Loading...
HomeMy WebLinkAboutBLD2008-00832 Cancelled SFR - BLD Inspections - 12/8/2023 GAELLIr CONCRETE MECHANICAL MANUFACTURED HOME C) Footings I Setbacks Date By Ribbons CO) Gas Piping X C) lntwiof Date By Inten or-Date By Date By M C) 00 Exteror Date By Exterior-Date By N) INSULATION Set-up Point Load I Isolated Footings Dt.MANUFACTURED HOME > Date B y EG I SLAB INSULWTION I - --I DOW By FIRE DEPARTMENT Foundation Walls; Floors 001c By Date BY Onto By DECKS FRAMING Wallis Date By Date By Data By PROPANE TANKS PLUMBING Vault Date 13Y Date By OTHER Groundwork Attic Date By Date By Type, Date ay DWV DRYWALL Type- Dete By Date nt. Brace Wall Date gyE Date sy FINAL INSPECTION 0 CD Water Line Fire Separation r_j CD Date By Date By Datu By Q CD OD 6 — Pass or Request Inspect. 0 CD Type of Insp. Fail Date Date Done By Comments co 5 - __ W CD hi 6 0 _dw 16A CD Cn LI 0 =3 Wnd D-,-) Dluabjo'� _71 M'n V-xt JCSO)rf- -10/q113 j0jq113 Ply OA OL4 fu .vy 41-7/17 Lf 101-7 MM ktalf(ld fewle .0141lb- -F"* /a-15 T�rz jjA16V IZI 0 0 PCX T_ � A'v Y Awr/01A_ Ac,'Tlex�' tvle L- ' rjjbWK- �VZ71tf Ido ,)pv,5" _,_6 6A,(_ t,,It4j.2.1 ln�ll¢�L� r � rnech �a; I - �10.4 scu.sscd A4-) ct I °� S o der n� f `�ee- MASON COUNTY 360-427-9670 Shelton ext.352 COMMUNITY SERVICES 3360 48-269 Erma ext.352 Inspection Hotline 360-427-7262 Building,Planning, Environmental Health,Community Health • 615 W.Alder St. Bldg. 8 - Shelton,WA 98584 www.co.rnason.wa.us CORRECTION/INSPECTION REPORT PERMIT/CASE NUMBER:ADDRESS/LOCATION: �( lYll��efSyGt Pei oS4/4 1 FINDINGS: V1-o &rk,,cc .50 A•.c ` ,A .`r ,-S cv 00 ,k ..+< vc 1 �o cc� -I:-vf 1, J o I J oG� 4ex C 4-R r C� Items listed above must be corrected to gain compliance. ❑ THIS IS NOT A COMPLETE INSPECTION ❑ This structure has been inspected by Mason County Building Department and the items listed above are in VIOLATION of Mason County laws and/or ordinances. ❑ Call for re-inspection when corrections are made before proceeding with any further work. `Make corrections, items will be checked on the next inspection. ❑ OK to Date: "t �Z ` ❑ Please contact our office regarding possible Department: structural damage incurred by recent "natural/man made"disasters.This is NOT a Inspector: CORRECTION NOTICE. DO NOT REMOVE THIS TAG MCC14.12 Dave Kuzawa From: haskellshollows@netzero.net Sent: Friday, October 23, 2020 2:20 PM To: Dave Kuzawa Subject: Building Update 565 E. Mikkelksen Rd. Shelton, WA Hi Mr. Kuzawa I wanted to let you know in writing regarding the progress I have made on my building permit BLD2008-00832 at 565 E. Mikkelsen Road,Shelton,WA 98584. In October 2019,you and a woman came to my property for an inspection. I told you that I was going through a divorce and my soon-to-be ex-husband was still living in my old house at 561 on this same property. I was living in our 30 foot Prowler trailer behind the 565 house being built. You informed me that there would not be any future requirements for inspections every 6 months, but to call you when an inspection was ready at a cost of$80. Also,you would be the only one I should contact for any future questions or inspections. On November 13, 2019, my divorce became final. My now ex-husband moved out, and I moved from the Prowler trailer into the 561 house and started to organize everything. In April this year, I believe I called and left you a message about some of the work I was doing. But, mostly it has been to clean up around the exterior yard of the 565 house and dispose of items of no use or garbage. I have been working on a "TO DO" list and it just keeps growing. It is helpful so that I can prioritize and focus on what needs to be done. I had to take apart the garage door because it was not installed correctly and was not functional. I can now park my Honda Fit and Dodge Ram truck in the garage,out of the weather. All material and garbage that was being stored under the front and back porches have been removed and taken to the dump. Several windows with wood or aluminum frames that were being stored against the back wall of the 565 house, as well as other items, have been removed. The glass was removed and taken to the dump. The aluminum frames were added to other aluminum stacked away from the 565 house. I plan to recycle all the aluminum at a later date. The wooden window frames were set aside to be disposed of, at a later time. I have taken inventory of all the materials I will be using to complete the 565 house. Some materials will be donated because I believe they are not needed or I do not want them. For the most part, I have replaced tools that my ex- husband took. What tools he left were trash or too rusty to use. Also, I had to spend a lot of time cleaning out the 561 house before I could moved in. Now that the weather is changing, I plan to work more inside the 565 house. But, last year after a heavy rain, I noticed that the basement was getting outside drainage in the back left corner that is up against the hill, despite a French drain that was installed around the base perimeter stem wall before filling in with pea gravel. When I was cleaning up the backyard around the 565 house, I found several rugs that had been laid down from the garage door to the Prowler trailer. Apparently, over the years,the rugs became covered in dirt, grass, and small wild strawberry plants, and the rugs seemed to have disappeared. I believe that, eventually,the rain was not able to drain through the rugs, and the rugs became hard packed. The heavy runoff of rain and the slope went directly towards that corner of the 565 house basement. Also, I could not find the opening of the French drain that exits to the front of the house, and there is no ditch to deter this excess run off. I have removed all these rugs and taken them to the dump. I will be monitoring the basement this winter in the hope that I have solved this problem. I will also be trying to find the exit opening that should be close to the front of the house on the West side, and the stem wall is still open partly on that side due to drain 1 pipes from the house to the septic tank.Also,there are electrical lines and a water line connected to the 5th wheel and the Prowler trailer(currently all shut off). After you made the suggestion, I contacted an HVAC person who came out. We talked about the furnace for the main floor,the attic furnace for the bedrooms, and the heating duct materials that I already have. He said that everything was OK, except the furnace in the attic would need to be replaced as it is going in the wrong direction. I plan to remove it, but keep it for spare parts as it is identical to the one for the main floor. He also said I could extend the heating ducts into the Recreation room by reducing the size of the ductwork to a 6" pipe, rather than putting in a wood stove or any electrical heat. He assured me that my heating ducts are sufficient in size. He suggested that I insulate the heating ducts at the same time as they are installed. We talked about the intake for the main floor furnace, a new door to the front of the furnace, and how it should all fit. I have a stick that has been used to mark where to install the electrical boxes around the perimeter floor of the main floor. I will use it when I to do all the upstairs bedrooms. The placement for the light switch's is easy. However, the electrical in the kitchen is not complete,yet. The drain pipe is mostly done and connected except for the bathroom to the Recreation room. However, I have not checked to see if I need any cleanout access openings installed in the basement. I have taken measurements for the washer/dryer,toilet,sink and full shower for the bathroom in the Recreation room. I am trying to figure the best way it will all fit in the space already built, and how the drain pipe will go, and the direction. I believe I have covered all that I plan to complete by the next inspection. I am open to any suggestions you may offer. I am appreciative of your time. Also, I am requesting that you respond to me by email, so that I can respond to you in a timely manner. Respectfully yours, Pat Haskell Homeowner of 565 E. Mikkelsen Road. Sponsored by https://www.newser.com/?utm_source=part&utm_medium=uol&utm_campaign=rss_taglines_more First US Nest of Murder Hornets Found,Thanks to Dental Floss http://thi rd pa rtyoffers.netzero.net/TGL3241/5f93492beb8f5492b34c7st0lvucl County Hit by Surge Ends Mask Mandate http://thirdpartyoffers.netzero.net/TGL3241/5f93492cld28d492b34c7st0lvuc2 Biden's Oil Remarks Are Resonating http://third pa rtyoffers.netzero.net/TG L3241/5f93492c416a b492b34c7st0lvuc3 2 Request To Revise AnApproved Plan Permit Number: BLD2006 -0a8 2. Name aGV_L_ Parcel Number3 21 3 _- QQ Phone Number daytime ( ) 4ai,o Project Address Mailing Address !A�,d (28 ZH Please provide a complete, detailed description of the proposed revisions to the approved plans: O -- Are two sets of the revised plans or addendum indicating the changes included? "M Yes ❑ No Are the approved site plans included? `Q Yes ❑ No Are the revisions clearly and accurately identified on the plans or addendum? '-411 Yes ❑ No Does the plan contain an engineer's or architect's lateral or vertical analysis? "W Yes ❑ No If Yes,Has the engineer or architect approved this revision? _`9 Yes ❑ No Is a stamped and signed approval included with this request? ❑ Yes ❑ No (Note:No structural changes to a"designed"plan will be approved without the written consent of the engineer and/or architect of record Does the proposed revision modify the footprint or location of the structure? ❑ Yes tee► No If Yes, Is a revised site plan, with all new setback dimensions included with this request? ❑ Yes No Additional Information: Applicant's signatur Date: Office Use Only Received by: Date Sent Assigned To Approved By Date Original Valuation: $ Additional Valuation: $ p Sq.Ft. x$ $ Sq.Ft. x$ $ LWEE.. Total New Valuation $ Additional Fees: Additional Planning Dept. $ Additional Plan Review $ Additional Conditions/Comments: Additional Building Permit $ Additional Plumbing $ Additional Mechanical $ Additional E.H. Dept. $ Other $ Total Amount Due: $ Amount To Be Paid Up-Front$ FLOOR' _ !� f F - r L } S s i Vl- 511 j d e r. SUPPOR7�r For lu 4:)P, I: sW tom- ;.���, rJG let-�'• IW`1���- i" �� ,. f�:�� g + r" t v NOT %o SCRLE �: ��.w����z��i` , X I „ flp I Loop- YO 5 t i l I t _ SVpoi� 7°.a r—Vie Ala' 5 Z .A v L t,.,.rt--D ws z L V ,7 MC SQUARED, INC. Job: 'OLYMPI(�)764-339 N 98506 Date: Z I�`� 13 • c1(b B® FAX(360)362-2044 Sheet: page of -4 IjAm , i , I7 1i I i , i 7 � _j— T i i iry i — ._,.__;!-__-.'c--•-�---"---•-�".--r--i'-'•-••�---'-�-- -i._.�_--Tom..._..,_._.._;.._ �_-F__...+..�_.1__ .�.__ 4 ._..._I_...._a__.�. i _ _ : : i L 'J 7 f ' x- -�- ' i 1 , _ _._..,tom..--.I---'�.--� � � ;----=--•.i----� i— 1 f � ; i _ . , 1 i + i AL- r _.._.' --- — -_j-___.{.-_. _._.�._... j. ���_...•�—__. �•—._ --�---�--- � —11 s -i i —�--_---- --�----+---_. i 3 i t i i i i MC SQUARED, INC. Job: k �LAL 'OLYMPIA, WASHINGTON 98506 (360) 754-9339 Date: By: FAX(360) 352-2044 Sheet: Page of 77 L ............. I..... 1 UP 4-- __4 T_ —7 -4 L-7 4- MC SQUARED, INC. Job: l�As raw 'OLYMPIA, WASHINGTON 98506 (360) 754-9339 Date: By: FAX(360) 352-2044 —� Sheet: Page �l . . i _ I 1 _ _ tie �. 1 i ' 1 ' L.9 S _ Z I L i i r t 1 — — 111 I E ', 3 I_ 111 ' i --. ... -- 1 MC SQUARED, INC. Job: P�� � OLYMPIA, WASHINGTON 98506 (360) 754-9339 Date: By: FAX(360) 352-2044 t Sheet: Page � of 1 t __ A( 4j� i ' I i ! ; 4 T { _1 L - ! i _+ _ j I ---t j I IVIC SQUARED, INC. Job: aw 'OLYMPIA, WASHINGTON 98506 (360) 754-9339 Date: By: FAX(360) 352-2044 Sheet: Page of 20 w f_vl- re r ?4 4, 4- -4- t 0 L • 4 ... ............ -24 4A • ------------ Ti i _j i s?" 41 1 Al f 71- T til __TT] MC SQUARED, INC. Job: - 'OLYMPIA, WASHINGTON 98506 (360) 754-9339 Date: By: FAX(360) 352-2044 `` II Sheet: Page V of : o ! !�.► ! QI" IS A1J I : Ll f I I4- Moy � 11 , i i i 3 I I I y -t----, �--- I � - 1 1 � It 1 i _ ILA 1.3 is ( —I 4- ! i 1 ' ••--�----�.----�-- ! � - + � -�_ __��-_ Tom'-" i _ � � r i i I , - MC- ( -U 4-R-ED,-INC. —mob: •OLYMPIA, WASHINGTON 98506 (360)754-9339 Date: By: FAX(360) 352-2044 Sheet: Page of� 1 i t — i ' ._.. i : - F ; ( _ i ( � G , i I UIVR I i 4 i 1 I 1 ti i t I i ; Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, WA 98584 RESIDENTIAL BUILDING PERMIT BLD2008-00832 OWNER: PAT HASKELL RECEIVED: 7/7/2008 ONTRACTOR: LICENSE: EXP:E ADDRESS: 565 E M KKELSEN RD SHELTON CANCELLED ISSUED:EXPIRES: 3/29/200 SITE 9 /29/2009 PARCEL NUMBER: 321341390050 LEGAL DESCRIPTION: TR 5 OF SW NE S 8/32 LOT: 2 SP#783 PROJECT DESCRIPTION: DIRECTIONS TO SITE: Complete Construction of SFR. HWY 3 TO MASON LAKE TOWARD LAKE LIMERICK RIGHT ON MIKKELSON RD .5 MILE TAKE LEFT GO TO END OF DIRT ROAD. General Information Construction &Occupancy Information Square Footage Information No. of Bedrooms: 4 Type of Constr.: V-B Type of Use: SF Insp.Area: No. of Bathrooms: 3 Occ. Group: R-3, U-1 Lot Size: Deck: Type of Work: NEW Fire Dist.: 5 No.of Stories: 3 Occ. Load: Building:2,582 Garage-Attached 598 Valuation: Building Height: Occ. Status: Basement:992 cov. decks 272 Manufactured Home Information Setback Information Shoreline&Planning Information Water Body: Make: Length: Ft. Front: Ft. Shoreline: Ft, SEPA?: Rear: Ft. Slope: Ft. Shoreline Desi Model: Width: Ft. Side 1: Ft. g Year: Serial No.: Side 2: Ft. Comp. Plan Desig.: Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Dishwasher 1 Exhaust Hood 1 Building Pre-Site Inspection KKK 7/7/2008 $68.00 S22008000 Kitchen Sink 1 Furnace<100K 2 Building Pre-Site Inspection KKK 7/7/2008 $68.00 522008000 Lavatories 3 Gas Outlets 4 EH Plan Review KKK 7/7/2008 $40.00 S22008000 Showers 1 Propane Tank 1 Building State Fee RTB 7/24/2008 $4.50 S12008000 Water Closets (Toilets) 3 Ventilation Fan 3 Mechanical Base Fee RTB 7/24/2008 $26.60 S12008000 Water Heaters 1 Woodstove 2 Plumbing Base Fee RTB 7/24/2008 $23.10 512008000 Bath Tubs 2 Dryer Vent 1 Building Permit Fee RTB 7/24/2008 $1,307.05 S12008000 Clothes Washer 1 Mechanical Fee RTB 7/24/2008 $270.90 S12008000 Plumbing Fee RTB 7/24/2008 $77.30 S12008000 Plan Check Fee RTB 9/16/2008 $612.00 S12008000 Water Adequacy Plan Review PJO 9/24/2008 $40.00 S12008000 EH Plan Review PJO 9/24/2008 $60.00 S12008000 Total $2,597.45 BLD2008-00832 Please refer to the following pages for conditions of this permit. 1 of 5 CASE NOTES FOR BLD2008-00832 CONDITIONS FOR BLD2008-00832 1) All other necessary permits from Mason County, Washington State and/or Federal Agencies that are rrpquir d for thi jproposed development and construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION. X 2) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-098 The pers n signin this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X �Q 3) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Depart�m�ent prior to any further inspections being performed or approvals granted. X EI-b , 4) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X 4t a a 5) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or Xremoval approved documents will result in failure of required building inspections. 6) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X �Ti� •��1%I 7) Washington State Energy Code Compliance has been approved using the following: Heat Type: Electric or other fuels, Compliance Method: Prescriptive option IV, Window(Max U-Factor):0.35, Skylight(Max U-Factor):0.58, Doors (Type/Max U-Factor):0.20 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation R-38, Vault Insulation R-38 (see exception), Slab Insulation R-10. Exception: R-30 insulation may be installed, up to 500 sq. ft., in single rafter or joist vaulted ceilings where the distance of the top of the ceiling and the underside of the roof sheathing is less than 12-inches and there is 1-inch vented airspace above the insulation. BLD2008-00832 Please referto the following pages for oonditions of this permit. 2 of 5 8) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other -vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2). X 9) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and s all be collected by the Building Department prior to any further inspections being performed or approvals granted. X 10) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revoc ion. X 11) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project.p� X 12) All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County X rdinance or regulation must be reviewed and approved by Mason County prior to construction. �z 13) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. X 14) All propane tanks must be installed in accordance with the International Fire Code and all applicable Mason County ordinances. All propane tanks filled on site must be located a minimum of 10' from any possible source of ignition (electrical outlets, electrical fixtures, compressors, etc), mechanical system air intake (direct vent appliance, ventilation air intake, etc), and/or any weeds, grass, brush, trash or any other similar combustible materials. Propane tanks less than 125 gallons must also be located a minimum of 5' from any building opening (foundation vents, windows, doors etc). Setback to the public way, or access easements shall be the greater of 25-ft or as specified in the Mason County Development Regulations. Setback to property lines shall be the greater of 5-ft or as specified in the Mason County Development Regulations. If a propane tank is exposed to probable vehicular damage, protective bollards must t3,e .2alled. BLD2008-00832 Please refer to the following pages for conditions of this permit. 3 of 5 15) All propane tanks must be installed in accordance with the International Fire Code and all applicable Mason County ordinances. All Propane tanks -between 125 and 500 gallons must be located a minimum of 10' from any building, possible source of ignition (electrical outlets, electrical fixtures, compressors, etc), and/or any weeds, grass, brush, trash or any other similar combustible materials. Setback to the public way, or access easements shall be the greater of 25-ft or as specified in the Mason County Development Regulations. Setback to property lines shall be the greater of 10-ft or as specified in the Mason County Development Regulations. If a propane tank is exposed to probable vehicular damage, protective bollards must be installed. L X 16) All propane tanks must be installed in accordance with the International Fire Code and all applicable Mason County ordinances. All propane tanks must meet the in2t�latbon requirements and minimum setbacks as listed in the Mason County Fire Marshal's Standards for the Installation of Propane Tanks. X 17) Fuel piping shall be inspected after the installation of fuel piping is complete, and before the attachment of fixtures, appliances, or shut-off valves. At the time of inspection the test pressure shall be no less than 10 psi held for no less than 15 minutes. Appliances to be attached to the fuel piping system shall not be used until the final inspection has been performed and approved by a Mason County building inspector. X 1L 18) The placement of small propane tanks are not normally subject to a permit review by the Planning Department; however, propane tanks are subject to Planning Department regulations. Such regulations primarily consist of setbacks from shorelines and features considered to be critical areas (streams, wetlands, slopes, etc.) If you think such features exist on or nearby your property, please contact the Planning Department so that exact setback requirements can be determined. X ��,(�.. 19) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Xason County or � es and building regulations. 20) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit (older have prevented action from being taken. No more than one extension may be granted. 21) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. X ipe 1L 22) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan" to ensure these structures meet the setback conditions listed. Xe�A 23) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your ;Approved Site PI n"to ensure these structures are shown and meet the setback conditions listed. 77T.' BLD2008-00832 Please referto the following pages for conditions of this permit. 4 of 5 thisperm it bpoomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of works by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property a tructure for review and inspection. OWN ER OR AGENT: DATE: BLD2008-00832 Please referto the following pages for conditions of this permit. 5 of 5 arc\��•�,il �.r, y < ��_ `��y-�,�' , _.�--- j.•. �, II' I I.N a.. - 1 .•. - ., , p _ � ..�-�m►. _._.. �. r �"ems q;' � S r I d1 _ s r'J 1 - S (r 1 � I ��a i '+fir. � •"�t � •��i� � wF��%i. i y I t v' I. S Yr r c " i o- r. : i a • � r.n•anatl' - �"i�:i ate' r ly,;ir1� ..,. i ✓�,... • S qq �f> A �t �M i< ���`� � '. � } •. / >...� � 1. ��, � �� r. f� • r ax~, r � ! 1 .. .S t � � r � r l f3+ --------------- r F�.. r, ,r a:. s a �y 1 d , S iw. y tZ b tow ry` IIM 'Y I l t ' t • r� 4 �i E# � t { w _ � Yi y� x I _ e , w r r, df d i 1 F` i . 9N4�F �� . e � ; I r r. " y 1 ..l .'_,y' .•,.# `.� �^ _ ifs a . ' 0 i r ' Alm— Jp �,, r• ix i �, L�Vr.• Y,i � � , ` K t n" �• ��"• ` ate\ t '`Y] F' -dIi Ott§ - "il gig. a ry - r q ,...,.ice 4,.,r�� � eJP ���ti�•H•�. '�� �1ti��e ��. _ 100 ,p,..^�'!.'` �I1 .•->"`"�� ,... .,.�..�,.,..'i"' -•- -',►. �'� `"'"'�t"'�'�'�r+�.1lr�{�`` ���� �.aay', �W".v�.�rNa.:va....ry ,, ..,.. J •t y • iL•�7y '- ram._ ..,,.�,� � _ •� � �yA•' _.P y R ! L' 7� wt�Y - v f �4 �Y'w ' 4 a � a I a• A � r . • r 1 4 ' `r _. ►-.err, - - 3 r a�..� E .f'^ T �� � ti y � •ed ,_; •g• � .++mot�a � +,a� � ,_ _,,...`:.' .� ♦.`fp. ,...,riq:�. .c:�?"-- - � .. ':Y-�+..... �$""' �',,.wt�r mac.-. A 9/17/2010 Case Activity Listing 7:36:OOAM I PON to Case#: BLD2008-00832 Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By BLDA010 Application Received 7/7/2008 7/7/2008 None DONE KKK 7/7/2008 KKK BLDC100 Inspection 7/10/2008 7/10/2008 None DONE LAW LAW 7/10/2008 LAW L Waters will perform a site inpsection as requested by Mrs.Haskell.-dc The owners wanted to meet to have do a framing inspection,I let them know that was not posible without first having an approved set of plans,they understood,we did go over some of the concerns they had about want the private inspector had told them.Note:the OSB sheeting is rated for 16 inch on center and the building was framed on 24 inch centers.Additional stud will need to be added. BLDB200 Environmental Health Review 7/7/2008 7/16/2008 None DONE TW 7/16/2008 TW RECORDS ON FILE,MAINTENACE REPORT OK,BEDROOMS OK BLDB201 More Info Letter-EH 7/16/2008 None DONE TW 7/16/2008 TW NEED APPROVED TWO PARTY WELL BLDA800 Documents Received 7/22/2008 None DONE CMH 7/22/2008 CMH NOTICE TO FUTURE PROPERTYU OWNERS OF PRIVATE 2 PARTY WATER SYSTEM,DATE STAMPED IN AND SENT DOWN TO TRISH. BLDB120 WSEC Compliance Review 7/24/2008 None DONE RTB 7/24/2008 RTB 1pg ftun.wood stove existing windows&doors ok 7-24-08 RTB BLDA200 HOLD 7/25/2008 7/25/2008 Hold DONE KS 7/25/2008 KS original construction plans in blue tube need to be returned to applicant when permit is issued. BLDA800 Documents Received 7/25/2008 None DONE KS 7/25/2008 KS SATISFACTORY BACTI FORWARDED TO TW. 7/25/08 KS BLDA800 Documents Received 8/13/2008 None DONE RTB 8/13/2008 RTB recieved letter from architect Ralph Provencal requesting that his name be removed from the permit and his work be returned I returned his work to him and put copy of letter in parcel file 8-13-08 RTB BLDA900 Telephone Call 8/13/2008 None DONE RTB 8/13/2008 RTB spoke to owner informed her that arch. has removed himself from the project and I returned his work to him 8-13-08 RTB Page 1 of 3 CaseActivity..rpt A 9/17/2010 Case Activity Listing 7:36:OOAM Case#: BLD2008-00832 Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By BLDA800 Documents Received 8/20/2008 None DONE RTB 8/20/2008 RTB owner submitted eng.addressing trusses,she will submit eng.for footing/found. later also porch or will remove porch 8-20-08 RTB BLDB110 Building Plan Review 7/7/2008 9/16/2008 None DONE RTB RTB 9/16/2008 RTB spoke to owner informed him I need floor plan for basement he will submit asap upon submittal I will check main house for compliance to IRC bracing requirements 2 story garage addition has been addressed by eng. front porch will need eng.due to posts over 10'in height also informed pat to bring in orig.county approved plans with floor plan 7-18-08 RTB review complete sent to case manager 7-24-08 RTB recieved phone call from arch. Ralph Provencal informing me he and eng.Nicolas Afeiche may be withdrawing their stamped drawings. If they do we would require owners to submit new eng. plans.8-7-08 RTB owners submitted new eng. for footing and found. and trusses. review complete sent to case manager 9-16-08 RTB BLDB210 Water Adequacy 7/7/2008 9/24/2008 None DONE AMH 9/24/2008 AMH 07.16.08 NEED APPROVED TWO PARTY WELL//Haskell's Hollow Approved for two connections. BLDA100 Approved for Issuance 9/24/2008 None DONE CMH 9/24/2008 CMH BLDA900 Telephone Call 9/26/2008 None DONE MEC 9/26/2008 MEC spoke to Pat on the phone,credited the two site inspection fees,total 136.00,deducted off the building permit line.Per earlier conversation we were waiving site inspection fee and she still got charged twice. 9-26-08 Mec BLDA500 Issue Building Permit 9/29/2008 None DONE KS 9/29/2008 KS BLDA540 Print Inspection Card 9/29/2008 None DONE KS 9/29/2008 KS BLDA900 Telephone Call 10/31/2008 None DONE RTB 10/31/2008 RTB INSPECTOR original architect Ralph Provencial has removed his designs from this project anything with his name or stamp is not approved to be used 10-31-08 RTB BLDC250 Permit Extension 3/29/2009 9/29/2009 None EXTD PIB 3/24/2009 PIB Extended 6 months from 3-29-09 to 9-29-09 per customer's written request. (weather issues preventing them from working on project.) BLDC105 Progress Inspection 9/29/2009 9/29/2009 None PASS 9/25/2009 PIB Progress over phone: framing completed. Page 2 of 3 CaseActivity-rpt Case Activit Listin 9/17/2010 3' g 7:36:OOAM Case#: BID2008-00832 l� Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated updated By BLDC105 Progress Inspection 3/29/2010 3/29/2010 None PASS P113 3/29/2010 PIB Progressed over the phone: One furnace is in and they are working on ducts. BLDB007 Plan Revisions Submitted 9/7/2010 None DONE TW 9/7/2010 TW change beams from wood to engineered steel BLDB400 Building Review Revision 9/7/2010 9/13/2010 None N/A DLC 9/13/2010 DLC Plan revisions changed wood floor beams to steel beams and are accompanied by engineered approved design,prepared by MC Squared,dated 8/31/2010. Told the Haskell's that it is likely that the building inspector will be able to approve the revisions on-site. If not the inspector will direct the owner to submit revisions to the bldg dept. for approval. Mr. Haskell is aware of the requirement for welding special inspection anmd has agreed to supply documents showing that he has credentials for such work. Have provided the Haskell's with the special inspection authorization form including policy for alternate approval via e-mail and when Mrs.H picked up site copy plans and eng revisions on 9.13.2010. A copy of the documents have been added to the inspector file and file copy plan file. do 9.13.2010 Page 3 of 3 CaseActivity..rpt 10/31/2008 Case Activity Listing 10:51:54AM Moto Case #: BLD2008-00832 Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By BLDA800 Documents Received 8/20/2008 None DONE RTB 8/20/2008 RTB owner submitted eng.addressing trusses,she will submit eng.for footing/found.later also porch or will remove porch 8-20-08 RTB BLDB110 Building Plan Review 7/7/2008 9/16/2008 None DONE RTB RTB 9/16/2008 RTB spoke to owner informed him I need floor plan for basement he will submit asap upon submittal I will check main house for compliance to IRC bracing requirements 2 story garage addition has been addressed by eng.front porch will need eng.due to posts over 10'in height also informed pat to bring in orig.county approved plans with floor plan 7-18-08 RTB review complete sent to case manager 7-24-08 RTB recieved phone call from arch.Ralph Provencal informing me he and eng.Nicolas Afeiche may be withdrawing their stamped drawings. If they do we would require owners to submit new eng. plans.8-7-08 RTB owners submitted new eng.for footing and found.and trusses. review complete sent to case manager 9-16-08 RTB BLDB210 Water Adequacy 7/7/2008 9/24/2008 None DONE AMH 9/24/2008 AMH 07.16.08 NEED APPROVED TWO PARTY WELL//Haskell's Hollow Approved for two connections. BLDA100 Approved for Issuance 9/24/2008 None DONE CMH 9/24/2008 CMH BLDA900 Telephone Call 9/26/2008 None DONE MEC 9/26/2008 MEC spoke to Pat on the phone,credited the two site inspection fees,total 136.00,deducted off the building permit line.Per earlier conversation we were waiving site inspection fee and she still got charged twice. 9-26-08 Mec BLDA500 Issue Building Permit 9/29/2008 None DONE KS 9/29/2008 KS BLDA540 Print Inspection Card 9/29/2008 None DONE KS 9/29/2008 KS BLDA900 Telephone Call 10/31/2008 None DONE RTB 10/31/2008 RTB INSPECTOR original architect Ralph Provencial has removed his designs from this project anything with his name or stamp is not approved to be used 10-31-08 RTB I Page 2 of 2 CaseActivity-rpt Case Activity Listing 1 M 10:51:54A 51:54M Case #: BLD2008-00832 i� Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By BLDA010 Application Received 7/7/2008 7/7/2008 None DONE KKK 7/7/2008 KKK BLDC100 Inspection 7/10/2008 7/10/2008 None DONE LAW LAW 7/10/2008 LAW L Waters will perform a site inpsection as requested by Mrs.Haskell.-do The owners wanted to meet to have do a framing inspection,I let them know that was not posible without first having an approved set of plans,they understood,we did go over some of the concerns they had about want the private inspector had told them.Note:the OSB sheeting is rated for 16 inch on center and the building was framed on 24 inch centers.Additional stud will need to be added. BLDB200 Environmental Health Review 7/7/2008 7/16/2008 None DONE TW 7/16/2008 TW RECORDS ON FILE,MAINTENACE REPORT OK,BEDROOMS OK BLDB201 More Info Letter-EH 7/16/2008 None DONE TW 7/16/2008 TW NEED APPROVED TWO PARTY WELL BLDA800 Documents Received 7/22/2008 None DONE CMH 7/22/2008 CMH NOTICE TO FUTURE PROPERTYU OWNERS OF PRIVATE 2 PARTY WATER SYSTEM,DATE STAMPED IN AND SENT DOWN TO TRISH. BLDB120 WSEC Compliance Review 7/24/2008 None DONE RTB 7/24/2008 RTB 1pg fern.wood stove existing windows&doors ok 7-24-08 RTB BLDA200 HOLD 7/25/2008 7/25/2008 Hold DONE KS 7/25/2008 KS original construction plans in blue tube need to be returned to applicant when permit is issued. BLDA800 Documents Received 7/25/2008 None DONE KS 7/25/2008 KS SATISFACTORY BACTI FORWARDED TO TW.7/25/08 KS BLDA800 Documents Received 8/13/2008 None DONE RTB 8/13/2008 RTB recieved letter from architect Ralph Provencal requesting that his name be removed from the permit and his work be returned I returned his work to him and put copy of letter in parcel file 8-13-08 RTB BLDA900 Telephone Call 8/13/2008 None DONE RTB 8/13/2008 RTB spoke to owner informed her that arch.has removed himself from the project and I returned his work to him 8-13-08 RTB Page 1 of 2 CaseActivity..rpt