HomeMy WebLinkAboutFPA2007-00021 - FPA Plot / Site Plans - 4/18/2008L ARIS ,w'px
E- LEXINGTO4-PL
ARNA Rival
uscP
ti 4 ER )RUNP D.Eivleuslatt. --,:isEtocosoALEIP-
STREET LOCATION MAP
ASSUMED
NO.
DATE
DESCRIPTION
BY
VICINITY MAP
NOT TO SCALE
EMERGENCY CONTACT PERSON
JEFF BERRY
PHONE: (360) 620-4052
Legend
SILT FENCE, SEE DETAIL
STRAW BALES, SEE DETAIL
200 FT WETLAND BUFFER
Call before you dig.
9 800 424-5555
RCW 19.122
EXPIRES: 29 MARCH 10
1//, //
// / / /
il / / / l/ /,
/
/. /, / / / /, / / /// %
/// / // / J /
//
/
/
/ J / j/;
/ /
/� /. / / / / // /
/ / /, /, /'
/r /
' ///0
// ,/ /. // / / J// / /
//
/ / /
/ / / /
/ / / /
/ /'
/i 1/
/ /
/ / % / / % / /' /
SELECTIVE HARVEST
PARCEL# 42125-32-00010
/
/
/
/
SELECTIVE HARVEST
(OUTSIDE FLAGGED
WETLAND)
•
PROJECT SITE
NOT TO SCALE
Paul C. Wadling, PE.
Civil Engineering Surveying Planning
PO BOX 305, Bremerton � WA 98310
phone: (360) 473n 3864 fax: (360) 479-3348
CLIENT
JEFF BERRY
FPA — STORM WATER SITE PLAN AND EROSION_
SEDIMENTATION CONTROL PLAN _ _ _ 0002f
DRAWN BY PCW
CHECKED BY P C W
DATE 04182008
SCALE 04182008
JOB NO
SHEET 1 OF 2
1:, ;; _ ; - D U i�(-)
EROSION CONTROL NOTES
THE FOLLOWING EROSION AND SEDIMENTATION CONTROL NOTES APPLY TO ALL
CONSTRUCTION SITE ACTIVITIES AT ALL TIMES, UNLESS OTHERWISE
SPECIFIED ON THESE PLANS:
1. THE OWNER AND HIS/HER CONTRACTOR SHALL BE RESPONSIBLE AT ALL
TIMES FOR PREVENTING SILT -LADEN RUNOFF FROM DISCHARGING FROM
THE PROJECT SITE. FAILURE BY THE OWNER AND/OR CONTRACTOR CAN
RESULT IN A FINE. THE DESIGNATED TEMPORARY CONTACT PERSON
NOTED ON THIS PLAN MUST BE AVAILABLE FOR CONTACT BY TELEPHONE
ON A 24 HOUR BASIS THROUGHOUT PROJECT ACTIVITY AND UNTIL THE
PROJECT HAS BEEN COMPLETED.
2. THE IMPLEMENTATION OF THIS SWPPP AND THE CONSTRUCTION,
MAINTENANCE, REPLACEMENT AND UPGRADING OF THIS SWPPP
IS THE RESPONSIBILITY OF THE OWNER AND/OR CONTRACTOR FROM THE
BEGINNING OF THE PROJECT UNTIL ALL SITE DISTURBING ACTIVATES ARE
COMPLETED AND THE SITE IS STABILIZED.
3. ANY ROCKED CONSTRUCTION ENTRANCES SHALL BE INSTALLLED PRIOR
TO BEGINNING ANY SITE DISTURBING ACTIVITY. IN ADDITION,
EQUIPMENT FOR THE CLEANING OF PUBLIC ROADWAYS SHALL BE
AVAILABLE AT ALL TIMES DURING CONSTRUCTION.
4. THE EROSION AND SEDIMENTATION CONTROL FACILITIES SHOWN ON THIS
PLAN ARE TO BE CONSIDERED ADEQUATE BASIC REQUIREMENTS FOR THE
ANTICIPATED SITE CONDITIONS. DURING CONSTRUCTION, DEVIATIONS
FROM THIS PLAN MAY BE NECESSARY IN ORDER TO MAINTAIN WATER
QUALITY. MINOR DEPARTURES FROM THIS PLAN ARE PERMITTED
5. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE
INSPECTED BY THE OWNER AND/OR CONTRACTOR ON A FREQUENT BASIS
AND IMMEDIATELY AFTER EACH RAINFALL, AND MAINTAINED AS
NECESSARY TO INSURE THEIR CONTINUED FUNCTIONING. ALL SEDIMENT
MUST BE REMOVED FROM SILT FENCES, STRAW BALES, SEDIMENT PONDS,
ETC. PRIOR TO THE SEDIMENT REACHING 1/2 ITS MAXIMUM POTENTIAL
DEPTH.
6. AT NO TIME SHALL CONCRETE, CONCRETE BY-PRODUCTS, VEHICLE
FLUIDS, PAINT, CHEMICALS, OR OTHER POLLUTING MATTER BE
PERMITTED TO DISCHARGE TO THE TEMPORARY OR PERMANENT DRAINAGE
SYSTEM, OR TO DISCHARGE FROM THE PROJECT SITE.
7. ALL WORK SHALL BE DONE ACCORDING TO BEST MANAGEMENT
PRACTICES AS DEFINED IN THE DOE STORM WATER MANAGEMENT MANUAL
FOR THE PUGET SOUND BASIN.
NOTE' S❑IL BERM AS LOCATED AND SHOWN ON THE SITE PLAN SHALL
BE INSTALLED UTILIZING NATIVE S❑IL COMPACTED TO A DEPTH OF
12—INCHES DIRECTLY AGAINST THE FRONT OF THE SILT FENCE.
SPECIFIC L❑CATI❑N SHALL BE DETERMINED IN THE FIELD BY THE
CONTRACTOR. INTENT OF THIS BERM IS TO PR❑VIDE AN ADDITI❑NAL
0.2 FT DEPTH STORMWATER IMP❑UNDMENT OF AN AREA EXCEEDING THE
MINIMUM AS IDENTIFIED ON THE PLAN.
"
"
I I
11111117414:::::
FILTER FABRIC
WIRE MESH
NOTE:
SILT INTERCEPT SWALE MAY BE
SUBSTITUTED FOR SILT FENCE
WHERE APPROPRIATE.
NAVD88
NGS "JCIA"
SILT FENCE
N.T.S.
R= 25' MIN.
12" MIN.
4" - 8" QUARRY SPALLS
PROVIDE FULL WIDTH OF
INGRESS/EGRESS AREA
INSERTED 2 FEET
INTO GROUND
POSITION FILTER FABRIC
OVER ENTIRE TRENCH
PERIMETER AND BACKFILL
\2r WITH NATIVE MATERIAL
ON THE UPSLOPE SIDE
OF THE FABRIC.
STABILIZED CONSTRUCTION ENTRANCE
12" DEPTH
QUARRY SPALLS
(USE AS REQUIRED)
N.T.S.
4 TEMPORARY ROCK LINED SWALE
C'Z (USE AS REQUIRED)
3 STRAW BALE SWALE
C-2 (USE AS REQUIRED) N.T.S.
STRAW BALES AS REQUIRED
STAKE BALES TO MAINTAIN POSITION
AS REQUIRED ( 2 STAKES / BALE )
1' 0" MIN. FREEBOARD
STABILIZATION NOTES
CONTROL MEASURE: STABILIZED CONSTRUCTION ENTRANCE.
PURPOSE: REDUCES THE AMOUNT OF DEBRIS TRANSPORTED ONTO PUBLIC ROADS FROM
CONSTRUCTION EQUIPMENT BY ACTION OF VEHICLE TIRES TRAVEUNG OVER GRAVEL PAD
REMOVING MOST MUD AND DEBRIS FROM TIRES.
DESIGN CRITERIA/SPECIFICATIONS:
DESIGN: (1) SEE DETAIL 2-C-1, (2) STABILIZED CONSTRUCTION ENTRANCES
SHOULD BE LOCATED WHEREVER VEHICLE ACCESS ROUTES INTERSECT PAVED ROADS; (3)
MATERIAL SHOULD BE QUARRY SPALLS, 4" - 8" SIZE; (4) THE ROCK PAD SHOULD BE AT EAST
12-INCHES THICK AND 100 FEET IN LENGTH. LENGTH MAY BE REDUCED TO 50-FEET FOR SITES
WITH MINOR GRADING (LESS THAN 1 ACRE OF EXPOSED SOIL); (5) WIDTH SHOULD BE THE FULL
WIDTH OF THE VEHICLE INGRESS AND EGRESS AREA. MINIMUM WIDTH SHOULD BE 20-FEET.
ADDITIONAL SUBGRADE STABILIZATION SUCH AS A GEOTEXTILE MAT MAY BE REQUIRED.
PROCEDURE: (1) A FILTER FABRIC FENCE SHOULD BE INSTALLED DOWNHILL FROM THE
CONSTRUCTION ENTRANCE TO INTERCEPT AND CONTAIN ANY SEDIMENT -LADEN RUNOFF FROM
THE ENTRANCE OR FROM TIRE WASHING; (2) IF THE ROCK PAD DOES NOT ADEQUATELY
REMOVE THE MUD FROM VEHICLE WHEELS, THE WHEELS SHOULD BE HOSED OFF BEFORE THE
VEHICLE ENTERS A PAVED STREET. THE WASHING SHOULD BE DONE ON AN AREA COVERED
WITH CRUSHED ROCK AND WAS WATER SHOULD DRAIN TO A SEDIMENT RETENTION FACILITY;
(3) STREET CLEANING EQUIPMENT SHOULD BE AVAILABLE AS REQUIRED.
MAINTENANCE: (1) ENTRANCES MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH STONE,
AS NECESSARY TO PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC ROADWAYS; (2) IF
SEDIMENT IS TRANSPORTED ONTO A ROAD SURFACE, THE ROADS SHALL BE CLEANED
THOROUGHLY AS A MINIMUM AT THE END OF EACH DAY. SEDIMENT SHOULD BE REMOVED
FROM ROADS BY SHOVELING OR SWEEPING. STREET WASHING SHOULD TAKE PLACE ONLY
AFTER SEDIMENT HAS BEEN REMOVED AS DESCRIBED ABOVE; (3) ANY ROCK SPALLS THAT
ARE LOOSENED FROM THE PAD AND END UP ON THE ROADWAY SHALL BE REMOVED
IMMEDIATELY.
CONTROL MEASURE: CONSTRUCTION ROAD STABILIZATION.
PURPOSE: TEMPORARILY STABILIZES ROADS, PARKING AREAS, AND ON -SITE TRANSPORTATION
ROUTES WITH STONE IMMEDIATELY AFTER GRADING, REDUCES EROSION CAUSED BY
CONSTRUCTION TRAFFIC OR RUNOFF.
DESIGN CRITERIA/SPECIFICATIONS:
DESIGN: (1) PROVIDE ROCK STABILIZATION WHEREVER THERE IS THE POTENTIAL FOR
EROSION OF TEMPORARY CONSTRUCTION ROUTES BY CONSTRUCTION TRAFFIC DURING WET
WEATHER; (2) ROCK STABIUZATION MAY BE UNNECESSARY WHERE SOILS ON SITE ARE
GRAVELLY; (3) A 6-INCH DEPTH OF 2" - 4" CRUSHED ROCK, GRAVEL BASE, OR CRUSHED
SURFACING BASE COURSE SHALL BE APPLIED IMMEDIATELY AFTER GRADING OR THE
COMPLETION OF UTILITY INSTALLATION WITHIN THE RIGHT-OF-WAY. A 3-INCH COURSE OF
ASPHALT TREATED BASE (ATM) MAY BE USED INSTEAD OF THE CRUSHED ROCK.
PROCEEDURE: (1) WHERE FEASIBLE, ALTERNATIVE ROUTES SHOULD BE MADE FOR
CONSTRUCTION TRAFFIC; ONE FOR USE IN DRY CONDITION, THE OTHER FOR WET CONDITIONS
WHICH INCORPORATES THE MEASURE LISTED BELOW; (2) TEMPORARY ROADS SHOULD
FOLLOW THE CONTOUR OF THE NATURAL TERRAIN TO THE EXTENT POSSIBLE. SLOPE SHOULD
NOT EXCEED 15 PERCENT. ROADWAYS SHOULD BE CAREFULLY GRADED TO DRAIN
TRANSVERSELY. PROVIDE DRAINAGE SWALES ON EACH SIDE OF THE ROADWAY IN THE CASE
OF A CROWNED SECTION, OR ONE SIDE IN THE CASE OF A SUPER ELEVATED SECTION. (3)
INSTALLED INLETS SHALL BE PROTECTED TO PREVENT SEDIMENT LADEN RUNOFF FROM
ENTERING THE STORM SYSTEM (SEE BMP'S ON FILTER INLET BARRIERS).
MAINTENANCE: INSPECT STABILIZED AREAS REGULARLY, ESPECIALLY AFTER LARGE STORM
EVENTS. ADD CRUSHED ROCK IF NECESSARY AND RE -STABILIZE ANY AREAS FOUND TO BE
ERODING.
CONTROL MEASURE: DUST CONTROL.
PURPOSE: PREVENTS SURFACE AND AIR MOVEMENT OF DUST FROM EXPOSED SOIL SURFACES.
DESIGN CRITERIA/SPECIFICATIONS: (1) MINIMIZE THE PERIOD OF SOIL EXPOSURE THROUGH
USE OF TEMPORARY GROUND COVER AND OTHER TEMPORARY STABILIZATION PRACTICES. (SEE
BARE GROUND BMP'S) (2) SITE SHOULD BE SPRINKLED WITH WATER UNTIL SURFACE IS WET.
REPEAT AS NEEDED. TO PREVENT CARRYOUT OF MUD ONTO STREET, REFER TO STABILIZED
CONSTRUCTION ENTRANCE BMP IN THIS SECTION. (3) SPRAY EXPOSED SOIL AREAS WITH AN
APPROPRIATE DUST PALLIATIVE. NOTE: OIL IS PROHIBITED FOR USE AS A PALLIATIVE.
CONTROL MEASURE: LIMIT CLEARING OF SITE.
PURPOSE: REDUCES LIKEUHOOD OF, OR EXTENT OF, TURBIDITY IN DOWNSTREAM
STORMWATER BY MINIMIZING THE SOURCE OF SILT PICKED UP ON SURFACE RUNOFF.
DESIGN CRITERIA/SPECIFICATIONS: CLEARING SHOULD BE LIMITED TO THE MINIMUM AREA
NECESSARY TO PERFORM WORK AND IMMEDIATELY REVEGETATE CLEARED AREAS. WHEN
POSSIBLE, CONSTRUCTION SHOULD BE PLANNED IN STAGES, AND ONLY THE STAGE BEING
WORKED ON SHOULD BE CLEARED. ONCE WORK IS COMPLETED, A GIVEN STAGE OF
CONSTRUCTION SHOULD BE IMMEDIATELY REVEGETATED OR OTHERWISE STABIUZED.
CONTROL MEASURE: COVER AREAS LEFT UNWORKED FOR MORE THAN 48 HOURS.
(SEE ALSO MULCHING, SODDING, PLASTIC SHEETING BMP'S).
PURPOSE: MINIMIZE THE AREA EXPOSED TO RAINFALL AND SURFACE RUNOFF, THEREBY
REDUCING THE AMOUNT OF EROSION OF BARE GROUND AND THE AMOUNT OF SEDIMENT THAT
MIGHT COLLECT IN SEDIMENTATION CONTROL STRUCTURES, SUCH AS SEDIMENT PONDS OR SILT
FENCES.
DESIGN CRITERIA/SPECIFICATIONS: DURING THE TIME PERIOD OF OCTOBER 1 THROUGH APRIL
30, AND AT OTHER TIMES OF THE YEAR WHEN THERE ARE EXTENDED PERIODS OF INCLEMENT
WEATHER, ALL PROJECT -DISTURBED SOIL AREAS THAT ARE TO BE LEFT UNWORKED FOR MORE
THAN 48 HOURS SHOULD BE COVERED BY MULCH, SODDING, OR PLASTIC COVERING. THIS
PROCEDURE IS BASED ON THE INCREASED POTENTIAL FOR, AND CONSEQUENCES OF, FAILURE
OF EROSION AND SEDIMENTATION CONTROL STRUCTURES DURING THIS PERIOD OF HIGH
PRECIPITATION AND THE ASSUMPTION THAT AREAS NOT BEING WORKED ARE LIKELY TO BE
LEFT UNATTENDED.
CONTROL MEASURE: MULCHING. (SEE ALSO NETS AND MATS).
PURPOSE: MULCHING PROVIDES IMMEDIATE TEMPORARY PROTECTION TO EXPOSED AREAS
AND ALLOWS GERMINATION AND PROTECTION OF SEEDED AREAS BY CONSERVING MOISTURE,
MODERATING SOIL TEMPERATURES, AND HOLDING FERTILIZER, SEED AND TOPSOIL IN PLACE.
DESIGN CRITERIA/SPECIFICATIONS:
DESIGN: (1) PREPARE SOIL AS FOR SEEDING; (2) FOR APPUCATION RATES AND
SPECIFICATIONS, SEE TABLE 3-1**; (3) NETS AND MATS USED IN CONJUNCTION WITH MULCH
SHOULD BE USED ON SLOPES STEEPER THAN 2:1; (4) WOOD FIBER CELLULOSE BLANKET ARE
CONSIDERED PROTECTIVE MULCHES AND CAN BE USED ALONE ON ERODIBLE SOILS AND DURING
ALL TIMES OF THE YEAR.
MATERIALS: (1) HAY OR STRAW: USE STRAW WHERE MULCH EFFECT IS TO BE MAINTAINED
FOR MORE THAN 3 MONTHS. HAY AND STRAW ARE SUBJECT TO WIND BLOWING UNLESS KEPT
MOIST OR TIED DOWN. THEY ARE THE MOST COMMON AND WIDELY USED MULCHING
MATERIAL; GOOD FOR EROSION CONTROL IN CRITICAL AREAS. ANCHOR BY CRIMPING, DISCING,
ROLLING OR PUNCHING INTO SOIL, COVERING WITH NETTING, SPRAYING WITH A CHEMICAL OR
FIBER BINDER OR BY KEEPING MOIST; (2) WOOD FIBER CELLULOSE (PARTLY -DIGESTED WOOD
FIBERS): WHEN USED FOR EROSION CONTROL ON CRITICAL AREAS, THE APPLICATION RATE
SHOULD BE DOUBLED. APPLY WITH HYDROMULCHER. NO TIE DOWN IS REQUIRED. PACKAGED
IN 100-LB BAGS. NOT RECOMMENDED FOR HIGHLY ERODIBLE SOILS IN HOT WEATHER; (3)
GRAVE, CRUSHED STONE OR SLAG: EXCELLENT MULCH FOR SHORT SLOPE AND AROUND WOODY
PLANTS AND ORNAMENTALS. USE WHERE SUBJECT TO FOOT TRAFFIC; (4) CORN STALKS:
SHREDDED INTO 4" - 6" LENGTHS, DECOMPOSES SLOWLY AND RESISTS WINDBLOW; (5) WOOD
CHIPS: CANNOT BE CLOSELY MOWED. DECOMPOSE SLOWLY AND DO NOT REQUIRE TACKING.
DOES NOT PROVIDE NITROGEN TO SEEDS UNLESS TREATED. TENDS TO WASH DOWN SLOPES
STEEPER THAN 6%; (6) BARK CHIPS/SHREDDED BARK: CANNOT BE CLOSELY MOWED.
ADDITIONAL NITROGEN FOR SEEDS NOT REQUIRED. TENDS TO WASH DOWN SLOPES STEEPER
THAN 6%. AVOID TILLING BARK OR SAWDUST INTO SOIL AS IT TENDS TO REMOVE NITROGEN
FROM SOIL, RELEASING IT ONLY WHEN IT DECAYS.
PROCEDURES: (1) MULCHES SHOULD BE USED FOLLOWING TEMPORARY OR PERMANENT
SEEDING; (2) MULCHING SHOULD IMMEDIATELY FOLLOW SEEDING IN AREAS WITH SLOPES
STEEPER THAN 2:1; (3) MULCHES SHOULD BE USED IN CLEARED AREAS THAT CANNOT BE
SEEDED BECAUSE OF THE SEASON; (4) MULCHES SHOULD BE USED ON EXPOSED SOILS
(INCLUDING STOCKPILES WHICH ARE NOT FINAL GRADED WITHIN 15 DAYS) UNLESS COVERED
WITH PLASTIC SHEETING.
MAINTENANCE: MULCHED AREAS SHOULD BE CHECKED PERIODICALLY, ESPECIALLY
FOLLOWING SEVERE STORMS, WHEN DAMAGED AREAS OF MULCH OR TIE -DOWN MATERIAL
SHOULD BE REPAIRED.
**-SEE TABLE 3-1, THIS SHEET
Legend
EXISTING LOGGIN
SILT FENCE, SEE DETAIL
STRAW BALES, SEE DETAIL
200 FT WETLAND BUFFER
12" HIGH COMPACTED SOIL BERM
STABILIZATION NOTES (CONT'D.)
CONTROL MEASURE:
Call before you dig.
800 424-5555
RCW 19.122
TEMPORARY EROSION CONTROL SEEDING. (SEE ALSO
TOPSOILING, SURFACE ROUGHENING, MULCHING, PLASTIC
SHEETING AND NETS AND MATS).
PURPOSE: REDUCES EROSION AND SEDIMENTATION BY TEMPORARILY STABILIZING EXPOSED
SOILS FOR UP TO 1 YEAR.
DESIGN CRITERIA/SPECIFICATIONS: (1) SEEDING CAN BE DONE DURING THE PERIOD OF
MARCH 1 THROUGH SEPTEMBER 30 (IF PLANTED BETWEEN MAY 15 AND AUGUST 15 IRRIGATION
MAY BE REQUIRED). SEEDING CAN SOMETIMES ALSO BE DONE SUCCESSFULLY DURING THE
REMAINDER OF THE YEAR, OCTOBER 1 THROUGH FEBRUARY 29, PROVIDED THAT THE SEED BED
IS IMMEDIATELY STABILIZED BY MULCHING, NET/MATS OR PLASTIC SHEETING; (2) SITE
PREPARATION, INCLUDING THE INSTALLATION OF SURFACE RUNOFF CONTROL MEASURES,
SHOULD BE COMPLETED PRIOR TO SEEDING. THE SEED BED SHOULD BE FIRM BUT NOT
COMPACT, WITH A FAIRLY FINE SURFACE. SURFACE ROUGHENING SHOULD BE DONE AT RIGHT
ANGLES TO THE SLOPE AND PREFERABLY TRACK WALKED UP SLOPE. TRACK WALKING IS
DRIVING A CRAWLER TRACTOR UP AND DOWN THE SLOPE, LEAVING A PATTERN OF CLEAT
IMPRINTS PARALLEL TO THE SLOPE CONTOURS; (3) HYDROSEEDING APPLICATIONS WITH
APPROVED SEED -MULCH -FERTILIZER MIXTURES MAY ALSO BE USED; (4) SOIL
AMENDMENTS/FERTILIZERS SHOULD BE APPLIED AS RECOMMENDED BY SUPPLIERS. WHEN
SEEDING OVER SUBSOIL (WITHOUT TOPSOIL), AVOID OVER -FERTILIZING, ESPECIALLY NEAR
AQUATIC FEATURES. INSTEAD, USE MULCH TO ASSIST IN NOURISHING SOIL. PROJECT SITES
ADJACENT TO BODIES OF WATER MUST USE NON -PHOSPHORUS FERTILIZER; (5) APPLY AN
APPROPRIATE SEED MIXTURE TO THE PREPARED SEED BED AT A RATE OF 120 LBS. PER ACRE.
TABLE 3-2** GIVES RECOMMENDED TEMPORARY EROSION CONTROL SEED MIXTURE.
MAINTENANCE: (1) INSPECT SEEDED AREAS FOR FAILURE AND MAKE NECESSARY REPAIRS
AND RESEED IMMEDIATELY; (2) SEED SHOULD BE SUPPLIED WITH ADEQUATE MOISTURE.
SUPPLY WATER AS NEEDED, ESPECIALLY IN ABNORMALLY HOT OR DRY WEATHER, OR ON
ADVERSE SITES. WATER APPLICATION RATES SHOULD BE CONTROLLED TO PREVENT RUNOFF.
INSUFFICIENT AMOUNTS OF WATER MAY BE MORE HARMFUL THAN NO WATER.
**-SEE TABLE 3-2, THIS SHEET
.-1000 SF IMPOUNDMENT AREA REO'D
EMERGENCY CONTACT PERSON
JEFF BERRY
PHONE: (360) 620-4052
-80
3200 SF IMPOUNDMENT EA REQ'D
(APPROX 14,000 SF PROVIDED
APPROX. 230 LF BERM
12" HIGH FOR FLOW CONT
LF BE
OR FLOW
M
ONTROL
A REQ'D
ED)
40 80
160
\J'(
F IMPOUNDMENT AREA REQ'D
(APPRRX 37,000 SF PROVIDED)
APP X. 260 LF BERM
12" HIGH FOR OW CONTROL
0
320
TABLE 3-1 MULCH MATERIAL, APPLICATION RATES AND SPECIFICATIONS
MULCH MATERIAL
QUAULTY
STANDARDS
APPLICATION
RATES
PER 1000 SQ FT
APPLICATION RATES
PER ACRE
DEPTH OF
APPLICATION
GRAVEL,
CRUSHED STONE
OR SLAG
WASHED: 3/4" -
1-1/2" SIZE
9 CU YDS
400 CU YDS.
3"
HAY OR STRAW
AIR-DRIED, FREE
FROM UNDESIRABLE
SEED & COARSE
MATERIAL
75-100 LBS.,
2-3 BALES
1.5 - 2.5 TONS
(90-100 BALES)
LIGHTLY COVER
ENTIRE SURFACE
(MIN. 2")
WOOD FIBER
CELLULOSE
DYED GREEN.
NO GROWTH
ORGANISM
INHIBITING FACTORS
25-30 LBS.
1000-1500 LBS.
2"
F IRF9: 29 MARCH 10
Paul C. Wa=li
Civil Enginee ig
\E.
Srveying Planning
phone: (36:0) =7; 3864 Tt fax: (360) 479-3348
email: pw.engineerocomcast;:net
1 INCH = 80 FEET
TABLE 3-2 TEMPORARY EROSION CONTROL SEED MIXTURE
NAME
PROPORTIONS BY
WEIGHT
PERCENT
PURITY
PERCENT
GERMINATION
REDTOP (AGROSTIS ALBE)
10%
92%
90%
ANNUAL RYE (LOLIUM
MULTIFOLIUM)
40%
98%
90%
CHEWINGS FESCUE (FESTUCA
REBRA COMMUTATA)
JAMESTOWN, BANNER,
SHADDOW OR KOKET
40%
97%
80%
WHITE DUTCH CLOVER
(TRIFOLIUM)
10%
96%
90%
C2
CLIENT
JEFF BERRY
FPA — STORM WATER SITE PLAN AND EROSION
SEDIMENTATION CONTROL PLAN
DRAWN BY PCW
DATE 04182008
JOB NO
CHECKED BY P C W
SCALE 04182008
SHEET 2 OF 2