS
DRAFTING
BY
DATE 7/11/94
DATE
DRAWN
CHECKED
DVS
DA
7/8/94
7/11/94
APPROVED
BTS
7/11/94
ENGINEERING
BY
DATE
ON
\O3THWEST PIPELI\E CO3PORATION
ONE OF THE VALLIAMS COMPANIES111)
SHELTON DELIVERY METER STATION
PLOT PLAN
MASON COUNTY, WASHINGTON
C&SREVIEW
PROJECT APPROVED
BTS
7/11/94 w.o. No. - 32946
SCALE 3/16'=1'-0' I
DWG. \O. PM5-SHL-P 1
I REVISION
4