HomeMy WebLinkAbout59-91 - Ord. Regulating Development in Flood Hazard Areas ORDINANCE NO. 59-91
IN THE MATTER OF:
AN ORDINANCE TO PROMOTE THE PUBLIC HEALTH, SAFETY, AND
GENERAL WELFARE, AND TO MINIMIZE PUBLIC AND PRIVATE
LOSSES BY REGULATING DEVELOPMENT IN FLOOD HAZARD AREAS
OF MASON COUNTY.
WHEREAS, specific areas in the County of Mason are subject to
periodic flooding from streams and rivers resulting in serious
damages to properties within these areas; and
WHEREAS, financial assistance is available through the National
Flood Insurance Program for damages resulting from flooding; and
WHEREAS, Mason County shall be reinstated into the National Flood
Insurance Program upon the adoption of this ordinance; and
WHEREAS, The Skokomish River Valley Flood Control Advisory
Committee and residents concerns were recognized through public
meetings and incorporated into this ordinance; and
WHEREAS, a comprehensive planning process for the development of
a Skokomish River Watershed Flood Control Comprehensive Plan ,all
begin following the adoption of this ordinance; and
WHEREAS, The Planning Commission of Mason County held a public
hearing on May 3, 1991 continued to May 9, 1991 to consider all
testimony and exhibits filed regarding flood damage prevention
regulations; and
WHEREAS, The Planning Commission of Mason County has reviewed all
testimony and exhibits and hereby recommends adoption of the
ordinance; and
WHEREAS, The Board of Mason County Commissioners held a public
hearing on May 23, 1991, for the purpose taking public testimony,
reviewing the Planning Commission recommendation, and to deliberate
on action to be taken;
NOW, THEREFORE, BE IT HEREBY ORDAINED, that the Board of Mason
County hereby ADOPTS the Flood Damage Prevention Ordinance of Mason
County as follows:
FLOOD °TI ORDINANCE
Mason County
SECTION 1®
STATUTORY AUTHORIZATION, FINDINGS OF FACT. PURPOSE, AND OBJECTIVES
1. 1 STATUTORY AUTHORIZATION
The legislature of the State of Washington has delegated the
responsibility to local governmental units to adopt regulations
designed to promote the public health, safety, and general welfare
of its citizenry® Regulations for the Skokomish River Valley set
forth in section 5. 4 are interim pending on the completion of a
kokomish River Watershed Flood Control Comprehensive Flan.
Therefore, The Board of Mason County Commissioners, Washington does
ordain as follows:
1. 2 FINDINGS OF FACT
( 1 ) The flood hazard areas of Mason County are subject to
periodic inundation which results in the loss of life
and property, health and safety hazards, disruption of
commerce and governmental services, extraordinary public
expenditures for flood protection and relief, and
impairment of the tax base; all of which adversely affect
the public health, safety, and general welfare.
( ) These flood losses are caused by the cumulative effect
of obstructions in areas of special flood hazards which
increase flood heights and velocities and when
inadequately anchored, damage uses in other areas. Uses
that are inadequately floodroofed, elevated, or
otherwise protected from flood damage also contribute to
the flood loss.
(C) Current methods of flood control, particularly in the
kokomish Valley, have proven unsatisfactory to local
residents and governmental agencies® Comprehensive flood
control measures are necessary to satisfy governmental
concerns but which will at the same time allow property
owners to protect their property.
1. 3 STATEMENT OF PURPOSE
It is the purpose of this ordinance to promote the public health,
safety, and general welfare, and to minimize public and private
losses due to .flood conditions in specific areas by provisions
designed:
Required for approval by E MA/Washington Department of Ecology
1
( 1 ) To protect human life, health, and property,
(2) To minimize expenditure of public money and costly flood
control projects;
(3) To minimize the need for rescue and relief efforts
associated with flooding and generally undertaken at the
expense of the general public;
(4) To minimize prolonged business interruptions;
(5) To minimize damage to public facilities and utilities
such as water and gas mains, electric, telephone and
sewer lines, streets, and bridges located in areas of
special flood hazard;
(6) To help maintain a stable tax base by providing for the
sound use and development of areas of special flood
hazard so as to minimize future flood blight areas;
(7) To ensure that potential buyers are notified that
property is in an area of special flood hazard; and,
(8) To ensure that those who occupy the areas of special
flood hazard participate, along with government, in
assuming responsibility for their actions, while at the
same time permitting those who occupy such areas the
ability to responsibly protect their property without
arbitrary and recriminating governmental action.
(9) To allow individuals to protect their life, health, and
property when it is done in accordance with all
applicable laws and regulations.
1. 4 METHODS OF REDUCING FLOOD LOSSES
In order to accomplish its purposes, this ordinance includes
methods and provisions for:
( 1 ) Restricting or prohibiting uses which are dangerous to health,
safety, and property due to water or erosion hazards, or which
result in damaging increases in erosion or in flood heights
or velocities;
(2) Requiring that uses vulnerable to floods, including
facilities which serve such uses, be protected against
flood damage at the time of initial construction;
(3) Controlling the alteration of natural flood plains,
stream channels, and natural protective barriers, which
help accommodate or channel flood waters;
(4) Controlling filling, grading, and other development which
may increase flood damage; and
(5) Preventing or regulating the construction of flood
barriers which will unnaturally divert flood waters or
may increase flood hazards in other areas.
(6) Controlling excessive erosion by constructing sound
erosion control structures and obtaining appropriate
permits and exemptions from all applicable local, state,
and federal jurisdictions.
2
SECTION 2. 0
DEFINITIONS
Unless specifically defined below, words or phrases used in this
ordinance shall be interpreted so as to give them the meaning they
have in common usage and to give this ordinance its most reasonable
application®
"A-ZONES" means those areas shown on the Federal Insurance Rate
Maps (FIRM) as that area of land within the flood plain which would
be inundated by the 1 -year- flood.
"ACCESSORY STRUCTURE" means nonresidential structures such as
detached garages, sheds, garden buildings, pole buildings, and
barns which are considered normal for farming and ranching
activities
"APPEAL" means a request for a review of the Director of General
Services interpretation of any provision of this ordinance or a
request for a variance.
"AREA OF SHALLOW FLOODING" means a designated AO or AH Zone on the
Flood Insurance Rate Map (FIRM) . The base flood depths range from
one to three feet; a clearly defined channel does not exist; the
Rath of flooding is unpredictable and indeterminate; and velocity
flow may be evident. AO is characterized as sheet flow and AH
indicates pending.
"AREA OF SPECIAL FLOOD HAZARD" means the land in the flood plain
within a community subject to a one percent or greater chance of
flooding at any given year. Designation on maps always includes
the letters A or V.
"BASE FLOOD" means the flood having a ( 1 ) percent chance of being
equalled or exceeded in any given year.
"CRITICAL FACILITY" means a facility for which even a slight chance
of flooding might be too great. Critical facilities include, but
are not limited to schools, nursing homes, hospitals, police, fire
and emergency response installations, installations which produce,
use, or store hazardous materials or hazardous waste.
"DEVELOPMENT" means any man-made change to improved or unimproved
real estate including, but not limited to buildings or other
structures, mining, dredging, filling, grading, paving, excavation,
or drilling operations located within the area of special flood
Hazard.
"FLOOD or FLOODING" means a general and temporary condition of
partial or complete inundation of normally dry land areas from:
( 1 ) The overflow of inland or tidal waters and/or
(2) The unusual and rapid accumulation of runoff of surface
waters from any source.
3
"FLOOD INSURANCE RATE MAP (FIRM) " means the official crap on which
the Federal Insurance Administration has delineated both the areas
of special flood hazards and the risk premium zones applicable to
the community.
"FLOOD INSURANCE STUDY" means the official report provided by the
Federal Insurance Administration that includes flood profiles, the
Flood Boundary-Floodway Map, and the water- surface elevation of the
base Flood.
"FLOOD PROTECTION ELEVATION" Means one foot above the base flood
elevation.
"FLaOODWAy" means the channel of a river or other watercourse and
the adjacent land areas that rust be reserved in order to discharge
the base flood without cumulatively increasing the water surface
elevation more than one foot.
"LOWEST FLOOR" means the lowest floor of the lowest enclosed area
(including basement) . An unfinished or flood resistant enclosure,
usable solely for parking of vehicles, building access or storage,
in an area other than a basement area, is not considered a
builder's lowest floor, provided that such enclosure is not built
so as to render the structure in violation of the applicable non-
elevation design requirements of this ordinance found at Section
a ®1 ( ) ®
"MANUFACTURED HOME" means a residential structure, transportable
in one or more sections, which is built on a permanent chassis and
is designed for use with or without a permanent foundation when
connected to the required utilities. For flood plain management
purposes the term "manufactured home" also includes park trailers,
travel trailers, and other similar vehicles placed on a site for
greater than 180 consecutive days. For insurance purposes the term
"manufactured home" does not include park trailers, travel
trailers, and other similar vehicles®
"MANUFACTURED HOME FADE OR SUBDIVISION" means a parcel ( or
contiguous parcels) of land divided into two or more manufactured
home lots for rent or sale.
"VIEW CONSTRUCTION" means structures for which the "start of
construction" commenced on or after the effective date of this
ordinance.
"PERMIT" means a written authorization from the Mason County
Department of General Services for any construction activity on all
lands regulated by this ordinance. Such permits shall include but
are not limited to excavation and grading permits for fills and
excavations under Chapter 7 of the Uniform Building Code,
shoreline permits for developments regulated by the Mason County
Shoreline Master~ Program, and building permits for all structures
4
under the Uniform Building Code.
ffPERSON" means any individual, partnership, corporation,
association, organization, cooperative, public or municipal
corporation, or any agency of the state or local government unit
however designated.
"SPECIAL FLOOD HAZARD AREA" means an area subject to a base or 100
year flood; areas of special flood hazard are shown on the flood
insurance rate map as Zone A, AO, Al-30, AE, A99, AH, VO, V1-30,
VE, or V.
"SPECIAL FLOOD RISK ZONE" means that area of the Skokomish River
Valley identified by the Federal Emergency Management Agency in the
scientific study entitled "The Flood Insurance Study for
Unincorporated Areas Mason", Community Panel Number 530115 0180,
Detailed Study Area.
"START OF CONSTRUCTION" includes substantial improvement, and means
the date the building permit was issued, provided the actual start
of construction, repair, reconstruction, placement, or other
improvement was within 180 days of the permit date® The actual
start means either the first placement of permanent construction
of a structure on a site, such as the pouring of slab or footings,
the installation of piles, the construction of columns, or any work
beyond the stage of excavation; or the placement of a manufactured
home on a foundation® Permanent construction does not include land
preparation, such as clearing, grading and filling; nor does it
include the installation of streets and/or walkways; nor does it
include excavation for a basement, footings, piers, or foundation
or the erection of temporary forms; nor does it include the
installation on the property of accessory buildings, such as
garages or sheds not occupied as dwelling units or not part of the
main structure.
"STRUCTURE" means a walled or roofed building including a gas or
liquid storage tank that is principally above ground.
"SUBSTANTIAL IMPROVEMENT" means any repair, reconstruction, or
improvement of a structure, the cost of which equals or exceeds 50
percent of the market value of the structure either:
( 1 ) Before the improvement or repair is started, or
(2) If the structure has been damaged and is being restored,
before the damage occurred® For the purposes of this
definition "substantial improvement" is considered to
occur when the first alteration of any wall, ceiling,
floor, or other structural part of the building commences
whether or not that alteration affects the external
dimension of the structure®
The term does not, however, include either:
( 1 ) Any project for improvement of a structure to comply with
existing state or local health, sanitary, or safety code
5
specifications which are solely necessary to assure safe
living conditions, or
(2) Any alteration of structure listed on the National
Register of Historic Places or a State Inventory of
Historic Places.
"VARIANCES" means a grant of relief from the requirements of this
ordinance which permits construction in a manner that would
otherwise be prohibited by this ordinance.
"WATER DEPENDENT" means a structure for commerce or industry which
cannot exist in any other location and is dependent on the water
by reason of the intrinsic nature of its operations®
"WETLANDS" means those lands transitional between terrestrial and
aquatic systems where the water table is usually at or near the
surface or the land is covered by shallow water. Wetlands have the
following three characteristics®
( 1 ) at least periodically, the land supports predominately
hydrophytes; and
(2) the substrate is predominately undrained hydric soil; and
(3) the substrate is nonsoil and is saturated with water or
covered by shallow water for some time during the growing
season of each year®
SECTION 3®
GENERAL PROVISIONS
3. 1 LANDS TO WHICH THIS ORDINANCE APPLIES
This ordinance shall apply to all areas of special flood hazards
and special flood risk zones within the jurisdiction of Mason
County®
*3. 2 BASIS FOR ESTABLISHING THE AREAS OF SPECIAL FLOOD HAZARD
The areas of special flood hazard identified by the Federal
Insurance Administration in a scientific and engineering report
entitle "The Flood Insurance Study for Mason County" dated
February 5, 1987, with accompanying Flood Insurance Maps is hereby
adopted by reference and declared to be part of this ordinance.
The Flood Insurance Study is on file at Mason County Planning
Department®
3. 3 PENALTIES FOR NONCOMPLIANCE
No structure or land shall hereafter be constructed, located,
extended, converted, or altered without full compliance with the
terms of this ordinance and other applicable regulations.
Violation of the provisions of this ordinance by failure to comply
with any of its requirements ( including violations of conditions
and safeguards established in connection with conditions) shall
constitute a misdemeanor. Any person who violates this ordinance
or fails to comply with any of its requirements shall upon
conviction thereof be fined not more than $1,,000 or imprisoned for
not more than C, da�s or both, for each violation, and in addition
shall pay all costs and expenses involved in the case. Nothing
herein contained shall prevent Mason County from taking such other
lawful action as is necessary to prevent or remedy any violation.
C® ABROGATION AND GREATER RESTRICTIONS
This ordinance is not intended to repeal, abrogate, or impair any
existing easements, covenants, or deed restrictions. However,
where this ordinance and another ordinance, easement, covenant, or
deed restriction conflict or overlap, whichever imposes the more
stringent restrictions shall prevail.
C® INTERPRETATION
In the interpretation and application of this ordinance, all
provisions shall be:
( 1 ) Considered as minimum requirements;
(2) Deemed neither to limit nor repeal any other powers
granted under State statutes.
® C WARNING AND DISCLAIMER OF LIABILITY
The degree of flood protection required by this ordinance is
considered reasonable for regulatory purposes and is based on
scientific and engineering considerations. Larger floods can and
will occur on rare occasions. Flood heights may be increased by
man-made or natural causes. This ordinance does not imply that
land outside the areas of special flood hazards or uses permitted
within such areas will be free from flooding or flood damages.
This ordinance shall not create liability on the part of Mason
County, any officer or employee thereof, or the Federal Insurance
Administration, for any flood damages that result from reliance on
this ordinance or any administrative decision lawfully made
hereunder®
SECTION 4®
ADMINISTRATION
4. 1 ESTABLISHMENT OF DEVELOPMENT PERMIT
*4. 1-1 Development Permit Required
A development permit shall be obtained before construction or
development begins within any area of special flood hazard
established in Section 3. 2 and special flood risk zones® The
permit shall be for all structures including manufactured homes,
as set forth in the "DEFINITIONS", and for all development
7
including fill and other activities, also as set forth in the
"DEFINITIONS".
4. 1-2 A.2p 1 ic t ion for _Deve�lom�ent �Permj�-t g�
Application for a development permit shall be made on forms
furnished by the Director of General Services and may include but
not be limited to plans in duplicate drawn to scale showing the
nature, location, dimensions, and elevations of the area in
question and existing or proposed structures, fill, storage of
materials, drainage facilities, and the location of the foregoing.
Specifically, the following information is required:
( 1 ) Elevation in relation to mean sea level, of the lowest
floor ( including basement ) of all structures;
(2) Elevation in relation to mean sea level to which any
structure has been floodproofed;
(3) Certification by a registered professional engineer or
architect that the floodproofing methods for any
nonresidential structure meet the floodproofing criteria
in Section 5. 2-2; and
(4) Description of the extent to which a watercourse will be
altered or relocated as a result of proposed development.
4. 2 DESIGNATION OF THE DIRECTOR OF GENERAL SERVICES
The Director of General Services is hereby appointed to administer
and implement this ordinance by granting or denying development
permit applications in accordance with its provisions.
® DUTIES AND RESPONSIBILITIES OF THE DIRECTOR OF GENERAL SERVICES
Duties of the Director of General Services shall include, but not
be limited to:
b3®1 Permit Review
( 1 ) Review all development permits to determine that the permit
requirements of this ordinance have been satisfied.
* (2) Review all development permits to determine that all necessary
permits have been obtained from those Federal, State, or local
governmental agencies from which prior approval is required.
(3) Review all development permits to determine if the proposed
development is located in the floodway. If located in the
floodway, assure that the provisions of Section 5. 3 are met.
*4. 3-2 Use of Other Base Flood Data
When base flood elevation data has not been provided in
accordance with Section 3. 2, BASIS FOR ESTABLISHING THE AREAS
OF SPECIAL FLOOD HAZARD, the Director of General Services shall
obtain, review, and reasonably utilize any base flood elevation
and floodway data available from a Federal, State, or other
source, in order to administer Sections 5. 2, SPECIFIC STANDARDS,
and 5. 3, FLOODWAYS.
*4. 3-3 Information to be Obtained and Maintained
( 1 ) Where base flood elevation data is provided through the
Flood Insurance Study or required as in Section 4. 3-2,
obtain and record the actual (as-built ) elevation ( in
relation to mean sea level) of the lowest floor,
including basement, of all new or substantially improved
structures, and whether or not the structure contains a
basement.
(2) For all new or substantially improved floodproofed
structures:
(1) verify and record the actual elevation ( in
relation to mean sea level) , and
( ii ) maintain the floodproofing certifications required
in Section 4. 1-2 (3) .
(3) Maintain for public inspection all records pertaining to
the provisions of this ordinance.
*4. 3-4 Alteration of Watercourses
( 1 ) Notify adjacent communities and the Washington State
Department of Ecology prior to any alteration or
relocation of a watercourse, and submit evidence of such
notification to the Federal Insurance Administration.
(2) Require that maintenance is provided within the altered
or relocated portion of said watercourse so that the
Mood carrying capacity is not diminished.
4. 3-5 2
re n Ite ptatin of FIRM Boundaries
--
Make interpretations where needed, as to exact location of the
boundaries of the areas of special flood hazards (for example,
where there appears to be conflict between a mapped boundary and
actual field conditions) . The person contesting the location of
the boundary shall be given a reasonable opportunity to appeal the
interpretation as provided by Section 4. 4.
4. 4 VARIANCE PROCEDURE
4. 4-1 &paaal Board
( 1 ) The Board of County Commissioners shall act as the Board
of Appeals to hear and decide appeals and requests for
variances from the requirements of this ordinance.
(2) The Board of Appeals shall hear and decide appeals when
it is alleged there is an error in any requirement,
decision, or determination made by the Director of
General Services in the enforcement or administration of
this ordinance.
(3) Those aggrieved by the decision of the Board of Appeals
or any taxpayer, may appeal such decision to the u Q
;?�gr 10 r
Court as provided in RCW IC,,.�ha ter 36. 70.
(4) In passing upon such applications, the Board of _Appeals
shall consider all technical evaluations, all relevant
factors, standards specified in other sections of this
ordinance, and;
i. the danger that materials may be swept onto
other lands to the injury of others;
iie the danger to life and property due to flooding or
erosion damage;
iii. the susceptibility of the proposed facility and
its contents to flood damage and the effect of
such damage on the individual owner;
iv. the importance of the services provided by the
proposed facility to the community;
vm the necessity to the facility of a waterfront
location, where applicable;
vib the availability of alternative locations for
the proposed use which are not subject to
flooding or erosion damage;
vii. the compatibility of the proposed use with
existing and anticipated development ;
viii. the relationship of the proposed use to the
comprehensive plan and flood plain management
program for that area;
ix. the safety of access to the property in times
of flood for ordinary and emergency vehicles;
X. the expected heights, velocity, duration, rate
of rise, and sediment transport of the flood
waters and the effects of wave action, if
applicable, expected at the site; and
xib the costs of providing governmental services
during and after flood conditions, including
maintenance and repair of public utilities and
facilities such as sewer, gas electrical, and
water systems, and streets and bridges.
(5) Upon consideration of the factors of Section 4. 4-1 (4) and
the purposes of this ordinance, the Board of sale may
attach such conditions to the granting of variances as
it deems necessary to further the purposes of this
ordinance.
(6) The Director of General Services shall maintain the
records of all appeal actions and report any variances
to the Federal Insurance Administration upon request.
4. 4-2 Conditions of Variances
( 1 ) Generally, the only condition under which a variance
from the elevation standard may be issued is for, new
construction and substantial improvements to be erected
on a lot of one-half acre or less in size contiguous to
and surrounded by lots with existing structures
constructed below the base flood level, providing items
(i-xi ) in Section 4. 4-1 (4) have been fully considered.
As the lot size increases the technical justification
required for issuing the variance increases®
(2) Variances may be issued for the reconstruction,
rehabilitation or restoration of structures listed on
the National Register of Historic Places or the State
Inventory of Historic Places, without regard to the
procedures set forth in this section.
(3) Variances shall not be issued within a designated
floodway if any increase in flood levels during the base
flood discharge would result®
(4) Variances shall only be issued upon a determination that
the variance is the minimum necessary, considering the
flood hazard, to afford relief®
(5) Variances shall only be issued upon:
i® a showing of good and sufficient cause-;
iim a determination that failure to grant the
variance would result in exceptional hardship
to the applicant;
iii. a determination that the granting of a
variance will not result in increased flood
heights, additional threats to public safety,
extraordinary public expense, create
nuisances, cause fraud on or victimization of
the public as identified in Section 4. 1-4(4) ,
or conflict with existing local laws or
ordinances.
(6) Variances as interpreted in the National Flood Insurance
Program are based on the general zoning law principle
that they pertain to a physical piece of property; they
are not personal in nature and do not pertain to the
structure, its inhabitants, econ OM4C
L or financial
circumstances. They primarily address small lots in
densely populated residential neighborhoods. As such,
variances from the flood elevations should be quite rare.
(7) Variances may be issued for nonresidential buildings in
very limited circumstances to allow a lesser degree of
floodproofing than watertight or dry-floodproofing, where
it can be determined that such action will have low
damage potential, complies with all other variance
criteria except 4. 4-2( l ) , and otherwise complies with
Sections 5. 1-1 and 5. 1-2 of the GENERAL STANDARDS.
(8) Any applicant to whom a variance is granted shall be
given written notice that the structure will be permitted
to be built with a lowest floor elevation below the base
flood elevation and that the cost of flood insurance will
be commensurate with the increased risk resulting from
the reduced lowest floor elevation.
SECTION 5. 0
PROVISTONS FOR FLOOD HAZARD REDUCTIOM
*5. 1 GENERAL STANDARDS
In all areas of special flood hazards as shown on the Federal
Insurance Rate Maps (FIRM) and as defined in section 2. 0, the
following standards are required:
*5. 1-1 Anchoring
( 1 ) All new construction and substantial improvements shall
be anchored to prevent flotation, collapse, or lateral
movement of the structure.
(2) All manufactured homes must likewise be anchored to
prevent flotation, collapse, or lateral movement, and
shall be installed using methods and practices that
minimize flood damage. Anchoring methods may include,
but are not limited to, use of over-the-top or frame ties
to ground anchors. (Reference FEMA's Manufactured Home
Installation in Flood Hazard Areas" guidebook for
additional techniques. )
*5. 1-2 Construction Materials and Methods
( 1 ) All new construction and substantial improvements shall
be constructed with materials and utility equipment
resistant to flood damage.
(2) All new construction and substantial improvements shall
be constructed using methods and practices that minimize
flood damage.
(3) Electrical, heating, ventilation, plumbing, and air-
conditioning equipment and other service facilities shall
be designed and/or otherwise elevated or located so as
to prevent water from entering or accumulating within
the components during conditions of flooding.
*5. 13 Utilities
( 1 ) All new and replacement water supply systems shall be
designed to minimize or eliminate infiltration of flood
waters into the system.
(2) New and replacement sanitary sewage systems shall be
designed to minimize or eliminate infiltration of flood
waters into the systems and discharge from the systems
into flood waters; and
(3) On-site waste disposal systems shall be located to avoid
impairment to them or contamination from them during
flooding.
12
*5. 1-4 Subdivision_Pro-2osals
( 1 ) All subdivision proposals shall be consistent with the
need to minimize flood damage;
( 2) All subdivision proposals shall have public utilities and
facilities such as sewer, gas electrical, and water
systems located and constructed to minimize flood damage;
(3) All subdivision proposals shall have adequate drainage
provided to reduce exposure to flood damage; and
(4) Where base flood elevation data has not been provided or
is not available from another authoritative source, it
shall be generated for subdivision proposals and other
proposed developments which contain at least 50 lots or
5 acres (whichever is less) .
® 1- Review of uildin Permits
Where elevation data is not available either through the Flood
Insurance Study or from another authoritative source (Section
4. 3-2) , applications for building permits shall be reviewed to
assure that proposed construction will be reasonably safe from
flooding® The test of reasonableness is a local judgement and
includes use of historical data, high water marks, photographs
of past flooding, etc. , where available. Failure to elevate at
least two feet above grade in these zones may result in higher
insurance rates.
5. 2 SPECIFIC STANDARDS
In all areas of special flood hazards and special flood risk zones
where base flood elevation data has been provided as set forth in
Section 3. 2, BASIS FOR ESTABLISHING THE AREAS OF SPECIAL FLOOD
HAZARD or Section Use of Other Base Flood Data, the following
provisions are required:
*5. 2-1 Residential Construction
( 1 ) New construction and substantial improvement of any®
residential structure shall have the lowest floor,
including basement, elevated one foot or more above base
Mood elevation.
(2) Fully enclosed areas below the lowest floor that are
subject to flooding are prohibited, or shall be designed
to automatically equalize hydrostatic flood forces on
exterior walls by allowing for the entry and exit of
floodwaters. Designs for meeting this requirement must
either be certified by a registered professional engineer
architect or must meet or exceed the following minimum
criteria:
i® a minimum of two openings having a total net
area of not less than one square inch for
every square foot of enclosed area subject to
13
flooding shall be provided®
ii. The bottom of all openings shall be no higher
than one foot above grade.
iii. openings may be equipped with screens,
louvers, or other coverings or devices
provided that they permit the automatic
entry and exit of floodwaters®
5. 2-2 Nonresidential Construction
New construction and substantial improvement of any commercial,
industrial or other nonresidential structure, except those defined
as an accessory structure, shall either have the lowest floor,
including basement, elevated one foot or more above the level of
the base flood elevation; or, together with attendant utility and
sanitary facilities, shall;
( 1 ) Be flood roofed so that below one foot above the base
Mood level, the structure is watertight with walls
substantially impermeable to the passage of water.
(2) Have structural components capable of resisting
hydrostatic and hydrodynamic loads and effects of
buoyancy;
(3) Be certified by a registered professional engineer or
architect that the design and methods of construction
are in accordance with accepted standards of practice
for meeting provisions of this subsection based on their
development and/or review of the structural design,
specifications and plans. Such certifications shall be
provided to the official as set forth in Section 4. 3-
3(2) .
(4) Nonresidential structures that are elevated, not
floodproofed, must meet the same standards for space
below the lowest floor as described in 5. 2-1 (2) .
( 5) Applicants flood proofing nonresidential buildings shall
be notified that flood insurance premiums will be based
on rates that are one foot below the floodproofed level
(e. g. a building flood roofed to one foot above the base
Mood level will be rated as at the base flood level ? ®
5. 2-3 Accessory Structures
Construction or substantial improvement of accessory structures,
as defined in section 2. 0, shall either have the lowest floor
elevated one foot or more above the level of the base flood
elevation; or must meet the following criteria :
( 1 ) A minimum of two openings having a total net area of riot
less than one square inch for every square foot of
enclosed area subject to flooding shall be provided.
(2) The bottom of all openings shall be no higher than one
foot above grade.
( 3) Openings may be equipped with screens, louvers, or other
14
coverings provided they may permit the automatic entry
and exit of flood waters.
(4) Structures shall not be designed for human habitation.
(5) Structures shall be firmly anchored to prevent flotation
which may result in damage to other structures.
(6) Service facilities such as electrical and heating
equipment shall be elevated or floodproofed.
5. 2-4 Critical Facility
Construction of new critical facilities shall be, to the extent
possible, located outside the limits of the base flood plain.
Construction of new critical facilities shall be permissible
within the base flood plain if no feasible alternative site is
available. Critical facilities constructed within the base flood
plain shall have the lowest floor elevated to three feet or more
above the level of the base flood elevation at the site.
Flood roofing and sealing measures must be taken to ensure that
toxic substances will not be displaced by or released into flood
waters. Access routes elevated to or above the level of the base
flood plain shall be provided to all critical facilities to the
extent possible.
5. 2-5 Manufactured Homes
All manufactured homes to be placed or substantially improved
within Zones Al-30, AH, and AE on the community"s FIRM shall be
elevated on a permanent foundation such that the lowest floor of
the manufactured home is one foot or more above the Base Flood
Elevation; and is securely anchored to an adequately anchored
foundation system in accordance with the provisions of section
5. 1-1 (2) .
*5. 3 FLOOD WAYS
Located within areas of special flood hazard established in Section
3. 2 are areas designated as floodways. Since the floodway is an
extremely hazardous area due to the velocity of flood waters which
carry debris, potential projectiles, and erosion potential, the
following provisions apply except to that zone of special flood
risk, Skokomish River Valley as defined in section 2. 0.
( 1 ) Encroachments are prohibited including fill, new
construction, substantial improvements, and other
development unless certification by a registered
professional engineer or architect is provided
demonstrating that encroachments shall not result in any
increase in flood levels during the occurrence of the
base flood discharge.
(2) Construction or reconstruction of residential structures
is prohibited within designated floodways, except for (i )
repairs, reconstruction, or improvements to a structure
15
which do not increase the ground floor area; and ( ii)
repairs, reconstruction, or improvements to a structure,
the cost of which does not exceed 50 percent of the
market value of the structure either, (A) before the
repair, reconstruction, or repair is started, or ( B) if
the structure has been damaged, and is being restored,
before the damage occurred. Work done on structures to
comply with existing health, sanitary, or safety codes
or to structures identified as historic places shall not
be included in the 50 percent determination.
(3) If Section 5. 3( l ) is satisfied, all new construction and
substantial improvements shall comply with all applicable
flood hazard reduction provisions of Sections 5. 0,
PROVISIONS FOR FLOOD HAZARD REDUCTION.
*5. 4 SPECIAL FLOOD RISK ZONE - SKOKOMISH RIVER VALLEY INTERIM REGULATIONS
This section shall apply to that area of the Skokomish River Valley
identified by the Federal Emergency Management Agency in the
scientific study entitled "The Flood Insurance Study for
unincorporated areas Mason County, Community Panel number 530115
0180, Detailed Study Area. It sets forth INTERIM REGULATIONS that
shall apply to this designated area. These interim regulations
shall be replaced using a comprehensive planning process which
recognizes the role of diking in flood control management efforts.
Interim shall be defined as that period of time between the
adoption of this ordinance and the adoption of a Skokomish River
Watershed Flood Control Comprehensive Plan and subsequent
amendments to these regulations. The following regulations and
construction standards shall apply to the special flood risk zone:
( 1 ) New construction and substantial improvements of
residential and nonresidential structures within the
special flood risk zone shall have the lowest floor
elevated one foot or more above the base flood elevation
and shall be constructed according to the standards
provided in subsections 5. 1, 1® , and 5. 2, 1® .
(2) Areas where flood water releases and overflows from the
main Skokomish River channel shall not be modified,
meaning levied or diked, in any manner which would result
in increased stream flow in the main channel until these
regulations are amended in accordance with an adopted
Skokomish Watershed Flood Control Comprehensive Plan.
(3) Maintenance to existing levees, dikes, and other water
flow modification structures shall be permitted with
appropriate approvals from all affected agencies provided
that the maintenance does not result in increased stream
flow within the main channel. Emergency alterations to
dikes and levees necessary for the protection of human
life and property shall be permitted.
(4) Alterations to dikes and levees, and bank stabilization
efforts that would prevent legitimate potential emergency
situations shall be permitted, PROVIDED; that all
affected agencies have been notified and appropriate
approvals have been acquired.
(5) Any fill that is allowed in the special flood risk zone
shall be confined to the actual building site, other
means of elevating structures shall be encouraged such
as posts, piles, and stem walls.
(6) Solid road fills perpendicular to the flow of water are
prohibited in the special flood risk zone® The graveling
of driveways and other access roads is exempt.
(7) To the extent feasible fills shall be compensated by cuts
or extraction of like amounts of materials to alleviate
the effect of the fill.
(8) The highest portion of any lot shall be utilized as the
building site. Lots partially in the special flood risk
zone must comply with the regulations for the special
flood risk zone.
(9) Whenever feasible, new structures shall be located in the
hydraulic shadow of the existing structures.
SECTION 6®
COUNTYWIDE WETLANDS MANAGEMENT FOR FLOOD DAMAGE PREVENTION
To the maximum extent possible, developments shall be reviewed to
avoid the short and long term adverse impacts associated with the
destruction or modification of natural wetlands, especially those
activities which limit or disrupt the ability of the wetland to
alleviate flooding impacts. For this section the following
processes shall be implemented:
( 1 ) Review proposals for development within base flood plains
for their possible impacts on wetlands located within the
flood plain.
(2) Ensure that development activities in or around wetlands
do not negatively affect public safety, health, and
welfare by disrupting the wetlands' ability to reduce
flood and storm drainage.
(3) Ensure areas accustomed to or previously used for
agriculture, silviculture, and ranching activities such
as plowing, seeding, cultivating, minor drainage, or
upland soil and conservation practices where proven
feasible are exempted from the this section®
(4) Request technical assistance from The Department of
Ecology and The Army Corps of Engineers in identifying
wetland areas. Existing wetland map information from the
National Wetlands Inventory (KIWI ) can be used in
conjunction with the community's FIRM to prepare an
overlay zone indicating critical wetland areas deserving
special attention.
17
ADDENDUM
GOALS AND OBJECTIVES OF THE SKOKOMISH RIVER VALLEY RESIDENTS
Residents and property owners of the Skokomish River Valley have
meet in numerous community meetings and by majority agreement have
identif ied the following goals and objectives that are to be
adequately addressed in the Skokomish River Watershed Flood Control
Comprehensive Plan. These goals and objectives as well as other
comments and concerns have been recognized and incorporated into
this ordinance®
( 1 ) To maintain the river in its present channel in a way as
to alleviate flooding conditions throughout the valley
resulting in reduced flood damages to all existing
structures.
(2) To protect stream banks with approved stabilization
methods that control excessive erosion resulting in
decreased sediment and gravel accumulation within the
river channel.
(3) To perform proper river channel maintenance including the
maintenance of dikes, drainage ditches, and potential
flow obstructions resulting in reduced flood damages®
(4) To maintain and enhance fish and wildlife habitat.
This ordinance shall be in full force and effective this
date.
DATED this � day o _. 1�---_r—,
lia
MasonBoard of
County Commissioners
Mason County, Washington
Chai an
Cieioner
Commissioner
ATT Ts
Clerk of the Board
P OVED�MOFORM:
A D
Prosecuting Attorney
c: File
General Services
Public Works