Loading...
HomeMy WebLinkAboutBLD2020-00207 - BLD Plot / Site Planswoe LIGHTING - IECC COMPLIANCE A minimum of 75 percent of all luminaries shall be high efficacy luminaries unless lighting compliance was approved using the options available in IECC R404.1. Luminaries providing outdoor lighting and permanently mounted to a residential building or to other buildings on the same lost shall be high efficacy luminaries unless permanently installed outdoor luminaries are controlled by a motion sensor(s) with integral photocontrol photosensor or installed in or around swimming pools or water features. All fluorescent fixtures must e fitted with T-8 or small lamps (but not T-10 or T-12 lamps). IECC R404.1 CARBON MONOXIDE ALARMS Approved carbon monoxide alarms shall be installed in all new residential constructIon They shall be- i + v t each separate sleeping area in dwelling units, a minimum of 1 per floor. Carbon monoxide alarms shall be listed as complying with UL2034 installed in accordance with manufacturers installation specifications. SMOKE ALARMS IN EXISTING BUILDINGS Additions, alterations, and repairs shall be provided with smoke alarms as required for new dwellings, the smoke alarms shall be interconnected and hard wired. See item number 3 in plan review checklist attached. 2015 IECC/WASHINGTON STATE ENERGY CODE IECC/WSEC Compliance Method: Prescriptive Path — Marine 4 Type of Heat: i.)Widei Glazing/(windows, including glass doors) maximum U-Factor: U:44.1.4 Doors(fenestration): U-.30 or less (metal insulated) Wall Insulation: R-21, R-10 header �g Floor Insulation: R-3 Ceiling Insulation:R-49 Slab Insulation: R-10 Vault Insulation: R-38 Skylight maximum U factor:.50 Energy Credits R406.2 Option # :r ' FLOOR INSULATION Floor insulation shall be installed in a permanent manner in substantial contact with the surface being insulated. Insulation supports shall be installed so spacing is no more than 24" 0.C. Foundation vents shall be placed so that the top of the vent is below the lower surface of the floor insulation. IECC R402.2.7 r. la 0e3F WSEC PERMANENT CERTIFICATE A permanent certificate shall be posted within 3-feet of the electrical distribution panel. The certificate shall be completed bythe &door Ur design professional and shall list R-Values of insulation, glazing factors, type & efficiency of heating equipment, ,etas: IECC R401.3[RE] S E.ATHIG REQUIREMENTS FOR THE MAKI RESIDENCE ADDITION For addition-s roe use a minimum 416' APA rated sheathing panel laid with face gran perpendicular to the trusses and. all panels alternated by 1/2 panel length. Rccf nailing shoUld be done with 8d galvanized rails Vices at tr o G, at all h 1 edges and at 12' c.c. thnaugh the field. All new walls to be sheathed -with a minimum 5 it dh thickness APA rated siding panel (type T1-11). Floor panels shall be2 minimum 1 " APA StuFLOor, tongue and groove edged, rated panels likewise alternated by I/2 of a panel length iri layout and grued and nailed with 1<0kd galvanized or ring shank mils at S; gip. all des, 12' in the field. Edges of roof and floor diaphragms shall be nailed into solid blocking which fills the joist Di ass space, For :all wall panels,there shall .be one row of nails each plate and at least one row Into lead" I'm joist pacing of these nails shaft be IQ r b-x, edges and- 1 " throe h the fled. mil sole plate Into fd maternal (blocking or joists) with 1 . 12 rl n- Tees shall be connew to the top ply with Simpson type Hi hurricane clips at :maximum 24" o.c. unless indicated otherwise on the plan& FoUndations sly[cast on undisturbed competent subgrade materials. Any fill If required to support foundations sFall be a fully compacted select. pit. -run structural Ill. Mammals for the foundations sfilai'IM use a vendor prpproved mix design able to achieve an f, = 250E1 psi at 28 days, NI reinforcements shall meet ASMI A- 15, Grade 60, fsr = 40,000 'psi, All site bends shall satisfy AOI minimum bend radius criteria No bars are allowed t€1 be bent more than one time,. WASHINGTON STATE ENERGY CODE ID -EFFICIENT BUILDING ENVELOPE VERTICAL FENESTRATION TO BE U=0.24 Full truss t.. �.16 blast be availabl at framing STE COPS' THESE PLANS MU .3E ON THE JOB Si FOR INSPECTI( 220?-0 - co-c)7 qv-04t• 61 • ass MUST COMPLY WITH PERMIT CONDITIONS iJRREN e` .°Tcr;C0E CHANGES SUBMIT CHANGES FOR APPROVAL PRIOR TO PERFORMING WORK ENGINEERING/ARCHITECTURAL DRAWINGS Construction must match all design details and specifications of the Architectural and or the Engineering requirements OR a stamped letter of approval must be provided from the design professional responsible for the work that has been altered. ***NOTE: Structural engineering shall supersede Mason County "typical" notes for structural items.*** 11.0 015 REVIEWED FOR CODE COMPLIANCE MASON COUNTY BUILDING DEPARTMENT St?"LS (2"-( ANC S / /g6&�