HomeMy WebLinkAboutBLD2022-01522 Final Garage - BLD Inspections - 10/31/2023 j
MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584
1 � SHELTON:360-427-9670,EXT 352
COMMUNITY SERVICES
BELFAIR:360-275-4467,EXT 352
Building,Planning,EnvironmeMnl Health,Community Health ELMA:360-482-5269,EXT 352
— www.co.mason.wa.us
INSPECTION CARD AND CERTIFICATE OF OCCUPANCY*"
To schedule an inspection call or visit http://www.co.mason.wa.us/community-services/bid-inspectio hp
Permit Number BLD2022-01522 Date Issued 06/07/2023 Issued
Project NEW GARAGE ATTACHED TO EXISTING GARAGE&HOUSE
Site Address 130 E Lund Dr
Applicant KRASKOUSKAS ANTHONY PETER III&BONNIE JANE
Contractor COUNTER-FIT CONSTRUCTION INC
Contractor Phone 1.360.791.5666
Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type
Permit Type GARAGE/STORAGE Occupancy
-APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS.
-DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED.
-THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION, FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY.
-ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION.
-OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION.
"THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED."
PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET
Public Works Access/Driveway Other
Health Septic Well
Deptartment
Planning Site Inspection
Department
Fire Marshall Fire Apparatus Access Fire Sprinkler
Auto Fire Alarm Hood and Duct
Other Final
Building Building Official: Community Services Designee
Department
Concrete Setbacks 2- Slab
Footing Perimeter Point load Footing
Footing Interior Footing Decks/Porches
Foundation Stem Walls Z Z3_ �[_ i Other
Rough-In Groundwork Plumbing Framing
Groundwork Mechanical Plumbing
Groundwork Gas Pipe Mechanical
Gas Piping Shear Wall Nailing
Underfloor ems, -PS
Other
Insulation Slab Ceiling
Floor Vaulted Ceiling
Walls Vapor Barrier
Other
Wallboard Interior Wall Brace Panels Fire Walls
Nailing
Other
Final Building 1,p_31,22, 1 r
Manufactured Setbacks Setup
Home
Concrete Foot/Runners Final
Other
A
r �
MASON COUNTY 360-427-9670 Shelton ext.352
-275-4467 Belfair ext.352
COMMUNITY SERVICES 3 360-485 69 Elma ext.352
Building, Planning,Environmental Health,Community Health
615 W.Alder St.Bldg.8 - Shelton,WA 98584 www.masoncountywa.gov
CORRECTION/INSPECTION REPORT
PERMIT/CASE NUMBER: &Qo10.2a'
ADDRESS/LOCATION: 136 E LvA b l7r
FINDINGS:
Lk ee-
CLAv 2^of AJAYad jjj 4,e
DDO SoA) -)--ifAo-Ocoo.v7YWA.Go✓
Items listed above must be corrected to gain compliance.
❑ THIS IS NOT A COMPLETE INSPECTION
❑ This structure has been inspected by Mason County Building Department and the items listed
above are in VIOLATION of Mason County laws and/or ordinances.
❑ Call for re-inspection when corrections are made before proceeding with any further work.
Make corrections, items will be checked on the next inspection.
OK to &A1 Q PI-bfiog 1)ct^vn,,cA�I
Date: 5 30-D q ❑ Please contact our office regarding possible
Department: Run structural damage incurred by recent
Inspector: ,DED "natural/man made"disasters.This is NOT a
CORRECTION NOTICE.
DO NOT REMOVE THIS TAG
MCC14.12
Mason County
iy
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
F
2-01522 GARAGE/ STORAGE
DESCRIPTION: NEW GARAGE ATTACHED TO EXISTING ISSUED: 06/07/2023
HOUSE
ESS: 130 E LUND DR SHELTON EXPIRES: 12/04/2023
PARCEL: 321307590142
APPLICANT: KRASKOUSKAS ANTHONY PETER III& OWNER: KRASKOUSKAS ANTHONY PETER III&
BONNIE JANE BONNIE JANE
130 E LUND DR 130 E LUND DR
SHELTON,WA 98584 SHELTON,WA 98584
253-341-0840
CONTRACTOR: COUNTER-FIT CONSTRUCTION INC
5619 COUNTRYSIDE BEACH DR NW
OLYMPIA,WA98502
1.360.791.5666
GENERAL CONTRACTOR'S LICENSE: COUNTER-FIT CONSTRUCTION INC License: COUNTC1934JF
5619 COUNTRYSIDE BEACH DR NW Expires: 01/27/2024
OLYMPIA,WA98502
1.360.791.5666
VALUATIONS: FEES: Paid Due
U VB Utility, miscellaneous 851.00 $51,425.93 Building Permit Fee $715.82 $0.00
Planning Review Fee $240.00 $0.00
State Fee-Residential $6.50 $0.00
Change in Tenant- Minor EH $125.00 $0.00
Plan Review
Plan Check Fee $465.28 $0.00
Technology Surcharge $23.62 $0.00
Total: $51,425.93 Totals : $1,576.22 $0.00
REQUIRED INSPECTIONS
Setback Inspection Rough- Plumbing Inspection
Footing Inspection Mechanical Inspection
Foundation Wall-Pre-Pour Inspection Insulation Inspection
Printed by:Amber Selby on:06/07/2023 01:32 PM
Page 1 of 5
1
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
GARAGE/ STORAGE BLD2022-01522
Shearwall Inspection BLD-Final Inspection
Framing Inspection
CONDITIONS
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate
building permit and approval prior to construction of the retaining wall.
* When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by
the Mason County Department of Public Works. For more information contact Public Works, at(360)427-9670, ext. 450 or
100 W Public Works Dr. Shelton. The building permit will not be finaled until the permit holder can show proof that the
access permit from Public Works has been finaled and approved.
* Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly
corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of
pressure treated material.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit
application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the
responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that
Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement
of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater
Management Application/Worksheet the document entitled"Managing Storm Drainage on Small Lots, The Small Parcel
Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the
development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of
Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other,
parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final
inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater
management system have been installed as approved on the stormwater site plan.
Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting
from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any
construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that
office to review future planned work which may affect your project.
Printed by:Amber Selby on:06/07/2023 01:32 PM
Page 2 of 5
Mason County
y
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
GARAGE/ STORAGE BLD2022-01522
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
* The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility
of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked
"APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is
responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way.
* REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable
provisions of the current code and the manufacturer's installation instructions.
A drip edge shall be provided at eaves and gables of shingle roofs.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* All changes to "approved" building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
* The foundation/footing must be placed on undisturbed, firm-native soil. Proper frost depth shall be observed below grade
in undisturbed soils.
* The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more
than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards
for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to
another fire apparatus access road which connects to a county maintained public road.
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the
structure.
* By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed.
* When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and
approved by the Washington State Department of Transportation. For more information contact Washington State
Department of Transportation, at (206)357-2620, ext. 630.
Printed by:Amber Selby on:06/07/2023 01:32 PM
Page 3 of 5
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
GARAGE/ STORAGE BLD2022-01522
* OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
* The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10 gallons is not
allowed without the approval of the Mason County Fire Marshal.
* Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site
plan. Please check your"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed.
* Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather,
garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of
3000 psi (IRC Table R402.2).
* Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a
permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor
& Industries (L&I).
For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415-
4000.
* Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting
from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any
construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that
office to review future planned work which may affect your project.
* WIND LOADS - Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind
speed for Mason County is 85 MPH.
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee(refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
* All property lines shall be clearly identified at the time of foundation inspection.
* This structure is limited to U-occupancy use only (private garages, carports, sheds, and agricultural buildings.) Any other
use will be in violation of the international codes and Mason County Regulations unless a "Change of Use" permit is applied
for, reviewed and approved.
* This structure is approved as unheated space.
To be considered unheated space the area may be provided with a heating system that does not exceed maxium output of 1
watt per square foot., or 3.4 Btu/h per square foot. A permit and approval is required prior to installation of any heating
system.
When a heating system exceeds 1 watt per sq.ft (or 3.4 btu/h per sq. ft)the heated space shall be insulated in accordance
with the energy code in effect at the time of permit application.
Printed by:Amber Selby on:06/07/2023 01:32 PM
Page 4 of 5
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
GARAGE/ STORAGE BLD2022-01522
* Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to
the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of
the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In
addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Building Department prior to any further inspections being performed or approvals granted.
* Applicant/Owner assumes all responsibility if On-site Sewage Components are encumbered.
A.) Drainfield/Reserve requires a 1 Oft setback from all footing/foundations.
B.) Septic tank(s) requires 5ft setback from all footing/foundations.
C.) No foundation/ Perimeter Drains within 30ft, down gradient of Drainfield/Reserve area.
D.) No Cut Bank(s) (greater than 5ft and over 45 degrees)within 50ft, down gradient of Drainfield/Reserve area.
* Must adhere to HMP/CLMP planting requirements.
• Monitoring and maintenance shall be provided for the installed vegetation for 3 years or duration recommended by the
author of an HMP, whichever is longer. Each plant shall be inspected for survival and vigor. Installed plants that die shall be
replaced with the same species or another native species of the same height class with approval from Mason County. A brief
letter report with photographs summarizing monitoring findings shall be submitted to Mason County Planning by 1 Oct of
each monitoring year.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances go erning this type of work will be complied with whether
specified herein or not. T e granting of ermit does not presume to give authority to violate or cancel
the provisions o ny oX er scat cal regulating construction or the performance of construction.
Issued
Contractor or Authorized Agent: Dater �U
Printed by:Amber Selby on:06/07/2023 01:32 PM
Page 5 of 5
Page 1 of 91 L0aoa2� O 59,a
��-u� �/�S -- A) 6�1Zq(oE- S T-L rit-A
l �o k . Luio6 1 3a13D- 75-- 50�ya
05/18/2023
APPROVED
Digitally
SCR�signed
MASON COUNTY
tTD,/CDnPLANNING by Scott
5C07 I RUEDYA top Ruedy n 1
EH Setbacks
A.) Drainfield/Reserve requires l0'setback from footing/foundations EH APPROVED
B.)Septic tank(s)requires 5'setback from all footing/foundations
C.)No foundation/Perimeter Drains within 30ft,downgradient of Rhonda Thompson 01/1 312 0 2 3
Drainfield/Reserve area
D.)No Cut Bank(s)(greater than 5ft and over 45 degrees)within
50ft down gradient of Drainfield/Reserve area
RR5 Zoning
Front Yard Setback. 25'.
Side & Rear Yard Setbacks. Residential dwelling
and accessory structures is 20'.
OR 10% width of lot if not more than 100' wide
OR approved ADV
Xl��r✓ �
4
to
`A 5 n
,a m1n
Reserve DF in y�
between
1
See Mitigation Plan for planting requirements Planting must be completed prior to final.
r'�""'_'O'ENSE
Page 2 of 2 REPLANTING OF PROPOSED PLANTING OF ��� SUBJECT PARCEL PROPOSED NEW STRUCTURE
CLEARED BUFFER AREA INCLUDING (6)VINE MAPLE&(5)OSOBERRY I�i TYPE NS STREAM f 2 ROOF OVERHANG
(9)SALAL,(9)EVERGREEN HUCK. WHERE THE LANDSCAPE ALLOWS.
(9)OREGON GRAPE,(14)WESTERN TOTAL MITIGATION AREA BASED ON cv
SWORD FERN,(VIA SEED)MILKWEED. PLANT SPACING RADIUS OF 5'ON 75'TYPE NS STREAM BUFFER EXISTING CARPORT
TOTAL MITIGATION AREA BASED ON CENTER PER PLANT=215.93SQ.FT. 15'BUFFERSETBACK EXISTING SFR
ZONE SIZE 727 SQ.FT. 'I'L5' ---4---
PROPOSED BUFFER REDUCTION ESTIMATED DRAINFIELD AREA
MITIGATION ZONE A MASON CO.PARCELS
7 zoNE a j MITIGATION ZONE B MASON CO.10'CONTOURS
% \ : ESTIMATED TOP OF SLOPE ® MASON CO.STREET CENTERLINES
r
EXISTING CLEARED AREA(0.37 ACRES)
♦�r`!�..•,ZrUNE. � �� I i 2,475SQ.FT.
EXISTING
��..�� a,,,•^tee. SINGLE-FAMILY
J +de��+ ..• Li•.y s L_—_— -- r RESIDENCE/ATTACHED GARAGE
(INCLUDING ROOF OVERHANGS)
SQ.FT.
PROPOSED BUFFER 24'x 34' 1T x 32'
REDUCTION (1,109 SOFT 544 SQ.FT.
TOTAL AREA OF EXISTING
,♦ /' PROPOSED GARAGE, CARPORT
5'x 5'WALKWAY, (TO BE REMOVED)
/ 2'ROOF OVERHANG)
aZONEA
I
0 10 20 40 60
FT
Property owner is responsible to
providing monitoring. I
TOTAL PROPOSED STRUCTURAL'ROOF PRINT'FOR PROJECT —
(EXISTING SFR/ATTACHED GARAGE&PROPOSED SEMI-ATTACHED GARAGE)
3,584 SQ.FT.
MAXIMUM BUFFER WIDTH REDUCTION PROPOSED:
37.33%(281
PROPOSED BUFFER REDUCTION AREA:
470 SQ.FT.
PROPOSED BUFFER MITIGATION AREA:
943 SQ.FT.
PROPOSED MITIGATION RATIO: FIELDWORK CONDUCTED
2:1 10 FEBRUARY 2023
0 10 20 40 60
FT
This map is not survey quality.Locations and measurements are approximate.Boundary informationdepieted SITE PLAN: 130 E LUND DR.,SHELTON,WA 98584
herein has been obtained from the Mason County GIS Parcel Layer.GPS data was collected during fieldwork
CRATER LAND USE CONSULTING using a Juniper Geode with GNS3 sub4netar accuracy inappropriate conditions.Addifionalfeaturts shown ara DATE 21APRIL2023 STR SEC 30 TWP 21 N,RNG 03W
from information supplied by the Client or obtained from State and Local GIS data.We assume no lability for
477 PARPALA ROAD,NASELLE,WA 98638 discrepancies between this site plan and ground conditions. CLIENT KRASKOUSKAS,ANTHONY LAVLONG 47.275349°,-123.101601°
509-942-9309 RYAN@CRATERLUC.COM COUNTY MASON,WA SIZE 1.60ACRES
COORDINATE SYSTEM:NAD mal Co atePlane Washingmn North FIPS 4601 Feet PARCEL 4 321307520142 ZONING RR 5
PROJECTION:Lambert Conformal Conic
1
330' j
S 0' Open Space
I
dam.
03
CIO
375' ( 37
I
O x "
3 0a i
ON
w
_ W
_ N
L - - - - -
i
T
330' N 1 " = 50'
jw J L ,& P-D
xr. 1
Name & Parcel#30RV30 —75-- / N13—
Mason County DEC - 8 2022
Department of Community Development
Small Parcel Stormwater Management Application1"4%1"e QMotf 2)
Per Mason County Code,Title 14, Chapter 14.48 a stormwater site plan is required whenever a building application is
made for residential development, or redevelopment',with more than 2,000 square feet of impervious surfacez.
P Y P P e � 6 N
'Redevelopment means,on an already developed site,the creation or addition of impervious surfaces,struc „ t
including construction, installation or expansion of a building or other structure,and/or replacement of impervious surface that is not
part of a routine maintenance activity,and land disturbing activities associated with structural or impervious redevelopment.
2Common impervious surfaces include,but are not limited to,rooftops,walkways,patios,driveways,parking lots or storage areas,
concrete or asphalt paving,gravel roads,packed earthen materials,and oiled,macadam or other surfaces which similarly impede the
natural infiltration of stormwater.Open,uncovered retention/detention facilities shall not be considered as impervious surfaces.
To Calculate Impervious Surfaces Please Complete This Table
Surface Type Length X Width = Area *All dimensions in feet
Buildings X =
X = Measurements for buildings are taken at the
X _ perimeter of the farthest projections(example:
eaves/gutters)
X =
Driveways X =
X = Length of drive begins at the right of way
X =
Parking Areas X =
X = Any paved, gravel or packed area per definition
above table
X =
Patios/Walks X =
X = Any paved, gravel or packed area per definition
above table
X =
Others X =
X = If the total impervious area of the proposed site
X = development is greater than 2000 square feet a
Small Parcel Stormwater Site Plan is Required
Total Impervious Surface Area (sum of all areas)
If the Total Impervious Surface Area is LESS THAN 2000 Square Feet, please read,acknowledge and sign below.
Based Upon the information you have provided a Stormwater Site Plan IS NOT required for this development activity.
Owner/Builder/Agent Acknowledges that submission of inaccurate information may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below. I declare that I am the owner,owner's legal representative,or the contractor.I
further acknowledge that the information provided is accurate and employees of Mason County are granted access to the above-
e erty r tew nd ' ction as may be required.
Owner/Agent/Contractor(circle one)Date: C/VC
If the T tal Impervious rface Area is GREATER THAN 2000 Square Feet, please read,acknowledge and sign
the info tion provide on page 2 of 2.
Page 1 of 2
Name Parcel# BLD#
Mason County
Department of Community Development
Small Parcel Stormwater Management Application/Worksheet (page 2 of 2)
Based Upon the information you have provided a Stormwater Site Plan /S Required for this development activity.
Title 14,Chapter 14.48 of the Mason County Code(MCC)regulates compliance requirements for Stormwater
Management in this jurisdiction.A complete copy of the ordinance can be found on the Mason County website:
http//www.co.mason.wa—us/code/commissioners/index.htm
Please follow the links to "Title 14,Chapter 14.48 Stormwater Management".
Regulated activities shall be conducted only after Mason County Public Works approves a stormwater site plan
. (Mason County Code Title 14 Chapter 14.48 section 14.48.70).You will receive a copy of the Public Works document
entitled"Managing Storm Drainage on Small Lots,The Small Parcel Stormwater Site Plan".This document will assist
you in preparing the necessary information and plans for Public Works to review and approve. Per Department of
Public Works this document will constitute an approved plan if all of the relevant details* are to be installed in
their entirety AND no part of the stormwater system adversely affects any septic system(see Environmental Health
information below). If an alternative system is to be used a plan will need to be submitted to Public Works for approval.
A design by a registered professional may be required for more complex sites.
*These details are found in the document Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan
on the pages that begin with"Handout"
PLEASE INITIAL BELOW TO INDICATE THE STORMWATER MANAGEMENT PLAN FOR THIS SITE
A) The relevant details from Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan will be installed
in their entirety AND the system will be located as not to adversely affect any septic systems on this,or any other,parcel.
B) An alternative plan and/or professional design will be submitted to the Department of Public Works for approval AND the
system will be located as not to adversely affect any septic systems on this,or any other,parcel.
If you have further questions pertaining to parcel drainage and stormwater management Mason County's Public Works
Department can provide additional instructions,guidance and examples.(Section 14.48.130)contact Public works at:
Phone:(360)-427-9670 EXT.450
Mail: P 0 Box 1850, Shelton WA 98584
Physical:415 N 6th St,Shelton WA 98584
If this development has,or will have,a septic/drainfield system you may need to contact Mason County Division of
Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this,or
any other,parcel.You may also wish to consult with the septic design professional involved with the project. Mason
County Division of Environmental Health can be reached at:
Phone:(360)-427-9670 EXT.352
Mail:P 0 Box 1666, Shelton WA 98584
Physical:426 W Cedar St, Shelton WA 98584
A condition will be added to the building permit that states,in part,that all conditions the stormwater site plan will be met
prior to a request for final inspection of the building permit.
Owner/Builder/Agent Acknowledges that submission of inaccurate information may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below.I declare that I am the owner,owner's legal representative,or the contractor.I
further acknowledge that the information provided is accurate and employees of Mason County are granted access to the above-
described property for review and inspection as may be required.
X Owner/Agent/Contractor(circle one)Date:
Page 2 of 2
MASON COUNTY COMMUNITY SERVICES Permit No:1E 5020 2O f 5;1pZ
PERMIT ASS/STANCE CENTER:
BUILDING-PLANNING•PUBLIC HEALTH•FIRE MARSHAL
r�1 ` Co W.Alder Street,Shelton,WA 98584 K'F•i 1 _E I V�`7
Phone Shelton:(360)427-9670 ext.352-Fax:(360)427-7798 Phone V���rrrVV V
Beltair.(360)275-4467•Phone Elma:(360)482-5269 DEC - 8 2021
BUILDING PERMIT APPLICATION I L®'N
PROPERTY OWNER INFORMATION: CONT
NAME:Anthony Kraskouskas NEE:Counter-Fit Construction,Inc
MAILING ADDRESS:130 E.Lund Dr MAILING ADDRESS:5619 Countryside Beach Dr NW
CITY:Shelton STATE:WA ZIP:98584 C=:Olympia STATE:WA ZIP:98602
PHONE#1:253-341-0840 PHONE:360-791-5666 CELL:
PHONE#2: EMAIL:counterfitconstruction@gmail.com
EMAIL:tkraskouskas@icloud.com L&I REG#COUNTC1934JF EXP.Jarl 20�4
PRIMARY CONTACT: OWNER❑ CONTRACTOR Q OTHER❑
NAME counter-Fdconswdion,Inc EMAIL counterfitconstruction@gmail.com
MAILING ADDRESS 5619 Countryside Beach Dr NW CITY 0tynpla STATE WA ZIP98502
PHONE 360-791-5666 CELL
PARCEL INFORMATION:
PARCEL NUMBER(12 Digit Number) 32 1 30-7 5-9 01 42 ZONING RR5
LEGAL DESCRIPTION(Abbreviated)Tr 14-B of Survey 4/74 30/139 Tr B of SP#800 FIRE DISTRICT 6
_ SITE ADDRESS 130 E.Lund Dr CITYShelton
DIRECTIONS TO SITE ADDRESS East on Brockdale Rd,right onto E.Jensen Rd,continue until Lund Dr
IS THE PROJECT WITHIN 300 FT OF SLOPE(S)GREATER THAN 14%: YES❑ NO E] SNOW LOAD:Apsf
IS PROPERTY WITHIN 200 FT OF THE FOLLOWING: (Check all that apply):
SALTWATER❑ LAKE❑ R1VER/CREEK❑ POND❑ WETLAND❑ SEASONAL RUNOFF❑ STREAM❑
TYPE OF WORK: NEW❑ ADDITION❑ ALTERATION❑ REPAIR❑ OTHER ❑
USE OF STRUCTURE(Residence.Garage.Commercial Bldg,Etc.)Vehicle garage/storage
IS USE: PRIMARY 0 SEASONAL❑ NUMBER OF BEDROOMS 0 NUMBER OF BATHROOMS 0
HEATED STRUCTURE? YES(Whole Bldg)❑ YES(Pat(sI of Bldg)❑ NO 0
DESCRIBE WORK Construct new detached garage building for while and general storage.Install covered breezeway between proposed sWclure and aA ft garage
SQUARE FOOTAGE:(purposed)
IST FLOOR sq.ft. 2ND FLOOR sq.ft. 3RD FLOOR sq.ft. BASEMENT sq.&
DECK sq.ft. COVERED DECK sq.ft. STORAGE sq.ft. OTHER sq.ft.
GARAGE 851 sq.ft. Attached❑ Detached(] CARPORT sq.ft. Attached❑ Detached❑
MANUFACTURED HOME INFORMATION: *4 COPIES OF THE FLOOR PLAN REQUIRED*
MAKE MODEL YEAR LENGTH
WIDTH BEDROOMS BATHS SERIAL NUMBER
ENVIRONMENTAL HEALTH:
SEWAGE/SEWER SOURCE: SEPTIC 0 SEWER❑ / NEW❑ EXISTING
PLUMBING IN STRUCTURE? YES❑ NO 0 If yes,attach completed Water Adequacy Form
PERIMETER/FOUNDATION DRAINS PROPOSED? YES❑ NOQ EXISTING SQ.FT.
EXISTING BEDROOMS PROPOSED BEDROOMS TOTAL BEDROOMS
OWNER acknowledges that submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by
signature below.I declare that I am the owner and I further declare that I am entitled to receive this permit and to do the work as proposed.I have
obtained permission from all the necessary parties,including any easement holder or parties of interest regarding this project. The owner or legal
representative,represents that the Information provided is accurate and grants employees of Mason County access to the above described property
and structure(s)for review and inspection. This permit/application becomes null&void if work or authorized construction is not commenced within 180
days or if construction work is suspended for a period of 180 days.
OOF OF CONTINU ON THIS PERMIT IS BY MEANS OF INSPECTION. INACTIVITY OF THIS
E AP I 1 0 DAYS O ORE WILL CAUSE THE APPLICATION TO BE EXPIRED.(MASON
COUNTY CODE 14.08.42)
X
Signature of OWN (Must be signed by the OWNER) Date
DEPARVHNTAL REVIE APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS
BUILDING
PLANNING DEPARTMENT
FIRE MARSHAL
PUBLIC HEALTH