Loading...
HomeMy WebLinkAboutBLD2022-01522 Final Garage - BLD Inspections - 10/31/2023 j MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584 1 � SHELTON:360-427-9670,EXT 352 COMMUNITY SERVICES BELFAIR:360-275-4467,EXT 352 Building,Planning,EnvironmeMnl Health,Community Health ELMA:360-482-5269,EXT 352 — www.co.mason.wa.us INSPECTION CARD AND CERTIFICATE OF OCCUPANCY*" To schedule an inspection call or visit http://www.co.mason.wa.us/community-services/bid-inspectio hp Permit Number BLD2022-01522 Date Issued 06/07/2023 Issued Project NEW GARAGE ATTACHED TO EXISTING GARAGE&HOUSE Site Address 130 E Lund Dr Applicant KRASKOUSKAS ANTHONY PETER III&BONNIE JANE Contractor COUNTER-FIT CONSTRUCTION INC Contractor Phone 1.360.791.5666 Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type Permit Type GARAGE/STORAGE Occupancy -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION, FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. "THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED." PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works Access/Driveway Other Health Septic Well Deptartment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Building Official: Community Services Designee Department Concrete Setbacks 2- Slab Footing Perimeter Point load Footing Footing Interior Footing Decks/Porches Foundation Stem Walls Z Z3_ �[_ i Other Rough-In Groundwork Plumbing Framing Groundwork Mechanical Plumbing Groundwork Gas Pipe Mechanical Gas Piping Shear Wall Nailing Underfloor ems, -PS Other Insulation Slab Ceiling Floor Vaulted Ceiling Walls Vapor Barrier Other Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building 1,p_31,22, 1 r Manufactured Setbacks Setup Home Concrete Foot/Runners Final Other A r � MASON COUNTY 360-427-9670 Shelton ext.352 -275-4467 Belfair ext.352 COMMUNITY SERVICES 3 360-485 69 Elma ext.352 Building, Planning,Environmental Health,Community Health 615 W.Alder St.Bldg.8 - Shelton,WA 98584 www.masoncountywa.gov CORRECTION/INSPECTION REPORT PERMIT/CASE NUMBER: &Qo10.2a' ADDRESS/LOCATION: 136 E LvA b l7r FINDINGS: Lk ee- CLAv 2^of AJAYad jjj 4,e DDO SoA) -)--ifAo-Ocoo.v7YWA.Go✓ Items listed above must be corrected to gain compliance. ❑ THIS IS NOT A COMPLETE INSPECTION ❑ This structure has been inspected by Mason County Building Department and the items listed above are in VIOLATION of Mason County laws and/or ordinances. ❑ Call for re-inspection when corrections are made before proceeding with any further work. Make corrections, items will be checked on the next inspection. OK to &A1 Q PI-bfiog 1)ct^vn,,cA�I Date: 5 30-D q ❑ Please contact our office regarding possible Department: Run structural damage incurred by recent Inspector: ,DED "natural/man made"disasters.This is NOT a CORRECTION NOTICE. DO NOT REMOVE THIS TAG MCC14.12 Mason County iy Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov F 2-01522 GARAGE/ STORAGE DESCRIPTION: NEW GARAGE ATTACHED TO EXISTING ISSUED: 06/07/2023 HOUSE ESS: 130 E LUND DR SHELTON EXPIRES: 12/04/2023 PARCEL: 321307590142 APPLICANT: KRASKOUSKAS ANTHONY PETER III& OWNER: KRASKOUSKAS ANTHONY PETER III& BONNIE JANE BONNIE JANE 130 E LUND DR 130 E LUND DR SHELTON,WA 98584 SHELTON,WA 98584 253-341-0840 CONTRACTOR: COUNTER-FIT CONSTRUCTION INC 5619 COUNTRYSIDE BEACH DR NW OLYMPIA,WA98502 1.360.791.5666 GENERAL CONTRACTOR'S LICENSE: COUNTER-FIT CONSTRUCTION INC License: COUNTC1934JF 5619 COUNTRYSIDE BEACH DR NW Expires: 01/27/2024 OLYMPIA,WA98502 1.360.791.5666 VALUATIONS: FEES: Paid Due U VB Utility, miscellaneous 851.00 $51,425.93 Building Permit Fee $715.82 $0.00 Planning Review Fee $240.00 $0.00 State Fee-Residential $6.50 $0.00 Change in Tenant- Minor EH $125.00 $0.00 Plan Review Plan Check Fee $465.28 $0.00 Technology Surcharge $23.62 $0.00 Total: $51,425.93 Totals : $1,576.22 $0.00 REQUIRED INSPECTIONS Setback Inspection Rough- Plumbing Inspection Footing Inspection Mechanical Inspection Foundation Wall-Pre-Pour Inspection Insulation Inspection Printed by:Amber Selby on:06/07/2023 01:32 PM Page 1 of 5 1 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov GARAGE/ STORAGE BLD2022-01522 Shearwall Inspection BLD-Final Inspection Framing Inspection CONDITIONS * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate building permit and approval prior to construction of the retaining wall. * When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by the Mason County Department of Public Works. For more information contact Public Works, at(360)427-9670, ext. 450 or 100 W Public Works Dr. Shelton. The building permit will not be finaled until the permit holder can show proof that the access permit from Public Works has been finaled and approved. * Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled"Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater management system have been installed as approved on the stormwater site plan. Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. Printed by:Amber Selby on:06/07/2023 01:32 PM Page 2 of 5 Mason County y Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov GARAGE/ STORAGE BLD2022-01522 * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way. * REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. A drip edge shall be provided at eaves and gables of shingle roofs. * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * All changes to "approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. * The foundation/footing must be placed on undisturbed, firm-native soil. Proper frost depth shall be observed below grade in undisturbed soils. * The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. * Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. * By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. * When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and approved by the Washington State Department of Transportation. For more information contact Washington State Department of Transportation, at (206)357-2620, ext. 630. Printed by:Amber Selby on:06/07/2023 01:32 PM Page 3 of 5 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov GARAGE/ STORAGE BLD2022-01522 * OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. * The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10 gallons is not allowed without the approval of the Mason County Fire Marshal. * Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed. * Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2). * Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor & Industries (L&I). For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415- 4000. * Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. * WIND LOADS - Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind speed for Mason County is 85 MPH. * All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee(refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. * All property lines shall be clearly identified at the time of foundation inspection. * This structure is limited to U-occupancy use only (private garages, carports, sheds, and agricultural buildings.) Any other use will be in violation of the international codes and Mason County Regulations unless a "Change of Use" permit is applied for, reviewed and approved. * This structure is approved as unheated space. To be considered unheated space the area may be provided with a heating system that does not exceed maxium output of 1 watt per square foot., or 3.4 Btu/h per square foot. A permit and approval is required prior to installation of any heating system. When a heating system exceeds 1 watt per sq.ft (or 3.4 btu/h per sq. ft)the heated space shall be insulated in accordance with the energy code in effect at the time of permit application. Printed by:Amber Selby on:06/07/2023 01:32 PM Page 4 of 5 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov GARAGE/ STORAGE BLD2022-01522 * Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * Applicant/Owner assumes all responsibility if On-site Sewage Components are encumbered. A.) Drainfield/Reserve requires a 1 Oft setback from all footing/foundations. B.) Septic tank(s) requires 5ft setback from all footing/foundations. C.) No foundation/ Perimeter Drains within 30ft, down gradient of Drainfield/Reserve area. D.) No Cut Bank(s) (greater than 5ft and over 45 degrees)within 50ft, down gradient of Drainfield/Reserve area. * Must adhere to HMP/CLMP planting requirements. • Monitoring and maintenance shall be provided for the installed vegetation for 3 years or duration recommended by the author of an HMP, whichever is longer. Each plant shall be inspected for survival and vigor. Installed plants that die shall be replaced with the same species or another native species of the same height class with approval from Mason County. A brief letter report with photographs summarizing monitoring findings shall be submitted to Mason County Planning by 1 Oct of each monitoring year. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances go erning this type of work will be complied with whether specified herein or not. T e granting of ermit does not presume to give authority to violate or cancel the provisions o ny oX er scat cal regulating construction or the performance of construction. Issued Contractor or Authorized Agent: Dater �U Printed by:Amber Selby on:06/07/2023 01:32 PM Page 5 of 5 Page 1 of 91 L0aoa2� O 59,a ��-u� �/�S -- A) 6�1Zq(oE- S T-L rit-A l �o k . Luio6 1 3a13D- 75-- 50�ya 05/18/2023 APPROVED Digitally SCR�signed MASON COUNTY tTD,/CDnPLANNING by Scott 5C07 I RUEDYA top Ruedy n 1 EH Setbacks A.) Drainfield/Reserve requires l0'setback from footing/foundations EH APPROVED B.)Septic tank(s)requires 5'setback from all footing/foundations C.)No foundation/Perimeter Drains within 30ft,downgradient of Rhonda Thompson 01/1 312 0 2 3 Drainfield/Reserve area D.)No Cut Bank(s)(greater than 5ft and over 45 degrees)within 50ft down gradient of Drainfield/Reserve area RR5 Zoning Front Yard Setback. 25'. Side & Rear Yard Setbacks. Residential dwelling and accessory structures is 20'. OR 10% width of lot if not more than 100' wide OR approved ADV Xl��r✓ � 4 to `A 5 n ,a m1n Reserve DF in y� between 1 See Mitigation Plan for planting requirements Planting must be completed prior to final. r'�""'_'O'ENSE Page 2 of 2 REPLANTING OF PROPOSED PLANTING OF ��� SUBJECT PARCEL PROPOSED NEW STRUCTURE CLEARED BUFFER AREA INCLUDING (6)VINE MAPLE&(5)OSOBERRY I�i TYPE NS STREAM f 2 ROOF OVERHANG (9)SALAL,(9)EVERGREEN HUCK. WHERE THE LANDSCAPE ALLOWS. (9)OREGON GRAPE,(14)WESTERN TOTAL MITIGATION AREA BASED ON cv SWORD FERN,(VIA SEED)MILKWEED. PLANT SPACING RADIUS OF 5'ON 75'TYPE NS STREAM BUFFER EXISTING CARPORT TOTAL MITIGATION AREA BASED ON CENTER PER PLANT=215.93SQ.FT. 15'BUFFERSETBACK EXISTING SFR ZONE SIZE 727 SQ.FT. 'I'L5' ---4--- PROPOSED BUFFER REDUCTION ESTIMATED DRAINFIELD AREA MITIGATION ZONE A MASON CO.PARCELS 7 zoNE a j MITIGATION ZONE B MASON CO.10'CONTOURS % \ : ESTIMATED TOP OF SLOPE ® MASON CO.STREET CENTERLINES r EXISTING CLEARED AREA(0.37 ACRES) ♦�r`!�..•,ZrUNE. � �� I i 2,475SQ.FT. EXISTING ��..�� a,,,•^tee. SINGLE-FAMILY J +de��+ ..• Li•.y s L_—_— -- r RESIDENCE/ATTACHED GARAGE (INCLUDING ROOF OVERHANGS) SQ.FT. PROPOSED BUFFER 24'x 34' 1T x 32' REDUCTION (1,109 SOFT 544 SQ.FT. TOTAL AREA OF EXISTING ,♦ /' PROPOSED GARAGE, CARPORT 5'x 5'WALKWAY, (TO BE REMOVED) / 2'ROOF OVERHANG) aZONEA I 0 10 20 40 60 FT Property owner is responsible to providing monitoring. I TOTAL PROPOSED STRUCTURAL'ROOF PRINT'FOR PROJECT — (EXISTING SFR/ATTACHED GARAGE&PROPOSED SEMI-ATTACHED GARAGE) 3,584 SQ.FT. MAXIMUM BUFFER WIDTH REDUCTION PROPOSED: 37.33%(281 PROPOSED BUFFER REDUCTION AREA: 470 SQ.FT. PROPOSED BUFFER MITIGATION AREA: 943 SQ.FT. PROPOSED MITIGATION RATIO: FIELDWORK CONDUCTED 2:1 10 FEBRUARY 2023 0 10 20 40 60 FT This map is not survey quality.Locations and measurements are approximate.Boundary informationdepieted SITE PLAN: 130 E LUND DR.,SHELTON,WA 98584 herein has been obtained from the Mason County GIS Parcel Layer.GPS data was collected during fieldwork CRATER LAND USE CONSULTING using a Juniper Geode with GNS3 sub4netar accuracy inappropriate conditions.Addifionalfeaturts shown ara DATE 21APRIL2023 STR SEC 30 TWP 21 N,RNG 03W from information supplied by the Client or obtained from State and Local GIS data.We assume no lability for 477 PARPALA ROAD,NASELLE,WA 98638 discrepancies between this site plan and ground conditions. CLIENT KRASKOUSKAS,ANTHONY LAVLONG 47.275349°,-123.101601° 509-942-9309 RYAN@CRATERLUC.COM COUNTY MASON,WA SIZE 1.60ACRES COORDINATE SYSTEM:NAD mal Co atePlane Washingmn North FIPS 4601 Feet PARCEL 4 321307520142 ZONING RR 5 PROJECTION:Lambert Conformal Conic 1 330' j S 0' Open Space I dam. 03 CIO 375' ( 37 I O x " 3 0a i ON w _ W _ N L - - - - - i T 330' N 1 " = 50' jw J L ,& P-D xr. 1 Name & Parcel#30RV30 —75-- / N13— Mason County DEC - 8 2022 Department of Community Development Small Parcel Stormwater Management Application1"4%1"e QMotf 2) Per Mason County Code,Title 14, Chapter 14.48 a stormwater site plan is required whenever a building application is made for residential development, or redevelopment',with more than 2,000 square feet of impervious surfacez. P Y P P e � 6 N 'Redevelopment means,on an already developed site,the creation or addition of impervious surfaces,struc „ t including construction, installation or expansion of a building or other structure,and/or replacement of impervious surface that is not part of a routine maintenance activity,and land disturbing activities associated with structural or impervious redevelopment. 2Common impervious surfaces include,but are not limited to,rooftops,walkways,patios,driveways,parking lots or storage areas, concrete or asphalt paving,gravel roads,packed earthen materials,and oiled,macadam or other surfaces which similarly impede the natural infiltration of stormwater.Open,uncovered retention/detention facilities shall not be considered as impervious surfaces. To Calculate Impervious Surfaces Please Complete This Table Surface Type Length X Width = Area *All dimensions in feet Buildings X = X = Measurements for buildings are taken at the X _ perimeter of the farthest projections(example: eaves/gutters) X = Driveways X = X = Length of drive begins at the right of way X = Parking Areas X = X = Any paved, gravel or packed area per definition above table X = Patios/Walks X = X = Any paved, gravel or packed area per definition above table X = Others X = X = If the total impervious area of the proposed site X = development is greater than 2000 square feet a Small Parcel Stormwater Site Plan is Required Total Impervious Surface Area (sum of all areas) If the Total Impervious Surface Area is LESS THAN 2000 Square Feet, please read,acknowledge and sign below. Based Upon the information you have provided a Stormwater Site Plan IS NOT required for this development activity. Owner/Builder/Agent Acknowledges that submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner,owner's legal representative,or the contractor.I further acknowledge that the information provided is accurate and employees of Mason County are granted access to the above- e erty r tew nd ' ction as may be required. Owner/Agent/Contractor(circle one)Date: C/VC If the T tal Impervious rface Area is GREATER THAN 2000 Square Feet, please read,acknowledge and sign the info tion provide on page 2 of 2. Page 1 of 2 Name Parcel# BLD# Mason County Department of Community Development Small Parcel Stormwater Management Application/Worksheet (page 2 of 2) Based Upon the information you have provided a Stormwater Site Plan /S Required for this development activity. Title 14,Chapter 14.48 of the Mason County Code(MCC)regulates compliance requirements for Stormwater Management in this jurisdiction.A complete copy of the ordinance can be found on the Mason County website: http//www.co.mason.wa—us/code/commissioners/index.htm Please follow the links to "Title 14,Chapter 14.48 Stormwater Management". Regulated activities shall be conducted only after Mason County Public Works approves a stormwater site plan . (Mason County Code Title 14 Chapter 14.48 section 14.48.70).You will receive a copy of the Public Works document entitled"Managing Storm Drainage on Small Lots,The Small Parcel Stormwater Site Plan".This document will assist you in preparing the necessary information and plans for Public Works to review and approve. Per Department of Public Works this document will constitute an approved plan if all of the relevant details* are to be installed in their entirety AND no part of the stormwater system adversely affects any septic system(see Environmental Health information below). If an alternative system is to be used a plan will need to be submitted to Public Works for approval. A design by a registered professional may be required for more complex sites. *These details are found in the document Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan on the pages that begin with"Handout" PLEASE INITIAL BELOW TO INDICATE THE STORMWATER MANAGEMENT PLAN FOR THIS SITE A) The relevant details from Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan will be installed in their entirety AND the system will be located as not to adversely affect any septic systems on this,or any other,parcel. B) An alternative plan and/or professional design will be submitted to the Department of Public Works for approval AND the system will be located as not to adversely affect any septic systems on this,or any other,parcel. If you have further questions pertaining to parcel drainage and stormwater management Mason County's Public Works Department can provide additional instructions,guidance and examples.(Section 14.48.130)contact Public works at: Phone:(360)-427-9670 EXT.450 Mail: P 0 Box 1850, Shelton WA 98584 Physical:415 N 6th St,Shelton WA 98584 If this development has,or will have,a septic/drainfield system you may need to contact Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this,or any other,parcel.You may also wish to consult with the septic design professional involved with the project. Mason County Division of Environmental Health can be reached at: Phone:(360)-427-9670 EXT.352 Mail:P 0 Box 1666, Shelton WA 98584 Physical:426 W Cedar St, Shelton WA 98584 A condition will be added to the building permit that states,in part,that all conditions the stormwater site plan will be met prior to a request for final inspection of the building permit. Owner/Builder/Agent Acknowledges that submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below.I declare that I am the owner,owner's legal representative,or the contractor.I further acknowledge that the information provided is accurate and employees of Mason County are granted access to the above- described property for review and inspection as may be required. X Owner/Agent/Contractor(circle one)Date: Page 2 of 2 MASON COUNTY COMMUNITY SERVICES Permit No:1E 5020 2O f 5;1pZ PERMIT ASS/STANCE CENTER: BUILDING-PLANNING•PUBLIC HEALTH•FIRE MARSHAL r�1 ` Co W.Alder Street,Shelton,WA 98584 K'F•i 1 _E I V�`7 Phone Shelton:(360)427-9670 ext.352-Fax:(360)427-7798 Phone V���rrrVV V Beltair.(360)275-4467•Phone Elma:(360)482-5269 DEC - 8 2021 BUILDING PERMIT APPLICATION I L®'N PROPERTY OWNER INFORMATION: CONT NAME:Anthony Kraskouskas NEE:Counter-Fit Construction,Inc MAILING ADDRESS:130 E.Lund Dr MAILING ADDRESS:5619 Countryside Beach Dr NW CITY:Shelton STATE:WA ZIP:98584 C=:Olympia STATE:WA ZIP:98602 PHONE#1:253-341-0840 PHONE:360-791-5666 CELL: PHONE#2: EMAIL:counterfitconstruction@gmail.com EMAIL:tkraskouskas@icloud.com L&I REG#COUNTC1934JF EXP.Jarl 20�4 PRIMARY CONTACT: OWNER❑ CONTRACTOR Q OTHER❑ NAME counter-Fdconswdion,Inc EMAIL counterfitconstruction@gmail.com MAILING ADDRESS 5619 Countryside Beach Dr NW CITY 0tynpla STATE WA ZIP98502 PHONE 360-791-5666 CELL PARCEL INFORMATION: PARCEL NUMBER(12 Digit Number) 32 1 30-7 5-9 01 42 ZONING RR5 LEGAL DESCRIPTION(Abbreviated)Tr 14-B of Survey 4/74 30/139 Tr B of SP#800 FIRE DISTRICT 6 _ SITE ADDRESS 130 E.Lund Dr CITYShelton DIRECTIONS TO SITE ADDRESS East on Brockdale Rd,right onto E.Jensen Rd,continue until Lund Dr IS THE PROJECT WITHIN 300 FT OF SLOPE(S)GREATER THAN 14%: YES❑ NO E] SNOW LOAD:Apsf IS PROPERTY WITHIN 200 FT OF THE FOLLOWING: (Check all that apply): SALTWATER❑ LAKE❑ R1VER/CREEK❑ POND❑ WETLAND❑ SEASONAL RUNOFF❑ STREAM❑ TYPE OF WORK: NEW❑ ADDITION❑ ALTERATION❑ REPAIR❑ OTHER ❑ USE OF STRUCTURE(Residence.Garage.Commercial Bldg,Etc.)Vehicle garage/storage IS USE: PRIMARY 0 SEASONAL❑ NUMBER OF BEDROOMS 0 NUMBER OF BATHROOMS 0 HEATED STRUCTURE? YES(Whole Bldg)❑ YES(Pat(sI of Bldg)❑ NO 0 DESCRIBE WORK Construct new detached garage building for while and general storage.Install covered breezeway between proposed sWclure and aA ft garage SQUARE FOOTAGE:(purposed) IST FLOOR sq.ft. 2ND FLOOR sq.ft. 3RD FLOOR sq.ft. BASEMENT sq.& DECK sq.ft. COVERED DECK sq.ft. STORAGE sq.ft. OTHER sq.ft. GARAGE 851 sq.ft. Attached❑ Detached(] CARPORT sq.ft. Attached❑ Detached❑ MANUFACTURED HOME INFORMATION: *4 COPIES OF THE FLOOR PLAN REQUIRED* MAKE MODEL YEAR LENGTH WIDTH BEDROOMS BATHS SERIAL NUMBER ENVIRONMENTAL HEALTH: SEWAGE/SEWER SOURCE: SEPTIC 0 SEWER❑ / NEW❑ EXISTING PLUMBING IN STRUCTURE? YES❑ NO 0 If yes,attach completed Water Adequacy Form PERIMETER/FOUNDATION DRAINS PROPOSED? YES❑ NOQ EXISTING SQ.FT. EXISTING BEDROOMS PROPOSED BEDROOMS TOTAL BEDROOMS OWNER acknowledges that submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner and I further declare that I am entitled to receive this permit and to do the work as proposed.I have obtained permission from all the necessary parties,including any easement holder or parties of interest regarding this project. The owner or legal representative,represents that the Information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null&void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. OOF OF CONTINU ON THIS PERMIT IS BY MEANS OF INSPECTION. INACTIVITY OF THIS E AP I 1 0 DAYS O ORE WILL CAUSE THE APPLICATION TO BE EXPIRED.(MASON COUNTY CODE 14.08.42) X Signature of OWN (Must be signed by the OWNER) Date DEPARVHNTAL REVIE APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS BUILDING PLANNING DEPARTMENT FIRE MARSHAL PUBLIC HEALTH