HomeMy WebLinkAbout66-88 - Res. Six Year Transportation Improvement Program 1989-1994SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 39 TO 94
MASON COUNTY
COUNTY NO,. 23
P F
R
I N PRO:TEnT IDENTIFICATION
0 CC /DESCRIPTION OF WORK
R TL.
Y E.;
1 COUNTY WIDE PAVEMENT ON AC
On•all class of existing asphalt pavements
------------
HEARING DATE : 08/16/86
ADOPTION DATE: 08/16/88
RESOLUTION NO: 66-88
-PROJECT nosTs IN THOUSANDS OF DOLLARS- 0 FEDERAL
L. Nt 0 OBLIGATION
E0 AU -EXPENDITURE PLAN- - - - - --FUNDS, - - - - - - 0. PLAN
N 3 R
G OW R D 1ST ND 3RD 5TH TOT LOC RAP FED 6. 1ST 2ND
T RO Y I YEAR YEAR 4TH 6TH AND OR YEAR -6TH
YEAR YEAR OTH UAB
P 230 230 460 460 1380 1380 P E
R/W
WORK CODES BD CON
UTIL CODES
----_-_-_-_-_-_-_-_-_-__
F.A. PROJ NO.
TOT
P 1.25 130 z. 295 9'7'5 825 P E
COUNTY WIDE. AC PAVEMENT ON BST
R/W
On all class of existi..ng BST surfaced roads. with hicih v WORK CODES: BD CON
olumes, AC plus shoulder w.idening UTIL CODES: F.A. P8O3 NO.
-------------------
--••••--•
TOT 0 0
3 COUNTY BST 4 P 150 150 :300 300 900 900 P E
t.' R/W
Eliminate hihh cost gravel maintenance by orading, drai WORK CODES: ABC CON
vino and surfaci.ng UTIL CODES; F.A. PROJ NO.
- TOT 0 0
--- .
4 COUNTY WIDE MINOR CONSTRUCTION 4 P 170 170 340 340 -1020 1020 P E
R/W
Includes traffic control drainaoe, safety project in WORK CODES: BHKC CON
ferser7tions, walks, bikeways and guard rails UTIL CODES: F.A. PROJ NO.
-------------
TOT 0
5 COUNTY WIDE SUB -BASE REPAIR . 5 P 100 100 200 200 600 600 P E
R/W
Reconstruction of sub --base and resurfacing Suggested r MORK CODES: ABC CON
oad - Cloquallum, Lynch, Sheiton-Matlock (Matlock to B UTIL CODESt F.A. PROJ NO. •
- rady) -• - ____ TOT 0 Q
6 COUNTY WIDE BRIDGE $ LARGE CULVERT CONSTRUCTION 4 P 60 60 120 120 . 360 360 P E
R/W
WORK _CODES: L CON
UTIL CODES: ' FA. PROJ NO.
- TOT 0
COUNTY WIDE UPGRADING GRAVEL ROADS 4. P 140 140 280 280 840. 240 - • • P E
R/W
WORK CODES'. ABC CON
UTIL CODES'. . F.P PROJ NO.
0 0
•
SIX YEAR TRANSPORTATION :IMPROVEMENT PROGRAM 39 TO 94 Page
MASON COUNTY
P F 7PROjE01 COSTS IN THOUSANDS OF DOLLARS- fa FEDERAL ,
R U L MCF fa OBLIGATION
I N PROJECT IDENTIFICATION E AAU EXFENDITURE PLAN- FUNDS a PLAN
• nc /DESCRIPTION OF WORK N -3 RN a
R TL G PW R D 16T 2ND 3RD 5TH Tni Inc RAP FED 6. 1ST 2610
I A T RO Y 1 YEAR YEAR 4TH 6TH AND OR ilt YEAR -6TH
• S u
K R N YEAR YEAR OTH UAB O. YEAR.
Y S
. .
8 0? 84110-0.04 MISSION CREEK BRIDGE 42 .03 1 P 100 100 100 P E
0.03 TO 0.06 R/W
Replace Culvert with bridge, plus new approaches WORK CODES: L CON
UTIL CODES:
F.A. PROJ NO.
-- -- TOT
9 08 10000-5.85 ROCK CREEK N0.1 BRIDGE .04 4 P 60 60 60 P E
5.33 TO 5.87 R/W
Replacement of Bridge plus new approaches WORK C0DE8 6 CON
UTIL CODES:
10 08 10000-16.60 CLOQUALLUM CREEK BRIDGE
16.58 TO 16.62
Replacement of Bridge plus new approaches
11 08 90100-23.35 EDDY EVERS BRIDGE
73.25 TO 23.50
Replacement of Bridge plus new approaches
(Posted 24 Tons - one lane truck and busses)
.04 4 - P 110
WORK CODES: L
F.A. PROj NO.
TOT
110 110 P E.
R/W
nflN
UTIL CODES: F.A. PROJ NO.
TOT 0 0
25 4
P 450 450 60 . ' 390 P E
R./Id
WORK CODES L CON
UTIL OODES.
F.A. PROD NO.
TOT 0 0
12 08 02070-1.30 SCHAFER PARK BRIDGE .06 4 P 420 420 60 360 P E
1.27 TO 1.33 R/W •
Replacement 01: Bridge plus new approaches WORK CODES: L CON •
NPosted 15 Tons, one lane, Truck and Busses) UTIL CODES: F.A. PROj NO.
TOT
17 nP 10000-14.82 HERMAN'S OLD SCHOOLHOUSE BRIDGE p E
Replacement of Bridye plus new approaches WORK CODES: L CON
UTIL CODES:
14 OS 10000-15.60 HERMAN'S CLOQUALLUM CREEK BRIDGE
15,•,58 TO 15.62
Replacement of Bridge plus new approaches
.04 4 11
WORK CODER; L
UTIL CODES:
F.A. PROJ NO.
TOT 0 0
120 120 120
P E
R/W
CON
FF. A . PROJ NO .
707 0 0
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
8'9 TO 94 Page
MASON COUNTY
P F
R U L MCF 0 OBLIGATION
I N PROJECT IDENTIFICATION E A A U -EXPENDITURE PLAN- ------FUNDS ilt PLAN
. 0 CC /DESCRIPTION OF WORK N jRN 111.
R T G OW R D 1ST 2ND 7R1) 5TH TOT LOC RAP FED l'i. 1ST 2ND
.,. A T RD Y I YEAR YEAR 4TH 6TH AND ORU YEAR -6TH
T s H R N YEAR YEAR OTH UAB a YEAR
Y 8 8 K 9 II:
-PROJECT COSTS IN THOUSANDS OF DOLLARS- a FEDERAL
15 oe 10290-0.35 HLIBOKI BRIDGE .10• 4 P . 110 110 110 P E
0.30 TO 0.40 R/W
Replacement of Bridge plus new approaches WORK CODES: L CON
UTIL CODES; F.A. PROJ NO.
TOT
--------
16 07 96140-2.45 MCLANE COVE BRIDGE
2.35 TO 2.55
Replacement of- bridge plus new approaches
.20 4 8 220 220 - 220 • . P E
R/W
WORK CODES: L CON
UTIL CODES: F.A. PROJ NO.
TOT 0 C,
17' 08 10000 OLOQUALLUM ROAD. .72 4 350 ' 350' 350 P E
11.75 TO 12.47
R/W
Rock Corner (1 mile wast of Bulb Farm Road) Relax Curve WORK CODES: ABD CON
18 08 15500 LYNCH ROAD
3.95 TO 4.95
Deer Harbor to 0.30 miles No.
New corridor overland
UTIL EODES
F.A. PRFIT NO.
TOT 0 0
-• • Y. • - Y.- ^ a. -• ••.•. -• •__ -•
1.00 4' P 350 350 3so •
WORK CODES: ABC
UTIL CODES:
P E
R/W
CON
F.A. PROj NO.
- • TOT 00
19 09 23910 AGATE ROAD .75 4 P 350 350 350 P E
0.00 TO 0.75 8/5!
R. #3 to 0.20 miles So. of Spencer j_ake Road WORK CODES: 4E-11) CON
Realign and Regrade UTIL CODES
F.A. PROJ NO.
TOT
--------------------------------------------------------------- , ___________________________________________ _______
20 OS 77910' AGATE ROAD .60 4 P :::'0 250 50 200 -P E
075 TO 1.55 R/W
.0.20 Se. of Spencer Lake Road to Julian Road (pluyH) WORK CODES: ABD CON
Realign and Regrade UTIL CODES:
V.A. PROJ NO.
TOT 0
21 07 28e50 PICKERING ROAD 1.23 4 750 250 250 P E
0.'00 TO 1.23 R/W
S.R. 113to 1984 Project Realign and Regrade WORK CODES: ABO CON
UTIL. CODES:
F.A. PROJ NO.
TOT 0
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
MASON COUNTY
sV lu
94 Page
P F -PROJECT COSTS IN THOUSANDS OF DOLLARS- a FEDERAL
R U L MCF 0. OBLIGATION
1 N PROJECT IDENTIFqCATION F A A U -EXPENDITURE PLAN- -FUNDS- - --
O CC /DESCRIPTION OF WORK N J R N ilt
• R TL G OW R D 1ST 280 399 5TH TOT LOC RAP FED ilk 1ST 2110
I A T RO Y 1 YEAR YEAR 4T1I 6TH AND OR 0 YEAR -6TH
• !.::) H' R YEAR YEAR OTH U913 ill YEAR
Y 9 0 R ilt
22 08 63010. MASON BENSON ROAD . 1.45 4 P 440 440 440 P E
1.13 TO 2.58 R/W
Trails Road (Fire Hall) to So. Railroad Crossing WORK CODESABC CON
Realignment and Regrade UTIL CODES: • F.A. PROJ NO.
- , ______ TOT
23 08 79800 BEAR CREEK - DEWATTO ROAD 1.15 4 9 250•
8.60 TO 9.75
0.37 W. of Tiger Mission Road to start a+ Chip Seal Rea WORK 0fln9s ABC
ligp and Regrade UT 1 L CODES:
250
9 E
R/W
CON
F.A. PROj NO.
TOT
0 0
24 07 97500 BELFAIR - TAHUYA ROAD .38 4 90 ?0 90- 9 F
TO 8.13 .. R/W
,
Haven Lake Road to Tahuya River Bridge Realign and Regn WORK.CODES.; ABD CON
ado UTIL CODES: F.A. PROJ NO.
- - TOT 0 0
(
25 07 97670 MCREAVY ROAD - .23 4 C7i ,,,,,,-
..../ 85 85 - 9 E
0.00 TO 0.23 R/W
S.R. 4106 to 4t8 Street, Realign and Regrade, including WORK CODES: ABD CON
sidewalks UTIL CODES; F. 0. PROJ NO. ____
- - TOT 0
26 08 51800 MCEWAN PRAIRIE ROAD .02 4 9 150 •
0.81 TO 0.83
Railroad Crossing WORK CODES; I
UTIL CODES:
150 18
-132
P E
9/9
CON 147
F.A. PROJ NO.
RRS - - TOT 150
27 08 63010 MASON BENSON ROAD .02 6 P 150 150 le 132 P E
1.22 TO 1.24
Railroad Croseing WORK 0:0099 1 CON
UTIL CODES:
147
F.A. PROJ NO.
RRS - - TOT 150 0
28 09 51720 JOHN'S PRAIRIE ROAD .02 6 P 150 150 • 18 132 P E 3
2.72 TO 2.74 9/9
Railroad Crossing WORK CODES: I CON 147
UTIL CODES: F.A. PROJ NO.
999 - TOT 150 0
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 89 TO 94
MASON COUNTY
P F -PROJECT COSTS IN THOUSANDS OF DOLLARS- 6. FEDERAL
R U L. 5 C F :lc OBLIGATION
j. N PROJECT IDENTIFICATION E A A U -EXPENDITURE PLAN- :—FUNDS (.1 PLAN
0 CC /DESCRIPTION OF WORK N 3 R N 6.
R TL G OW R D 1ST 2N1) 3111) 5TH TOT Loc RAP FED 6. IRT 2ND
I A T RO Y I YEAR YEAR 4TH 6TH AND OR 6. YEAR -6TH
T G H R N YEAR YEAR OTH UAD 6. YEAR
Y • S K G
29 09 54650 ST ANDREWS DRIVE .02 6 P 150 150 18 17.2 P E
2.01 TO
Rail,.-osd Croo'sI,lo, WORK CODES; I CON 147
UTIL CODES; • F.A. PROJ NO.
RRS - - TOT 150
---------------------------• • - --- .
30 09 18730 DINNS SWIGER LOOP .80 4 100 10 110 110 P E
0.00 TO 0.80 R/W
Arcadia Road south o.eo miles (westerly leg) Realign an WORK CODES; ADC CON
d Regrade UTIL CODES; .F.A. PROj NO.
31 09 18730 DINNS SWIGER LOOP ROAD
.1.71 TO 2.19
,Gravel portion of Easterly Les Widen and pave with BEJ
.46 3
85 10 95 95
WORK CODES:: ABC
UTIL CODES'.:
TOT 0
P E
R/W
• CON
F.A. P503 NO.
TOT
32 17 13200 WALKER PARK ROAD :70 4 P 775 • 335 70 265 F E
0.36 TO 1.06 R/W
Rebuild Road with Cut-bs, Gutters and Sidewalks WORK CODES; BDFO CON.
UTIL CODES; F.A. PROj NO.
-------.
33 oe 15500 LYNCH ROAD
2.95 TO 3.95
Hudson Road to Deer Harbor
Realign and Regrade
1.00 4
250
WORK CODES: ABC
UTJL CODES:
TOT 0
250 950 • - P E
R/W
CON
F.A. PROJ NO.
TOT
34 oe 23910 AGATE ROAD 1.00 4 250 250 50 200 P E
1.55 TO 2.55 R/W
Julian Read to 0.14 miles So. Bertelsen Road WORK CODES ABD CON
Realign and Regrade UT IL CODESt F.A. PROJ NO.
TOT 0
35 oe 51720 JOHNS PRAIRIE ROAD 4 P . 40 40 40 120 120 P E
VARIES • R/W
City Limits to County Shop WORK CODES; ADD CON
Widem in selected areas and A.C. Pavement UTIL CODES; F.A. PROJ NO.
- TOT 0 0
------------
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
MASON COUNTY
p -PROJECT COSTS IN THOUSANDS OF DOLLARS- FEDERAL
R U L M C F 1 OBLIGATION
L N PROJECT IDENTIFICATION E A A U -EXPENDITURE PLAN- ------FUNDS-------1 PLAN
0 CC /DESCRIPTION OF WORK N J R N U
R TL G OW R D 1812ND 38.13 51H TOT LOC RAP FED a 1ST 2,ND
I A T RO Y I YEAR YEAR 4TH 6TH AND OR • fa YEAR -6TH
7 s 8 R N YEAR YEAR OTH UAD O. YEAR
Y 6,,
. K R CA
y .------
--------
36 03 52210 MASON LAKE ROAD .63 4 P :750 350 350 P E
2.19 TO 2.82 R/W
St. Andrews Drive to Ballantrae Drive . WORK CODES; ADDL CON.
Realign and Regrade includes relocating Dridse/Oulvert UTIL CODES; . P.A. PROJ NO.
over Cranberry.Creek and Railroad Underpass - TOT 0 0
--------------- -
77 03 52210 mAsnN LAKE ROAD .88 4 ' P 1713 176 176 P E
2.32 TO 7.70 R/W
Dallantrae Drive to 600 feet past Limerick Road WORK CODES: ABD CON
Realign and Regrade UTIL CODES; F.A. PROJ NO.
- TOT 0 0
• . . .
38 OR 42310 TRAILS ROAD .90 4 250 250 250 P E
2.55 TO 7.45 . R/W
Mile Post 2.55 to 0.10 .Mile So. Mason Lake Drive West R WORK CODES; ABC CON
ealign and Regrade UTIL CODES: F.A. PROJ NO.
TOT 0 0
39 08 70390 NORTH SHORE ROAD 1.00 4 270 270 270 P E
9.63 TO 10.63 R/W
Mile Post 9.63 to Belfair Tahuya Road Realign and Regra WORK CODES; ABD CON
de UTIL CODES; • F.A. PROj NO.
40 oe 79800 BEAR CREEK. DEWATTO ROAD.
6.77 TO 7.65
0.07 E. Panther Lake Road to 0.16 E. Gold Creek Road Re
align and Regrade
.eR 4
250 250 250
WORK CODES; ABC
UTIL CODES;
- TOT 0
FA. PROJ NO.
P E
R/W
CON
TOT
41 07 96140 GRAPEVIEW LOOP ROAD 1.05 4 270 270 270 P E
6.V3 TO 7.98 R/W
*elson Road to G.R. 83 Realign and Regrade WORK CODES; ADD CON
UTIL ODES; F.A. PROJ NO.
- -. TOT 0
42 09 02750 STAR LAKE ROAD 1.10 7 00 100 1100 P E
0.00 TO 1.10
R/W
Cloquallum Road north 1.10 miles. to Country Club Regrad WORK CODES; ABC CON
e, drain and surface UTIL CODES: P.A. PROJ NO.
TOT
0 C)
SIX YEAR TRANSPORTATION IMPROVFME"T PROGRAM 89 TO
MASON COUNT
94
P F 7-PROJECT COSTS IN THOUSANDS OF DOLLARS- Ilk FEDERAL
R U 6 M C F is.i OBLIGATION
I N PROjECT IDENTIFICATION F A A U -EXPENDITURE PLAN- -FUNDS------- 6. PLAN.
• CC /DESCRIPTION OF WORK N J R N 0.
R TL OW R D 1S7 2ND 3RD 5TH TOT LOC RAP FED a 1ST 2ND
T 0 T Pn Y 1 YEAR YEAR 4153 6TH AND OR ilt YEAR -63H
i
-1- S H R • 8 YEAR YEAR OTH UAB fa YEAR
S y G 1'.4
_______ • _ ___
43 09 04670 LITTLE EGYPT ROAD ' 2.00 3 45 90 45 180 180 3 E
0.00 TO 2.00 R/W
Shelton -Matlock Road south to 2.00 Mile Post Reorade, WORK nnDES: ABC CON
drain and surface UTIL CODES: F.A. PROJ NO.
- - TOT 0
44 09 28370 CLAY ROAD .54 3 . eo eo eo p E
o.99 TO 1.53 R/W.
Phillips Lake Loop Road to' Dead End Re53.rage5 drain. and WORK CODES: ABC CON
surface UTIL CODES: F.A. PROJ NO.
- -- . TOT 0 Q
45 o? 5e386 DALBY ROAD 1.02. 3 P leo leo • leo P
0.00 TO 1.02 R/W
McReavy Road to S.R. *106 WORK CODES: ABC CON
Drainage, Widen, Reconstruct intersection with UTIL CODES: F.A.. PROJ NO..
S.R. #106 - . 7 TOT 0 0
49 08 10000 CLOGUALLUM ROAD 1.60 4 P 350 350 350 P E
15.00 TO 1990.R/W
Mile post 15.00 to Cloguallum Creek Bridge WORKCODES: ADD CON
Realign and Regrade UTIL CODES F.A. PROJ NO.
- - TOT _____
Q 0
47 08 10000 CLOQUALLUM ROAD .91 4 180 leo 'BO 53
14.09 TO 15.00 R/W
Mile post 14.09 to mile post 15.00 WORK CODES: ABD CON
Realign and Regrade UTIL CODES: F.A. PROJ NO..
TOT
- -------
48 08 15500 LYNCH ROAD
4.?5 TO 6.85
0.30 N. Bay .East to Totten Shores Realign and Regrade
7H
WORK CODES: ABD
UTIL CODES F.A. PROJ NO.
TOT 0 0
49 08 15500 LYNCH ROAD 2.00 4 360 360 360 P E
6.85 TO 3.85 , R/W
Totten Shores Road to Arcadia Rnad Realign and Regrade WORK CODES ABC CON
UTIL CODES:
F.A. FF:OJ NO.
TOT 0
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 89 TO 94
MASON COUNTY
P r:( E.:,
P P -PROJECT COSTS IN THOUSANDS OF DOLLARS- 6. FEDERAL
11 U L. MCF ill. OBLIGATION
I N PROJECT IDENTIFICATION E A A U -EXPENnITURE PLAN- l'a PLAN
0 CC /DESCRIPTION 0 WORK N JRN [...t
R TL G OW R D 1ST 21410 3951 5TH TOT LOC RAP FED is.,k1ST 2ND
I A T Rj O y 1 YEAR YEAR 4TH 6TH AND OR YEAR -62H
T 8 H R N YEAR YEAR OTH UAB O. YEAR
y s K G 1
50 08 21?10 AGATE ROAD .87 4 R 250 250 50 200 P E •
2.55 TO 3.42 R/W
0.14 So. Bertelsen Rood 14n AC WORK CODES ABD CON
Realign and Regrade UTIL CODES: F,A. PROj NO.
TOT
51 07 29850 PICKERING ROAD .81 4 P 220 P E
220 220
1.64 TO 2.45 R/W
East end of 1984 Project to AC WORK CODES: ADD CON
Realign and Reg-adUTIL CODES: P.A. PROJ NO.
-
__ TOT 0 0
- _
52 os 29850 PICKERING ROAD 1.10 4 270 270 270 P E
.
3.41 TO 4.51 R/W
Hartstene Bridge Road to Scenic View Drive Realign and WORK CODES: ADC CON
Regrade UTIL CODES: P.A. PROJ NO.
- TOT. --7 - (I;
-........_
53 08 50090 BROCKDALE ROAD 1.55 4 p 250
4.96 TO 6.41
McReavy Ro'L.,,td intersection to S.R. #101 WORK CODES: ADD
Realign and Regrade include new Intersection S.R.. #101 UTIL CODES:
54 os .51720 JOHN'S PRAIRIEROAD
3.42 TO 3.90
Capitol Hill Roadto S.R. #3 New Construction•on New Al
ignment
55 oe 52210 MASON LAKE ROAD
3.70 TO 4.98
600 feet past Limerick Road to Emerald Lake Drive Reali
go and Regrade
48 1
250 50 800
F.A. PROj NO.,
P E
R/W
CON
TOT
3sn 350 350 P E
R/W
4089 CODES: ADD CON
UTIL CODES:
1.28 4
.....
F.A. PROJ NO.
TOT 0 0
170 170 170 P E
R/W
WORK CODES: ABC CON
UTIL CODES: F.A. PROJ NO.
. TOT 0
56 08 62310 TRAILS ROAD .80 4 P 250 250 50 200 P E
0.00 TO 0.80 R/W
S.R. 14106 to mile post 0.80 WORK CODES: ABC CON
Realign and Regrade UTIL CODES: FA. 4803 NO.
TOT 0
•_ .. • ••_.__•____
SIX YEAR TRANSPORTATION IMPROVEMENT p966948 89 TO 94 Page
MASON COUNTY
P F -PROjECT COSTS IN THOUSANDS OF DOLLARS- O. FEDERAL
R U L M C F ..I. OBLIGATION
I N PROJECT IDENTIFICATION E A A U -EXPENDITURE PLAN- • FUNDS a PLAN
O CC /DESCRIPTION OF WORK N J R N l'..1.
R TL G OW R D 1ST 201) 39:1) 5TH TOT LOC RAP FED a 168 201)
I A T RO Y I YEAR YEAR 4TH 6TH AND OR 1 YEAR -6TH
T 6 H R N YEAR YEAR OTH' UAB a YEAR
9 8 K 0
57 08 62310 TRAILS ROAD .79 4 P 200 . . 200 200 P F
0,80 TO 1.59 R/W
Mile post 0.89 to Trails End Drive WORK CODES; ABC. CON
Realign and Regrade . UTIL CODES; F.A. PROJ NO.
TOT 0 0
58 08-79800 BEAR CREEK - DEWATTO ROAD .95 4 750 250 250 P E
7.65 9.60 R/W
0.16 E. Gold Creek Road to 0.37 W. -iger Mission Road R WORK CODES: ABC CON
ealign and Regrade UTIL CODES; F.A. PROJ.NO.
- - TOT 0 0
59 08 79e00 BEAR CREEK - DEWATTO ROAD ..97 4 200 200 200 P F
9.75 TO 10.63 R/W
W. end of Chip Seal to Old Bel -fair Hwy. Realign and Reg . • WORK CODES; ABC CON
rade UTIL CODES: F.A. PROJ NO.
- - TOT - 0 0
.
60 08 e0610 ELFENDAHL PASS ROAD 1.65 4 n
. 400 '400 400 P E
0.00 TO 1.85
North Shore Road to Belfair Tahuya Road WORK CODES; ABC CON
Realign and Regrade UTIL CODES: F.A. PROJ NO. ______ __
- TOT 0 ' 0
61 07 90100 SHELTON -- MATLOCK ROAn .47 3 9 .630 630 70 560 P E
0.91 TO 1.3e R/W
City Limits to Goldsborough Bridge Minor Widening WORK CODES; ABD CON
UTIL CODES;
FA. PROj NO. - _
TOT 0
62 07 96140 GRAPEVIEW LOOP ROAD 1.47 4 300 300 300 P
4.43 TO 5.90 R/W
Stor-e to Cronguest Road Realign and Regrade WORK CODES; ABD CON
UTIL CODES: •
F.A. PROj NO.
- • - TOT - 0 0
63'07 96140 GRAPEV I EW LOOP ROAD .83 4 200 200 200 P E
6.10 TO 6.97 R/W
Cronquest Road to Nelson Road Realign and Rode WORK CODES; ABD CON
UTIL CODES; F.A. PROj NOK .
i - - TOT 0 0
SIX YEAR TRAwoponTATzow z!`,pRovE,,,smT pF:ooni�)M To 94 page 1u
��aow ooumTv
p � -pnOjEoT COSTS IN TmzuoAmoS OF oou-ARs- u �EoEnm-
R u L m o F u ooLzoATzOw
z m PRoaccT zoEwTzFzoATzom A A U -sxpEwozTURE PI -AN- u pLow
u CC /m=SCRI.rTIum OF wuRn m- ^ x m u
R Tl- o ow n o IoT 2wo 3Ro 5TH TOT Loo RAP FED u
z A T f--�o v z YEAR YEAR 4TH 6TH AND OR u
T o H R w YEAR YEAR oTH uAa u
v s K s u
64 19 512uu zeLAwo ���� no�o .�� � 110 110 zzn
o'VV To 0'53.
Shelton springs Road'to Island Lake Drive Realign and R woR!::� 000Eo" Aso
egrade uTzL cooEs: F.A. pRoa NO.
- -___ TOT o "
65 19 513*0 zaLAmo L.ql,:::E DRIVE .74 4 150 15* 150 p E
0.44 To z.io R/w
Brocxdaze Road to island Lake Road Realign and �egrade CooEs, ABC com
zsT 2wo
YEAR -6TH
YEAR
66 op 6049u nAoow LAxE DRIVE SOUTH
o'oV To 0'73
Fas6n Lake Road to mason Lake Court Realign and Regrade
'73 4
pE
R/w
oow
F.A. pno3 NO.
- Tor *
ISO 180 zau p E
R/w
woM::� cooEs: Aso oom
uTzL 000Es: F.4. pRoa NO.
67 *9 6758,o onzvE '07 4 70 70 7o P E
CR'owm OF H1.1 1 R/w
Reconstruction of Crown Vertical To improve sight �-Jista ooDEs: ABC Com
nce uTzL, CooEo: F.A. pnoa NO.
--------------------------------------------
6o 09 o6o7o SAmo Hzu- ROAD 1'33 4 p rwo 300 300 P E
n.uo To 1.33 R/"Al
to mize post I wo000E'n': ABC cow
neazign an.". �egra�Je uTzL 000Eo: F.A. Fnoa NO.
- - ToT
... _..... ... .... ... _..... ..... ______________.... .... ... ____.... ... ______.... _..... _..... .... .... ......... ..... ..... ___
'---------------------------------------..... .... --.... ..... -... ..... ....
69 09 aAmo *zu- 1.33 p oon :,�oo : on p �
1'33 2.W..) n/w
From mile post 1.33 Uo Transfer Station Bo oow
Realign and Regraue uTzL cooEQ. F.A. p503 NO.
- - TOT V o
__..... _--- --- ___________-__________________--__________________________.... ........ __... ..... .... __-_____________-_____________________
70 (DR 20190V onEaTvzEw onzvE 2.02 4 400 400 400 p E
0.00 To 2.02 R/w
Agate Store t-o o,ive Realign �'-,egrade woM::: oODEs: ABC CON
uTzL CODES- F.A. pRoa NO.
- - TOT o o
---
____________________________________________________________________________________________________________________________________
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 89 TO 94 Page 11
MASON COUNTY
--------.-------------------------------H---=======================================================,------------------
P F -PROJECT COSTS IN.THOUSANDS OF DOLLARS- 6. FEDERAL
R U L MCF 6 OBLIGATION
I N PROJECT IDENTIFICATION E A A U -EXPENDITURE PLAN- FUNDS------- 6. PLAN
0 CC• /DESCRIPTION OF WORK 9 JRN 6 R TL. G OW P. D 1ST 2140 3RD 5TH TOT LOC RAP FED 6 1ST 2N0
I A H RO Y I YEAR YEAR 4TH 6TH AND OR 6 , YEAR -6TH
T 13 H R N YEAR YEAR OTH UAB .6 YEAR
K 9
71 08 23910 AGATE ROAD (f' 4 195 195 195 P E
3.76 TO 4.55 R/W
Agate Store to Libby Road Realign and Reg :' WORK CCDFS ABD CON
UTIL CODES; .
A. PROj NO.
--
TOT
.-----.
72 oe 28850 PICKERING ROAD .84 4 P 220 220 220 P E
4.51 Ti; 5.35 r
Scenic View Drive to Schneider Road WORK CODES ABC rnN
Realign and Regrade .UTIL. CODESP.A. PROJ NO.
TOT 0 . 0
---------
73 00 28050 PICKERING ROAD 9C 4 250 250 250 P E
5.35 TO 6.24 R/W
Schneider Read to Benson Loop Road WORK CODESABC cnN
Realign and Regrade UTIL CODES: F.A. PROJ NO. •
TOT - 0 0
74 OS 41640 SKOKOMISH VALLEY ROAD .75 3 ' 120 120 120 P E
0.00.TO 0.75 R/W
S. #101 thru -First Curve Minnr widen, Relax +irst Cur WORK CODES ABD CON
ve UTIL CODES', F.A. PROJ NO.
•
TOT 0 0
75 oe 44200 LAKE CUSHMAN.ROAD 1.60 4 730 730 730. 9 E •
- 1.40 TO 3.00 R/W
Realign and Redrade WORK CODESABC CON
UTIL CODES: F.A. PROJ NO;
76 08 44200 LAKE CUSHMAN ROAD 1.65 4 •
2.96 TO 4.61
Golf Course Road. to Cushman Resort Road Realign and Reg WORK CODES: ABC
r'ade
TOT 0 0
730 730 730 P F'
R/W
CON
----------
UTIL CODES: F.A. PROJ NO.-
- -_ TOT 0
77 00 62310 TRAILS ROAD. .96 4 250 250 50 200 P E
1.59 TO 2.55 R/W
Trails End Drive south to Mile Post 2.55 Realign and Re WORK CODES', ABC cON
grade UTTI CODES', P.A. PROJ NO.
- TOT 0 0
-------------------
SIX YEAR TRANSPORTATION IMPROVEMENT PROORAM 99 TO 94
-MASON COUNTY
Page
P F -PROJECT COSTS IN THOUSANDS OF DOLLARS- 6. FEDERAL
R U - , M C F 111. OBLIGATION
I N PROJECT IDENTIFICATION E A A U -EXpENDITURE PLAN- ------FUNDS, PLAN
O CC /DESCRIPTION OF WORK N J R N O.
R TL G OW R D 1S1 2ND 390 5TH TOT LOC RAP FED 5 1ST 2N8
I A T RO 7 I YEAR YEAR 4TH 6TH AND OR 5 YEAR -6TH
S H R N YEAR YEAR OTH UAB ill. YEAR
Y S K 9
•
78 07 v6140 bRAPEVII,JA! LOOP ROAD 'J.. I b 4 250 250 250 P E
1.62 TO 2.73. R/W
Stadium.Deach Road to Murray Road South Realigm and Reg WORK CODES: ADD CON
rade UTIL CODES: PA. PROJ NO. ......____
- - TOT 0
L._
79 07 96140 GRAPEVIEW LOOP ROAD .72 4 '250 250 50 200 P E
2.78 TO 3.50 R/w
R .. c-, 1.- fr 'r--,Tbr.r, Road Rehlign and Regrade WORK CODES: ADD CON
UTIL CODES:
A. PROj NO.
- - TOT 0 0
SO 07 96140 GRAPEVIEW LOOP ROAD .93 4 250 750 50 200 P E
3.50 TO 4.43. R/W
Lombard Road to Store Realign and Regrade WORK CODES: ABD CON
UTIL C00ES,.1 ' F.A. PROJ NO.
TOT 0 0
91 09 39410 WINSART ROAD .-52 4 130 130 130 P E
0.00 TO 0.52 R/W
North Island Drive to Thrrell COVE StatePark Realign a. WORK CODES: ADC CON
nd Regrade UTIL CODES: F.A. PROJ NO.
- - TOT C.). - 0 ___
82 09 e6070 SAND HILL ROAD 1:.28 4 P 300 300 300 P E
2-66 TO 3.94 R/W
Transfer Station to Delmore Road wnsK CODES.: ABC CON
Realign and Regrade • UTIL CODES: F.A. PROJ NO.
- TOT o o
83 09 86070 SAND HILL ROAD 1.88 4 P 400 400 400 . P E
3.94 TO 5.82 R/W
Delmore Road to Bear Creek - Dewatto Road WORK CODES: ABC CON
Realign and Regrade UTIL CODES: F.A. PRnJ NO.
TOT 0 0
84 NEW ROAD FROM S.R. 5102 TO BROCKDALE ROAD 2.00 I 590 590 590 . P E
R/W
A New Road from S.R. 5102 east to Drockdale Road. To pr WORK CODES: ABD -CON
ovide a direct route to and from U.S. #101 and -Mason La
UTIL CODES: FA. PROJ NO.
ke area. 6 bypass of the City of Shelton. TOT 0 0
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 89 TO 94
MASON COUNTY
'.. .....
P F -PROjECT COST& IN THOUSANDS OF DOLLARS- l'.A FEDERAL
R U L M C F 6. OBLIGATION
I N PROJECT IDENTIFICATION E A' •A U -EXPENDITURE PLAN- FUNDS. IsJ. PLAN
O Cp DESCRIPTION OF WORK N J R. N C.J.
R TL. 9 OW R D 1ST 2ND 390 5TH TOT LOC RAP FED 6. 1ST 2ND
I A T RO Y 1 YEAR YEAR 4TH 6TH ANp OR f'..E. YFAR -60H
T S 1-1 R N YEAR YEAR OTH !JAB II!. YEAR
85 NEW ROAD FROM S.R. 11110 ukAPEVIEw LuuP KOAD 5 89 1 460 460 460 P E
R/W
From S.R. *3 east to the Grapeview Loop Road (Fair Hart) WORK CODESABD CON
or Marina) UTIL CODESg
... --------
A. PROJ NO.
TOT 0
86 NEW ROAD FROM JOHN'S PRAIRIE ROAD TO MASON LAKE ROAD 1.00 1 750 350 350 P E
R/W
.0.30 miles east of railroad tracks on John 's Prairie Ro WORK CODES; ADD CON
ad to area of Mikkelsen Road on Mason Lake Road
UTIL CODES; F.A. 9903 NO.
TOT 0
87 09 47100 TERRACE ROAD .70 1 220 220 220 9 E
R/W
Improve access to U.S. #101 from plats. of Canaj View Te WORK CODESABC CON
rrace and White Starr. UTIL CODESF.A. PROJ NO.
TOT 0 0
e8 09 86700 ROY.BOAD ROAD EXTENSION .30 \I. 230 230 230 9 E
END OF ROY BOAD ROAD TO S.R.,, #3 R/W
New construction to provide improved traffic movement b WORK CODESt ADD CON
tweenSR. 413 and S.R #300 UTIL COES .A PROJ NO.
- - TnT o 0
89 09 11600 STORY ROAD EXTENSION 50 1
END OF STORY ROAD TO CLOOHALLUM ROAD
New. construction from end 61: Story Road to Cloquall.um R WORK CODESADD
oad to. provide access to U.S. #101 UTIL CODES;
.780 780 780
9 E
R/W
CON
P.A. 99.O3 NO.
- - TOT 0 0
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 89 TO 94 Page 14
MASON COUNTY
SUMMARY OF COSTS BY FUNDING CATEGORY
FUNDED PROJECTS
UNFUNDED PROJECTS
. (Proposed and Unknown)
Total s
Totals
O it a
EXPENDITURE PLAN FUNDING PLAN
6 is i`t
FEDERAL OBLIGATION PLAN
1st Year- is Local 0 1st Year Rem Years All Years
la 2nd Year 6 RAF is P E 0
0 .3-4 Yer 6 UA2 la. rj/W
5-6 Year :i Fed. a CONST t
O. is
17,
6 1st Year 4275 it Local. 22808 0 1st Year Rem Years All Ye: -
6 . 2nd Year 3906 6 RAP 2160 0 F' E 12 0
6 3-4 Year. 9200 i UAB • 265 • 6 R/W 0 t 0 0
O L -6 Year 91 +�0 i i, 1 27588588
'.t Fed. i8 r:.t CONST 0 ..�
6 •la a
TOTAL ALL PROJECTS
Total s ...
•2651 1 26511 400 • 11 600
i_l' 1st Year 4275 tt Local 22S0rl 6 1st Year Re.rn Years All Years
O 2nd Year. 3906 la RAF' 2160 6. 2 E 12 0 12
6 3-4 Year 9200 la ' UAB 265 tt 2/8 0 0 0
el 5-6 Year 9130 a Fed.- 1278 d CONST 588 0 528:
ra • 6 6 -
26511 - 26511
---------------------------------------
6_;C,
0 6_0
WHEREAS, in compliance with R.C.W. 36.81,121 and W.A,C. 136-14, the Board of Mason County Commissioners hereby certifies that a priority array
of potential projects on this County's arterial system was prepared by the County Engineer and available to the Board of County Commissioners during the
preparation of a proposed six (6) year comprehensive road construction program for the period January 1, 1989 through December 31, 1994; and,
WHEREAS, in further compliance with said law, the Board has held thereon a public hearing this 16th day of August, 1988, to consider same;
NOW THEREFORE, BE IT HEREBY RESOLVED by the Board of Mason County Commissioners, in regular session assembled, that the attached Six (6) Year
Construction Program for Mason County roads be adopted as set forth in detail, for the period mentioned, consisting of pages numbered 1 through 14,
which are incorporated and made part of this Resolution.
PASSED AND UNANIMOUSLY ADOPTED this 16th day of August,, 1988.
D OF MASON C
Chairperson
MISSIONERS
er 2nroer