HomeMy WebLinkAbout27-89 - Res. Assigning County Road Project NumbersRESOLUTION NO 27-89
BEFORE THE BOARD OF COUNTY COMMISSIONERS of
MASON County, Washington.
In the matter of initiating county road projects and assigning CRP numbers.
IT IS HEREBY RESOLVED THAT the roads listed below be improved as shown between the points indicated.
These projects are hereby declared to be public necessity and the county road engineer is hereby ordered and authorized to
report and proceed thereon as by law provided. (RCIv 36.75.OS0. 36.80.030. 3n.R0070) (Optional Rcfcrcncrsj.
•
IT IS FURTHER RESOLVED that appropriations from the officially adopted road fund budget and based on the county
engineer's estimates are hereby made in the amounts and for the purposes shown:
(1)
12)
I71
(4)
(5)
I6)
(7)
MI
MI
NAME NAE AND/OR
BRIDGE NUMBER
ROAD
LOG'
NO.
TYPE OF
WORK
(S4• Cod.I
C
NT
T
AProg.
A
C
T
�
i
COST ESTIMATE
ENGIN.
ITHOUSANDSI
CONSTRUCTION
Annual
Const.
Item
No
CRP
No.
M.P. TO M.P.
R.O.W.
FEDERAL
LOCAL
ELFENDAHL PASS ROAD
DEWATTO ROAD
CAMAS DRIVE
DANA DRIVE
HARTSTENE ISLAND SOURTH
SPENCER LAKE ROAD
80610
76080
30380
31110
31110
28240
1.85
3.10
0.00
5.08
4.27
1.88
3.50
3.73
0.46
5.70
5.08
2.45
D-3rd Sh.
D-3rd Sh.
D-3rd Sh.
D-3rd $h.
D-3rd Sh.
D-3rd Sh.
X
X
X
X
X
X
16.5
6.3
4.6
6.2
8.1
5.7
2
2
2
2
2
2
1167
[168
116'C
117C
1171
1172
1,4) TYPE OF WORK CODE
A. PRELIMINARY ENGINEERING
S. RIGHT•OF•WAY
C. GRADING.DRAINING.SURFACING
O. LIGHT BIT SURF. TREATMENT
E. A.C. OR P.C.C. PAVEMENT
F. CURBS & GUTTERS
G SIDEWALKS
H. TRAFFIC FACILITIES
1. BRIDGE CONSTRUCTION
J. PATI{, &TRAILS RCW
47.301
ADOPTED this 14th day of March, 1989
ATTEST
Clerk of the Board
cc: Co. Commissioners
Engineer
JOURNAL: Publ. lt.,
3/23
(5) The construction is to be accomplished by contract
in accordance with RCW 36.77.020 et. seq.
(6) The construction is to be accomplished by county
forces in accordance with RCW 36.77.060 and WAC
136-18.
BOARD OF COUNTY COMMISSIONERS OF
(.Bill Rd. Dept.)
MASON COUNTY, WASH.
Member