Loading...
HomeMy WebLinkAboutSHX2015-00022 MEP2015-00007 Hatchery Replace Culverts, Bridge - SHX Permit / Conditions - 4/16/2015 �oN_sraTFo MASON COUNTY �P C DEPARTMENT OF COMMUNITY DEVELOPMENT o A o Planning Division i o T z 426 W Cedar St, Shelton, WA 98584 x Y y (360)427-9670 OJ �O 1864 Exemption from Shoreline Management Act Case No.: SHX2015-00022 Substantial Development Permit Requirement The Proposal By: WA STATE DEPT OF FISH &WILDLIFE 600 CAPITOL WAY NORTH OLYMPIA, WA 98501 To undertake the following development: MCKERNAN HATCHERY MAINTENANCE & REPAIRS ARE REQUIRED TO REMOVE TWO (2) FISH BLOCKING CULVERTS AND REPLACE WITH A BRIDGE Within WEAVER CREEK and/or its associated wetlands is exempt from the requirement of substantial development because the development is categorized under WAC 173-27-040(2) as being category B-normal maintenance Please contact Grace Miller at ext 360 if you have any questions. Issued: 4/16/2015 ���. ��'' Expires: 4/16/2017 Authorized Local Government Official cc: ( APPLICANT -- WDFW USACOE WDOE TRIBAL COUNCIL t. 5���✓�[I nG all Contact List MASON COUNTY DCD Sent A to(check all that apply)on Skokomish Tribal Nation, Nat Res.Dept. WA Department of Ecology ATTN: Randy Lumper Enviro ental Re ' Section N 541 Tribal Center Rd.,Skokomish Nation,98584 PO BOX Olympia,98504-7703 KM rA.y(Qj�E�(/, riumper@skokomish.org separe er cy.wa.gov / Skokomish Tribal Historic Preservation Officer ED WA Department of Commerce ATTN: Kris Miller reviewteam@commerce.wa.gov 80 N Tribal Center Rd,Skokomish Nation,98584 shlanay1 @skokomish.org U.S.Army Corps of Engineers �? SEPA Reviewer-Darren Habei Quinault Indian Nation PO Box C-3755,Seattle, 98124 ATTN: Mark Mobbs darren.habel@usace.army.mil PO Box 189,Tahola, 98587 mmobbs@quinault.org r7 WA Dept of Fish and Wildlife hpapplications@dfw.wa.goy Squaxin Tribal Nation, Natural Res. Dept 2952 SE Old Olympic HWY,Shelton 98584 WA Dept of Fish and Wildlife jdickison@squaxin.u; ATTN: Margie Bigelow (Habitat Biologist-S Puget Sound Watershed) The Confederated Tribe of the Chehalis 2391 W Deegan Rd.,Shelton,98574 ATTN:SEPA Reviewer-Glen Connelly margaret.bigelow@dfw.wa.gov 420 Howanut Rd.,Oakville,98568 gconneily@chehalistribe.org ® WA Dept of Fish&Wildlife ATTN:Leonard Machut ® WA DNR, South Puget Sound Region (Habitat Biologist-Hood Canal Watershed) 950 Farman Avenue N, Enumclaw,98022-9282 48 Devonshire Rd,Montesano,98563-9618 southpuget.region@dnr.wa.gov leonard.machut@dfw.wa.gov WA DNR,Aquatic Resources ® WA Dept.of Transportation PO BOX 47027,Olympia,98504-7027 ATTN: Dale Severson and@dnr.wa.gov P.O. Box 47440,Olympia 98504-7440 OR-SEPA-REVIEW@wsdot.wa.gov WA DNR, SEPA Center ATTN: External Coordinator City of Shelton PO BOX 47015,Olympia,98504-7015 ATTN:Jason Dose sepacenter@dnr.wa.gov 525 West Cota St.,Shelton 98584 jasond@ci.shelton.wa.us Olympic Region Clean Air Agency ATTN:Aaron Manley Port of Shelton 2940-B Limited Ln. NW,Olympia.98502 ATTN: Brandon Palmer aaron.maniey@orcaa.org 21 West Sanderson Way,Shelton 98584 Brandon P@portofsheiton.com ® Mason County Transit ATTN: Mike Oliver Office of Archaeology&Historic Preservation l PO Box 1880,Shelton, 98584 ATTN:Lance Wollwage moliver@masontransit.org P.O.Box 48343,Olympia,98504-8343 Lance.Wolkvage@dahp.wa.gov Mason County PUD#1 ATTN: Jocelyn Gray Tacoma Public Utilities-Real Property Services N 21971 Hwy 101,Shelton,98584 ATTN: Dave Letterman jocelyneg@mason-pud1.org 3628 S 35th St,Tacoma, 98409-3192 dietten-n@cityoftacoma.org Mason Cty P.W.ATTN: Other. ® Mason Cty E.H.ATTN: School District C tvt �r Agent _ CpVeAf 5 i Mason Cty Bldg ATTN: Applicant ttl.pr4A) MC DCD last updated on I IM12014 C000 '�(bP GJat�� w� I /04/ Cry dY,l �a�s '�d�w, w�r�©✓ 1 r MASON COUNTY RECEIVED DEPARTMENT OF COMMUNITY DEVELOPMENT Building III—426 west Cedar Street MAR 0 5 2015 \ n P.O.Box 279,Shelton,WA 98584 X�(/ (360)427-9670—Ext.352 n ) 426 W. CEDAR ST. `11/ mi�ll�1 — itwl SHORELINE PERMIT APPLICATION '.30PERMIT NO. 54 SHORELINE SUBSTANTIAL DEVELOPMENT SHORELINE VARIANCE* DATE RECEIVED �3I5 SHORELINE CONDITIONAL USE* SHORELINE EXEMPTION The Washington State Shoreline Management Act (RCW 90.58) requires that substantial developments within designated shorelines of the state comply with its administrative procedures(WAC 173-14)and the provisions of the Mason County Shoreline Management Master Program.The purpose of this Act and local program is to protect the state's shoreline resources. The program requires that substantial development(any development of which the total cost or fair market value exceeds $5,718.00 or materially interferes with the normal public use of the water or shorelines of the State be reviewed with the goals, polices, and performance standards established in the Master Program. Answer all questions completely. Attach any additional information that my further describe the proposed development. Incomplete applications will be returned. Shoreline Variances and Conditional uses have additional pages that shall be attached to this application. APPLICANT: A s H 1 kl G(TD la ST/+T E -Ft 4-6 ARP St LP 6FE ADDRESS: nDO +I?ylv L Y\(A'`1 N0 p—IH (street) n lti rA e 1.4, \^4A (city) (state) (zip) 1 TELEPHONE: 1A 3 66), �aZ' 0.3 (home) (business) AUTHORIZED REPRESENTATIVE: C�N y Hn 1/P(Se t'1 ADDRESS: G O D D L YV A y Al O?-Tr~-( (stre'O lLi w�� la 1 � q BSA (city) / '3 state (zip) TELEPHONE: PROPERTY DESCRIPTION: General location(include property address,water body and associated wetlands—identify the name of the shoreline): wo P VI /0eKu-ngh -Icluev,•J ytl 1h1. De4e4fe 90"�940101, WA W-041 1 V�,e p r o f ec.� I s a c,4-w 4-1- oL h I vl - S4 d�eA w Arta, 1 N Wave, Gre�lc �A 4,0 h "ehenl r2! 14 , R /-/ K1• 30 .2-o5) Legal description (include section, township, and range to the nearest quarter, quarter section or latitude and longitude to the nearest minute. Projects located in open water areas away from land shall provide a longitude location)—include all parcel numbers: 5Ik7'zI 124V4 <`�4• 3a7z,' `23.20�1) shoreline 2011 app.doc r r 1 t r OWNERSHIP: Contract Applicant Owner Lessee Purchaser (Identify) Other Owner: STATr- F-�M6 (titIW- Fe, - 04y)MEK 6toy KtLvDSi�,q' Xy�hori2ed Arfe K " Gov C,4 To /4 Y• (p 1!)wL Pl'+, W'4. (city) (state) (zip) DEVELOPMENT DESCRIPTON Development(identify and describe the proposed project,including the type of materials to be used,construction methods,principle dimensions,and other pertinent information): PL".5f: Use(identify current use of property with exist improvements: Reason for requesting development: ACKOWLEDGEMENT I hereby declare,to the best of my knowledge and belief,the forgoing information and all attached information is true and correct. (applicant or authorized representative) (date) shoreline 2011 app.doc f Publication Cost Agreement Publication cost is the responsibility of the applicant. Final permit processing will not occur until advertising fees have been paid to the newspaper by the applicant.The Shelton-Mason County Journal will bill the applicant directly. I/WE understand that I/WE must sign and date the attached acknowledgment indicating and that I/WE understand that is MY/OUR responsibility. I/WE must submit the signed page as part of application in order for it to be considered as complete. ST'AT- _ r1WIA(lo 1rU(oltF- N 4 Signature of Property Owner Date Print Name OR Signature of Applicant Date Print Name C4ttlf tl1�9 4101' C��45�� ► � S � � h VVVO, shoreline 2011 app.doc LIST OF ADJACENT PROPERTY OWNERS' MAILING ADDRESSES WITHIN 300 FEET OF YOUR PROPERTY BOUNDARIES FOR PUBLIC HEARING NOTIFICATION Addresses are to be obtained from the Mason County Assessor's Office, Bldg. 1, Second Floor. �V V't f-f- i'Gt, i I-A Fvo-K A R S'nq N '5 fia t-e RAJ-naafi-ee to (J vt(dN r vq/�' G I/J l °t l,U 1-e Ta t !fit . ���oi�rs'o�. I� V • �°ID�� yo • mot- QM(. fot,( CoMM rest 5 rq,f e LAt4 0 U( Ilr Sl o n.r Vq( brtl'µC-tTn0 [i641 i'LI) LiFF Goo C"-,W 0111KATID, VA- P-D. (3®� 114- K�S'�L 99�elr p,4 h �,O- PVY- 20q j . shoreline 2011 app.doc 'Shoreline Exemption Application WDFW McKernan Hatchery Culvert Removal and Bridge Replacement Washington State Fish and Wildlife 600 Capitol Way Olympia, WA.98501 3/4/2015 RE: WDFW McKernan Hatchery Culvert Removal and Bridge Replacement 411 W. Deyette Road Shelton,WA. 98584 Development Description Development: Identify and describe the proposed project,including the type of materials to be used, construction methods,principle dimensions and other pertinent information. Weaver Creekflows through the McKernan Hatchery, where it is used near the hatchery entrance as an in- line rearing pond. The rearing pond is 28 to 30 feet wide with a weir at the downstream end and 2 screened culverts at the upstream end that are frequently backwatered. The two damaged 4 foot x 42 foot CMP screened culverts are located within 30 foot wide ponded area. These culverts will be removed and replaced with a 42 foot x 12 foot wide bridge, with a new removable screen system used to contain juvenile fish during rearing. The new screen system includes a poured slab, steel walkway, screen frame, and removable screens. When fish are not being reared, the screens are removable and the rearing pond will become an open 28-30 foot wide channel and fish passable. The bridge is supported by precast spread footings. The existing walls of the pond will be extended through the footprint of the bridge and used as the bridge abutments. Stream bed material will be placed within Ordinary High Water(OHW)in the new in-stream channel. The project below OHW will have geotextile, ecology blocks, bridge footings and streambed material. Above Ordinary High Water will have backfill crushed rock material, bridge abutments and the new bridge. The fill will come from a local quarry.Any excavated material will be disposed of at an approved facility out of the flood plain. Supersacks will placed to isolate the construction area, and water will be rerouted. Any water exposed to construction activities will not be allowed to reenter the stream. It will be pumped to an uplands area where siltation will be filtered to prevent turbid water re-entering Weaver Creek. Sediment control measures will include careful dewatering, straw mulch, silt fence, and/or straw wattles. During construction, sediment laden water will be pumped into a settling pond that is separatedfrom any source of clean water. Upon completion of the project, upstream banks will be planted with willows and a native grass/shrub mix.No clearing of vegetation will be done. The site will be repaved upon completion. Any other areas of disturbed soils will be reseeded. Large rootwad materials will be placed just downstream of the in-line rearing channel to protect the banks of Weaver Creek against erosion and to provide habitat. Shoreline Exemption Application WDFW McKernan Hatchery Culvert Removal and Bridge Replacement Washington State Fish and Wildlife 600 Capitol Way Olympia, WA. 98501 Disturbed soils will be restored with native grass mix. On both sides of the bridge and underneath the bridge willows and native grasses will be planted. Willow cuttings will be placed underneath the bridge. The proposed project will restore fish passage in Weaver Creek when fish are not being reared in the channel. Best Management Practices during construction will protect water quality from turbidity and other pollutants. Construction will be performed during approved work windows, and within permit regulations. All permits will be obtained before construction starts. USE (Identify) current use of property with existing improvements Weaver Creek flows through the McKernan Hatchery where the creek is used near the hatchery entrance as an in- line raring pond. There are two damaged 4 foot x 42 foot CMP screened culverts at one end of the rearing pond. Maintenance repairs are required to continue hatchery operations in this rearing pond. The damaged culverts will be removed and replaced with a 42 foot long x 12 foot wide bridge with a new removable screen system used to contain juvenile fish during rearing. Weaver Creek stream flow under the bridge is expected to match the present ecological functions at project completion. NO change in hydrology is expected by the result of this project. When the culverts are removed, there will be no effects from backwatering,ponding and sediment caused by the eroding culverts entering Weaver Creek. Floodplain flows well return to more natural functions. Reason for requesting Development: A maintenance repair is required at the McKernan Hatchery to remove two CMP eroding damaged culverts at the end of an in-line rearing pond in Weaver Creek. This repair will improve hatchery operations,provide a better fish rearing system, and restore the habitat where the culverts are presently located. Fish passage in Weaver Creek will be restored when fish are not being reared in the channel. Atproject completion Weaver Creek will have a more natural passage of water during flood conditions that will provide relief to nearby floodplain area. Please refer to enclosed JARPA for additional details. • ,tN,� 4 TA7j ram. o b y v. n Q State of Washington DEPARTMENT OF FISH AND WILDLIFE Mailing Address: 600 Capitol Way N'Olympia,WA 98501-1091 •(360)902-2200,TDD(360)902-2207 Main Office Location: Natural Resources Building' 1111 Washington Street SE'Olympia,WA March 4, 2015 Ms. Grace Miller Mason County Department of Building and Planning Planning and Development Services 426 West Cedar Street Shelton, Washington 98584 RE: McKernan Hatchery Culvert Removal Bridge Placement— Mason County Application Dear Ms. Miller: The Washington State Department of Fish and Wildlife is proposing a project at the McKernan Hatchery. The proposed project will remove culverts and replace them with a bridge. This project is proposed for construction during summer 2015. McKernan Hatchery has two culverts under a roadway at the end of an in-line rearing pond that are failing, causing frequent backwatering and creating a barrier to fish passage. These repairs will improve hatchery operations, provide a better fish rearing system, and restore fish passage. Large woody materials will also be placed at the downstream end of the in-line rearing pond, to provide additional habitat restoration. Enclosed are application materials for a shoreline exemption pen-nit. Application materials include: Mason County Environmental Application, Shoreline Exemption Application, Biological Assessment, permit drawings, a State Environmental Policy Act checklist and Determination of Non-Significance, and a check for payment. Thank you for your assistance with this project. If you have any questions concerning this project, please contact me at 360.902.8422, or via email at cindy.knudsen(iWfw.wa.gov. Sincerely, Cindy Knudsen Fish and Wildlife Biologist Permitting Capital and Asset Management Program Enclosures (7) cc: Glenn F. Gerth, P.E., Chief Engineer Read File t Publication Cost Agreement Publication cost is the responsibility of the applicant.Final permit processing will not occur until advertising fees have been paid to the newspaper by the applicant.The Shelton-Mason County Journal will bill the applicant directly. I/WE understand that I/WE must sign and date the attached acknowledgment indicating and that I/WE understand that is MY/OUR responsibility. I/WE must submit the signed page as part of application in order for it to be considered as complete. / ,f r, ,j �e fiU� �r•4T� prS�f�U ultc l�uFe Signature of Property Owner Date Print Name OR Signature of Applicant Date Print Name shoreline 2011 app.doc t MASON COUNTY RECEIVED DEPARTMENT OF COMMUNITY DEVELOPMENT Building III—426 west Cedar Street WAR 2 3 2015 P.O.Box 279,Shelton,WA 98584 (360)427-9670-Ext.352 AZ6 W.CEDAR S SHORELINE PERMIT APPLICATION PERMIT NO.S AX 2015- =ZZ SHORELINE SUBSTANTIAL DEVELOPMENT SHORELINE VARIANCE* DATE RECEIVED -rl-.1b 1.6 SHORELINE CONDITIONAL USE* SHORELINE EXEMPTION �• The Washington State Shoreline Management Act (RCW 90.58) requires that substantial developments within designated shorelines of the state comply with its administrative procedures(WAC 173-14)and the provisions of the Mason County Shoreline Management Master Program.The purpose of this Act and local program is to protect the state's shoreline resources. The program requires that substantial development(any development of which the total cost or fair market value exceeds $5,718.00 or materially interferes with the normal public use of the water or shorelines of the State be reviewed with the goals, polices, and performance standards established in the Master Program. Answer all questions completely. Attach any additional information that my further describe the proposed development. Incomplete applications will be returned. Shoreline Variances and Conditional uses have additional pages that shall be attached to this application. APPLICANT: W A S H i M Gl To la STAT E 9D Y4l UP tIFF ADDRESS: BOO +pJoL W Ay Igo p-IH (city) (state) (zip) 1 TELEPHONE: 1A 366)' q0z- 0.3 (home) (business) AUTHORIZED REPRESENTATIVE: (S NG,pp�l Kn t)o(Se f1 ADDRESS: W 9 r G 0 D CA pvf-0 L YV AY f�o P-TFI (street,)', I�YVt 101 1/�,(A -/65-0 1 (city) s t (zip) TELEPHONE: �60 D PROPERTY DESCRIPTION: General location(include property address,water body and associated wetlands—identify the name of the shoreline): V\t KI Me-Ke✓utn -fther!i qn wt. Dne•(+e 90aof, 9ie,1kM, GU14 10S-0 e� 11A-e- p ro i e-& !s 14,cA-W 4�- a h ih - S41-ea rat ,4rea t K 111 ma w--- Greck 721 /4 , R I!W 2) "lz3.20�l� Legal description (include section, township, and range to the nearest quarter, quarter section or latitude and longitude to the nearest minute. Projects located in open water areas away from land shall provide a longitude location)—include all parcel numbers: '�I I?T Z I NR,q W (q • 3072,1 [23.20` ) PA�Zc t # Y2J 163z(60la shoreline 2011 app.doe OWNERSHIP: Contract Applicant Owner Lessee Purchaser (Identify) Other Owner: �A•5 rt t�J.�7�cal 5 r A 7`£ ���M� l�!(A Lt�G — o cc�ru�2 G,rcyY l���D� �• Iy o r;ate f����-¢" �oU CA� toL W/4Y . (V7;0Wt so1 (city) (state) (zip) DEVELOPMENT DESCRIPTON Development(identify and describe the proposed project,including the type of materials to be used,construction methods,principle dimensions,and other pertinent information): Use(identify current use of property with exist improvements: Reason for /requesting Jdevelopment: ACKO WLEDGEMENT I hereby declare,to the best of my knowledge and belief;the forgoing information and all attached information is true and correct. (applicant or authorized representative) (date) shoreline 2011 app.doc Shoreline Exemption Application WDFW McKernan Hatchery Culvert Removal and Bridge Replacement Washington State Fish and Wildlife 600 Capitol Way Olympia, WA.98501 3/9/2015 RE: WDFW McKernan Hatchery Culvert Removal and Bridge Replacement 411 W. Deyette Road Shelton,WA. 98584 Development Description Development: Identify and describe the proposed project,including the type of materials to be used, construction methods,principle dimensions and other pertinent information. Weaver Creekflows through the McKernan Hatchery, where it is used near the hatchery entrance as an in- line rearing pond. The rearing pond is 28 to 30 feet wide with a weir at the downstream end and 2 screened culverts at the upstream end that are frequently backwatered. The two damaged 4 foot x 42 foot CMP screened culverts are located within 30 foot wide ponded area. These culverts will be removed and replaced with a 42 foot x 12 foot wide bridge, with a new removable screen system used to contain juvenile fish during rearing. The new screen system includes a poured slab, steel walkway, screen frame, and removable screens. When fish are not being reared, the screens are removable and the rearing pond will become an open 28-30 foot wide channel and fish passable. The bridge is supported by precast spread footings. The existing walls of the pond will be extended through the footprint of the bridge and used as the bridge abutments. Stream bed material will be placed within Ordinary High Water(OHW)in the new in-stream channel. The project below OHW will have geotextile, ecology blocks, bridge footings and streambed material. Above Ordinary High Water will have backfill crushed rock material, bridge abutments and the new bridge. The fill will come from a local quarry.Any excavated material will be disposed of at an approved facility out of the flood plain. Supersacks will placed to isolate the construction area, and water will be rerouted. Any water exposed to construction activities will not be allowed to reenter the stream. It will be pumped to an uplands area where siltation will be filtered to prevent turbid water re-entering Weaver Creek. Sediment control measures will include careful dewatering, straw mulch, silt fence, and/or straw wattles. During construction, sediment laden water will be pumped into a settling pond that is separated from any source of clean water. Upon completion of the project, upstream banks will be planted with willows and a native grass/shrub mix. No clearing of vegetation will be done. The site will be repaved upon completion. Any other areas of disturbed soils will be reseeded. Large rootwad materials will be placed just downstream of the in-line rearing channel to protect the banks of Weaver Creek against erosion and to provide habitat. Shoreline Exemption Application WDFW McKernan Hatchery Culvert Removal and Bridge Replacement Washington State Fish and Wildlife 600 Capitol Way Olympia, WA.98501 I i Disturbed soils will be restored with native grass mix. On both sides of the bridge and underneath the bridge willows and native grasses will be planted. Willow cuttings will be placed underneath the bridge. The proposed project will restore fish passage in Weaver Creek when fish are not being reared in the channel. Best Management Practices during construction will protect water quality from turbidity and other pollutants. Construction will be performed during approved work windows, and within permit regulations. All permits will be obtained before construction starts. Please refer to enclosed JARPA for additional details. Qb PROJECT LOCATION STATE MAP NOT TO SCALE Q� sy SKOKOMISH VALLEY RD 101 o w o � McKERNAN HATCHERY PROJECT LOCATION Y Y 101 f/I PURCY CR z r I VICINITY MAP NOT TO SCALE ENG. PROJECT NO. MN:H37:14-1 PORTION OF: SECT. 16. T 21 N. R 4 W REFERENCE NUMBER: PROJECT LOCATION (ADDRESS): PROPOSED PROJECT: APPLICANT: McKERNAN HATCHERY BRIDGE AND WALKWAY INSTALLATION WASHINGTON DEPT. of FISH & WILDLIFE W 411 DEYETTE ROAD 600 CAPITOL WAY N. SHELTON, WA 98584 OLYMPIA, WA 98501-1091 IN: WEAVER CREEK ADJACENT PROPERTY OWNER: LAT/LONG: 47.3072/-123.204 NEAR/AT: SHELTON 1• DATUM: NAVD 88 COUNTY: MASON 2 SHEET 1 OF 12 DATE:2/27/2015 STATE: WA JAI PROJECT III LOCATION SITE 2 \ WELL 1{1 , \ DOMESTIC WELL \ "\ RESIDENCE //• \\\ \� / / �rt 1 i \\_ WELL r2 PUMPS _ I I e� FISH LADDER WAVER CREEK t PROJECT LOCATION GAS TANK SITE 1 ° DEGASSING TOWER "�•� �NOJ� / gJ\�°��aG �\ 4' i 0x OFFICE AND CARPORT I I DEGASSING TOWER I I i I OVERALL SITE PLAN SCALE: 1" = 100 O 50 100 25 75 150 McKERNAN HATCHERY LEGEND SCALE: 1" = 100' CONCRETE STRUCTURE —.°.—r.—.°.— 6"0 WATER DRAIN FENCE r r—r N—.o u— 24"0 WATER DRAIN PROPERTY LINE — — r••�—r••�— 4"0 PERF PIPE DRAIN WATER EDGE —• — —••—••—•• 48"0 CMP DRAIN PAVED ROADWAY ——--—————— UNDERGROUND ELECTRICAL —w—re—as— —""—•"'—"" 12*0 WATER SUPPLY DOMESTIC WATER —or—wv—ow— —Y61—""—""— 18'0 WATER SUPPLY SANITARY SEWER 12"0 STEEL SUPPLY 18"0 STEEL SUPPLY QUANTITIES MATERIAL CUT ABOVE OHW FILL ABOVE OHW CUT BELOW OHW FILL BELOW OHW TYPICAL ROAD FILL —53 CY — —120 CY — ECOLOGY BLOCKS — — — 35 CY CONCRETE — 5 CY — 3 CY STREAMBED MIX — — — 10 CY REFERENCE NUMBER: GRAVEL APPROACH — 20 CY — — APPLICANT NAME: QUARRY SPALLS - 5 CY - - WASHINGTON DEPT. of FISH & WILDLIFE ASPHALT — 5 CY — — PROPOSED PROJECT: ROOTWADS — — — 20 CY BRIDGE AND WALKWAY INSTALLATION NET TOTALS —28 CY —52 CY LOCATION: McKERNAN HATCHERY ENG. PROJECT NO. MN:H37:14-1 SHEET 2 OF 12 DATE:2/27/2015 W 2 GRASSY AREA W ASPHALT ROAD a FENCE TYP. (2) 48" CMP TO BE REMOVED ASPHALT ROAD — ?',00 i E. 31..44' TOP OF PIPE 2+50 ELEV a 34.40' ECOLOGY BLOCK w TYP. w _ 3+00 3+50 — —,-- — _ _ REARING POND a+oo .E. 30.51' -- TOP OF PIPE FLOW 35 34.73' ASPHALT ROAD TBM 9�A TOP NE CORNER OF CONC. VAULT ELEV. 40.29' GRASSY AREA 0 GPS PK NAIL O o AERATOR TOWER INCUBATION AND REARING POND 0 20 40 10 30 60 SCALE: 1" = 40' uu HATCHERY BUILDING NAVD 88 EXISTING SITE PLAN SCALE: 1" = 40' REFERENCE NUMBER: APPLICANT NAME: WASHINGTON DEPT. of FISH & WILDLIFE PROPOSED PROJECT: BRIDGE AND WALKWAY INSTALLATION LOCATION: McKERNAN HATCHERY ENG. PROJECT NO. MN:H37:14-1 SHEET 3 OF 12 DATE:2/27/2015 W Z _ GRASSY AREA a ASPHALT ROAD x a D (2) 46" CMP STAGING AREA IN ROAD FENCE ry TYP. TO BE REMOVED - -OR ON EXISTING ASPHALT ASPHALT ROAD 5' BETWEEN WALKWAY FOOTPRINT - ----___-- - -AND SUPERSACK PLACEMENT J 3 PUMP FOR ECOLOGY BLOCK TYP. CONSTRUCTION - - - a SUPERSACK TYP., _ -WATER `--- REARING POND FLOW PUMP FOR - CLEAN WATER FOOTPRINT OF WALKWAY FILTER FABRIC FENCE FOR REFERENCE ASPHALT ROAD TBM 9N,o TOP NE CORNER OF Zr CONC. VAULT �.� ELEV. - 40.29' GRASSY AREA 9� GPS PK NAIL � O AERATOR TOWER INCUBATION AND REARING POND 0 20 40 10 30 BO SCALE: 1" = 40' DATUM HATCHERY BUILDING NAVD 88 DEWATERING SITE PLAN SCALE: 1" = 40' REFERENCE NUMBER: APPLICANT NAME: WASHINGTON DEPT. of FISH & WILDLIFE PROPOSED PROJECT: BRIDGE AND WALKWAY INSTALLATION LOCATION: McKERNAN HATCHERY ENG. PROJECT NO. MN:H37:1 4-1 SHEET 4 OF 12 DATE:2/27/201 5 b� ��=:EXISTING•",5 Q� - ROAD w 3 99 TYP TOP BANK------- TOP 6114K I m TEMPORARY FISH SCREEN I I �70P BANK PER HPA REQUIREMENTS. 1 (IF WATER IS PRESENT) CLEAN SCREENS DAILY. TOE- — 0 TOE TOE TOE A 5 5 STREAM— — CHANNEL — — i —TOE- i TOE 70E _ � 1 — � 'TOE -- � _STOP BANK ZT 6 PLACE STRAW BALE TOP BANK o' BARRIER ALONG LOW SIDE OF INFILTRATION SITE. 6 �' TOP SANK PUMP 2 4 5 8 TYP Y SET UP AREA EXISTING \�- / ROAD PUMP STANDING WATER FROM I CONSTRUCTION AREA TO UPLAND INFILTRATION SITE. ( SITE TO BE KED I CONSTRUCTION ENGINEER PR TYPICAL DEWATERING PLAN NOT TO SCALE DEWATERING NOTES: SOIL STABILIZATION NOTES: 1. ALL WORK SHALL BE IN ACCORDANCE WITH HPA. 2. DURING CONSTRUCTION (IF WATER IS PRESENT) STREAM LOW SHALL BE DIVERTED 1. ALL EXPOSED SURFACES SHALL BE REVEGETATED WITHIN 30 DAYS OF THROUGH BYPASS OR EXISTING PIPE. IF HIGH FLOW, (2) DIVERSION PIPES MAY BE AREA COMPLETION. COMPLETION INCLUDES ALL SLOPES TO FINISH NEEDED. CONTOUR AND ALL CLEARED AREAS, NOT GRAVELED, SMOOTH AND CLEAR OF DEBRIS TO THE SATISFACTION OF THE ENGINEER. 3. PLACE SUPER SACKS FILLED WITH PEA GRAVEL TO SEAL BYPASS INLET AND OUTLET. 2. REVEGETATION SHALL MEAN BROADCAST SEEDING OR HYDRO-SEEDING.. 4. DIVERSION SHALL BE APPROVED BY INSPECTOR PRIOR TO EXCAVATION. 3. MULCHING AND MATTING SHALL BE UTILIZED DURING PERIODS OF 5. FISH REMOVAL SHALL BE COMPLETED BY PERMITTING STAFF. CONSTRUCTION DELAYS OR WINTER DOWNTIME FOR TEMPORARILY PROTECTING EXPOSED SOILS, 6. EXCAVATE EXISTING FILL. 7. REMOVE EXISTING CULVERT AND DISPOSE OF OFF SITE. 8. PLACE NEW BED MATERIAL MIX AND REMOVE BYPASS PIPE. 9. COVER ALL EXPOSED SOIL WITH STRAW MULCH AND GRASS SEED. 10. REMOVE DIVERSION BAGS AND FISH SCREENS BY HAND. SUPERSACK DAM 2 - BAGS HIGH MIN. ISOLATED WORK AREA TEMPORARY FISH SCREEN PER HPA REQUIREMENTS. (IF WATER IS PRESENT) 6 MIL. VISQUEEN SUPERSACK DAM 2 CLEAN SCREENS DAILY. BAGS HIGH MIN. DEWATERING PIPE PEA GRAVEL SANDBAG OR ENGINEER TO VERIFY NATIVE STREAM BED GRAVEL SIZE REQUIREMENT AT 6 MIL. VISQUEEN PLACED BY HAND TIME OF CONSTRUCTION FLOW TOE IN FRONT OF PLASTIC ROUND STREAM - -- -^ INTO STREAM BED 1:1 BED ROCK MIN., 1'-O" DEEP Q O NOTE A REFERENCE NUMBER: 5 5 APPLICANT NAME: WASHINGTON DEPT. of FISH & WILDLIFE PROPOSED PROJECT: BRIDGE AND WALKWAY INSTALLATION LOCATION: McKERNAN HATCHERY ENG. PROJECT NO. MN:H37:14-1 SHEET 5 OF 12 DATE:2/27 2015 2 x 2 WELD WIRE FILTER FABRIC MATERIAL FABRIC OR EQUAL MIRAFI 100x BIDIM OR TYPICAL EQUIVALENT WOOD STAKE OR REBAR STAKED AND ENTRENCHED STRAW BALE FASTEN WITH STAPLES ,,- OR WIRE RINGS TYPJ 'I o BINDING WIRE TWINE II II °� � io COMPACTED SOIL TO x L� PREVENT PIPING 4"TRENCH II II II u� 11 `2" x 2" DOUGI AS FIR BURY BOTTOM OF FILTER FABRIC OR EQUAL, AS APPROVED MATERIAL IN 4" x 4"TRENCH BY ENGINEER - TYP. BACKFILL AS SPECIFIED. t gMPALES DETAIL cJ 6 2" x 2" DOUGLAS FIR FILTER FABRIC OR EQUAL, AS APPROVED STRAW BALES MATERIAL BY ENGINEER , TYP. m 1. BALES SHALL BE PLACED IN A SINGLE ROW, NEW GRADED OR LENGTHWISE ON THE CONTOUR, WITH ENDS OF DISTURBED SIDE SLOPE ADJACENT BALES TIGHTLY ABUTTING ONE ANOTHER. PILE 2"TO 4" QUARRY a °` SPALLS IN FLOW CHANNEL 2. THE BARRIER SHALL BE ENTRENCHED AND 1'-O" MIN. DEPTH OR LOCAL BACKFILLED. A TRENCH SHALL BE A MINIMUM OF MATERIAL AS APPROVED io 4 INCHES. BACKFILL SOIL SHALL CONFORM TO iv THE GROUND LEVEL ON THE DOWNHILL SIDE AND l— SHALL BE BUILT UP 4 INCHES AGAINST THE 4" UPHILL SIDE OF THE BARRIER. EACH BALE SHALL BE SECURELY ANCHORED BY AT LEAST 2 STAKES SECTION OR REBAR DRIVEN THROUGH THE BALE. 3. THE GAP BETWEEN THE BALES SHALL BE CHINKED (FILLED BY WEDGING) WITH STRAW TO TYPICAL FILTER FABRIC FENCE PREVENT WATER FROM ESCAPING BETWEEN THE NOT TO SCALE BALES. FILTER FABRIC FENCE NOTES: 1. FILTER FABRIC SHALL BE A CONTINUOUS ROLL CUT TO LENGTH OF BARRIER AS NEEDED. IF JOINTS ARE NECESSARY FABRIC SHALL BE SPLICED TOGETHER ONLY AT SUPPORT POSTS WITH A MINIMUM OF SIX (6) INCH OVERLAP. BOTH ENDS SHALL BE SECURED AS REQUIRED. 2. FILTER FABRIC SHALL BE INSTALLED TO FOLLOW CONTOURS. FENCE POSTS SHALL BE SPACED A MAXIMUM OF EIGHT (8) FEET APART UNLESS OTHERWISE SHOWN HEREIN. ALL POSTS SHALL BE DRIVEN INTO THE GROUND A MINIMUM OF 30 INCHES. 3. A TRENCH SHALL BE EXCAVATED. ROUGHLY FOUR (4) INCHES WIDE BY FOUR (4) INCHES DEEP UPSLOPE AND ADJACENT TO THE POST TO ALLOW THE FILTER FABRIC TO BE BURIED. 4. WHEN STANDARD STRENGTH FILTER FABRIC IS UTILIZED, A WIRE SINGLE SPACE MESH SUPPORT FENCE SHALL BE FASTENED TO THE UPSLOPE (OR UPSTREAM) SIDE OF THE POSTS USING ONE (1) INCH MINIMUM LENGTH WIRE STAPLES, TIE WIRE OR APPROVED HOG RINGS. ALL WIRE SUPPORT SHALL EXTEND INTO THE TRENCH A MINIMUM OF FOUR (4) INCHES AND SHALL NOT EXTEND MORE THAN 36 INCHES ABOVE ORIGINAL GRADE. 5. ALL FILTER FABRIC SHALL BE STAPLED OR WIRED TO SUPPORT FENCING AND A MINIMUM OF 12 INCHES OF FABRIC SHALL BE EXTENDED INTO THE TRENCH. FILTER FABRIC SHALL NOT BE STAPLED OR FASTENED TO EXISTING TREES OF STRUCTURES UNLESS OTHERWISE APPROVED BY THE ENGINEER. 6. IF HIGH STRENGTH FILTER FABRIC AND CLOSER SPACING ARE USED, THE WIRE SUPPORT - FENCING MAY BE ELIMINATED. HIGH STRENGTH FABRIC SHALL BE STAPLED OR WIRED DIRECTLY TO POSTS AS REQUIRED BY THE ENGINEER. 7. CUTOFF TRENCH SHALL BE BACKFILLED WITH NATIVE SOIL OR 3/4 INCH MINIMUM DIAMETER WASHED GRAVEL OR OTHER SIMILAR SOURCE AS APPROVED BY THE ENGINEER. 8. FILTER FENCING SHALL BE INSTALLED WHERE SHOWN ON THE PLAN OR AS DIRECTED BY THE ENGINEER PRIOR TO COMMENCEMENT OF WORK. ALL FENCING SHALL BE INSPECTED DAILY DURING CONSTRUCTION AND AFTER EACH SIGNIFICANT RAINFALL EVENT UNTIL SITE HAS BEEN PERMANENTLY STABILIZED. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. 9. REMOVAL OF TRAPPED SEDIMENT SHALL BE PERFORMED WHEN AMOUNTS REACH APPROXIMATELY 1/3 HEIGHT OF THE FENCE. MATERIAL REMOVED FROM FENCE SHALL BE DISPOSED OF AT AN APPROVED OFFSITE LOCATION UNLESS OTHERWISE DIRECTED BY THE ENGINEER REFERENCE NUMBER: APPLICANT NAME: 10. FILTER FENCING SHALL REMAIN IN-PLACE UNTIL SITE HAS BEEN REVEGETATED TO ORIGINAL WASHINGTON DEPT. of FISH & WILDLIFE CONDITION OR DIRECTED BY THE ENGINEER. CONTRACTOR SHALL BE RESPONSIBLE FOR FENCING REMOVAL FROM THE SITE WITHIN 30 DAYS OF SITE STABILIZATION. PROPOSED PROJECT: BRIDGE AND WALKWAY INSTALLATION LOCATION: McKERNAN HATCHERY ENG. PROJECT NO. MN:H37:14-1 SHEET 6 OF 12 DATE:2 27 2015 EXISTING GRASSY AREA EXISTING FENCE TYP. W Z_ PLANTING AREA } # APPROX. 630 S.F. W } } } + # + 4 # # 4 4 4 + } a + + + a a#a+ a+}++i+++++++...++ g NEW 12' x g4 2' BRIDGE + #++++++ + + + + + a EXISTING ASPHALT ROAD + + + + + + i + + + + — + a } 5 NEW ECOLOGY BLOCK - TYR EXISTING ECOLOGY BLOCK TYP. NEW 25' x 6' WALKWAY WITH SCREENS EXISTING REARING POND + +++++++++ + FLOW a # # a a + + + + +++ +++++++++ + +++ + ++++ ++ I ul + + + + 4+4 f a +a-+ + --- .T + 4 # f ♦ f + f i } i i+ } f f �J5 + + # + # + + + + + + + + 35 4 f + + i } } } f fl i IT + + + # i } 4 1 + a } O O PLANTING AREA APPROX. 42' APPROX. 785 S.F. OF NEW ECOLOGY BLOCKS EXISTING ASPHALT ROAD NEW ROAD GRADING EXISTING GRASSY AREA 0 0 40 10 30 60 �x SCALE: 1' a 40' a Z� 9 s Aa TBM ra TOP NE CORNER OF CONC. VAULT GPS PK NAIL ELEV. - 40.29' EXISTING AERATOR TOWER PROPOSED SITE 1 PLAN REFERENCE NUMBER: SCALE: 1- - 20' APPLICANT NAME: WASHINGTON DEPT. of FISH & WILDLIFE PROPOSED PROJECT: BRIDGE AND WALKWAY INSTALLATION LOCATION: McKERNAN HATCHERY ENG. PROJECT NO. MN:H37:1 4—'I SHEET 7 OF 12 DATE:2/27 2015 39 39 38 38 37 37 36 ___ 36 35 35 34 _ _ OHW 33.50 .EXISTING GRADE 34 33 33 32 — — — --- ----- — 32 31 --- — 31 30 30 -30 -20 -10 0 10 20 30 3+00 EXISTING CREEK SECTION SCALE: 1" = 10' N o a o ++ o o m o + n + n M O 11 II p M ++ M II II II N W II II M OD N M xl II II F N W 40 II II II II II II 40 N w N W NEW 42' x 12' BRIDGE 35 35 3350 — FINISHED FINISHED GRADE --- x 16' ABUTMENT - TYP. 30 STA = 0+10 STA = 0+36 NEW ECOLOGY 30 o, ELEV = 31.80 _� 6'WSDOT -,0 ELEV = 31.69 BLOCK ti TYP. STREAMBED _ > SEDIMENT 0+10 0+20 0+30 0+40 BRIDGE PROFILE SCALE: 1" = 8' REFERENCE NUMBER: APPLICANT NAME: WASHINGTON DEPT. of FISH & WILDLIFE PROPOSED PROJECT: BRIDGE AND WALKWAY INSTALLATION LOCATION: McKERNAN HATCHERY ENG. PROJECT NO. MN:H37:14-1 SHEET 8 OF 12 DATE:2/27/2015 a N 0 0. � o+ + n d' N + Mo II II O IIm n o 0 p n o II II II n a g a p n n M p + n� < 41 N w wOj II 0 n W � ppj �+ �n 'w WRH%FSHS REENS 40 40 35 35 OHW = 33.50 FINISHED GRADE 30 30 STA = 0+11 STA = 0+37 ELEV 31.50 ,� CONC SLAB 1 v,uoi ELEV = 31.50 0+10 0+20 0+30 0+40 WALKWAY PROFILE SCALE: 1" = S' REFERENCE NUMBER: APPLICANT NAME: WASHINGTON DEPT. of FISH & WILDLIFE PROPOSED PROJECT: BRIDGE AND WALKWAY INSTALLATION LOCATION: McKERNAN HATCHERY ENG. PROJECT NO. MN:H37:14-1 SHEET 9 OF 12 DATE:2/27/2015 PROPERTY LINE x / INTERLOCK 10 CY OF ROOTWADS WITH STEMS 0 20 ao / 10 30 60 SCALE: 1' 40' 30 ♦ FVp� a Z �EXISTINC ECOLOGY BLOCKS TYP. 5/ QGaG INTERLOCK 10 CY OF R�R\NG ROOTWADS WITH STEMS iX61 Fj < � NZc� 35 -� ifNS �Q PROP�D SITE 2 PLAN 2 PLAN SCALE: 1" =SCALE: 2, REFERENCE NUMBER: APPLICANT NAME: WASHINGTON DEPT. of FISH & WILDLIFE PROPOSED PROJECT: BRIDGE AND WALKWAY INSTALLATION LOCATION: McKERNAN HATCHERY ENG. PROJECT NO. MN:H37:1 4—1 SHEET 10 OF 12 DATE:2/27/201 rJ' 35 J.V Ll APPROX. 130 S.F. OF ASPHALT CUT 35 1 1 \ EDGE OF EXISTING PAVEMENT� TYP. 1 --�---- APPROX. 80 S.F. \ OF ASPHALT FILL � 1 \ / EDGE OF NEW PAVEMENT TYP. 1 � 1 I 1 I \ I I APPROX. 470 S.F. l OF ASPHALT FILL PAVING PLAN scALE: i' - z0 REFERENCE NUMBER: APPLICANT NAME: WASHINGTON DEPT. of FISH & WILDLIFE PROPOSED PROJECT: BRIDGE AND WALKWAY INSTALLATION LOCATION: McKERNAN HATCHERY ENG. PROJECT NO. MN:H37:14-1 SHEET 11 OF 12 DATE:2 27/2015 FINISHED GRADE BRIDGE DECK III A I � I E H 3' B 1•-s" 1'-s" '�: % OH.W N � X X X ECOLOGY BLOCK 1YP. v X X X BANK SECTION NOT TO SCALE > X X NOTE: REFERENCE FOR MATERIALS ONLY. STAPLE LAYOUT NOT TO SCALE ' ' ANCHOR TRENCH TYPICAL BANK SECTION NOTES: A. CRUSHED SURFACING BASE COURSE COMPACTED 90 PERCENT, -' WSDOT 9-03.9(3), IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATION FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION 2012. GEOTEXTILE EDGE B. BALLAST ROCK COMPACTED IN 12 INCH LIFTS, WSDOT 9-03.9(1), •' IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATION FOR ROAD, 3'-O" BRIDGE, AND MUNICIPAL CONSTRUCTION 2012. (12 INCH LIFTS) MIN C. PRE-CAST CONCRETE ABUTMENTS SHINGLE SPLICE D. MAINTAIN 9 INCHES CLEARANCE BETWEEN QUARRY SPALLS AND BRIDGE STRINGERS. E. 6" COBBLES WSDOT 9-03.11(2). IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATION FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION 2012. GEOTEXTILE LAYOUT F. EXISTING GROUND. NOT TO SCALE G. WILLOW CUTTINGS. 12" H. ENGINEERED STREAMBED MIX WSDOT 9-03.11(2)AND STREAMBED GEOTEXTILE MIN. SEDIMENT WSDOT 9-03.11(1). PERCENTAGE BY VOLUME. �PEGEOTEXTILE NOTES: TANATIVE 1. ANCHOR TRENCHES ARE TO BE INSTALL AT LEAST 3 FEET BEYONDSTAPLE J SO THE CREST OF THE SLOPE IN A SLOPE CONDITION. STAPLES - J// 2. OVERLAPS (EDGE TO EDGE) BETWEEN ROLLS SHOULD BE 3 TO 4 3'-0" MAX. CTRS. INCHES. THE (END TO END) SLICE BETWEEN ROLLS SHOULD BE 2 TO 3 FEET AND SHINGLED IN THE DIRECTION OF THE WATER FLOW. ALWAYS SECURELY FASTEN TO THE GROUND THE EDGES AND TYPICAL ANCHOR TRENCH DETAIL OVERLAPS WITH INTERVALS OF 3 FEET. NOT TO SCALE 3. SECURELY FASTEN DOWN THE CENTER OF EACH ROLL STAGGERING 24" MIN. CENTERLINE STAPLES BETWEEN THE OUTSIDE STAPLES WITH A END OVERLAP SPACING INTERNAL OF 3 FEET. GEOTEXTILE FLOW 4. 3 - 4 STAPLES PER SQUARE YARD. 5. ALWAYS INSTALL TO ROWS OF STAPLES SPACED 1.5 x 1.5 FEET APART AT THE ROLL SPLICE LOCATIONS. STAPLE 6 ADDITIONALINSTALL oAPLES AS REQUIRED TO ENSURE CONTINUOUS CONTTACT WITH THE TYPICAL SHINGLE SPLICE DETAIL NOT TO SCALE 7. 8 INCH MINIMUM U-SHAPED STAPLES SHOULD BE INSTALLED FLUSH WITH THE SOIL SURFACE. REFERENCE NUMBER: B. LEADING EDGES OF FABRIC SHALL BE BURIED A MINIMUM OF 12 APPLICANT NAME: INCHES AT A MINIMUM 45 DEGREE DOWN ANGLE. WASHINGTON DEPT. of FISH & WILDLIFE PROPOSED PROJECT: BRIDGE AND WALKWAY INSTALLATION LOCATION: McKERNAN HATCHERY ENG. PROJECT NO. MN:H37:14-1 SHEET 12 OF 12 DATE:2/27/2015 �oN STgT MASON COUNTY A o N DEPARTMENT OF COMMUNITY DEVELOPMENT S N z Planning Division z� N Y 426 W Cedar St, Shelton, WA 98584 (360)427-9670 1864 MASON COUNTY ENVIRONMENTAL PERMIT April 16, 2015 WA STATE DEPT OF FISH & WILDLIFE 600 CAPITOL WAY NORTH OLYMPIA WA 98501 Parcel Number(s): 421163260010 Expiration Date: 4/16/2017 12:00:OOA Date Issued: 4/16/2015 Case Number: MEP2015-00007 Project Description: MCKERNAN HATCHERY MAINTENANCE & REPAIRS ARE REQUIRED TO REMOVE TWO (2) FISH BLOCKING CULVERTS AND REPLACE WITH A BRIDGE The following critical areas are present on this property: Long-Term Commercial Forest XX FWHCA Ch. 17.10.060; Ch. 17.01.110; Mineral Resource Lands XX Frequently Flooded Areas Ch. 17.01.066; Ch. 17.01.090; Inholding Lands Landslide Hazard Areas Ch. 17.01.062; Ch. 17.01.100; Wetlands Seismic Hazard Areas Ch. 17.01.070; Ch. 17.01.102; Critical Aquifer Recharge Erosion Hazard Areas Ch. 17.01.080; Ch. 17.01.104. This permit, with conditions, is granted pursuant to the Mason County Resource Ordinance (Chapter 17.01 MCC.) Nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project. This permit may be rescinded if the permitee fails to complete the project as proposed or fails to comply with the standards of this ordinance. Authorized Local Government Official Date Conditions: 4/16/2015 Page 1 of 2 MEP2015-00007 1 r MASON COUNTY ENVIRONMENTAL PERMIT 4/16/2015 Case No.: MEP2015-00007 1.) All upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). 2.) All construction and demolition debris must be removed from the beach after project completion. Proper disposal of construction debris must be on land in such a manner that debris cannot enter or cause water quality degredation of State waters. 3.) Approved per dimensions and setbacks on submitted site plan. 4.) All work to be done in accordace with the BE. No permit or exemption authorizing construction shall extend for a term of more than five years. If actual construction of a development for which a permit has been granted has not begun within two years after approval, the Review Authority, the Mason County Planning Department, shall review the Mason Environmental Permit(MEP)and upon showing good cause, may extend the initial two year period by one year. No permit shall be extended unless the applicant has requested such review and extension prior to the exporation date. Signature Date OWNER - REPRESENTATIVE - CONTRACTOR Print Name (Circle one to indicate) 4/16/2015 Page 2 of 2 MEP2015-00007 (y i ` 1 MASON ENVIRONMENTAL PERMIT($630 or$380 w/other permit) Mason County Permit Center Use: ❑ CONDITIONAL USE($1520) MEP Zd 1 9� - DOW ❑ HABITAT MANAGEMENT PLAN REVIEW($445) Date Rcvd �J"Q•2L l55 MASON COUNTY 14AR 2 3 2015 DEPARTMENT OF COMMUNITY DEVELOPMENrP W. CEDAR ST, Mason County Resource Ordinance(Chapter 17.01 MCC) ENVIRONMENTAL PERMIT APPLICATION The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is under the authority of Chapters 36.32, 36.70A, 39.34, 58.17, 76.09, 84.33, 84.34 and 90.58 RCW. PLEASE PRINT 1. PROPERTY OWNER Name: YV A 5 H t 1U To iq 4-1A Tl: Mailing Address: G Q D <---A-1-a I+o L V\I,A y, V/Vt P !A, VV A _`3 Sp l Work Phone: W 010 2• 814 2-1 Email Address:., ,,&Kh v S-eh Q Home/Cell Phone: N /A Fax#: 360 - I'p 2, S 3 6 ? If an agent is acting for the property owner during the permit process, complete#2. 2.AUTHORIZED AGENT W A 5 H I N CI TO r f `�Ti4 r �SN /�J`I►'' W L G i Name: �l/`f 9 y 1.<gV nS E N Mailing Address: �,00 CA � I to/- t/�4 y Np KT'� Work Phone: 36© l p 2 O f 2 2 Email Address Home/Cell Phone: NlA Fax# 36 d Gjv 2 g 7 6 3.PROJECT SITE --h[ P F V 4 Nk C KERR N A N AA TCge-R Y J Site Address: 4T 11 VU• R e 4 e-�e Ro A P 5 i-Tol4 WA, Parcel#: 1421( 6 J Z 6 60 j Q Legal Description: Directions to Site: FR6M W. 6APK0A4tSr4 V9'/*/ RliQp> &o L6,s To W• f, Yr::jT6 R.o.+p . Tvgt4 (Z.t,�/4TTo 57-ALf onQ W, Df&Ik�oQ P-06D -Cgil d- ey�tf o Wp Attach a site plan showing the following: Lot Dimensions,Flood Zones,Existing Structures,Fences, Water Lines,Driveways,Drainage Plans,Shorelines,Septic System,Topography,Proposed Improvements,Easements,North Arrow,and Scale. Also draw a separate topography diagram. _. r ^•:(, P\i Pay. RC,i,cd June 2010 4. State which section requires permit: ❑ Long Term Commercial Forest,Chapter 17.10.060 Frequently Flooded Areas,Chapter 17.01.090 ❑ Mineral Resource Lands,Chapter 17.01.066 ❑ Landslide Hazard Area,Chapter 17.01.100 ❑ Aquifer Recharge Area,Chapter 17.01.080 ❑ Seismic Hazard Areas,Chapter 17.01.102 ❑ Erosion Hazard Area,Chapter 17.01.104 Fish&Wildlife Habitat Conservation Areas,Chapter ❑ In-Holding Lands,Chapter 17.01.062 17.01.110 ❑ Wetlands,Chapter 17.01.070 5. Identify current use of the property with existing improvements: -lq(5 is FtsP R+fcgi;,ey . MAi1\1TF-1%4,►.i,CE R�p p/4iJ2S A?-E REQJtP p yp �Z,e✓ybL)0 �Wv "iq el_vcKIIC; Cv!46,45.� Arch lace w �►'�dqe . 6. Identify and describe the proposed project,including the type of materials to be used,construction methods, principle dimensions,and other pertinent information(attach additional sheets,if needed): 7. Describe why the action requiring this permit cannot be avoided. TH" CV JER-TS JA-vF_ EtLv bf0 pvJtr'41&4e, 4144 A-rt 04-wkmeon- TlC_ 6>1ver-eS ��r>cK �Slf Aj � °� el/ 5s e . AAA1 "s,\te 9C �'s W �� rrs�t � �G75 'o pA Ss 4 Cv F . 8. Will there be an alteration of a wetland and/or wetland vegetation area(circle one)? Yes 9. Identify any surface water on or adjacent to property(circle one): Saltwater Lake `Strea Pond Wetland Drainage Ditch 10. Identify existing septic/sewer connection(circle one): If septic is located on project site,include records. Connected to Septic Connected to Community Septic N['4 11. Identify existing water supply(circle one): Public Water Supply Well pas r DE: WEAVE_A CR_4_::EK -1 N STP-9AIK 11. Type of Job (circle one): RE,+R4 lint po0'1t ' New Add Alteration Repair Demolition Other: Print Name Signature Date i P\k . ]! F Ite�isedJune201i) Shoreline Exemption Application WDFW McKernan Hatchery Culvert Removal and Bridge Replacement Washington State Fish and Wildlife 600 Capitol Way Olympia,WA. 98501 3/9/2015 RE: WDFW McKernan Hatchery Culvert Removal and Bridge Replacement 411 W. Deyette Road Shelton, WA. 98584 Development Description Development: Identify and describe the proposed project,including the type of materials to be used, construction methods, principle dimensions and other pertinent information. Weaver Creek flows through the McKernan Hatchery, where it is used near the hatchery entrance as an in- line rearing pond. The rearing pond is 28 to 30 feet wide with a weir at the downstream end and 2 screened culverts at the upstream end that are frequently backwatered. The two damaged 4 foot x 42 foot CMP screened culverts are located within 30 foot wide ponded area. These culverts will be removed and replaced with a 42 foot x 12 foot wide bridge, with a new removable screen system used to contain juvenile fish during rearing. The new screen system includes a poured slab, steel walkway, screen frame, and removable screens. When fish are not being reared, the screens are removable and the rearing pond will become an open 28-30 foot wide channel and fish passable. The bridge is supported by precast spread footings. The existing walls of the pond will be extended through the footprint of the bridge and used as the bridge abutments. Stream bed material will be placed within Ordinary High Water(OHW) in the new in-stream channel. The project below OHW will have geotextile, ecology blocks, bridge footings and streambed material. Above Ordinary High Water will have backfill crushed rock material, bridge abutments and the new bridge. The fill will come from a local quarry.Any excavated material will be disposed of at an approved facility out of the flood plain. Supersacks will placed to isolate the construction area, and water will be rerouted. Any water exposed to construction activities will not be allowed to reenter the stream. It will be pumped to an uplands area where siltation will be filtered to prevent turbid water re-entering Weaver Creek. Sediment control measures will include careful dewatering, straw mulch, silt fence, and/or straw wattles. During construction, sediment laden water will be pumped into a settlingpond that is separatedfrom any source of clean water. Upon completion of the project, upstream banks will be planted with willows and a native grass/shrub mix.No clearing of vegetation will be done. The site will be repaved upon completion. Any other areas of disturbed soils will be reseeded. Large rootwad materials will be placed just downstream of the in-line rearing channel to protect the banks of Weaver Creek against erosion and to provide habitat. Shoreline Exemption Application WDFW McKernan Hatchery Culvert Removal and Bridge Replacement Washington State Fish and Wildlife 600 Capitol Way Olympia, WA. 98501 Disturbed soils will be restored with native grass mix. On both sides of the bridge and underneath the bridge willows and native grasses will be planted. Willow cuttings will be placed underneath the bridge. The proposedproject will restore fish passage in Weaver Creek when fish are not being reared in the channel. Best Management Practices during construction will protect water quality from turbidity and other pollutants. Construction will be performed during approved work windows, and within permit regulations.All permits will be obtained before construction starts. Please refer to enclosed JARPA for additional details. o �Tnr�.nFY �E E ED J�y'tIAA9 ',Oyn PAR 3 0 2015 State of Washington _ NNING DEPARTMENT OF FISH AND WILDLIFE M C C PEA Mailing Address: 600 Capitol Way N•Olympia,WA 98501-1091 •(360)902-2200,TDD(360)902-2207 Main Office Location: Natural Resources Building• 1111 Washington Street SE•Olympia,WA March 25, 2015 Ms. Grace Miller Mason County Planning Department 426 W Cedar Street Shelton, WA 98584 Re: McKernan Hatchery- No Net Rise Floodplain Determination Parcel Number 42116-32-60010 Dear Ms. Miller: The Washington Department of Fish and Wildlife is proposing a project at the McKernan Hatchery, located at 411 W. Deyette Road, Shelton. The project will remove existing double culverts (2- 48"x 42' CMPs) from entrance to the hatchery and replace them with a 42-foot bridge on precast concrete footings. The project will include dewatering, culvert removal,bridge installation, screen installation, and bank restoration. The project to replace culverts with a bridge at the McKernan Fish Hatchery will not impact flooding or flood elevations in the Skokomish Valley Floodplain. The McKernan Hatchery currently operates an in-line rearing pond constructed with ecology blocks and a geotextile liner. The pond utilizes water from Weaver Creek to rear fish. The rearing pond is bound by an existing weir at the lower end and two screened culverts at the upper end of the pond. The existing culverts are beginning to fail. The project would include installing a new removable screen system to contain juvenile fish during rearing. The screen system would consist of a poured concrete slab, a steel walkway and screen frame, and removable screens. When fish are not being reared in the pond, it would be an open channel and fish passable. The double culverts would be replaced with a 42 foot long by 12 foot wide concrete bridge. The existing walls of the pond would be extended through the footprint of the bridge and used as part of the bridge abutment. The bridge would be supported by precast spread footings. There will also be approximately 10 pieces of large wood, logs, and root wads installed downstream of the hatchery pond to control an area of bank erosion. The width of the current pond is approximately 30 feet. The width under the proposed bridge would be a continuation on the pond at 28 to 30 feet. The pond is currently backwatered downstream and routinely has a water depth of 0.5 to 2.0 feet and velocities of less than 1 fps to 2 fps. Ms. Grace Miller March 26, 2015 Page 2 The project will consist of placing geotextile, ecology blocks, streambed material, and large woody material, below the base flood elevation. Above base flood elevation, crushed rock material,bridge abutments, and the new bridge will be installed. The site will be repaved upon completion. Sediment control measures will include careful dewatering, use of straw much, silt fence, and/or straw wattles. Upon completion of the project, upstream banks will be planted with a native shrub mix. The McKeman hatchery is located at the fringe of the 100-year flood plain of the Skokomish River. The flood mechanism at this site is directly from the Skokomish River with little impact from Weaver Creek. Using the 1998 FIRM data, Panel# 53011501801), the base flood elevation, zoned A2, is estimated at 35.5 feet NAVD 88. The current road elevation as surveyed by a licensed, professional surveyor was 36.75 (NAVD 88). As shown in the permit drawings, the top of the culverts to be removed are at 34.4 feet and 34.7 feet. The water surface elevation at the inlets and at the downstream weir at time of survey was approximately 35 feet elevation. The bridge will span Weaver Creek. Weaver Creek is a spring fed creek with very little fluctuation between high flow and low flow. It is a low velocity and low gradient stream that is heavily impacted by beaver activity, agriculture ditch diversion, and hatchery activities. At the hatchery, Weaver creek is consistently near bank full width with water elevations controlled by hatchery operations. With current beaver activity and hatchery maintenance, the water elevations rarely change by more than 12-inches between summer and winter flow. The bridge installation and screening will allow for more open channel, and a wider stream section underneath the hatchery access road, and the ability to keep the channel unrestricted during periods when the hatchery is not managing fish. Multiple ground elevations were taken around the project sight ranging from 36.1 to 36.75 feet. As we are proposing removing the culverts and fill from the stream channel, it is estimated that there will be a net removal of fill of 75 cubic yards below elevation 35. There will also be a net removal of 43 cubic yards of material between elevation 35 and 36. The proposed deck elevation for the new bridge will be 37.0 feet. The top of footing and the bottom of the bridge deck will be at 35.5 to 36.0 feet elevation depending on the depth of the concrete bridge section. The bottom of the bridge deck will be just slightly higher than the top of bank immediately downstream. Replacement of the culverts with a bridge allows for greater conveyance capacity and less fill within the 100-year flood plain elevations. Slightly raising the road elevation will prevent any backwatering of flood waters. The bridge will also not impede water from topping the banks at the hatchery should a greater than 100-year event occur. All materials used will withstand 100- year floods. The bridge and abutments will be anchored and stable. Ms. Grace Miller March 26, 2015 Page 3 The 10 pieces of woody material will be embedded into the bank and interlocked to remain stable at all water levels. The area of bank erosion occurs at a particularly wide area of the channel immediately downstream of the weir. The additional wood will reduce scour and erosion, enhance habitat, and have no effect on flood elevations. The current water level is within 1-foot of the base flood elevation. The area is very low gradient and low energy. The addition of the wood will not impact water elevations during periods of flooding or any other time. Sources used include: • https:Hfortress.wa. og v/ecy/coastalatlas/tools/FloodMap.aspx • https://msc.fema.gov • Floodplain of the Skokomish River— Special Flood Risk Zones, Mason County Planning Department 2007 9sten , Oe Kuykendall, P.E., Environmental Engineer Capital and Asset Management Program Enclosures: (4) cc: Glenn F. Gerth, P.E., Chief Engineer Cindy Knudsen, Permitting Biologist WDFW Project File Read File Intranetix Viewer [5301150180D.tifJ P.- Page I of I MEW ✓� "Mx h �'� 'IwnwM rlro MuuNa necA�11 FLOOM SURANCE REIE MAP r NIASON COUNTY, -S•__.. "' t WASHINGTON ' .._.16 i(UNtNC(l[MMIA{Np AILEA5/ x-- \\ tI COMMUNIT1dANEl NUMBER 530115 0180 D \� MAP REYMEO- \ DECEMBERB.11" CS5 VL Joo-\:-) 11 ram http://map l.msc.fema.gov/idms/IntraV iew.cgi?ROT=O&O_X=7394&O_Y=5082&O_ZM... 3/16/2015 c - � Q N D w .26 � g r 0 x LL a� LA R7 4 Gi LL �a IUL m L T, Q m r� V rr; i, ti � _W Z GRASSY AREA a ASPHALT ROAD 0 a 536 35.00 FENCE 35 36.21 ASPHALT ROAD FENCE 538 35.89--. _ _ FENCE �4 TOP OF. E 47 ELEV = 34.40' - TOE CRE K __ �., _-- REARING POND E. 30. 1' TOP OF PIPE FLOW - J$ 35.26 _ = 34.73' TOP CREEK ASPHALT ROAD 33 35.11 FENCE TBM 9J+q TOP NE CORNER OF g. CONC. VAULT 9<� ELEV. = 40.29' GRASSY AREA P� GPS PK NAIL O O AERATOR TOWER INCUBATION AND REARING POND D 20 40 10 30 60 SCALE: 1" = 40' DATUM HATCHERY BUILDING NAVD 88 POINTS SCALE: 1" = 40' REFERENCE NUMBER: APPLICANT NAME: WASHINGTON DEPT. of FISH & WILDLIFE PROPOSED PROJECT: BRIDGE AND WALKWAY INSTALLATION LOCATION: McKERNAN HATCHERY ENG. PROJECT NO. MN:H37:14-1 SHEET — OF — DATE:2/27/2015 PROPERTY LINE 441 X 33.90 TOP CREEK 401 X 36.24 PAVEMENT EDGE / INTERLOCK 10 CY OF ROOTWADS WITH STEMS �h 0 20 40 / 10 30 60 SCALE: 1" = 40' 30 a a y c� c; yo EXISTING ECOLOGY BLOCKS TYP. y/ 407 36.77 456 CONC. X 35.94 TOP CREEK FVpA s� cl i 35 T 'fz M P01 NTS SCALE: 1 = 20' REFERENCE NUMBER: APPLICANT NAME: WASHINGTON DEPT. of FISH & WILDLIFE PROPOSED PROJECT: BRIDGE AND WALKWAY INSTALLATION LOCATION: McKERNAN HATCHERY ENG. PROJECT NO. MN:H37:14-1 SHEET — OF — DATE:2/27/2015 p 3 a 11......... m O \ 0 A m g � — m a m n �A h P g g aa88V 3G3Gg 3 Kill: I -Fill x as 1 0� ED � O d m rt AP77 s Z Io N � C CD --t rn 3 a O O_ i cn — O A&: lt�r m a - • --------------------------------------- AGENCY USE ONLY Date received: US Army Corps WASHINGTON STATE se��rs ; Joint Aquatic Resources Permit Agency reference#: 1,2 Tax Parcel Application (DARPA) Form , USE BLACK OR BLUE INK TO ENTER ANSWERS IN THE WHITE SPACES BELOW. ' , `---------------------------------- Part 1-Project Identification 1. Project Name (A name for your project that you create.Examples:Smith's Dock or Seabrook Lane Development) hel WDFW McKernan Hatchery Culvert Removal Part 2-Applicant The person and/or organization responsible for the project. hel 2a. Name (Last, First,Middle) Knudsen, Cindy 2b. Organization(If applicable) Washington State Fish and Wildlife 2c. Mailing Address(street or PO Box) 600 Capitol Way North 2d. City, State, Zip Olympia, WA. 98501 2e. Phone(1) 2f. Phone(2) 2g. Fax 2h. E-mail ( 360) 902 8300 (360) 902 8422 (360)902 8376 Cindy.knudsen@dfw.wa.gov Additional forms may be required for the following permits: • If your project may qualify for Department of the Army authorization through a Regional General Permit(RGP),contact the U.S.Army Corps of Engineers for application information(206)764-3495. • If your project might affect species listed under the Endangered Species Act,you will need to fill out a Specific Project Information Form(SPIF)or prepare a Biological Evaluation. Forms can be found at hftp://www.nws.usace.arrnv.mil/Missions/CivilWorks/Regulatory/PermitGuidebook/EndangeredSpecies.aspx. • Not all cities and counties accept the JARPA for their local Shoreline permits.If you need a Shoreline permit,contact the appropriate city or county government to make sure they accept the JARPA. 2To access an online JARPA form with[help]screens,go to http://www.epermitting.wa.gov/site/alias resourcecenter/iarpa iarpa form/9984/iarpa form.aspx. For other help,contact the Governor's Office for Regulatory Innovation and Assistance at(800)917-0043 or help(d)-ora.wa.gov. JARPA Revision 2012.2 Page 1 of 15 Part 3-Authorized Agent or Contact Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b of this application.) hel 3a. Name (Last, First, Middle) Knudsen, Cynthia J. 3b. Organization (if applicable) Washington State Fish and Wildlife 3c. Mailing Address (Street or Po Box) 600 Capitol Way North 3d. City, State, Zip Olympia, WA. 98501 3e. Phone(1) 3f. Phone(2) 3g. Fax 3h. E-mail (360) 902 8300 (360) 902 8422 (360) 902 8376 Cindy.knudsen@dfw.wa.gov Part 4-Property Owner(s) Contact information for people or organizations owning the property(ies)where the project will occur. Consider both upland and aquatic ownership because the upland owners may not own the adjacent aquatic land. [help] ® Same as applicant. (Skip to Part 5.) ❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.) ❑ There are multiple upland property owners. Complete the section below and fill out DARPA Attachment A for each additional property owner. ❑ Your project is on Department of Natural Resources (DNR)-managed aquatic lands. If you don't know, contact the DNR at (360) 902-1100 to determine aquatic land ownership. If yes, complete JARPA Attachment E to apply for the Aquatic Use Authorization. 4a. Name (Last, First, Middle) 4b. Organization (if applicable) Washington State Fish and Wildlife 4c. Mailing Address (Street or Po Box) 600 Capitol Way North 4d. City, State, Zip Olympia, WA. 98501 4e. Phone(1) 4f. Phone(2) 4g. Fax 4h. E-mail (360) 902 8300 (360) 902 8422 (360) 902 8376 Cindy.knudsen@dfw.wa.gov JARPA Revision 2012.2 Page 2 of 15 i Part 5-Project Location(s) Identifying information about the property or properties where the project will occur. [help] ❑ There are multiple project locations (e.g. linear projects). Complete the section below and use DARPA Attachment B for each additional project location. 5a. Indicate the type of ownership of the property. (Check all that apply.) hel ❑ Private ❑ Federal ® Publicly owned (state, county,city,special districts like schools, ports,etc.) ❑ Tribal ❑ Department of Natural Resources (DNR)— managed aquatic lands (Complete JARPA Attachment E) 5b. Street Address (Cannot be a PO Box. If there is no address,provide other location information in 5p.) hel McKernan Hatchery W. 411 Deyette Road 5C. City, State, Zip(If the project is not in a city or town, provide the name of the nearest city or town.) [help] Shelton, WA. 98584 5d. County h[ elpl Mason 5e. Provide the section, township, and range for the project location. hel '/4 Section Section Township Range 16 21 N R4W 5f. Provide the latitude and longitude of the project location. [beipj • Example:47.03922 N lat./-122.89142 W long. (Use decimal degrees-NAD 83) 47.3072, N. Lat. /-123,204 W Long. NAVD 88 5g. List the tax parcel number(s)for the project location. hel • The local county assessor's office can provide this information. 421163260010 5h. Contact information for all adjoining property owners. (If you need more space, use JARPA Attachment C.) hei Name Mailing Address Tax Parcel # (if known) Washington State Dept. of Fish Washington State Dept. of Fish &Wildlife 421163260020 and Wildlife 600 Capitol Way North Olympia, WA. 98501 Hunter Et. Al James M & Joan P.O. Box 147 421163100030 Union WA. 98592 Mikesell, Roger D. & Judith E. 251 W. Deyette Rd. 421163200010 Shelton, WA. 98584 Unter Et.AI. Greg, Curt Hunter P.O. Box 2049 42116-33-00000 ---- -----...........__._...._....... Shelton Wa. 98584 4211632000020 JARPA Revision 2012.2 Page 3 of 15 Si. List all wetlands on or adjacent to the project location. k No wetlands are present. 5j. List all waterbodies (other than wetlands)on or adjacent to the project location. heM Weaver Creek is at the project location 5k. Is any part of the project area within a 100-year floodplain? hel ❑ Yes ® No ® Don't know (A portion of the property parcel appears to be out of the floodplain) 51. Briefly describe the vegetation and habitat conditions on the property. tLeM The proposed project is located at the McKernan fish hatchery. The project location is in a channelized portion of Weaver Creek flowing through hatchery grounds that is used for juvenile rearing. There is vegetative cover on the banks of Weaver Creek upstream and downstream of the project location with deciduous trees(willow and maple)and herbaceous plants such as willow shrubs grasses,thistle and blackberry. Weaver Creek is characterized by cobble and gravel substrates with moderate depth and flow conditions. There are beaver dams nearby. Weaver Creek has water input from springs near but not directly adjacent to the project location. The project vicinity is in a natural area with large woody debris along the natural course of the stream with approximately 85%mixed hardwood and deciduous cover. The substrate in Weaver Creek adjacent to the project location has mixed instream cobble sizes. Instream fines are present with typical low summer flows. No wetlands are present near the project location. According to USGS Washington Stream Stats3,Weaver Creek is within a basin area that has a mean annual precipitation of 97.9 inches. There is a drainage area at the project site of 0.11 square miles. Peak flow through the project area for a 100 year flow event is estimated at 42.3 cfs. There are several natural spring inputs draining into the general project area. 5m. Describe how the property is currently used. hei The property is used as a fish hatchery. 5n. Describe how the adjacent properties are currently used. hey The project is in a natural forested area with rural residential and agricultural properties nearby. 50. Describe the structures (above and below ground) on the property, including their purpose(s) and current condition. hei At the proposed project location,there are several outbuildings,hatchery raceways, staff residences, and rearing ponds. 5p. Provide driving directions from the closest highway to the project location, and attach a map. heM From Interstate 5,take exit 104 Right for US-101 North toward Port Angeles/Aberdeen. Keep right to stay on US-101 N. After 21.3 miles, turn left onto W. Skokomish Valley Road for 1.7 miles and then turn left onto W.Deyette Road.Turn right to stay on W. Deyette Road. The project location is at the western edge of the property. Location: T 21N,R 4W, S 16 (47.3072,-123.204). Part 6-Project Description 3 http://water.usgs.gov/osw/streamstats/Washington.htmi JARPA Revision 2012.2 Page 4 of 15 6a. Briefly summarize the overall project. You can provide more detail in 6b. hel ] Weaver Creek flows through the McKernan Hatchery, where it is used near the hatchery entrance as an in-line rearing pond. The rearing pond is 28 to 30 feet wide with a weir at the downstream end and 2 screened culverts at the upstream end that are frequently backwatered. The two damaged 4 foot x 42 foot CMP screened culverts will be removed and replaced with a 42 foot long x 12 foot wide bridge, with a new removable screen system used to contain juvenile fish during rearing. Rootwads will also be placed at the end of the in line channel to create fish habitat. The new screen system under the bridge includes a poured slab, steel walkway, screen frame, and removable screens. When fish are not being reared, the screens are removable and the rearing pond will become an open 28-30 foot wide channel and fish passable. The new bridge is supported by precast spread footings. The existing ecology block walls of the pond will be extended through the footprint of the bridge and used as the bridge abutments. Stream bed material will be placed within Ordinary High Water (OHW)in the new in-stream channel. The project below OHW will have geotextile, ecology blocks, bridge footings and streambed material.Above Ordinary High Water will have backfill crushed rock material, bridge abutments and the new bridge. The fill will come from a local quarry.Any excavated material will be disposed of at an approved facility out of the flood plain. Supersacks will be placed to isolate the construction area at both ends of the bridge portion of the project. Water will be rerouted through a bypass pipe, and then through the existing channel. Any water exposed to construction activities will not be allowed to reenter the stream. During construction, sediment laden water will be pumped into a settling pond that is separated from any source of clean water. Sediment control measures will include careful dewatering, straw mulch, silt fence, and/or straw wattles. Water will be pumped to an uplands area where it will be filtered to prevent turbid water or other contaminants from re-entering Weaver Creek. Before construction, no clearing of vegetation will be done. Upon completion of the project, upstream banks and any disturbed soils will be planted with a native grass/shrub mix. The bridge site will be repaved upon completion to match existing conditions. Underneath the bridge on both sides, willow cuttings will be planted. Construction will be performed during approved work windows and within permit regulations.All permits will be obtained before construction starts. 6b. Describe the purpose of the project and why you want or need to perform it. [beipj The McKernan Hatchery currently operates an in-line rearing pond on Weaver Creek that is constructed with ecology blocks and a geotextile liner. The rearing pond is bound by an existing weir at the lower end and 2 screened culverts at the upper end. The existing culverts are beginning to fail. This maintenance repair is required to remove the two CMP eroding damaged culverts, install a bridge with a new screening system under the bridge. This repair will improve hatchery operations,provide a better fish rearing system, and restore the habitat where the culverts are presently located.Rootwads will be placed at the end of the in-line channel to protect the banks against erosion, and to provide habitat. The proposed project will restore fish passage in Weaver Creek when fish are not being reared in the channel. Weaver Creek will also have a more natural passage of water during flood conditions. Rootwads will protect the banks at the end of the rearing channel against erosion and provide habitat. 6C. Indicate the project category. (Check all that apply) hel ® Commercial ❑ Residential ❑ Institutional ❑ Transportation ❑ Recreational ® Maintenance ❑ Environmental Enhancement 6d. Indicate the major elements of your project. (Check all that apply) [help] JARPA Revision 2012.2 Page 5 of 15 ❑ Aquaculture ® Culvert (removal) ❑ Float ❑ Retaining Wall ® Bank Stabilization ❑ Dam /Weir ❑ Floating Home (upland) ❑ Boat House ❑ Dike/ Levee /Jetty ❑ Geotechnical Survey ❑ Road ❑ Boat Launch ❑ Ditch ❑ Land Clearing ❑ Scientific Measurement Device ❑ Boat Lift ❑ Dock/ Pier ❑ Marina / Moorage ❑ Stairs ® Bridge ❑ Dredging ❑ Mining ❑ Stormwater facility ❑ Bulkhead ❑ Fence ❑ Outfall Structure ❑ Swimming Pool ❑ Buoy ❑ Ferry Terminal ❑ Piling/Dolphin ❑ Utility Line ® Channel Modification ❑ Fishway ❑ Raft ® Other: Rootwad placement 6e. Describe how you plan to construct each project element checked in 6d. Include specific construction methods and equipment to be used. hel • Identify where each element will occur in relation to the nearest waterbody. • Indicate which activities are within the 100-year floodplain. Weaver Creek flows through the McKernan Hatchery, where it is used as a 28 to 30 feet wide in-line rearing pond. There is a weir at the downstream end and 2 damaged screened culverts at the upstream end. The culverts are frequently backwatered. The two culverts will be removed and a bridge(42 foot long x 12 foot wide)will be installed with a new removable screen system to contain juvenile fish during rearing. At the downstream end of the project, rootwads will be pressed into place with an excavator staged on the bank of Weaver Creek. Construction access will be gained though hatchery grounds; no trees will be removed and no new site access roads will be created. Only minimal ground disturbance is expected. Supersack bags filled with pea gravel reinforced with plastic lining material will be placed at both ends of the project, and Weaver Creek will be diverted around the project area with bypass pipes. The height of the supersacks will be raised to an elevation thatprevents stream flow from entering the work area. The super-sack sandbags are each filled with approximately 1 cubic yard of sand or gravel with an impermeable plastic liner will be woven through the middle of the sack layers. Siltation curtains will be installed to limit turbidity impacts.Interior walls may be placed within the isolated area into separate smaller areas for a more efficient handling of construction water. Water in the construction area will be diverted to an upland bio-infiltration site where the diverted water cannot reenter Weaver Creek. Hay bales staked and entrenched with a wood stake or rebar will be placed along the low side of the bio- infiltration site to prevent water from re-entering Weaver Creek. This site will be staked infield by the engineer prior to construction. Water diversion techniques will be approved by the project engineer, and in accordance with the terms and conditions of the HPA and other required permits. Streambed mix(3 inch minus) will be installed in the stream bed after the culverts have been removed. Turbidity impacts are expected to be short in duration, site specific, and temporary in nature. Since this area has typical low flow during summer, the turbidity impacts will more than likely be confined to the construction area within the sediment control structures, and limited at a maximum to 200 to 300 feet downstream during construction activities. Rewatering the area will be done slowly and according to BMPs. Construction activities will be at low water levels. Since maximum peak velocity is estimated at considerably less than I0cfs in the culvert removal area during the seasonal low flow work window, the maximum amount of sediment transport is not expected to extend any farther than an estimated maximum distance of 300 feet. Work will be conducted during approved work windows during low flow conditions and as approved by all required permits. Noise from construction activities above ambient levels is limited to the working hours between 7 a.m. and 6p.m. In water construction activities are expected to be completed in a maximum of two weeks, staging of equipment may occur JARPA Revision 2012.2 Page 6 of 15 earlier. Typical construction machinery will be used including dump truck, excavator, track hoe and compactor all staged above OHW. No area will be cleared for temporary access, No trees will be removed and machines will not enter the water.After the existing fill from the proposed project site is removed the existing culverts will be removed and disposed of offsite at an approved landfill. Any materials purchased for the proposed project, if required, will come from local quarry. In the unlikely event that historic artifacts are discovered, construction activities will stop and the proper authorities will be notified. Short term construction activities may affect a pool in the project location if one exists, however, habitat will be restored at project completion that will match conditions present at the site for pool frequency and pool quality. Fish removal will be done by dragging nets through the project area, then staking nets above and below the project area, to prevent any possible species from entering the site during construction, or as required by permits. At project completion, sandbags will be removed by hand, and then the bypass pipe, silt fence, and fish screen materials will be removed. Sediment controls will include careful dewatering, straw mulch, silt fence, and/or straw wattles. Upon completion of the project upstream banks will be planted with a native grass/shrub mix. Please see project drawings for additional details. 6f. What are the anticipated start and end dates for project construction? (Month/Year) hem • If the project will be constructed in phases or stages,use JARPA Attachment D to list the start and end dates of each phase or stage. Anticipated In water: August 1 — 15, 2015 Start date: July, 2015 End date: August 31, 2016 ❑ See JARPA Attachment D 6g. Fair market value of the project, including materials, labor, machine rentals, etc. hem $ 200,000 6h. Will any portion of the project receive federal funding? [ftgjpj • If yes, list each agency providing funds. ❑ Yes ® No ❑ Don't know Part 7—Wetlands: Impacts and Mitigation ❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area. (If there are none, skip to Part 8.) hel 7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. hem ® Not applicable 7b. Will the project impact wetlands? heI ❑ Yes ® No ❑ Don't know 7c. Will the project impact wetland buffers? hel ❑ Yes ® No ❑ Don't know 7d. Has a wetland delineation report been prepared? hel • If Yes,submit the report, including data sheets,with the JARPA package. ❑ Yes ® No JARPA Revision 2012.2 Page 7 of 15 7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating System? [help] . If Yes,submit the wetland rating forms and figures with the JARPA package. ❑ Yes ® No ❑ Don't know 7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? [hpjpj • If Yes, submit the plan with the JARPA package and answer 7g. • If No,or Not applicable,explain below why a mitigation plan should not be required. ❑ Yes ❑ No ® Not applicable 7g. Summarize what the mitigation plan is meant to accomplish, and describe how a watershed approach was used to design the plan. help] N/A 71h. Use the table below to list the type and rating of each wetland impacted, the extent and duration of the impact, and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a similar table, you can state (below) where we can find this information in the plan. hel Activity (fill, Wetland Wetland Impact Duration Proposed Wetland drain, excavate, Name' type and area (sq. of impact3 mitigation mitigation area flood, etc.) rating ft. or type' (sq. ft. or category2 Acres) acres) N/A If no official name for the wetland exists,create a unique name(such as"Wetland 1"). The name should be consistent with other project documents,such as a wetland delineation report. 2 Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System.Provide the wetland rating forms with the JARPA package. 3Indicate the days, months or years the wetland will be measurably impacted by the activity. Enter"permanent'if applicable. 4 Creation(C),Re-establishment/Rehabilitation(R),Enhancement(E),Preservation(P), Mitigation Bank/In-lieu fee(B) Page number(s)for similar information in the mitigation plan, if available: 7L For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in cubic yards that will be used, and how and where it will be placed into the wetland. Lei ] N/A 7j. For all excavating activities identified in 7h, describe the excavation method, type and amount of material in cubic yards you will remove, and where the material will be disposed. hel ] N/A Part 8—Waterbodies (other than wetlands): Impacts and Mitigation In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) Lel ® Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.) JARPA Revision 2012.2 Page 8 of 15 8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment. hel ❑ Not applicable Weaver Creek stream flow under the bridge is expected to match the present ecological functions at project completion. No change in hydrology is expected by the result of this project. When the culverts are removed, there will be no effects from backwatering,ponding, and sediment caused by the eroding culverts entering Weaver Creek. Floodplain flows will return to more natural functions. Supersacks will be placed to isolate the construction area, and water will be rerouted. Any water exposed to construction activities will not be allowed to reenter the stream.All precautions will be taken to avoid exposing Weaver Creek to concrete pouring activities. Sediment control measures will include careful dewatering, straw mulch, silt fence, and/or straw wattles. Any water in the construction area will be pumped to an upland bio-infiltration site separated from any source of clean water. Hay bales staked and entrenched with a wood stake or rebar will be placed along the low side of the bio- infiltration site to prevent water from re-entering Weaver Creek. Best Management Practices during construction will protect water quality in Weaver Creek from turbidity and other pollutants. Water diversion techniques will be approved by the project engineer, and in accordance with the terms and conditions of the HPA and other required permits. At project completion, sandbags used during water diversion will be removed by hand, and then the bypass pipe and silt fence, and fish screen materials will be removed. Rewatering the area will be done according to BMPs. Since maximum peak velocity is estimated at considerably less than IOcfs in the culvert removal area during the seasonal low flow work window, the maximum amount of sediment transport will not reach farther than an estimated maximum distance of 300 feet. Upon completion of the project, upstream banks will be planted with a native grass and shrub mix. Willow cuttings will be placed underneath the bridge.Any disturbed soils will be reseeded.No clearing of vegetation will be done. Please refer to the project drawings for detailed plant placements. The site will be repaved upon completion. Construction will be performed during approved work windows, and within permit regulations. 8b. Will your project impact a waterbody or the area around a waterbody? hel ® Yes ❑ No 8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland waterbodies? hei • If Yes,submit the plan with the JARPA package and answer 8d. • If No,or Not applicable,explain below why a mitigation plan should not be required. ❑ Yes ❑ No ® Not applicable This maintenance project will remove culverts, and install rootwads. Fish passage and habitat conditions will be improved. 8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was used to design the plan. • If you already completed 7g you do not need to restate your answer here. [help] N/A JARPA Revision 2012.2 Page 9 of 15 8e. Summarize impact(s)to each waterbody in the table below. [help] Activity (clear, Waterbody Impact Duration Amount of material Area (sq. ft. or dredge, fill, pile name location of impact3 (cubic yards) to be linear ft.) of drive, etc.) placed in or waterbody removed from directly affected waterbody Excavatel Weaver Above 2 weeks 63 cy native fill 504 sq feet Creek OHW underneath roadway above Weaver Creek Fill Weaver Above 2 weeks Quarry Spalls 60 sq ft Creek OHW 5 c Fill Weaver Below 2 weeks Ecology Blocks 120 sq ft Creek OHW 35 c Fill Weaver Below 2 Weeks Concrete 3 cy 675 sq ft Creek OHW Fill Weaver Below 2 weeks Streambed Mix 504 sq ft Creek OHW 10 c Fill Weaver Below 1 day 20 cy (2) Rootwads 200+ sq ft Creek OHW If no official name for the waterbody exists,create a unique name(such as"Stream V)The name should be consistent with other documents provided. 2 Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent,provide the distance between the impact and the waterbody and indicate whether the impact will occur within the 100-year flood plain. 3 Indicate the days,months or years the waterbody will be measurably impacted by the work. Enter"permanent"if applicable. 8f. For all activities identified in 8e, describe the source and nature of the fill material, amount(in cubic yards) you will use, and how and where it will be placed into the waterbody. Lop] Fill materials will come from a local quarry. Fill will be placed from an excavator staged above OHW. 5 cy quarry spalls 35 cy Ecology Blocks 3 cy Concrete 10 cy Streambed mix 8g. For all excavating or dredging activities identified in 8e, describe the method for excavating or dredging, type and amount of material you will remove, and where the material will be disposed. hei 63 cubic yards of native soil material will be excavated above OHW. These materials are located under the roadway, and above the culverts. These materials will be disposed of off-site. Part 9-Additional Information Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of this section as you can. It is ok if you cannot answer a question. 9a. If you have already worked with any government agencies on this project, list them below. heU Agency Name Contact Name Phone Most Recent Date of Contact Mason County Grace Miller (360) 427 9670 1/23/15 USACE Darren Habel (206) 764 6883 1/23/15 WDFW Margie Bigelow ( 360) 427-2179 3/2/15 9b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 of this JARPA on the Washington DARPA Revision 2012.2 Page 10 of 15 Department of Ecology's 303(d) List? h[ el, • If Yes,list the parameter(s)below. • If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at: http://www.ecy.wa.gov/programs/wa/303d/. ❑ Yes ® No, 9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? [heipJ • Go to http://cfpub.epa.gov/surf/locatelindex.cfm to help identify the HUC. Skokomish Watershed-- 17110017 9d. What Water Resource Inventory Area Number(WRIA#) is the project in? hem • Go to http://www ecy wa qov/services/gis/maps/wria/w(a htm to find the WRIA#. 16 9e. Will the in-water construction work comply with the State of Washington water quality standards for turbidity? het • Go to hftp://www.ecy.wa.gov/i)rograms/wq/swqs/criteria.html for the standards. ® Yes ❑ No ❑ Not applicable 9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline environment designation? heI • If you don't know, contact the local planning department. • For more information,go to: http://www.ecy.wa.gov/i)rograms/sea/sma/laws rumes/173-26/211 designations.html. ❑ Rural ❑ Urban ❑ Natural ❑ Aquatic ® Conservancy ❑ Other 9g. What is the Washington Department of Natural Resources Water Type? hem • Go to http//www dnr wa gov/BusinessPermits/Topics/ForestPractmcesApplmcations/Pages/fp watertyping aspx for the Forest Practices Water Typing System. ❑ Shoreline ® Fish ❑ Non-Fish Perennial ❑ Non-Fish Seasonal 9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater manual? hel • If No, provide the name of the manual your project is designed to meet. ® Yes ❑ No Name of manual: Western Washington Stormwater Manual 91. Does the project site have known contaminated sediment? heel t • If Yes, please describe below. ❑ Yes ® No 9j. If you know what the property was used for in the past, describe below. telp This site has been the site of the McKernan Hatchery for several years. 9k. Has a cultural resource (archaeological) survey been performed on the project area? nel • If Yes,attach it to your JARPA package. ❑ Yes ® No JARPA Revision 2012.2 Page 11 of 15 91. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project area or might be affected by the proposed work. [help] Steelhead, Coastal/Puget Sound DPS (Oncorhynchus mykiss) Chinook,Puget Sound ESU(Oncorhynchus tshawytscha) Chum salmon,Hood Canal summer ESU(Oncorhynchus keta) 9m. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and Species List that might be affected by the proposed work. h�ei Steelhead,Coastal/Puget Sound DPS (Oncorhynchus mykiss) Chinook,Puget Sound ESU(Oncorhynchus tshawytscha) Chum salmon, Hood Canal summer ESU(Oncorhynchus keta) Bull trout, Coastal/Puget Sound IRU (Salvelinus confluentus) CRITICAL HABITAT Chinook,Puget Sound ESU(Oncorhynchus tshawytscha)-Critical Habitat ending at(47.3097, -123.2384)Weaver Creek (George Adams Fish Hatchery), south of the project location. Chum salmon,Hood Canal summer ESU(Oncorhynchus keta) -Critical Habitat is found in Mason County in the South Fork of the Skokomish River but not at the project location, ending at(47.3209,-123.2211). Chum salmon,Hood Canal summer ESU(Oncorhynchus keta),critical habitat is present in the watershed in the lower end of the Skokomish Subbasin and nearest to the proposed project at endpoint(47.3209,-123.2211)approximately one mile NE (overland)from the hatchery in an unnamed stream segment off of the south fork of the Skokomish River. There are possibly(unknown)opportunities for chum to migrate through Weaver Creek,but spawning or rearing opportunities are not believed to be occurring at the project location. Bull trout Coastal/Puget Sound IRU Bull Trout are present in the Skokomish River,but available data does not place bull trout or their critical habitat at or near the proposed project location. Limiting factors include fines and low summer flows that could affect water temperatures and opportunities for rearing of bull trout.The closest location of bull trout critical habitat is approximately one mile NE of the proposed project location in the South Fork of the Skokomish River(47.315,- 123.247). They are not typically found in Weaver Creek. There are listed Marbled Murrelet(Brachyamphus marmoratus)and Northern Spotted Owl(Strix occidentalis caruina),and Critical Habitat for Marbled murrelet, and Northern spotted owl in Mason county. There are no Marbled murrelet or Northern spotted owls or anywhere near the project location. Giant chain fern(Woodwardia fimbriata) is within one mile of the project location. Within two miles of the project location there are low elevation sphagnum bogs,with dulichium arundinaceum Acidic Fen and schoenoplectus subterminalis Herbaceous Vegetation.No rare plants or rare plant habitat areas are found at the project location. Part 10—SEPA Compliance and Permits Use the resources and checklist below to identify the permits you are applying for. • Online Project Questionnaire at http://apps.ecy.wa.gov/opas/. • Governor's Office for Regulatory Innovation and Assistance at (800) 917-0043 or helper-ora.wa.gov. • For a list of addresses to send your JARPA to, click on agency addresses for completed JARPA. 10a. Compliance with the State Environmental Policy Act (SEPA). (Check all that apply.) hf elal • For more information about SEPA,go to www.ecy.wa.gov/programs/sea/seva/e-review.htmi. JARPA Revision 2012.2 Page 12 of 15 ® A copy of the SEPA determination or letter of exemption is included with this application. ❑ A SEPA determination is pending with (lead agency). The expected decision date is ❑ I am applying for a Fish Habitat Enhancement Exemption. (Check the box below in 10b.) hel ❑ This project is exempt (choose type of exemption below). ❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt? ❑ Other: ❑ SEPA is pre-empted by federal law. 10b. Indicate the permits you are applying for. (Check all that apply.) hel LOCAL GOVERNMENT Local Government Shoreline permits: ❑ Substantial Development ❑ Conditional Use ❑ Variance X Shoreline Exemption Type (explain): Maintenance— Mason County Other City/County permits: ❑ Floodplain Development Permit ❑ Critical Areas Ordinance STATE GOVERNMENT Washington Department of Fish and Wildlife: ® Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption — Attach Exemption Form Effective July 10, 2012, you must submit a check for $150 to Washington Department of Fish and Wildlife, unless your project qualifies for an exemption or alternative payment method below. Do not send cash. Check the appropriate boxes: ❑$150 check enclosed. Check# Attach check made payable to Washington Department of Fish and Wildlife. ❑My project is exempt from the application fee. (Check appropriate exemption) ® HPA processing is conducted by applicant-funded WDFW staff. Agreement# 85743 ❑ Mineral prospecting and mining. ❑ Project occurs on farm and agricultural land. (Attach a copy of current land use classification recorded with the county auditor,or other proof of current land use.) ❑ Project is a modification of an existing HPA originally applied for, prior to July 10, 2012. HPA# Washington Department of Natural Resources: ❑ Aquatic Use Authorization Complete DARPA Attachment E and submit a check for$25 payable to the Washington Department of Natural Resources. Do not send cash. Washington Department of Ecology: ❑ Section 401 Water Quality Certification JARPA Revision 2012.2 Page 13 of 15 FEDERAL GOVERNMENT United States Department of the Army permits (U.S. Army Corps of Engineers): ® Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters) United States Coast Guard permits: ❑ Private Aids to Navigation (for non-bridge projects) Part 11—Authorizing Signatures Signatures are required before submitting the JARPA package. The JARPA package includes the JARPA form, project plans, photos, etc. hel 11 a. Applicant Signature (required) hel I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work only after I have received all necessary permits. I hereby authorize the agent named in Part 3 of this application to act on my behalf in matters related to this application. (initial) By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the permitting agencies entering the property where the project is located to inspect the project site or any work related to the project. (initial) /Kit Applicant Printed Name Applicant Signature Date 11 b. Authorized Agent Signature hel I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work only after all necessary permits have been issued. JAt . CitAuthorized Agent Printed Name Authorized Agent Signature Date 11 c. Property Owner Signature (if not applicant) hel Not required if project is on existing rights-of-way or easements. I consent to the permitting agencies entering the property where the project is located to inspect the project site or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the landowner. Property Owner Printed Name Property Owner Signature Date 18 U.S.0§1001 provides that:Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly falsifies, conceals,or covers up by any trick,scheme,or device a material fact or makes any false,fictitious,or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false,fictitious,or fraudulent statement or entry,shall be fined not more than$10,000 or imprisoned not more than 5 years or both. If you require this document in another format,contact the Governor's Office for Regulatory Innovation and Assistance(ORIA)at(800) 917-0043. People with hearing loss can call 711 for Washington Relay Service. People with a speech disability can call(877)833-6341. ORIA publication number: ENV-019-09 rev.08/2013 JARPA Revision 2012.2 Page 14 of 15 Restoration Programmatic for the State of Washington Specific Project Information;Form U.S. Army Corps of Engineers, Seattle District, Regulatory Branch July 29,2008 version Use this form to notify the U.S. Army Corps of Engineers, Seattle District(Corps) of a proposed restoration project that falls within the range of the nine restoration activities considered by National Marine Fisheries Service (NMFS) and the U.S. Fish and Wildlife Service(USFWS) during its Section 7 of the Endangered Species Act(ESA) consultation(NMFS Reference No. 2008/03598; USFWS Reference No. 13410-2008-F-0209). You may also use this form if your project slightly deviates from the description and scope of the nine project categories addressed in this consultation. However, should the resulting impacts exceed those considered in the NMFS and USFWS Biological Opinion you will need to consult individually(which generally takes longer) and potentially provide additional information. The Corps is responsible, in most cases, for ensuring that a project complies with the requirements of Section 106 of the National Historic Preservation Act. Table of Contents IGENERAL INFORMATION..................................................................................................................................1 II EFFECT DETERMINATIONS FOR FISH SPECIES USFWS&NMFS..........................................................9 III EFFECT DETERMINATIONS FOR LISTED TERRESTRIAL SPECIES.....................................................15 IVSIGNATURE...........................................................................................................................................................20 APPENDIX A:DEWATERING AND FISH CAPTURE PROTOCOL........................................................................22 I GENERAL INFORMATION A. Date: 3/3/2015 Corps reference no.: B. Applicant name (same as in JARPA): Washington State Fish and Wildlife Address Washington State Fish and Wildlife 600 Capitol Way North Olympia WA 98501 C. Agent Name (same as on JARPA): Cindy Knudsen Address: Washington State Fish and Wildlife 600 Capitol Way North 01=:pia, WA, 99501 D. Location(s) of activity: Section: 16 Township: 21 N Range: 4W Latitude (xxx° xx' xx.x"): 47° 18 '25.92" (47.3072) Longitude (xxx° xx' xx.x"): -1 31 121 3994" (-123.204) 1 UTM: Waterbody: Weaver Creek County: Mason ESU or IRU: Puget Sound E. Project elements. In the table below, fill in the maximum length of each project element proposed and the number of structures where applicable. This information will be used by the Services for calculating your take exemption: Action Category Project Length and Width Number of where applicable Structures 1. Fish Passage: a. Culvert Replacement and N/A Relocation b. Retrofitting Culverts N/A c. Culvert Removal 48"x 42 feet 2 d. Tidegate Removal N/A e. Removal or Modification of N/A Sediment Bars or Terraces f. Temporary Placement of Erosion prevention materials: Sandbags, Hay Bales and supersack sandbags two bags Ecology Blocks high, single row hay bales will be used as described: page 5 and 6 of project drawings. g. Construction of Structures to N/A Provide Passage over Small Dams 2. Installation of Instream Structures: a. Placement of Woody Debris 10 cy, approx.. (10 feet across) b. Placement of Live Stakes 120 sq yd. Approx. 180 2 foot on center c. Placement of Engineered Log N/A Jams d. Grade Control ELJs N/A e. Trapping Mobile Wood N/A f. Placement of Boulders N/A 2 Action Category Project Length and Width Number of where applicable Structures i g. Boulder Weirs and Roughened N/A Channels h. Gravel Placement Associated 20 cy above OHW with Structure Placement 3. Levee Removal and N/A Modification 4. Side Channel/Off Channel (Approximately) 200 s.q. ft., Habitat Restoration and under bridge Reconnection 5. Salmonid Spawning Gravel 10 cy spawning gravel Restoration 6. Forage Fish Spawning Gravel N/A Restoration 7. Hardened Fords and Fencing N/A for Livestock Stream Crossings 8. Irrigation Screen Installation N/A and Replacement 9. Debris and Structure Removal N/A *For all action categories selected at section IE of this SPIF, the project will comply with all elements of the project description and the conservation measures. Exceptions noted below. F. Description of the proposed work: [Describe the work to be accomplished including purpose, number and type of structures to be installed or constructed, construction materials and machinery to be used, and anticipated construction techniques to be employed. You may attach additional pages or, if completing this form by computer, expand the space below to provide this information. Attach maps or drawings to clearly illustrate the location, nature, and extent of the proposed work.] Weaver Creek flows through the McKernan Hatchery, where the creek is used near the hatchery entrance as an in-line rearing pond. The rearing pond is 28 to 30 feet wide with a weir at the downstream end and 2 screened culverts at the upstream end, which are frequently backwatered. The two damaged 4 foot x 42 foot CMP screened culverts are located within 30 foot wide ponded area. These culverts will be removed and replaced with a 42 foot x 12 foot wide bridge, with a new removable screen system used to contain juvenile fish during rearing. 3 The new screen system includes a poured slab, steel walkway, screen frame, and removable screens. When fish are not being reared, the screens are removable and the rearingpond will become an open 28-30 foot wide channel and fish passable. The bridge is supported by precast spread footings. The existing walls of the pond will be extended through the footprint of the bridge and used as the bridge abutments. Stream bed material will be placed within Ordinary High Water(OHW)in the new in-stream channel. The project below OHW will have geotextile, ecology blocks, bridge footings and streambed material.Above Ordinary High Water will have backfill crushed rock material, bridge abutments and the new bridge and a bridge walkway. The fill will come from a local quarry. Any excavated material will be disposed of at an approved facility out of the flood plain. Supersacks, two layers high will be placed to isolate the construction area, and water will be rerouted using bypass pipe. Any water exposed to construction activities will not be allowed to reenter the stream. It will be pumped to an uplands area where siltation will be filtered to prevent turbid water re-entering Weaver Creek. Sediment control measures will include careful dewatering, straw mulch, siltfence, and/or straw wattles. During construction, sediment laden water will be pumped into a settling pond that is separated from any source of clean water. Upon completion of the project, upstream banks will be planted with a native shrub mix.No clearing of vegetation will be done. The site will be repaved upon completion.Any other areas of disturbed soils will be reseeded. Disturbed soils will be restored with native grass mix. On both sides of the bridge and underneath the bridge native plants will be planted. Willow cuttings will be placed underneath the bridge.Please refer to the project drawings for detailed plant placements. The proposed project will restore fish passage in Weaver Creek when fish are not being reared in the channel. Best Management Practices during construction willprotect water quality from turbidity and other pollutants. Construction will be performed during approved work windows, and within permit regulations.All permits will be obtained before construction starts. G. Project timing: Start date July 1,2015 Start Date In-water Work August 1,2015 End date September,2015 End Date In-water Work August 15,2015 H. Anticipated cubic feet per second (CFS) of stream at time of construction: Less than I foot pre second or 2 feet per second is expected. I. How much area do you propose to clear for temporary access? No area will be cleared for temporary access. J. How many trees and what sizes will be felled for temporary access? No trees will be felled for temporary access. 4 K. Will your temporary access traverse across slopes steeper than 30%? No. Temporary access will be through McKernan Hatchery grounds. The slope is less than 3%. L. How many temporary stream crossings do you propose? List all best management practices (BMPs) proposed to avoid and minimize impacts from stream crossings. No streams will be crossed. Access to the construction site will be through the McKernan hatchery grounds on paved areas. Equipment will be staged from above OHW on the banks of Weaver Creek. M. Culvert replacements: 1. Append the applicable "Summary Form for Fish-Passage Design Data"that can be found in the WDFW Culvert Manual ((Bates et al. 2003) Appendix F). See Attached. 2. Append maintenance plan that shows that culvert will be in design condition prior to each fish passage season. Culverts will be removed, but not replaced with additional culverts. A bridge and a walkway will be installed. 3. If your project is in gradients 6— 10 % and abridge is not feasible,use stream simulation option and provide annual monitoring data of substrate, invert elevation, and channel form (elements of roughened channel: boulders, pools, low flow channel) including a picture prior to each migration season. This project will be from 0-3%grade. Culverts will be removed and abridge and walkway will be installed. No change in grade is expected. 4. If your culvert is longer than 150 feet include tribal comments. If you discussed your design with WDFW, include WDFW comments or a record of your conversation with WDFW. This project will remove two culverts presently on site. The bridge that will be installed is 12 feet wide x 42 feet long. 5. Are you increasing the amount of rip-rap. If so,by how much? No riprap will be used. The project will consist ofplacement of. geotextile, ecology blocks, and streambed material below Ordinary High Water. Above Ordinary High Water will be quarry spalls, crushed rock material, bridge abutments, and the new bridge and walkway. 5 6. Describe how proper ecological functions (bedload movement, debris movement, flood flows) in addition to fish passage will be met. The pond is currently backwatered downstream and routinely has a water depth of 0.S to 2.0 feet and velocities of less than ]fps to fps. Stream flow under the bridge at project completion is expected to match present ecological functions in Weaver Creek. Floodplain flows will return to more natural functions. 7. If you are increasing the length or width of a road: The roadway over Weaver Creek will not be increased in length or width. A new bridge will replace the current roadway in the same footprint. The width of the pond is approximately 30 feet. The width of the bridge would be a continuation of the pond at 28- 30 feet. a. Quantify the increased impervious surface created as a result of this activity. During excavation and removal of the culverts, earth will be removed, and a bridge placed over Weaver Creek. Less impervious surfaces results with the installation of the bridge. b. List measures that you propose to use to avoid impacts to resources and water quality. The proposed project will restore fish passage in Weaver Creek when fish are not being reared in the channel. No equipment will enter the water. Best Management Practices during construction will prevent water from entering Weaver Creek. Water quality will be protected from turbidity and other pollutants. No waste materials will be discharged into surface water. Construction will be performed during approved work windows, and within permit regulations. Water in Weaver Creek will be temporarily rerouted around the construction area using supersacks and pipes, work will be done in a dry area. Streambed mix will be placed in stream before water is returned to Weaver Creek.No dredging will be done. No wetlands or wetland buffers will be disturbed. Refueling of construction equipment will be done away from the construction area where any spilled materials will not enter the creek. After construction, disturbed soils will be restored with native grass mix. On both sides of the bridge and underneath the bridge, native plants will be planted. Willow cuttings will be planted underneath the bridge. Please refer to the project drawings for plant placements. Measures shall be taken to ensure that no petroleum products, hydraulic fluid,fresh cement, sediments, sediment-laden water, chemicals, or any other toxic or deleterious materials are allowed to enter or leach into waters of the U.S. To the extent feasible, work requiring use of heavy equipment will be completed by working from the top of the bank. If required, stream crossings will be performed at right angle if possible; and. no stream crossings will be performed at spawning sites when spawners are 6 present or eggs or alevins could be in the gravel; and the number of crossings will be minimized. All waste material such as construction debris, silt, excess dirt or overburden resulting from this project will generally be deposited above the limits of floodwater in an upland disposal site. Note: Permanent road improvements that result in increased traffic or development are not permitted under this PBA. This project will not result in increased traffic or development at the McKernan Hatchery. N. Rock grade control structures: How much combined rock is proposed for structures? No rock control grade structures are proposed as a component of this project. O. Removal or modification of sediment bars or terraces: Has there been previous removal of sediment at this location? If yes when and how much? No sediment has been removed at this location previously. P. Side Channel/Off Channel Habitat Creation: 1. Has a reach assessment or analysis been conducted for this project? No. A reach assessment has not been completed for this project. At the downstream end of the project, rootwads will be pressed into place with an excavator staged on the bank of Weaver Creek. 2 How many years will the project take to complete? This project could take from three to six weeks to complete. 3. Demonstrate sufficient hydrology for a self-sustaining channel. Weaver Creek is at the McKernan Hatchery where fish have been raised in this channel for several years. No change in hydrology is expected by the result of this project. Water will have a more natural flow through the creek after completion. Q. Will you be isolating the work area? [Explain how your decision on working in the wet or dry, or partially isolation the area, will minimize impacts to salmonids.] Yes, the construction area will be isolated by diverting the water through pipes and pumping it to an uplands location where it will enter a settlingpond and filtered through straw bales and siltation curtains and natural surfaces before water eventually returns to Weaver Creek. Impacts to salmonids will be minimal because best management practices will be used to protect water quality, as described in 7b (above). Work will be done during approved work windows, and within permit regulations. 7 R. Give a maximum estimate for the duration and length of downstream turbidity impacts. The Services will use this estimate for giving you your take exemption. (During construction you will be monitoring downstream sedimentation every 20 min to verify/refine your given estimate.) Expected water velocity is a slow velocity,from 1 —3 feet per second. Water in the construction area will be pumped uplands and routed around the site. Construction will be done in dry conditions. Clean washed gravel will be used for placement instream under the bridge, sized specifically for fish spawning. Turbidity could enter Weaver Creek when water is reintroduced to the site at job completion, and during supersack placement and removal. These effects are with a limited duration, temporary, and within approved work windows. Effects are not expected to travel more than 300 feet downstream. S. Explain what equipment will generate noise above ambient levels and for what period during the day and for how many days. Noise will be generated during normal work hours from 7 a.m. to 6 p.m. and.from typical construction equipment such as dump trucks, excavator, and track hoe and pickup trucks. Work is expected to take less than three weeks. T. Please attach HPA or explain why you do not need one. The HPA will be obtained before construction work starts. It will be submitted with this application, or as soon as obtained. U. If your project does not meet all of the criteria outlined in the PBA, but is a restoration action of similar scope and impacts, contact the Services with the project's description, conservation measures and reason(s) it may not currently fit under the PBA. Provide below any supporting conversations with NMFS and/or USFWS staff, including a list of the PBA criteria your project won't meet. This is a living document. We are continuously working on refining the proposed/covered actions and conservation measures. This project meets the intent of the Programmatic Biological Assessment of Restoration Actions in Washington State. The project will comply with all general conservation measures of the PBA. The project will comply with all of the conservation measures frequently associated with restoration actions, with the following exceptions: General Conservation measures Section 1 Pre-Construction/Surveying: (number 5) Page 23 8 • The programmatic requires that no permanent access-ways will be built. This project installs a bridge that will be a permanent access way of a fish rearing area on the grounds of McKernan Hatchery. General Conservation Measures: (Section 1) Page 27 Frequently Associated with some of the Proposed Restoration Actions This project will comply with all of the PBAs conservation measures frequently associated with restoration actions; however, this project does not comply with number 7:Installation of Bank Stabilization Features in all sections (a through g). • This project will use precast concrete ecology blocks under the bridge as a bank stabilization measure commonly required as bridge footings. • After water is diverted away from the construction area, a poured in place cement footing will be placed in Weaver Creek required as a sill for fish screens. The fish screens are amended at the edges with an approved instream gravel mix. This project addresses Weaver Creek habitat degradation caused by instream culvert. Bank stabilization measures to support more natural habitat in Weaver Creek by restoring natural flow patterns. Concrete blocks are not approved as bank stabilization features. This project requires precast concrete blocks underneath the bridge that will be subject to erosion from high water events. Willow cuttings will be planted underneath the bridge, above the bridge foundation to provide habitat during high water events and to prevent erosion. The project will comply with all of the PBA s conservation measures frequently associated with restoration actions, with the only exceptions noted above. Excluded Elements (EAs) This project is not proposing any excluded activities or excluded restoration actions dermed as excluded under the PBA. II EFFECT DETERMINATIONS FOR FISH SPECIES USFWS & NMFS Each project should have the appropriate effect determination. The PBA allows for No Effect(NE), Not Likely to Adversely Affect (NLAA), or Likely to Adversely Affect(LAA) determinations for listed species. Each determination must be adequately documented in this form. If you need assistance in determining the appropriate effect determination, consult the Corps, USFWS, and NMFS staff. Check all currently listed evolutionarily significant units (ESUs) or Interim Recovery Units (IRUs) that may occur in the fifth field watershed where the project is located. Endangered Upper Columbia River Spring-run Chinook (Oncorhynchus tshawytscha) Snake River Sockeye (Oncorhynchus nerka) Upper Columbia River Steelhead(Oncorhynchus mykiss) 9 Threatened Bull trout, Coastal/Puget Sound IRU (Salvelinus confluentus) Bull trout, Columbia River IRU (Salvelinus confluentus) Coho salmon, Lower Columbia River ESU (O. kisutch) Chinook salmon, Lower Columbia River ESU (Oncorhynchus tshawytscha) x Chinook salmon, Puget Sound ESU (Oncorhynchus tshawytscha) Chinook salmon, Snake River Spring/Summer-run ESU (Oncorhynchus tshawytscha) Chinook salmon, Snake River Fall-run ESU (Oncorhynchus tshawytscha) Chum salmon, Columbia River ESU (Oncorhynchus keta) x Chum salmon, Hood Canal summer ESU (Oncorhynchus keta) Steelhead trout, Lower Columbia River ESU (Oncorhynchus mykiss) Steelhead trout, Middle Columbia River ESU (Oncorhynchus mykiss) x Steelhead trout, Coastal/Puget Sound DPS (Oncorhynchus mykiss) Steelhead trout, Snake River ESU(Oncorhynchus mykiss) Designated _ Critical habitat for Coastal/Puget Sound bull trout IRU Critical habitat for Columbia River bull trout IRU Critical habitat for Columbia River chum salmon ESU Critical habitat for Hood Canal summer chum salmon ESU Critical habitat for Lower Columbia River Chinook salmon ESU (47.3097,-123.2384)Weaver Creek x Critical habitat for Upper Columbia River Spring-run Chinook salmon ESU Critical habitat for Snake River Spring/Summer-run Chinook salmon ESU Critical habitat for Snake River Fall-run Chinook salmon ESU Critical habitat for Puget Sound Chinook salmon ESU Critical habitat for Lower Columbia River steelhead trout ESU Critical habitat for Upper Columbia River steelhead trout ESU Critical habitat for Middle Columbia River steelhead trout ESU Critical habitat for Snake River steelhead trout ESU Lake Ozette Sockeye salmon are not covered by this programmatic at this time. Directions: Use the Notes section under each question to document your rational and decision making process for presence or absence of the fish, and the effect determination. FILL OUT THIS SECTION FOR EACH INDIVIDUAL ESU THAT OCCURS IN THE FIFTH FIELD WATERSHED Effect Determination by Species: Steelhead, Coastal/Puget Sound DPS (Oncorhynchus mykiss) Chinook, Puget Sound ESU (Oncorhynchus tshawytscha) Chum salmon, Hood Canal summer ESU (Oncorhynchus keta) 10 ESU and critical habitat: Chum salmon, Hood Canal summer ESU (Oncorhynchus keta) - Critical Habitat Critical Habitat for Chum is in Mason County, in the South Fork of the Skokomish River but not at the project location(47.3209,-123.2211) 1) Is the project in a fifth- field watershed that contains or has the potential to contain insert species) Steelhead, Coastal/Puget Sound DPS (Oncorhynchus mykiss) Chinook, Puget Sound ESU (Oncorhynchus tshawytscha) YES If yes, list fifth field watershed, and go to question 2. Fifth-field watershed: NO If no, the project will have "No Effect" on(insert species). Go to question 5. Notes: 2) Do the stream(s) in which impacts may occur contain suitable habitat for Steelhead, Coastal/Puget Sound DPS(Oncorhynchus mykiss) Chinook, Puget Sound ESU(Oncorhynchus tshawytscha)? Yes. For bull trout use Tables 1 & 2 of Appendix A and/or the draft recovery plans (available at: http://www.fws.goy/pacific/bulltrout/recover) and a distribution map the USFWS posted at http://www.fws.gov/westwafwo/index.html to determine if your project is within critical habitat for bull trout. For other salmon you may use the NMFS critical habitat web page at http://www.nwr.noaa.gov/Salmon-Habitat/Critical-Habitat/CH-Mgps.cfin determine if your project is within critical habitat. YES x If yes, what type of habitat is present? Spawning x Rearing x Migratory Corridor x Not known Go to Question 3. " (insert species). Go to question 5. NO If no the project will have No Effect on inse p J Notes: The proposed project is in a rural area surrounded by rural residential and agricultural properties. Mason County Skokomish River Compressive Flood Hazard Management(2007)plan states that along much of Weaver Creek and unnamed tributaries in the Valley, the existing riparian zone has been degraded and altered by past pasturing and farming practices. 11 Habitat in the general project location has an 85%overhead cover mixed hardwood and deciduous cover. Weaver Creek has mixed cobble sizes instream, with instream fines present during typical low summer flows. The proposed project will remove two damaged eroding culverts that will restore habitat where the culverts are located. Fish will be able to migrate into a rearing channel within the hatchery without passing through the culverts. Habitat will be restored where the culverts are located with approved instream gravel mix and restorative plantings. Habitat exists at the project location for Chinook and Steelhead for rearing and migration (and possibly infrequent spawning). There is vegetative cover on the banks of Weaver Creek upstream and downstream of the project location including deciduous trees (willow and maple) and herbaceous plants such as willow shrubs grasses, thistle and blackberry. Weaver Creek is characterized by cobble and gravel substrates with moderate depth and flow conditions. Weaver Creek has water input . from springs that contribute flow to Weaver Creek near the project location. 3)Approximately how far is the project from the nearest suitable habitat(in river miles, upstream or downstream) for chum salmon, Chinook salmon, steelhead? Go to question 4. Chum salmon, Hood Canal summer ESU(Oncorhynchus keta), critical habitat is present in the watershed in the lower end of the Skokomish Subbasin and nearest to the proposed project at endpoint (47.3209,-123.2211) approximately one mile NE(overland) in an unnamed stream segment off of the south fork of the Skokomish River. There are possibly(unknown) opportunities for chum to migrate through Weaver Creek, but spawning or rearing opportunities are not believed to be occurring at the project location. Chinook, Puget Sound ESU(Oncorhynchus tshawytscha) - Critical Habitat for Chinook is in Mason County in the South Fork of the Skokomish River, and up to (47.3097,-123.2384) Weaver Creek Bull trout are present in Mason County in the general watershed region (Skokomish River South Fork). Presence of bull trout at the project location is undocumented. The last end point identified for critical habitat for bull trout is north of the project location in the South Fork of the Skokomish River at 47.425,-123.354. Notes: 4) Does the proposed activity have the potential to alter or affect the following indicators: temperature, sediment, chemical contamination/nutrients, physical barriers, substrate embeddedness, large woody debris,pool frequency, pool quality, off-channel habitat, refugia, wetted width/depth ratio, streambank condition, floodplain connectivity, peak/base flows, drainage network, disturbance history, function of riparian reserves, or disturbance regime? 12 YES x If yes, briefly explain which habitat elements will be affected and indicate if the effects will be short term or long-term. For example, many activities will have increased levels of turbidity during project implementation, but are expected to result in long-term improvements to the target indicators Temperature—short term affects may raise temperature slightly during construction activities but there will be long term improvements to habitat at completion of the project. Sediment-short term affects may raise sediment levels slightly that could reach as far as 100-300 feet downstream, but best management practices will be used and there will be long term improvements at completion of the project. Sediment impacts are temporary short lived and construction related. Best management practices will used throughout all project activities. Chemical contamination/nutrients-short term affects may disturb levels of substrate that could affect nutrient levels slightly at the project location, but there will be long term improvements at completion of the project. Best management practices will used throughout all project activities. Physical barriers—This project removes two culverts that are physical barriers to fish passage. Removal of the culverts will be a temporary disturbance to Weaver Creek; however removal of the culverts will provide long term improvements to fish habitat at project completion, because more natural flow and habitat conditions will be restored to Weaver Creek. Best management practices will used throughout all project activities. Substrate embeddedness-Short term effects from this project may increase temporary impacts to substrate embeddedness at the project location, however, substrate will be replaced at the project location that is representative of the typical substrate in the vicinity of the project location. Fine materials (3 inch minus), will be embedded in the restored substrate that will match typical conditions in the stream bed areas at and around the site providing long term improvements at project completion. Best management practices will used throughout all project activities. Large woody debris—Habitat throughout the project vicinity has large woody debris throughout the natural course of the stream. This project will not disturb any LWD at or near the project location, although there may be some incidental removal of some shrub material, sticks, or grass during project activities. Best management practices will used throughout allproject activities, and the area will be restored byplanting native plant materials including some willow and native shrub species. At the downstream end of the project, rootwads will be pressed into place with an excavator staged on the bank of Weaver Creek. Pool frequency-Pool quality- Short term construction activities may affect a pool in the project location (if one exists), however, habitat will be restored at project completion that will complement any existing habitat in the vicinity including restoring the area to match conditions present at the site for pool frequency and pool quality. Removal of the eroding damaged culverts will provide long term improvements at project completion. Best management practices will used throughout all project activities. Off channel habitat- This project is not in a location considered off channel habitat; however, removal of the culverts will havepositive effects on all surrounding habitat areas. Natural flow will be established through the area that is expected to have long term improvements at completion of the project.At the downstream end of the project, rootwads will be pressed into place with an excavator staged on the bank of Weaver Creek. 13 Re u is-Short term affects will affect some bank areas of refugia near where the culverts will be removed, however, during the expected work window there will be fewer rearing individuals using refugia in the project location. There are expected to be long term improvements to the general;habitat in the area at the completion of the pr'oject. Best management practices will used throughout all project activities, including replanting the area after project completion with native plant species.At the downstream end of the project, rootwads will be pressed into place with an excavator staged on the bank of Weaver Creek. Wetted width/depth ratio—There will be some short term changes to the wetted habitat area during project activities, due to rechanneling the stream in the area and diverting water in the construction area to an uplands area and reestablishing a new channel area at project completion, When the project is completed there will be overall improvements throughout the course of the stream. This project will return the area to more natural wetted width and depth ratio conditions that will provide overall habitat improvement with more normal floodplain functions. Best management practices will used throughout all project activities. Streambank condition-Short term affects will change the habitat in the immediate project location, by removal of some instream and bank cover, however there are thought to be few individuals present during the approved work window, and restoration plantings will be done with native species that will eventually reestablish stream bank conditions. Long term improvements are expected at project completion.Refer to project drawings for a list ofproposed plantings that will eventually restore the area. Foodplain connectivity—This project restores the area by removing the eroding damaged culverts. This will create more natural movement of waters through the stream during flood conditions, and provide relief to the nearby floodplain area. Long term improvements are expected at project completion that will improve floodplain connectivity. Peak-base flows-This project restores the area by removing the eroding damaged culverts to create more natural movement of waters through the stream during flood conditions assisting more natural movement of peak-base flows through the area. Long term improvements are expected at project completion. Drainare network—This project restores the area by removing the eroding damaged culverts to create more natural drainage network of waters through the typical stream flow patterns including flood conditions. This project is expected to provide relief to the nearby floodplain area. Long term improvements are expected at project completion. Disturbance history-Short term affects from water diversion during construction will create short term disturbance history that will affect the micro climates present at the site for native and listed species, however, these communities will reestablish when water is returned to the stream due to restoration activities at the site duringproject completion. There will be long term improvements at completion of the project due to returning the stream to more natural flow patterns. Function of riparian reserves—Restoration plantings in the project area will contribute to the long term improvement of riparian reserves in the area. Function of riparian areas will be maintained at the project completion. Best management practices will used throughout all project activities. Disturbance regime-This project will contribute to the disturbance regime in the area through short term affects due to water diversion, but there will be long term improvements at project completion. Best management practices will used throughout all construction activities. There will be turbidity generated by project activities, however water, (if present)will be diverted through a pipe pumped to an upland location where it will be filtered through hay bales and or straw wattles, and filtered through grassy areas where 14 water will eventually be reintroduced downstream of the construction activities. These Best Management Practices will produce less disturbance from siltation and turbidity to Weaver Creek. NO If no, the project will have "No Effect" on (insert species). Go to question 4. Notes: 5) Provide rationale for effect determination Effect Determination: not likely to adversely effect This project diverts Weaver Creek away from its usual course during a time when listed salmonids are not likely to be present. During construction,and the project restores and improves habitat functions provided by the original channel,by restoring fish passage and installing large woody material habitat structures. Listed fish are not expected to be at the project area during approved work windows. Fish removal will be done by moving fish out of the area with nets. This project will be conducted during seasonal low flow conditions. Construction effects will be temporary, of short duration and during approved work windows to avoid impacts to any species that could be present at the site. Restoration activities will remove silted gravel materials along with the culverts,and restore the stream section in this area with approved instream gravel materials. Over time the replanted area will provide cover for migrating and rearing individuals. Steelhead,Coastal/Puget Sound DPS(Oncorhynchus mykiss):not likely to adversely affect NLTAA Chinook,Puget Sound ESU(Oncorhynchus tshawytscha): not likely to adversely affect NLTAA Chum salmon,Hood Canal summer ESU(Oncorhynchus keta):not likely to adversely affect NLTAA Critical Habitat,Chinook,Puget Sound ESU(Oncorhynchus tshawytscha):not likely to adversely affect NLTAA Critical Habitat-Chum salmon,Hood Canal summer ESU(Oncorhynchus keta): not likely to adversely affect NLTAA Note: If you are dewatering an area, electroshocking in an area, or are doing major in-water work where listed salmonids are likely to be present during the work window, you will probably have a LAA effect determination. Note: If you are dewatering an area, electroshocking in an area, or are doing major in-water work where listed salmonids are likely to be present during the work window, you will probably have a LAA effect determination. III EFFECT DETERMINATIONS FOR LISTED TERRESTRIAL SPECIES 1. To determine which listed species may occur in the project area follow the steps below: a. Obtain a county species list from the USFWS web page. http://www.fws.gov/westwafwo/se/SE List/endangered Species.asp http://www.fws.gov/eastemwashington/count /`20species%201ists.htm b. Site-specific information of listed species occurrences in Washington State may be obtained from the Washington Department of Fish and Wildlife Priority Habitat and Species Program http://www.wdfw.wa.gov/hab/phspage.htm and from the Washington 15 Department of Natural Resources Natural Heritage Program at http://www.dnr.wa. og v/php/. c. Remove species from the species list when habitat is not available for the species in the project area or"vicinity of activity" (generally 1 mile radius around the project site. The area that may be affected by any project impacts including noise and turbidity.) 2. When filling out the information below consider: Each project should have the appropriate effect determination. The PBA allows for NE or NLTAA determinations for terrestrial species, and NE,NLTAA or LTAA for aquatic species. Each determination must be adequately documented in this form. If you need assistance in determining the appropriate effect determination,request help from a Corps ESA Coordinator or the USFWS. The USFWS contact is Tom McDowell at 360-753-9426. a. For information on species biology,range and critical habitat use the USFWS web site: http://www.fws.gov/westwafwo/index.html b. Conservation Measures are listed in Appendix B c. If you do not implement all conservation measures related to the species present please explain. LISTED TERRESTRIAL SPECIES Please refer to the PBA for actions that may affect these species and conservation measures to protect terrestrial species. For information on the listed terrestrial and aquatic species that occur in Washington, visit the following website: ecos.fws.gov or contact the following FWS field offices: Western Washington Office in Lacey: (360) 753-6044 John Grettenberger Central Washington Office in Wenatchee: (509) 665-3508 Jessica Gonzales Eastern Washington office in Spokane: (509) 891-6839 Suzanne Audet COASTAL ECOSYSTEMS Listed Species: Brown Pelican (Pelecanus occidentalis), Oregon silverspot butterfly (Speyeria zerene hippolyta), and Snowy Plover(Charadrius alexandrinus nivosus): a) Will the activity occur in Grays Harbor, Wahkiakum, Pacific, Jefferson or Clallam Counties? No Put NE under"Effect Determination" for these three coastal species. Yes If yes go to b) b) Will the activity alter sand islands or coastal dunes and meadows in Grays Harbor or Pacific County? No Yes c) Conservation Measures to be applied: N/A d) Effect Determination for coastal species and rationale: 16 No Effect(NE)for Brown Pelican (Pelecanus occidentalis), Oregon silverspot butterfly (Speyeria zerene hippolyta), and Snowy Plover (Charadrius alexandrinus nivosus. This project is in Mason County. Habitat for these species does not occur at the project location. CARNIVORES and CARIBOU 1. Gray Wolf(Canis lupus)—The range of the grey wolf includes the Blue Mountains, northeast Washington (Rocky Mountains) and the Cascade Mountains. There are no confirmed records of wolves west of the Cascade Crest and no documented den sites in the state. 2. Grizzly Bear(Ursus arctus horribillis)—The grizzly bear recovery plan identifies high alpine areas in the North Cascades (north of Interstate 90 to the Canadian border) as important for recovery of this species in Washington. 3. Canada lynx (Lynx Canadensis) -This species occurs in high elevation forests (generally above 4,000 feet) in the North Cascades and northeast Washington. 4. The woodland caribou (Rangifer tarandus caribou) occurs in high elevation forests (generally above 4,000 feet) in northeast Washington (Pend Oreille County). a) Will the activity be conducted in or near mountain meadows or forest openings, high elevation forests, or ungulate wintering or calving sites in the geographic areas where these listed species may occur? No Yes If yes, apply the appropriate seasonal restrictions identified in the PBA to minimize disturbance If you do not know whether your project will affect suitable habitat or feeding areas for these species, lease contact the USFWS office in Spokane. p p a) Effect Determination for these species and rationale. Document any supporting conversations with USFWS staff: Habitat for the Gray Wolf(Canis lupus), Grizzly Bear(Ursus arctus horribillis), Canada lynx (Lynx Canadensis), and woodland caribou (Rangifer tarandus caribou)is not at the project area. Grey Wolf is found primarily west of the cascade crest, however, there are no documented den sites in Mason County. Habitat is found for the grizzly bear in the North Cascades and northeast Washington; however there are no documented grizzly bear(s) in Mason County. Habitat for Canada lynx and woodland caribou occurs in high elevation forests. There are no high elevation forests at the project location. Determination for the above species: No Effect(NE) Pygmy rabbit (Brachylagus idahoensis) 1. The pygmy rabbit historically was found in dense, tall sagebrush areas east of the Columbia River (Douglas, Adams, Lincoln, Grant and Benton Counties). a) Will the activity occur in native sagebrush areas of the central Columbia Plateau? No Put NE under"Effect Determination"and proceed to next species. 17 Yes If yes, contact the USFWS. d) Effect Determination and rationale: No Effect(NE)- Habitat not at project location for pygmy rabbit. MATURE FORESTS in the CASCADE and OLYMPIC MOUNTAINS: Marbled Murrelet(Brachyramphus marmoratus) For information on the marbled murrelet, see htty://www.fws.gov/pacific/marbledmurrelet/index.html a)Are you within 50 miles of marine water? No Put NE under"Effect Determination" and proceed to next species Yes b) Is there suitable habitat(mature conifer-dominated forests over 80 years old)within 200 feet of the project vicinity? No Yes Not known c) Will the activity generate noise above ambient levels within 200 feet(1.0 mile if blasting, low- elevation aircraft operations, or pile driving) of potential suitable nesting habitat? No Yes If yes, apply conservation measures to minimize disturbance. d) Does the activity include low elevation operation of aircraft,pile driving, or blasting within 1 mile of suitable or occupied nesting or foraging habitat? No Yes If yes, apply seasonal restrictions to minimize disturbance. Activities in the marine environment that include pile driving or blasting may need to go through individual consultation. Contact the USFWS office in Lacey for specific restrictions related to underwater sound in marine areas. e) Will the project affect suitable nesting habitat or designated critical for marbled murrelets? Activities that remove or kill trees with suitable platforms, remove suitable platforms, or reduce the suitability of the stand as nesting habitat are not covered under this PBA. No. f) Notes: g) Conservation Measures to be applied: N/A h) Effect Determination and rationale: N/A. This activity is not in Marbled murrelet sections, or near adjacent sections that will disturb nesting areas, or foraging sites for the Marbled Murrelet. 18 Northern spotted owl(Strix occidentalis caurina) For information, including critical habitat designation see http•//ecos fws gov/speciesProfile/SpeciesReport.do?spcodc=B08B This species is undergoing review for habitat. The latest FR publication is 07 012011. 071011201176 FR 38575 38576 The web link provides information that indicates that habitat for the Northern spotted owl exists in the Olympic Mountain region, however this project is not believed to be within critical habitat for the northern spotted owl or in any areas where construction activities could disturb this species. a) Is there suitable habitat (mature conifer forests over 80 years old) within 200 feet of the project vicinity? No Put NE under"Effect Determination" and proceed to next species Yes Not known This project area is within areas where there have been primarily second growth conifer forests. No suitable habitat is expected to be within the project area.NE b) What type of forest habitat is present in the vicinity of the activity? nesting or foraging habitat dispersal habitat designated critical habitat none d) Will the activity occur in nesting or foraging habitat? No Yes If yes, apply seasonal operating restrictions to minimize disturbance. e) Will the activity generate above ambient noise within 200 feet(1.0 mile if blasting,pile driving or aircraft operations)of suitable nesting habitat? No Yes If yes, apply seasonal restrictions. f) Will the activity occur in or remove trees from spotted owl designated critical habitat? No Yes If yes, explain how/if this will affect the function of the stand. g) Notes: h) Conservation Measures to be applied: N/A i) Effect Determination for northern spotted owls: Effect Determination for designated critical habitat for the northern spotted owl: NE—no spotted owls are within the proposed project location. NE—no effect is expected for critical habitat for the northern spotted owl. Listed Plants: No herbicide use, mechanical vegetation management, or construction activities are permitted in areas that could support listed plants under this programmatic. 19 Information on these species can be found at: http://ecos.fws.gov, the Washington Department of Fish and Wildlife Priority Habitat and Species Program at (360)-902-2543 or their website at www.wdfw.wa.gov/hab/phspage.htm, or the Washington Department of Natural Resources Natural Heritage Program at(360) 902-1667 or their website at www.dnr.wa. og v/nhp/. 1.Hackelia venusta (showy stickseed)this species occurs in Chelan County,between 984 and 1,600 feet in elevation, in the Ponderosa Pine zone 2.Lomatium bradshawii(Bradshaw's desert-parsley)—this species occurs in wetlands, prairies and grasslands in Clark County 3. Sidalcea oregana var. calva (Wenatchee Mountains checker-mallow) -this species is found in the Peshastin Creek watersheds in Chelan County. Information on critical habitat for this species can be found at: http://ecos.fws.gov/docs/federal_register/fr3793.pdf 4. Castilleja levisecta (golden paintbrush)-this plant occurs in Island, San Juan, and Thurston Counties and is found in open grasslands,prairies, and grass dominated coastal bluffs. 5.Howellia aquatilis (water howellia)—this aquatic plant is found in and around seasonal wetlands in Mason, Pierce, Thurston, Clark, and Spokane Counties. 6.Lupinus sulphureus ssp. kincaidii (Kincaids lupine) -this plant occurs near Boistfort, Lewis County in native upland prairie habitat. 7. Sidalcea nelsoniana (Nelson's checkermallow)- this plant is found in wetlands, stream corridors, or wet prairies in Lewis or Cowlitz Counties. 8. Silene spaldingii(Spalding's silene/catchfly)—this plant is also associated with native prairies and occurs in Asotin, Lincoln, Spokane, and Whitman Counties. 9. Spiranthes diluvialis (Ute ladies'-tresses)—this plant grows on the margins of springs, wet meadows, floodplains, and riparian areas in Okanagon and Grant County Please document conversations with USFWS staff and provide adequate information on botanical surveys and/or habitat analysis to support your effect determination. Effect determination for listed plants: NE. There are no Howellia aquatilis locations near the project area in Mason County. The other plants are not anywhere near Mason County. IV SIGNATURE 20 I hereby verify that this work will comply with all applicable requirements of the above- referenced Biological Opinion should a Department of the Army authorization be issued for this work. Certain categories of activities require the permittee to submit-post construction reports to the Corps and/or the Services. These reports are identified in the PBA. For projects deviating from PBA criteria, the Services may require additional post-construction reporting. These additional reports will be clearly identified and agreed upon by the Services and applicant during the coordination process. By signing this form, the applicant agrees to submit within the required time frame all applicable post-construction reports. Signature of Applicant: CIA, moo`- /RWat4__ Date: 313/2—D �4 Signature of Agent: D��— Date: (S' 21 APPENDIX A: DEWATERING AND FISH CAPTURE PROTOCOL Work to facilitate habitat restoration may occur in isolation from flowing waters or in flowing water depending on site conditions to minimize impacts to salmonids. If bull trout or other listed salmonids could be present in the vicinity of the project use the following dichotomous key to determine which dewatering protocol and timing window you need to implement for your project. This key references information within the Draft Recovery Plan for the Coastal- Puget Sound Distinct Population Segment of Bull Trout Volumes I and II(USFWS 2004a; USFWS 2004b), and the Draft Recovery Plan for the Columbia River Distinct Population Segment of Bull Trout(USFWS 2002). http://www.fws.gov/pacific/bulltrout/recovery.html. If you have questions, contact the USFWS. 1. Is the project located within a documented or potential bull trout Local Population Area that is excluded from coverage under this programmatic consultation(see Table 1)? a. Yes—Dewatering in a documented or potential bull trout Local Population Area in eastern Washington is not covered under this programmatic consultation. Complete an individual section 7 consultation for the project. Please contact the USFWS office in Spokane or Wenatchee for assistance. b. No—go to 2 2. Is the project located within a water body where any listed salmonids are likely to be present? For specific bull trout areas where projects are permitted see Table 2. a. Yes—go to 3 b. No -use "Protocol for Dewatering Outside High Likelihood Listed Fish Areas"; 3. Is the stream flow at the time of project construction anticipated to be greater than or equal to 5 cubic feet per second and is the dewatered stream length (not including the culvert and plunge pool length, if present) greater than or equal to 33 ft? a. No -use "Protocol for Dewatering Outside High Likelihood Listed Fish Areas"; b. Yes - use "Protocol I Dewatering Within High Likelihood Listed Fish Areas"; and consult with a USFWS bull trout biologist staff on appropriate timing window. 22 Table 1: Bull Trout Spawning and Rearing Areas.that are Excluded from the Programmatic (Listed in order of WRIA number) Management or Core Area Spawning and Rearing Areas Excluded Recover Unit (no in-water work is permitted in these areas) Umatilla-Walla Walla Walla Core Mill Creek and tributaries Walla River Basin Area Wolf Fork above Coates Creek WRIA 32 N Fk Touchet and tributaries upstream of Wolf Fk confluence S Fk Touchet River and tributaries above Griffin Creek Snake River Basin Asotin Creek N Fk Asotin Creek including Charley and Cougar Creeks—above confluence with Charley Cr Tucannon River Tucannon River from confluence with Little Tucannon Upper Tucannon River and tributaries above confluence with WRIA 35 Hixon Creek Cummings Creek Middle Columbia Yakima River Core WRIA 37 River Basin Area N and MFk Ahtanum Creek-above the confluence of S Fk S Fk Ahtanum Creek—above confluence with N Fk Ahtanum WRIA 38 Rattlesnake Creek—upstream of confluence with Naches River WRIA 39 Taneum Creek—upstream of Taneum Campground Upper Yakima—upstream of Lake Easton Dam Cie Elum River—upstream of confluence with Yakima River N Fk Teanaway—upstream of confluence with Yakima River Upper Columbia Wenatchee River Core Upper Wenatchee and tributaries above confluence with the River Basin Area Chiwawa,including Nason Cr,Little Wenatchee,White and the WRIA 45 Chiwawa Rivers Chiwaukum Creek and Icicle Creek—upstream from confluence with the Wenatchee River Ingalls Creek-upstream of confluence with Peshastin Creek Entiat River Core Entiat River—above confluence with the Mad River Area Mad River—above confluence with Entiat River WRIA 46 Methow River Core Upper Methow tributaries-Lost River,Early Winters Cr,W Fk Area Methow,Goat Cr,and Wolf Cr WRIA 48 Chewack River—upstream of Twentymile Cr Twisp River and tributaries above confluence of,and including, Little Bride Creek Gold Cr—upstream of confluence with Methow River Northeast Pend Oreille River Le Clerc Creek—upstream of mouth Washington WRIA 62 1 Spawning and rearing areas on lands administered by the U.S.Forest Service or Bureau of Land Management are not listed because these lands are not included in this Programmatic 23 Table 2 List of streams and marine areas that important for bull trout recovery where in-water work,is permitted Management Unit Bull Trout Areas Olympic Peninsula- Hood Canal and independent tributaries Marine Strait of Juan de Fuca and independent tributaries(includes Bell,Morse,Ennis, Siebert Creeks) Pacific Ocean and independent coastal tributaries(includes Goodman, Mosquito,Cedar,Steamboat,Kalaloch and Joe Creeks,Raft,Moclips and Copalis Rivers) Lower Chehalis River/Grays Harbor and independent Tributaries(includes Humptulips,Wishkah,Wynoochee and Satsop Rivers) Olympic Peninsula- Dungeness River—mouth to RM 10 Freshwater Skokomish River—mouth to head of Cushman Reservoir Hoh River—mouth to headwaters Queets River—mouth to headwaters Quinault River- mouth to headwaters Puget Sound-Marine All marine shorelines including North Puget Sound,Main Basin,Whidbey Basin,and South Puget Sound Puget Sound- Samish River,Whatcom Creek,Squalicum Creek,Duwamish and lower Green Freshwater River,and Lower Nisqually River including the Nisqually River estuary and McAllister Creek(FMO areas outside of core areas) Lake Washington including the following: lower Cedar River;Sammamish River;Lakes Washington,Sammamish,and Union;and Ship Canal Nooksack River—mouth to National Forest boundary(North and South Forks) Skagit River—mouth to National Forest boundary StMaguamish River—mouth to headwaters of N Fork;Deer Creek—mouth to National Forest boundary;S Fork and Canyon Cr—mouth to National Forest boundary Snohomish/Skykomish—mouth to confluence of Skykomish and Snoqualmie Rivers;Pilchuck River;Snoquahnie River to falls;Tolt River;Skykomish River —mouth to National Forest boundary,including Sultan River,Woods Creek and Wallace River;S Fk Skykomish to National Forest boundary Puyallup River—mouth,including Mowich River,to National Park boundary; Carbon River—mouth to National Forest boundary; White River—mouth to National Forest boundary 24 Management Unit Bull Trout Areas Lower Columbia Lewis River—mouth to RM 75 (Upper Falls),including Swift,Yale,and Mervin Reservoirs Klickitat River—mouth to confluence of W FK Klickitat Mainstems of the Columbia,Snake,Walla Walla,Pend Oreille,and Grande Ronde Rivers Middle Columbia River Ahtanum Creek—mouth to confluence of N and S Forks Basin Naches River—mouth to confluence of Little Naches and Bumping River Tieton River—mouth to Rimrock Lake Yakima River—mouth to Easton(RM 203)and Teanaway River Upper Columbia River Wenatchee River—mouth to confluence of the Chiwawa;Peshastin Cr— Basin mouth to confluence of Ingalls Cr;Chewack River—confluence with Wenatchee to RM 20;Beaver Cr—mouth to Blue Buck Cr Entiat River—mouth to confluence with Mad River Methow River—mouth to confluence of Lost River Northeast Washington Pend Oreille River;Tacoma Cr- mouth to Little Tacoma;Small Creek— Pend Oreille River mouth to forks;Sullivan Creek to and including Sullivan Lake Walla Walla River Touchet River—mouth to forks; Basin S Fk Touchet River—to confluence of Griffin Cr N Fk Touchet to Wolf Fork;Wolf Fork to confluence of Coates Cr Mill Creek and tributaries Snake River Basin Mainstem Snake and Grande Ronde Rivers; Asotin Creek—mouth to confluence of N Fk Asotin and Charley Cr; Tucannon River—mouth to confluence of Hixon Cr 25 Protocol I Dewatering Within High Likelihood Listed Fish Areas A. Fish Capture—General Guidelines 1. Fish Capture Methods a. Minnow traps. Optional. Traps may be left in place prior to dewatering and may be used in conjunction with seining. Once dewatering starts,minnow traps should only be used if there is someone present to check the traps every few hours, and remove the traps once the water level becomes too low. b. Seining. Required. Use seine with mesh of a size to ensure entrapment of the residing ESA-listed fish and age classes. c. Sanctuary dip nets. Required. Use in conjunction with other methods as area is dewatered. d. Electrofishing. Optional. Use electrofishing only after other means of fish capture have been exhausted or where other means of fish capture are not be feasible. Applicants shall adhere to NMFS Backpack Electrofishing Guidelines (NMFS 2000). 2. Fish capture operations will be conducted by or under the supervision of a fishery biologist experienced in such efforts and all staff working with the capture operation must have the necessary knowledge, skills, and abilities to ensure the safe handling of all ESA-listed fish. 3. The applicant must obtain any other Federal, State and local permits and authorizations necessary for the conduct of fish capture activities. 4. A description of any capture and release effort will be included in a post-project report, including the name and address of the supervisory fish biologist, methods used to isolate the work area and minimize disturbances to ESA-listed species, stream conditions before and following placement and removal of barriers; the means of fish removal; the number and size of fish removed by species and age class; condition upon release of all fish handled; and any incidence of observed injury or mortality. 5. Storage and Release. ESA-listed fish must be handled with extreme care and kept in water at all times during transfer procedures. The transfer of ESA-listed fish must be conducted using a sanctuary net that holds water during transfer, whenever necessary to prevent the added stress of an out-of-water transfer. A healthy environment for non-ESA listed fish shall be provided by large buckets (five gallon minimum to prevent overcrowding) and minimal handling of fish. The water temperature in the transfer buckets shall not exceed the temperature of cold pool water in the subject stream. Retain fish the minimum time possible to ensure that stress is minimized, temperatures do not rise, and dissolved oxygen remains suitable. Release fish as near as possible to the isolated reach in a pool or area that provides cover and flow refuge. 26 B. Dewater Instream Work Area and Fish Capture Fish screen. Except for gravity diversions that have gradual and small outfall drops directly into water, all water intake structures must have a fish screen installed, operated, and maintained in accordance with NMFS Guidelines (NMFS 1997; Chapter 11 in NMFS 2008). The sequence for stream flow diversion will be: Note: this sequence will take one 24-hour period prior to construction to complete(of which 12 hours are for staged dewatering with 6 hours overnight). We suggest you start in the morning the day before project construction is scheduled and leave the reach dewatered overnight according to instruction below. 1. Install flow conveyance devices (pumps, discharge lines, gravity drain lines, conduits, and channels), but do not divert flow. 2. Install upstream barrier. Allow water to flow over upstream barrier. 3. Install block net at upstream end of work area. Block nets will be checked every 4 hours, 24 hours a day. If any fish are impinged or killed on the nets they will be checked hourly. 4. Reduce flow over upstream barrier by one-third for a minimum of 6 hours. 5. Inspect as discharge is diminishing and in dewatered areas for stranded and trapped fish and remove them with sanctuary dip nets. 6. Reduce flow over upstream barrier by an additional one-third for a minimum of 6 hours. 7. Again, inspect dewatered areas for stranded and trapped fish and remove them with sanctuary dip nets. 8. Leave the project area in a stable, low flow(one third of flow) condition, overnight, allowing fish to leave the area volitionally. 9. In the morning, remove any remaining fish from the area to be dewatered using seines and/or hand held sanctuary dip-nets. 10. Divert upstream flow completely. 11. Install downstream barrier if necessary(only in low gradient,backwatered reaches). 12. If water remains within the work area; seine, dip net, and lastly electrofish(if using this technique),the project area until catch rates have reached no fish for 3 consecutive passes. Move rocks as needed to flush fish and effectively electrofish the work area. 13. If needed,pump water out of isolated pools within the project area to a temporary storage and treatment site or into upland areas and filter through vegetation prior to reentering the stream channel. Continue to seine, dip net and electrofish while pumping. 14. If fish continue to be captured, shut pump off before average water depths reach one foot. Continue to seine, dip net and electrofish until no fish are caught for 3 consecutive passes. 15. Pump dry and check substrate for remaining fish. 16. Continue to pump water from the project area as needed for the duration of the project. The diversion structure is typically a temporary dam built just upstream of the project site with sand bags that are filled with clean gravel or stream/floodplain rock and covered with plastic sheeting. A portable bladder dam or other non-erosive diversion technologies may be used to contain stream flow. Mining of stream or floodplain rock can be used for diversion dam construction if it does not result in significant additional floodplain or stream disturbance. Often gravel has to be moved to key in logs in which case it makes sense to use this gravel for the diversion structure. 27 The temporary bypass system must consist of non-erosive techniques, such as a pipe or a plastic-lined channel, both of which must be sized large enough to accommodate the predicted peak flow rate during construction. In cases of channel rerouting, water can be diverted to one side of the existing channel. Dissipate flow at the outfall of the bypass system to diffuse erosive energy of the flow. Place the outflow in an area that minimizes or prevents damage to riparian vegetation. If the diversion inlet is a gravity diversion and is not screened to allow for downstream passage of fish,place diversion outlet in a location that facilitates gradual and safe reentry of fish into the stream channel. C. Rewater Instream Work Area Remove stream diversion and restore stream flow. Heavy machinery operating from the bank may be used to aid in removal of diversion structures. Slowly re-water the construction site to prevent loss of surface water downstream as the construction site streambed absorbs water and to prevent a sudden increase in stream turbidity. Look downstream during re-watering to prevent stranding of aquatic organisms below the construction site. All stream diversion devices, equipment, pipe, and conduits will be removed and disturbed soil and vegetation will be restored after the diversion is no longer needed. 28 Protocol II Dewatering Outside High Likelihood Listed Fish Areas If bull trout or other listed salmonids are captured at any time during the dewatering process, immediately notify a USFWS bull trout biologist or NMFS biologist and obtain guidance to either continue to dewater and remove fish or stop activities and re-water the project site. Normal guidance: 1. If you encounter listed fish at or prior to step 3 switch to Protocol I 2. If you encounter listed fish after step 3, continue to dewater and remove fish, paying close attention to presence of additional listed salmonids. A. Fish Capture—General Guidelines 1. Fish Capture Methods a. Minnow traps. Optional. Traps may be left in place prior to dewatering and may be used in conjunction with seining. Once dewatering starts,minnow traps should only be used if there is someone present to check the traps every few hours, and remove the traps once the water level becomes too low. b. Seining. Required. Use seine with mesh of such a size to ensure entrapment of the residing ESA-listed fish and age classes. c. Sanctuary dip nets. Required. Use in conjunction with other methods as area is dewatered. d. Electrofishing. Optional. Use electrofishing only after other means of fish capture have been exhausted or where other means of fish capture are not be feasible. Applicants shall adhere to NMFS Backpack Electrofishing Guidelines. 2. Fish capture operations will be conducted by or under the supervision of a fishery biologist experienced in such efforts and all staff working with the seining operation must have the necessary knowledge, skills, and abilities to ensure the safe handling of all ESA-listed fish. 3. The applicant must obtain any other Federal, State and local permits and authorizations necessary for the conduct of fish capture activities. 4. A description of any seine and release effort will be included in a post-project report, including the name and address of the supervisory fish biologist,methods used to isolate the work area and minimize disturbances to ESA-listed species, stream conditions before and following placement and removal of barriers; the means of fish removal; the number and size of fish removed by species; conditions upon release of all fish handled; and any incidence of observed injury or mortality. 5. Storage and Release. Fish must be handled with extreme care and kept in water to the maximum extent possible during transfer procedures. A healthy environment for the stressed fish shall be provided by large buckets (five gallon minimum to prevent overcrowding) and minimal handling of fish. The temperature of the water shall not exceed the temperature in large deep holding pools of the subject system. The transfer of any ESA-listed fish must be conducted using a sanctuary net that holds water during transfer, to prevent the added stress of 29 an out-of-water transfer. Retain fish the minimum time possible to ensure that stress is minimized, temperatures do not rise, and dissolved oxygen remains suitable. Release fish as near as possible to the isolated reach in a pool or area that provides cover and flow refuge. B. Dewater Instream Work Area and Fish Capture Fish screen. Except for gravity diversions that have gradual and small outfall drops directly into water, all water intake structures must have a fish screen installed, operated, and maintained in accordance with the NMFS Guidelines (NMFS 1997; Chapter 1 I in NMFS 2008). The sequence for stream flow diversion would be as follows: 1. Install flow conveyance devices (pumps, discharge lines, gravity drain lines, conduits, and channels), but do not divert flow. 2. Install block net at upstream end or work area. 3. Seine and dip net through the entire project area in a downstream direction, starting at the upstream end; thereby moving fish out of the project area. Then, if necessary electrofish. 4. Install upstream barrier and divert upstream flow completely. 5. Capture any remaining fish using hand held dip-nets. 6. Install downstream barrier if necessary(only in low gradient backwatered reaches). 7. If water remains within the work area; seine and dip net, if necessary electrofish the project area until catch rates have reached no fish for 3 consecutive passes. 8. Pump water out of isolated pools within the project area to a temporary storage and treatment site or into upland areas and filter through vegetation prior to re-entering the stream channel. Continue to seine, dip net, or electrofish while pumping. 9. If fish continue to be captured, shut pump off before average water depths reach one foot. Continue to seine, dip net, or electrofish until no fish are caught for 3 consecutive passes. 10. Pump dry and check substrate for remaining fish and remove them. 11. Continue to pump water from the project area as needed for the duration of the project. The diversion structure is typically a temporary dam built just upstream of the project site with sand bags that are filled with clean gravel or stream/floodplain rock and covered with plastic sheeting. A portable bladder dam or other non-erosive diversion technologies may be used to contain stream flow. Mining of stream or floodplain rock can be used for diversion dam construction if it does not result in significant additional floodplain or stream disturbance. Often gravel has to be moved to key in logs in which case it makes sense to use this gravel for the diversion structure. The temporary bypass system must consist of non-erosive techniques, such as a pipe or a plastic-lined channel,both of which must be sized large enough to accommodate the predicted peak flow rate during construction. In cases of channel rerouting, water can be diverted to one side of the existing channel. Dissipate flow at the outfall of the bypass system to diffuse erosive energy of the flow. Place the outflow in an area that minimizes or prevents damage to riparian vegetation. If the diversion inlet is a gravity diversion and is not screened to allow for downstream passage of fish,place diversion outlet in a location that facilitates gradual and safe reentry of fish into the stream channel. 30 C. Rewater Instream Work Area Remove stream diversion and restore stream flow. Heavy machinery operating from the bank may be used to aid in removal of diversion structures. Slowly re-water the construction site to prevent loss of surface water downstream as the construction site streambed absorbs water and to prevent a sudden increase in stream turbidity. Look downstream during re-watering to prevent stranding of aquatic organisms below the construction site. All stream diversion devices, equipment, pipe, and conduits will be removed and disturbed soil and vegetation will be restored after the diversion is no longer needed. Literature Cited NMFS (National Marine Fisheries Service). 1997. Fish Screening Criteria for Anadromous Salmonids. NMFS Southwest Region, (January 1997). 12 p. http://swr.nmfs.noaa.gov/hcd/fishscm.pd NMFS (National Marine Fisheries Service). 2000. Guidelines for Electrofishing Waters Containing Salmonids Listed Under the ESA. http://www.nwr.noaa.gov/ESA-Salmon-Regulations- Permits/4d-Rules/upload/electro2000.pdf NMFS (National Marine Fisheries Service). February 2008. ANADROMOUS SALMONID PASSAGE FACILITY DESIGN. http://www.nwr.noaa.gov/Salmon- Hydropower/FERC/upload/Fish Passage_Design.pdf USFWS (USFWS). 2002. Bull trout (Salvelinus confluentus) draft recovery plan. Chapter One. Fish and Wildlife Service, Portland, Oregon. 137 pp. USFWS (USFWS). 2004a. Draft Recovery Plan for the Coastal-Puget Sound Distinct Population Segment of Bull Trout(Salvelinus confluentus). Volume I (of II): Puget Sound Management Unit. Portland, Oregon. 389 +xvii pp. USFWS (USFWS). 2004b. Draft Recovery Plan for the Coastal-Puget Sound Distinct Population Segment of Bull Trout(Salvelinus confluentus). Volume II (of II): Olympic Peninsula Management Unit. Portland, Oregon. 277 + xvi pp. 31 LITERATURE CITED Bates,IK.,B.Bernard,B.Heiner,J.P.Klavas,and P.D.Powers. 2003. Design of Road Culverts for Fish Passage. Washington Department of Fish and Wildlife,Olympia,WA. http://wdfw.wa.gov/hab/engineer/cm/culvert manual fmal.pdf NMFS(National Marine Fisheries Service). 2000. Guidelines for Electrofishing Waters Containing Salmonids Listed Under the Endangered Species Act. 32 Design of Road Culverts for Fish Passage 86 Appendix F — Summary Forms for Fish-Passage Design Data The following forms demonstrate the process of designing fish passage for a specific culvert. The purpose of the forms is to document the final design of a culvert,help permit reviewers and funding entities verify compliance with fish-passage regulations and expedite permitting. Not all sections will apply to all culverts; chose the sections relevant to your culvert-design process. There are two separate forms,one of which deals with culverts designed under the Stream-Simulation and No-Slope Design options. The other form deals exclusively with culverts designed under the Hydraulic Design Option. These forms should be submitted with project plans that show,at a minimum,project layout, channel and culvert profiles,details of unique features, care of water(erosion control,water diversion,etc.), and road-runoff treatment. Additional review information may be needed for specific situations. Data required on these forms are defined in this guideline and must be developed using acceptable methods,such as those described in the guideline. Refer to"Explanation of Forms Content"at the end of these forms for additional information. Design of Road Culverts for Fish Passage 87 Summary Form for Fish-Passage Design Data No-Slope and Stream-Simulation Design Options Project Identification: Stream name: Date: WRIA: Tributary to Name of road cros •ng: Road owner: Designer: v Contact(phone,email): Brief Narrative of Project: AA Design Option Used Stream Simulation No slope Description of Culvert � Existin Propos d Shape: A� Material: � Rise: ft Span: ft ft Upstream invert elevation: Downstream invert elevation: 1 -2JwS�1 Length: ft I-L4—ft J Slope: _ft/ft r ft/ft Culvert countersink(upstream): Culvert bed width (upstream): ft ft Culvert countersink(downstream): Culvert bed width (downstream): ft ft Culvert skew angle to stream: deg deg Slope ratio (channel slope/culvert-slope) Height of road fill ft ft uOtU'r bra e� Bed material t(Nabdral or imported, D 100,D84, D50 and D 16, if available,or verbal characterization such as,"nine-inch-minus, ell-graded river rock"): w ,d3. I . How is imported bed material designed for stability? ` no r ^ a��l.e L0C1(�c� 10 i 'JsA XA ,/ Additional culvert information,other conditions or concerns: Fish Species of fish likely to be present and any special passage requirements that the culvert must satisfy: Design of Road Culverts for Fish Passage 88 Hydrology Estimated Low-and Peak-Flood Flows (cfs):; i Qz Qioo Current watershed conditions Future watershed conditions Describe how flows were estimated and what the assumptions are for future conditions (necessary only for Stream- Simulation Design Option): Upstream Channel Description ; Elevation of streambed at upstream end of culvert: Upstream channel slope: ft/ft Channel-bed width (average of three measurements over a length of 20 channel widths or a minimum of 200 ft. Please see Appendix H) fl ft Streambed material type and the basis of vertical control(wood-or rock-dominated): Sit Streambed size distribution: Dioo (other sizes for Stream-Simulation Method): D84 Dso D 16 Is there evidence of a significant amount of bed-material transport? /Y� Is the channel in equilibrium (not aggrading or degrading)? ( Y ) N Is there a significant amount of mobile,woody debris present? Y Provide proposed grade-control information. Include type,elevation and distance from culvert IV Structures in bed or channel that could be exposed or undermined by upstream channel regrade: IN � 14 Add' ional upstref m information, other conditions or concerns: AL4� a D n Downstream-Channel Description Elevation of streambed at downstream control point: Downstream channel slope: fdft Channel-bed width: ft Streambed material type: C �J D ,1 Design of Road Culverts for Fish Passage 89 Provid proposed grade-control information. Include type,elevation and distance from culve S ire,;in bed or channel that could be affected by culvert design and installation: Additional Information Describe any existing or proposed structures or natural features that would be detrimental to fish passage, interfere with compliance with regulations or compromise habitat considerations. Examples of this may include trash racks, sediment basins,storm-water-control devices,existing upstream or downstream barrier culverts, or bedrock chutes. ` STATE•r� 6 c� State of Washington DEPARTMENT OF FISH AND WILDLIFE Mailing Address: 600 Capitol Way N-Olympia,Washington 98501-1091 -(360)902-2200,TDD(360)902-2207 Main Office location:Natural Resources Building-1111 Washington Street SE-Olympia,WA DETERMINATION OF NONSIGNIFICANCE (DNS) Name of Proposal: DNS 15-014: MCKERNAN HATCHERY CULVERT REMOVAL Description of Proposal: Weaver Creek flows through the WDFW McKernan Hatchery, where it is used near the hatchery entrance as an in-line rearing pond. The rearing pond is 28 to 30 feet wide with a weir at the downstream end and 2 screened culverts at the upstream end that are frequently backwatered. The two damaged 4 foot x 42 foot CMP screened culverts are located within 30 foot wide ponded area. These culverts will be removed and replaced with a 42 foot x 12 foot wide bridge, with a new removable screen system used to contain juvenile fish during rearing. The new screen system includes a poured slab, steel walkway, screen frame, and removable screens. When fish are not being reared, the screens are removable and the rearing pond will become an open 28-30 foot wide channel and fish passable. The bridge is supported by precast spread footings. The existing ecology block walls of the pond will be extended through the footprint of the bridge and used as the bridge abutments. Stream bed material will be placed within Ordinary High Water(OHW) in the new in-stream channel. Proponent/Applicant: Washington State Department of Fish and Wildlife(WDFW) Contact: Cindy Knudsen 600 Capitol Way North Olympia,WA 98501 (360) 902-8422 Cindy.KnudsenCCC)dfw.wa.gov Location of Proposal,including street,if any: WDFW McKernan Hatchery, off Hwy 101 fShelton, Mason Count Washington: Township 21N Range 4W Section 16. northwest o g , Y g p Lead Agency: Washington Department of Fish and Wildlife(WDFW) WDFW has determined that this proposal will likely not have a significant adverse impact on the environment. Therefore, state law' does not require an environmental impact statement (EIS). WDFW made this determination of nonsignificance(DNS) after we reviewed the environmental checklist and other information on file with us. We issued this DNS according to state rules.2 We will not act on this proposal for 14 days from the date we issued the DNS. Agencies, affected tribes, and members of the public are invited to comment on this proposal or DNS. We must receive your comments within 14 days of the date of this letter. The comment period will end at 5:00 pm on March 18,2015. Method of Comment: The following procedures shall govern the method to comment on agency SEPA proposals. Comments received through these procedures are part of the official SEPA record for this proposal. You can submit your comments any one of the following ways: • Email to SEPAdesk2La�dfw.wa.gov • Online at the WDFW SEPA website comment link at: http://wdfw.wa.gov/licensing/sepa/ • Fax to (360) 902-2946; • Mail to the address below. Responsible Official: Lisa Wood Position/Title: SEPA/NEPA Coordinator, WDFW Regulatory Services Section Address: 600 Capitol Way North, Olympia, WA 98501-1091 After the comment period closes, applicants may view the updated status of this proposal on the WDFW SEPA website: http://wdfw.wa.gov/licensing/sepa/. Once the status is posted as final, applicants and permittees may take action on the proposal. When a proposal is modified or withdrawn, notice will be given in accordance with state law.1 If you have questions about this DNS or the details of the proposal, contact Lisa Wood at the address, e-mail, or fax number above; you can also call her at (360) 902-2260. DATE OF ISSUE: March 4, 2015 SIGNATURE: 64 Footnotes 1. RCW 43.21C.030(2)(c) 2. WAC 197-11-340(2). SEPA Log Number:15-015.dns SEPA ENVIRONMENTAL CHECKLIST UPDATED 2014 Purpose of checklist. Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal are significant. This information is also helpful to determine if available avoidance, minimization or compensatory mitigation measures will address the probable significant impacts or if an environmental impact statement will be prepared to further analyze the proposal. Instructions for applicants: hjheel 1 This environmental checklist asks you to describe some basic information about your proposal. Please answer each question accurately and carefully, to the best of your knowledge. You may need to consult with an agency specialist or private consultant for some questions. You may use "not applicable" or "does not apply" only when you can explain why it does not apply and not when the answer is unknown. You may also attach or incorporate by reference additional studies reports. Complete and accurate answers to these questions often avoid delays with the SEPA process as well as later in the decision- making process. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Instructions for Lead Agencies: Please adjust the format of this template as needed. Additional information may be necessary to evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse impacts. The checklist is considered the first but not necessarily the only source of information needed to make an adequate threshold determination. Once a threshold determination is made, the lead agency is responsible for the completeness and accuracy of the checklist and other supporting documents. Use of checklist for nonproject proposals:[hel For nonproject proposals (such as ordinances, regulations, plans and programs), complete the applicable parts of sections A and B plus the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). Please completely answer all questions that apply and note that the words "project," "applicant," and "property or site" should be read as "proposal," "proponent," and "affected geographic area," respectively. The lead agency may exclude (for non-projects)questions in Part B - Environmental Elements—that do not contribute meaningfully to the analysis of the proposal. A. background h( eM 1. Name of project, ect, if applicable: hel proposed p f pl McKernan Hatchery Culvert Removal and Bridge Placement 2. Name of applicant: h( e SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 1 of 15 Washington State Department of Fish and Wildlife 3. Address and phone number of applicant and contact person: ILPM Washington State Department of Fish and Wildlife 600 Capitol Way North Olympia, WA. 98501 Cindy Knudsen 360 902 8422 Cindy.knudsenOdf v.wa.Qov 4. Date checklist prepared: hf elpl March 3, 2015 5. Agency requesting checklist: hf elpl Washington State Department of Fish and Wildlife 6. Proposed timing or schedule (including phasing, if applicable): hel Summer 2015 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. h( e By removing damaged culverts and replacing them with a bridge, this project provides facility maintenance for continued hatchery operations.At project completion, the repaired Weaver Creek rearing pond will continue to rear juvenile salmon. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. hf e A Biological Assessment, wetlands delineation and a no net rise report will be prepared for this site. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. hj elpl None are known. 10. List any government approvals or permits that will be needed for your proposal, if known. h( elpl An Army Corps of Engineers permit, HPA, shoreline exemption, and a buildingpermit will be required. SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 2 of 15 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) h( e Weaver Creekflows through the McKernan Hatchery, where it is used near the hatchery entrance as an in-line rearing pond. The rearing pond is 28 to 30 feet wide with a weir at the downstream end and 2 screened culverts at the upstream end that are frequently backwatered. The two damaged 4 foot x 42 foot CMP screened culverts are located within 30 foot wide ponded area. These culverts will be removed and replaced with a 42 foot x 12 foot wide bridge, with a new removable screen system used to contain juvenile fish during rearing. The new screen system includes a poured slab, steel walkway, screen frame, and removable screens. When fish are not being reared, the screens are removable and the rearing pond will become an open 28- 30 foot wide channel and fish passable. The bridge is supported by precast spread footings. The existing ecology block walls of the pond will be extended through the footprint of the bridge and used as the bridge abutments. Stream bed material will be placed within Ordinary High Water(OHW) in the new in-stream channel. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. heI From Interstate S, take exit 104 Right for US-101 North toward Port Angeles/Aberdeen. Keep right to stay on US- 101 N. After 21.3 miles, turn left onto W. Skokomish Valley Road for 1.7 miles, then turn left onto W. Deyette Road. Turn right to stay on W. Deyette Road. The project location is at the western edge of the property. Location: T 21N, R 4W, S 16(47.3072,-123.204). B. ENVIRONMENTAL ELEMENTS LbLel 1. Earth a. General description of the site hf e (circle one): Flat, rolling, hilly, steep slopes, mountainous, other The construction site is generally flat, surrounded by forested areas. b. What is the steepest slope on the site (approximate percent slope)? h( eipl The steepest slope at the site is 201o. c. What general types of soils are found on the site(for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any agricultural land of long-term commercial significance and whether the proposal results in removing any of these soils. hf elpl SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 3 of 15 The site contains Dungeness fine sandy loam(D), typically found in floodplains. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. hf el None are known. e. Describe'the purpose, type, total area, and approximate quantities and total affected area of any filling, excavation, and grading proposed. Indicate source of fill. hf elpl Excavation Materials: Roadway and native materials over Weaver Creek 63 cy(504 sq ft)above OHW Fill Materials: quarry spalls 5 cy (60 sfi above OHW Ecology Blocks Concrete 35 cy(60 sq)ft above OHW Precast Concrete Bridge footings 5 cy(96 sgft)above OHW Backfill crushed rock material gravel bridge approach areas(20 cy)above OHW Streambed mix 10 cy (504 sq ft) below OHW Poured concrete sill for screens 3 cy (180 sq ft) below OHW Large Woody Material 10 cy(200+sq ft)below OHW Square footage amounts are approximate. The project also includes geotextile material lining the stream banks and under quarry spalls.All fill materials will come from a local quarry.Any excavated material will be disposed of at an approved facility out of the flood plain. All fill will be placed from an excavator staged above OHW. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. hf el Yes erosion could occur as a result of construction activities. Best Management Practices(BMPs)will be used to prevent erosion. Supersacks will placed to isolate the construction area, and water will be rerouted through a bypass pipe. Any water exposed to construction activities will not be allowed to reenter the stream. Construction water will be pumped to an uplands area where siltation will be filtered to prevent turbid water re-entering Weaver Creek. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)?lbfjpj The only new impervious area will be the surface area of the new bridge(42 feet by 12 feet wide). h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: helpl Sediment control BMP measures will include careful dewatering, straw mulch, silt fence, and/or straw wattles. During construction, construction process water will be pumped into a settling pond that is separated from any source of clean water. No construction water will enter Weaver Creek. No vegetation clearing will be done, no trees will be removed. Upon completion of the project, all disturbed areas will be planted with a native grass/snub mix. SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 4 of 15 The bridge approach areas will be repaved upon completion.Any other areas of disturbed soils will be reseeded.Large Wood Materials will be placed with an excavator from the bank of Weaver Creek hatchery grounds, no machines will enter the water. 2. Air a. What types of emissions to the air would result from the proposal during construction, operation, and maintenance when the project is completed? If any, generally describe and give approximate quantities if known. hf e Typical emissions from heavy equipment are expected. The completed project will not have any emissions. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. [hel No source of off-site emissions or odor will affect this proposal. c. Proposed measures to reduce or control emissions or other impacts to air, if any: hel No measures are proposed to reduce or control emissions. 3. Water a. Surface Water: hf elpl 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. h� e Yes, Weaver Creek is at the project location. Weaver Creek flows into Puget Sound. Weaver Creek routinely has a water depth of 0,5 to 2.0 feet. Expected velocities are less than ]fps or 2 fps. 2)Will the project require any work over, in, or adjacent to (within 200 feet)the described waters? If yes, please describe and attach available plans. [hel The project will require working in, over, and adjacent to Weaver Creek. Water will be temporarily rerouted with a bypass pipe around the work site, and construction will be done in a dry area. Please refer to attached plans. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. hf e Fill will be placed instream before water is returned to Weaver Creek.No dredging will be done. No wetlands or wetland buffers will be disturbed. Streambed mix will be obtained from a local quarry. Fill materials:Streambed mix(10 cy), ecology blocks(35 cy),concrete(3 cy) 4)Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. hf elpl SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 5 Of 15 This project requires water diversion around the project area to remove the two failing culverts. Weaver Creek will be diverted around the construction area, using supersacks and bypass pipes. Expected diversion velocities are less than I fps to 2 fps. Water diversion techniques will be approved by the project engineer, and in accordance with the terms and conditions of the HPA and other required permits. At project completion, sandbags used during water diversion will be removed by hand, and then the bypass pipe and silt fence, and fish screen materials will be removed. 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. h( el Yes, the entire project is within the 100 year floodplain. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. h� elpl No waste materials will be discharged into surface water. Best Management Practices will be used to prevent turbid water from reentering Weaver Creek. Refueling of construction equipment will be done away from the construction area where any spilled materials will not enter the creek. b. Ground Water: 1)Will groundwater be withdrawn from a well for drinking water or other purposes? If so, ' give a general description of the well, proposed uses and approximate quantities withdrawn from the well. Will water be discharged to groundwater? Give general description, purpose, and approximate quantities if known. hf e Groundwater will not be withdrawn from a well or from any other source for this project.No water will be discharged to groundwater during construction or from the completed project. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any(for example: Domestic sewage; industrial, containing the following chemicals. . . ; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s)are expected to serve. hel � p7 No waste material will be discharged into the ground from septic tanks or from any other source. c. Water runoff(including stormwater): 1) Describe the source of runoff(including storm water) and method of collection and disposal, if any(include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. h Stormwater will run off the surface of the new bridge directly into the water of Weaver Creek. 2) Could waste materials enter ground or surface waters? If so, generally describe. hf eipl No waste material will be discharged into the ground from septic tanks or from any other source. 3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so, describe. SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 6 of 15 Drainage patterns will be affected in the vicinity of the site. Water will flow more naturally in Weaver Creek. Culvert removal will assist in passing high water events and floodplain functions. d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern impacts, if any: The proposed project will return Weaver Creek to a more natural flow pattern. Culvert removal will assist in passing water during high water events and assist in restoringfloodplain functions. 4. Plants Lhel a. Check the types of vegetation found on the site: hl elpl x deciduous tree: alder, maple, aspen, other _x_evergreen tree: fir, cedar, pine, other x shrubs _x_grass pasture crop or grain Orchards, vineyards or other permanent crops. wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other x other types of vegetation b. What kind and amount of vegetation will be removed or altered? hf elpl No vegetation will be removed or altered. The project is along Weaver Creek in an area where there are paved areas and grassy banks.Any incidental removal of vegetation will be restored with native grasses, c. List threatened and endangered species known to be on or near the site. hf elpl Within two miles of the site there are some rare plants typically found in low elevation freshwater wetlands or sphagnum bogs. No threatened and endangered species of plants are found at or near the project site. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: hf elpl Disturbed soils will be restored with native grass mix. On both sides of the bridge and underneath the bridge willow cuttings will be placed. e. List all noxious weeds and invasive species known to be on or near the site. No noxious weeds or invasive species of plants are known to be on or near the proposed project site. 5. Animals a. List any birds and other animals which have been observed on or near the site or are known to be on or near the site. Examples include: hf e birds: hawk, heron, eagle, songbirds, other: SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 7 of 15 mammals: deer, bear, elk, beaver, other: fish: bass, salmon, trout, herring, shellfish, other b. List any threatened and endangered species known to be on or near the site. hf elpl Steelhead, Coastal/Puget Sound DPS(Oncorhynchus mykiss) Chinook, Puget Sound ESU(Oncorhynchus tshawytscha) Chum salmon, Hood Canal summer ESU(Oncorhynchus keta) There are listed Marbled Murrelet(Brachyamphus marmoratus)and Northern Spotted Owl(Strix occidentalis caruina), and Critical Habitat for Marbled murrelet, and Northern spotted owl in Mason county. There are no marbled murrelet or Northern spotted owls or anywhere near the project location. c. Is the site part of a migration route? If so, explain. hf elpl Possible migration for Chinook, steelhead, coho, and native cutthroat trout exists at the proposed project location. d. Proposed measures to preserve or enhance wildlife, if any: hel The proposed project will restore fish passage in Weaver Creek when fish are not being reared in the channel. Best Management Practices during construction will protect water quality from turbidity and other pollutants. Construction will be performed during approved work windows, and within permit regulations. All permits will be obtained before construction starts. e. List any invasive animal species known to be on or near the site. No invasive animal species are known to be on or near the site. 6. Energy and natural resources a. What kinds of energy(electric, natural gas, oil, wood stove, solar)will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. [hel No source of energy will be required. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. h( elpl No. c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: hel No energy conservation features are proposed as apart of this project. 7. Environmental health SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 8 of 15 a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. [hel 1) Describe any known or possible contamination at the site from present or past uses. No contamination at the site is iknown. 2) Describe existing hazardous chemicals/conditions that might affect project development and design. This includes underground hazardous liquid and gas transmission pipelines located within the project area and in the vicinity. No existing hazardous chemicals or conditions are known to be at the site that would affect project development. 3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the project's development or construction, or at any time during the operating life of the project. No toxic or hazardous chemicals will be used or produced during the project, or at any time during the operating life of the project. 4) Describe special emergency services that might be required. None. 5) Proposed measures to reduce or control environmental health hazards, if any: Best Management Practices will be used to prevent water or soil contamination from any source of fuel used during construction. A spill kit will be at the construction site if any contaminants are spilled. b. Noise 1)What types of noise exist in the area which may affect your project(for example: traffic, equipment, operation, other)? help None. 2)What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indi- cate what hours noise would come from the site. LLelpl None. 3) Proposed measures to reduce or control noise impacts, if any: LLe1PJ None. 8. Land and shoreline use a. What is the current use of the site and adjacent properties?Will the proposal affect current land uses on nearby or adjacent properties? If so, describe. hI e SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 9 of 15 The McKernan Hatchery is at the project location. Nearby properties are rural residential with some agricultural areas. This project will not affect nearby or adjacent properties. b. Has the project site been used as working farmlands or working forest lands? If so, describe. How much agricultural or forest land of long-term commercial significance will be converted,to other uses as a result of the proposal, if any? If resource lands have not been designated, how many acres in farmland or forest land tax status will be converted to nonfarm or nonforest use? hf elpl No, this site has not been used as a working forest land.No land conversion of any kind will be done. 1)Will the proposal affect or be affected by surrounding working farm or forest land normal business operations, such as oversize equipment access, the application of pesticides, tilling, and harvesting? If so, how: No, this site will not be affected by surrounding workingfarm areas orforest land business operations, application ofpesticides, tilling or harvesting operations.Access for oversize equipment is not typically used at this hatchery site. c. Describe any structures on the site. hf pM At the proposed project location, there are several outbuildings, hatchery raceways, staff residences, and rearing ponds. d. Will any structures be demolished? If so, what? hf elpl Culverts will be removed at the project area. e. What is the current zoning classification of the site? h Rural Commercial 3 (RC3). f. What is the current comprehensive plan designation of the site? h Conservancy g. If applicable, what is the current shoreline master program designation of the site? h� e This project is considered to be an aquaculture development within a 'conservancy'designated shoreline. h. Has any part of the site been classified as a critical area by the city or county? If so, specify. hel The project is located within or near a flood zone.A critical areas report, and a no net rise declaration will be provided to Mason County. i. Approximately how many people would reside or work in the completed project? hf p!o SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 10 of 15 Several WDFW staff members will work at the hatchery facility, including the area of the Weaver Creek rearing pond. No WDFW staff will reside at the project(bridge)location. j. Approximately how many people would the completed project displace? hel This project will not displace any persons. k. Proposed measures to avoid or reduce displacement impacts, if any: hel No measures are proposed to reduce displacement impacts. L. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: 1hel m. Proposed measures to ensure the proposal is compatible with nearby agricultural and forest lands of long-term commercial significance, if any: The hatchery has been in operation at this site for several years, and this facility is compatible with surrounding agricultural and forest lands. 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, mid- dle, or low-income housing. h( elpl None. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. Jtg.!pJ c. Proposed measures to reduce or control housing impacts, if any: hel None. 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? hf e The bridge deck will be placed at ground level. The bridge railing is 4 feet high. b. What views in the immediate vicinity would be altered or obstructed? hf elpl None. c. Proposed measures to reduce or control aesthetic impacts, if any: hf elpl None. 11. Light and glare SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 11 of 15 a. What type of light or glare will the proposal produce? What time of day would it mainly occur? hel None. b. Could light or glare from the finished project be a safety hazard or interfere with views? 1hel None. c. What existing off-site sources of light or glare may affect your proposal? h[ g-[ None. d. Proposed measures to reduce or control light and glare impacts, if any: [help] None. 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? JLg!PJ There are hiking,fishing, wildlife viewing, and river access areas nearby. b. Would the proposed project displace any existing recreational uses? If so, describe. hel No. c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: hel None. 13. Historic and cultural preservation a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old listed in or eligible for listing in national, state, or local preservation registers located on or near the site? If so, specifically describe. h[ elpl A review of the database maintained by the Washington State Department of Archaeology and Historic Preservation (DAHP)shows no buildings, structures, or sites recorded in or near the project. b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation? This may include human burials or old cemeteries. Are there any material evidence, artifacts, or areas of cultural importance on or near the site? Please list any professional studies conducted at the site to identify such resources. h A review of the database maintained by DAHPand available historic maps show no landmarks, features or other evidence of indian or historic use or occupation known at this time.As part of WDFW's planning process a cutlrual review of the project will be completed. The review will include consultation with affected tribes and DAHP. c. Describe the methods used to assess the potential impacts to cultural and historic resources on or near the project site. Examples include consultation with tribes and the department of SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 12 of 15 archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc. heI A determination of the probability for the project to impact cultural resources will be based largely upon review and analysis of past environmental and cultural contexts and previous cultural resource studies and sites. Research to be conducted for this assessment includes review of environmental and cultural contexts from a variety of sources including the Washington State Department of Archaeology and Historic Preservation (DAHP), Washington Information System for Architectural and Archaeological Records Data (WISAARD), Bureau of Land Management's General Land Office (GLO) Survey Records database, HistoryLink, Historic Map Works, University of Washington's Digital Collection, and Washington State University's Early Washington Maps Collection. As the project requires a federal permit, government to government consultation is the responsibility of the USA CE. d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to resources. Please include plans for the above and any permits that may be required. . Cultural review of the project and the results of consultation would inform final project design. In the even that the project encounters archaeological deposits or features, WDFW's Inadvertent Discovery Plan should be enacted. Contractors and WDFW staff will be briefed on the plan prior to project initiation. 14. Transportation a. Identify public streets and highways serving the site or affected geographic area and describe proposed access to the existing street system. Show on site plans, if any. hel Highway 101, Skokomish Valley Road Serve this site. Please see project drawings. b. Is the site or affected geographic area currently served by public transit? If so, generally describe. If not, what is the approximate distance to the nearest transit stop? h( elpl The nearest public site is unknown. c. How many additional parking spaces would the completed project or non-project proposal have? How many would the project or proposal eliminate? hel None. d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle or state transportation facilities, not including driveways? If so, generally describe (indicate whether public or private). hf e This project will place a bridge will be placed on private property. e. Will the project or proposal use (or occur in the immediate vicinity of)water, rail, or air transportation? If so, generally describe. h( e SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 13 of 15 No, this project is on private property, that utilizes of water rail or air transportation. f. How many vehicular trips per day would be generated by the completed project or proposal? If known, indicate when peak volumes would occur and what percentage of the volume would be trucks (such as commercial and nonpassenger vehicles). What data or transportation models were used to make these estimates? hf elpl No trips will be generated by the completed project. The bridge will be used during typical hatchery operations. g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest products on roads or streets in the area? If so, generally describe. No the bridge is on private state property, only used for typical hatchery operations. h. Proposed measures to reduce or control transportation impacts, if any: h� elpl None. 15. Public services a. Would the project result in an increased need for public services (for example: fire protection, police protection, public transit, health care, schools, other)? If so, generally describe. hel No. b. Proposed measures to reduce or control direct impacts on public services, if any. hf e None. 16. Utilities a. Circle utilities currently available at the site: hel electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other These utilities are available on the hatchery grounds but not at the project location. b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. h No utilities are proposed. Typical construction activities will use generators or other sources of available, power if utilities are required. C. Signature HELP The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 14 of 15 Signature: l .M Ae, kywj<,,e�, Name of signee Position and Agency/Organization 0 �0!j b� f C� Date Submitted: t �-1 C1ld *i To M (� cc PSrF 14AM W r 0 L.(Fe SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 15 of 15 Qb PROJECT LOCATION STATE MAP NOT TO SCALE 0 s o° 04, ~� SKOKOMISH VALLEY RD � y 101 o w 0 o � McKERNAN HATCHERY PROJECT LOCATION N 0 O Y 101 N PURCY CR z r l� I VICINITY MAP NOT TO SCALE ENG. PROJECT NO. MN:H37:14-1 PORTION OF: SECT. 16, T 21 N. R 4 W REFERENCE NUMBER: PROJECT LOCATION (ADDRESS): PROPOSED PROJECT: APPLICANT: McKERNAN HATCHERY BRIDGE AND WALKWAY INSTALLATION WASHINGTON DEPT. of FISH & WILDLIFE W 411 DEYETTE ROAD 600 CAPITOL WAY N. SHELTON, WA 98584 OLYMPIA, WA 98501-1091 IN: WEAVER CREEK ADJACENT PROPERTY OWNER: LAT/LONG: 47.3072/-123.204 IN SHELTON 1. DATUM: NAVD 88 COUNTY: MASON 2 SHEET 1 OF 12 DATE:2/27/2015 STATE: WA ICI PROJECT LOCATION I�i SITE 2 \ WELL /1 / DOMESTIC WELL \ � ... RESIDENCE ---�I —J WELL /2 �� / PUMPS �••\..i"�.. \ _T r i� i� r� °y FISH LADDER •VER CREEK I 1 1 I ————•�� i /�x ., FJ" —fir`--~ ,,•�" , PROJECT S j,/ eo`'o GAS TANK LOCATION �aG I SITE 1 DEGASSING TOWER �`4 OFFICE AND CARPORT I I DEGASSING TOWER I I i I *EkA=L6D5ITE PLAN 0 50 100 25 75 150 McKERNAN HATCHERY LEGEND SCALE: 1` = 100' CONCRETE STRUCTURE —.e.—.A.—.e.— 6*0 WATER DRAIN FENCE 24"0 WATER DRAIN PROPERTY LINE — — s...—.0.1.— 4'0 PERF PIPE DRAIN WATER EDGE —••—••— — — — 48"0 CMP DRAIN PAVED ROADWAY ————————— UNDERGROUND ELECTRICAL —w—uw—u:— 61 12'0 WATER SUPPLY DOMESTIC WATER —w—w—w— 18"0 WATER SUPPLY SANITARY SEWER 12"0 STEEL SUPPLY 18e0 STEEL SUPPLY QUANTITIES MATERIAL CUT ABOVE OHW FILL ABOVE OHW CUT BELOW OHW FILL BELOW OHW TYPICAL ROAD FILL —63 CY — —120 CY — ECOLOGY BLOCKS — — — 35 CY CONCRETE — 5 CY — 3 CY STREAMBED MIX — — — 10 CY REFERENCE NUMBER: GRAVEL APPROACH — 20 CY — — APPLICANT NAME: QUARRY SPALLS - 5 CY - - WASHINGTON DEPT. of FISH & WILDLIFE ASPHALT — 5 CY — — PROPOSED PROJECT: ROOTWADS — — — 20 CY BRIDGE AND WALKWAY INSTALLATION NET TOTALS —28 CY —52 CY LOCATION: McKERNAN HATCHERY ENG. PROJECT NO. MN:H37:14-1 SHEET 2 OF 12 DATE:2/27/2015 W Z Zj GRASSY AREA w a. ASPHALT ROAD FENCE TYP. (2) 48- CMP TO BE REMOVED i ASPHALT ROAD �xVO TOP OF PIPE Axbo .E. = 31..44" ELEV = 34. 2+50 ECOLOGY BLOCK - TYP. 3+00 3+50 REARING POND 4+00 .E. = 30.51' TOP OF PIPE FLOW 35 E = 34.73' / ASPHALT ROAD TBM TOP NE CORNER OF CONIC. VAULT ELEV. 40.29' GRASSY AREA �' GPS PK NAIL O C� AERATOR TOWER INCUBATION AND REARING POND 0 20 40 10 30 60 SCALE: 1' - 40' DATUM HATCHERY BUILDING NAVD 88 EXISTING SITE PLAN SCALE: 1- = 40' REFERENCE NUMBER: APPLICANT NAME: WASHINGTON DEPT. of FISH & WILDLIFE PROPOSED PROJECT: BRIDGE AND WALKWAY INSTALLATION LOCATION: McKERNAN HATCHERY ENG. PROJECT NO. MN:H37:1 4—1 SHEET 3 OF 12 DATE:2/27/2015 W Z -3 GRASSY AREA ASPHALT ROAD it a STAGING AREA IN ROAD (2) 48" CMP (2 BE REMOVED OR ON EXISTING ASPHALT FENCE - TYP. —— -- ASPHALT ROAD I I 5' BETWEEN WALKWAY FOOTPRINT -- —AND SUPERSACK PLACEMENT _ --_.____ 3 PUMP FOR _I ECOLOGY BLOCK - TYP. CONSTRUCTION - - - w SUPERSACK - TYP. -- \WATER q ----- _.___REARING POND —�--- � FLOW ------ PUMP FOR CLEAN WATER FOOTPRINT OF WALKWAY FILTER FABRIC FENCE FOR REFERENCE ASPHALT ROAD TBM Till TOP NE CORNER OF CONC. VAULT ELEV. - 40.29' GRASSY AREA �Q, CPS PK NAIL AERATOR TOWER INCUBATION AND REARING POND 0 20 40 10 30 60 SCALE: 1" = 40' DATUM HATCHERY BUILDING NAVD 88 DEWATERING SITE PLAN SCALE: 1" = 40' REFERENCE NUMBER: APPLICANT NAME: WASHINGTON DEPT. of FISH & WILDLIFE PROPOSED PROJECT: BRIDGE AND WALKWAY INSTALLATION LOCATION: McKERNAN HATCHERY ENG. PROJECT NO. MN:H37:1 4—1 SHEET 4 OF 12 DATE:2/27/20 1 5 �o ,'-EkISTINC•�y Q� RQAD w $ 3 9 TYP TOP RANK— Top BANK N STOP BANK TEMPORARY FISH SCREEN PER HPA REQUIREMENTS. (IFWATER IS PRESENT TOE- CLEAN CL EAN SCREENS DAILY.. Z TOE TOE TOE A A 5 5 5 5 STREAM CHANNEL VUVU — —TOE— i i i TOE TOE _ `TOE 6 PLACE STRAW BALE TOP RANK- TOP BANK BARRIER ALONG LOW SIDE I o OF INFILTRATION SITE. 6 N TOP BANK PUMP 2 4 5 8 TYP 1 SET UP s AREA EXISTING PUMP STANDING WATER FROM C I ONSTRUCTION AREA TO UPLAND INFILTRATION SITE. ( SITE TO BE / STAKED EDT IN O FIELD BY ENGINEER PR TYPICAL DEWATERING PLAN NOT TO SCALE DEWATERING NOTES: SOIL STABILIZATION NOTES: 1. ALL WORK SHALL BE IN ACCORDANCE WITH HPA. 2. DURING CONSTRUCTION (IF WATER IS PRESENT) STREAM LOW SHALL BE DIVERTED 1. ALL EXPOSED SURFACES SHALL BE REVEGETATED WITHIN 30 DAYS OF AREA COMPLETION. COMPLETION INCLUDES ALL SLOPES TO FINISH THROUGH BYPASS OR EXISTING PIPE. IF HIGH FLOW, (2) DIVERSION PIPES MAY BE CONTOUR AND ALL CLEARED AREAS, NOT GRAVELED, SMOOTH AND NEEDED. CLEAR OF DEBRIS TO THE SATISFACTION OF THE ENGINEER. 3. PLACE SUPER SACKS FILLED WITH PEA GRAVEL TO SEAL BYPASS INLET AND OUTLET. 2. REVEGETATION SHALL MEAN BROADCAST SEEDING OR HYDRO-SEEDING.. 4. DIVERSION SHALL BE APPROVED BY INSPECTOR PRIOR TO EXCAVATION. 3. MULCHING AND MATTING SHALL BE UTILIZED DURING PERIODS OF 5. FISH REMOVAL SHALL BE COMPLETED BY PERMITTING STAFF. CONSTRUCTION DELAYS OR WINTER DOWNTIME FOR TEMPORARILY PROTECTING EXPOSED SOILS. 6. EXCAVATE EXISTING FILL 7. REMOVE EXISTING CULVERT AND DISPOSE OF OFF SITE. 8. PLACE NEW BED MATERIAL MIX AND REMOVE BYPASS PIPE. 9. COVER ALL EXPOSED SOIL WITH STRAW MULCH AND GRASS SEED. 10, REMOVE DIVERSION BAGS AND FISH SCREENS BY HAND. SUPERSACK DAM 2 BAGS HIGH MIN. ISOLATED WORK AREA TEMPORARY FISH SCREEN PER HPA REQUIREMENTS. (IF WATER IS PRESENT) 6 MIL. VISQUEEN SUPERSACK DAM 2 CLEAN SCREENS DAILY. BAGS HIGH MIN. DEWATERING PIPE '^ PEA GRAVEL SANDBAG OR ENGINEER TO VERIFY NATIVE STREAM BED GRAVEL SIZE REQUIREMENT AT 6 MIL. VISQUEEN PLACED BY HAND TIME OF CONSTRUCTION FLOW TOE IN FRONT OF PLASTIC ROUND STREAM INTO STREAM BED 1:1 BED ROCKO MIN., 1'-0' DEEP / CD / / / /. \�/j\// /\//�/ /.\// /�Y�/�/\ \/• SECTIONA REFERENCE NUMBER: NOT TO SCALE rJ rJ APPLICANT NAME: WASHINGTON DEPT. of FISH & WILDLIFE PROPOSED PROJECT: BRIDGE AND WALKWAY INSTALLATION LOCATION: McKERNAN HATCHERY ENG. PROJECT NO. MN:H37:14-1 SHEET 5 OF 12 DATE:2/27/2015 8'-0" 2 x 2 WELD WIRE FILTER FABRIC MATERIAL FABRIC OR EQUAL MIRAFI 10Ox BIDIM OR TYPICAL - EQUIVALENT W000 STAKE OR REBAR STAKED AND ENTRENCHED JI II STRAW BALE FASTEN WITH STAPLES /�I II BINDING WIRE OR TWINE OR WIRE RINGS TY . II II °D t m COMPACTED SOIL TO I PREVENT PIPING c �-�x 4_TRENC�H—��r II II N III u u `2"x 2' DOUGLAS FIR BURY BOTTOM OF FILTER FABRIC / / \ OR EQUAL, AS APPROVED MATERIAL IN 4" x 4"TRENCH BY ENGINEER TYP. BAC(FILL AS SPECIFIED. STRAW BALES D IL 1 NOT TO SCALE rj 6 2"x 2" DOUGLAS FIR FILTER FABRIC OR EQUAL, AS APPROVED STRAW BALES MATERIAL BY ENGINEER - TYP. 1. BALES SHALL BE PLACED IN A SINGLE ROW, NEW GRADED OR LENGTHWISE ON THE CONTOUR, WITH ENDS OF DISTURBED SIDE SLOPE �, ADJACENT BALES TIGHTLY ABUTTING ONE o �/T ANOTHER. PILE 2"TO 4"QUARRY < SPALLS IN FLOW CHANNEL 2. THE BARRIER SHALL BE ENTRENCHED AND 1'-O" MIN. DEPTH OR LOCAL BACKFILLED. A TRENCH SHALL BE A MINIMUM OF MATERIAL AS APPROVED 70 4 INCHES. BACKFILL SOIL SHALL CONFORM TO N THE GROUND LEVEL ON THE DOWNHILL SIDE AND SHALL BE BUILT UP 4 INCHES AGAINST THE 4" UPHILL SIDE OF THE BARRIER. EACH BALE SHALL F� BE SECURELY ANCHORED BY AT LEAST 2 STAKES SECTION OR REBAR DRIVEN THROUGH THE BALE. 3. THE GAP BETWEEN THE BALES SHALL BE CHINKED (FILLED BY WEDGING) WITH STRAW TO TYPICAL FILTER FABRIC FENCE PREVENT WATER FROM ESCAPING BETWEEN THE NOT TO SCALE BALES. FILTER FABRIC FENCE NOTES: 1. FILTER FABRIC SHALL BE A CONTINUOUS ROLL CUT TO LENGTH OF BARRIER AS NEEDED. IF JOINTS ARE NECESSARY FABRIC SHALL BE SPLICED TOGETHER ONLY AT SUPPORT POSTS WITH A MINIMUM OF SIX (6) INCH OVERLAP. BOTH ENDS SHALL BE SECURED AS REQUIRED. 2. FILTER FABRIC SHALL BE INSTALLED TO FOLLOW CONTOURS. FENCE POSTS SHALL BE SPACED A MAXIMUM OF EIGHT (8) FEET APART UNLESS OTHERWISE SHOWN HEREIN. ALL POSTS SHALL BE DRIVEN INTO THE GROUND A MINIMUM OF 30 INCHES. 3. A TRENCH SHALL BE EXCAVATED, ROUGHLY FOUR (4) INCHES WIDE BY FOUR (4) INCHES DEEP UPSLOPE AND ADJACENT TO THE POST TO ALLOW THE FILTER FABRIC TO BE BURIED. 4. WHEN STANDARD STRENGTH FILTER FABRIC IS UTILIZED, A WIRE SINGLE SPACE MESH SUPPORT FENCE SHALL BE FASTENED TO THE UPSLOPE (OR UPSTREAM) SIDE OF THE POSTS USING ONE (1) INCH MINIMUM LENGTH WIRE STAPLES, TIE WIRE OR APPROVED HOG RINGS. ALL WIRE SUPPORT SHALL EXTEND INTO THE TRENCH A MINIMUM OF FOUR (4) INCHES AND SHALL NOT EXTEND MORE THAN 36 INCHES ABOVE ORIGINAL GRADE. 5. ALL FILTER FABRIC SHALL BE STAPLED OR WIRED TO SUPPORT FENCING AND A MINIMUM OF 12 INCHES OF FABRIC SHALL BE EXTENDED INTO THE TRENCH. FILTER FABRIC SHALL NOT BE STAPLED OR FASTENED TO EXISTING TREES OF STRUCTURES UNLESS OTHERWISE APPROVED BY THE ENGINEER. 6. IF HIGH STRENGTH FILTER FABRIC AND CLOSER SPACING ARE USED,THE WIRE SUPPORT FENCING MAY BE ELIMINATED. HIGH STRENGTH FABRIC SHALL BE STAPLED OR WIRED DIRECTLY TO POSTS AS REQUIRED BY THE ENGINEER. 7. CUTOFF TRENCH SHALL BE BACKFILLED WITH NATIVE SOIL OR 3/4 INCH MINIMUM DIAMETER WASHED GRAVEL OR OTHER SIMILAR SOURCE AS APPROVED BY THE ENGINEER. 8. FILTER FENCING SHALL BE INSTALLED WHERE SHOWN ON THE PLAN OR AS DIRECTED BY THE ENGINEER PRIOR TO COMMENCEMENT OF WORK. ALL FENCING SHALL BE INSPECTED DAILY DURING CONSTRUCTION AND AFTER EACH SIGNIFICANT RAINFALL EVENT UNTIL SITE HAS BEEN PERMANENTLY STABILIZED. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. 9. REMOVAL OF TRAPPED SEDIMENT SHALL BE PERFORMED WHEN AMOUNTS REACH APPROXIMATELY 1/3 HEIGHT OF THE FENCE. MATERIAL REMOVED FROM FENCE SHALL BE DISPOSED OF AT AN APPROVED OFFSITE LOCATION UNLESS OTHERWISE DIRECTED BY THE ENGINEER REFERENCE NUMBER: APPLICANT NAME: 10. FILTER FENCING SHALL REMAIN IN-PLACE UNTIL SITE HAS BEEN REVEGETATED TO ORIGINAL WASHINGTON DEPT. of FISH & WILDLIFE CONDITION OR DIRECTED BY THE ENGINEER. CONTRACTOR SHALL BE RESPONSIBLE FOR FENCING REMOVAL FROM THE SITE WITHIN 30 DAYS OF SITE STABILIZATION. PROPOSED PROJECT: BRIDGE AND WALKWAY INSTALLATION LOCATION: McKERNAN HATCHERY ENG. PROJECT NO. MN:H37:14-1 SHEET 6 OF 12 DATE:2/27/2015 EXISTING GRASSY AREA EXISTING FENCE ti TYP. w z -' PLANTING AREA + + APPROX. 630 S.F. W + + + + a0 } + + 4 + 4 # C + + + ♦ + + # # 4 + 0. + + + + + + a + + + + + + + + + + +++ + + NEW 12' x 42' BRIDGE 4 + 4 4 + # + { { + 4 + + + + + # a { + + g o EXISTING ASPHALT ROAD + + + + # # # # # + + T+ + # { { # + # ++ + + + + + 1 1 + 1 + + + + { + + + + + — + a { r + 1 1 4 I I I I I I I 5 NEW ECOLOGY BLOCK - TYP. EXISTING ECOLOGY BLOCK TYP. NEW 25' x 6' WALKWAY WITH SCREENS EXISTING REARING POND a + a + + + + + + FLOW + + + + + + + + + + + a } a + + + + + + + + + + + ++++ + + +++ +++ + + + + # + + + + + +4+4++i+++++ + + ++++4++ + + + + ++ + + + 35 { + + + + + + + ++ 35 + + 4 4 + + +++ + 4 4 4 # +� + PLANTING AREA APPROX. 42' APPROX. 765 S.F. OF NEW ECOLOGY BLOCKS EXISTING ASPHALT ROAD NEW ROAD GRADING xEXISTING GRASSY AREA 0 20 4D 1D 30 60 x SCALE: 1" = 40' T" 1� TBM TOP NE CORNER OF CONC. VAULT GPS PK NAILELEV. - 40.29' EXISTING AERATOR TOWER IK- PROPOSED SITE 1 PLAN REFERENCE NUMBER: SCALE: 1" = 20' APPLICANT NAME: WASHINGTON DEPT. of FISH & WILDLIFE PROPOSED PROJECT: BRIDGE AND WALKWAY INSTALLATION LOCATION: McKERNAN HATCHERY ENG. PROJECT NO. MN:H37:14-1 SHEET 7 OF 12 DATE:2/27/2015 i 39 39 38 38 37 37 36 _ 36 35 I 35 34 _ ,, _ OHW = 33.50 .EXISTING GRADE -___-- - 34 33 _ _ 33 32 ----- - 32 31 31 30 30 -30 -20 -10 0 10 20 30 3+00 EXISTING CREEK SECTION scALE: 10' 0 � a o o+ n o o o + ,a,� o+ n a o II II 'I p M O M II II F � II II M rn O O II >II ¢ �i F �iJJ II II II II II II 40 i,. a 40 NEW 42' x 12' BRIDGE 35 --_ __ --- 35 OHW = 33.50 FINISHED GRADE ABUTMENT - TYP, 30 30 STA = 0+10 STA = 0+38 NEW ECOLOGY ELEV = +10 -_ 6' W'SDOT �. ELEV = 31.69 n BLOCK TYP. STREAMBED n ro SEDIMENT n M 0+10 0+20 0+30 0+40 BRIDGE PROFILE SCALE: 1" = 8' REFERENCE NUMBER: APPLICANT NAME: WASHINGTON DEPT. of FISH & WILDLIFE PROPOSED PROJECT: BRIDGE AND WALKWAY INSTALLATION LOCATION: McKERNAN HATCHERY ENG. PROJECT NO. MN:H37:14-1 SHEET 8 OF 12 DATE:2/27/2015 a N n o0 t6 0 ,o ro v es + n o+ n + n a , + no OD II II O A m n o ao o p o n o II IFI II A ++ n+ M + n + O 25' II �j II II In W In w 6' WALKWAY WITHxFSHSCREENS 40 40 35 35 OHW = 33.50 FINISHED GRADE 30 30 STA = 0+11 26' z 7' ■ 1 STA= 0+37 ELEV = 31.50 „� CONC SLAB ELEV= 31.50 0+10 0+20 0+30 0+40 WALKWAY PROFILE SCALE: 1" = 8' REFERENCE NUMBER: APPLICANT NAME: WASHINGTON DEPT. of FISH & WILDLIFE PROPOSED PROJECT: BRIDGE AND WALKWAY INSTALLATION LOCATION: McKERNAN HATCHERY ENG. PROJECT NO. MN:H37:14-1 SHEET 9 OF 12 DATE:2/27 2015 PROPERTY LINE x / INTERLOCK 10 CY OF ROOTWADS WITH STEMS hh 0 20 40 / 10 30 60 SCALE: 1' = 40' 30 ,yo i a � Zc c� 3° ✓EXISTING ECOLOGY BLOCKS TIP. 5/ 3 POIA� INTERLOCK 10 CY OF EPR\NG RDOTWADS WITH STEMS R f 2� SS Ji Z PROPOSED SITE 2 PLAN 2 PLAN SCALE: ice= 2020 REFERENCE NUMBER: APPLICANT NAME: WASHINGTON DEPT. of FISH & WILDLIFE PROPOSED PROJECT: BRIDGE AND WALKWAY INSTALLATION LOCATION: McKERNAN HATCHERY ENG. PROJECT NO. MN:H37:14-1 SHEET 10 OF 12 DATE:2/27/2015 3s Ll APPROX. 130 S.F. OF ASPHALT CUT � 35 -------------- 1 \ EDGE OF EXISTING PAVEMENT- TYP. 1 _ _________________ APPROX. 80 S.F. \ / OF ASPHALT FILL \\ // 1 / / EDGE OF NEW PAVEMENT TW. 1 1 I 1 I \ I 1 I APPROX. 470 S.F. l OF ASPHALT FILL PAVING 20�PLAN SCALE: 1� - REFERENCE NUMBER: APPLICANT NAME: WASHINGTON DEPT. of FISH & WILDLIFE PROPOSED PROJECT: BRIDGE AND WALKWAY INSTALLATION LOCATION: McKERNAN HATCHERY ENG. PROJECT NO. MN:H37:14-1 SHEET 11 OF 12 DATE:2/27/2O15 BRIDGE DECK FINISHED GRADE I) A I c I E H 3 B FOHW \ N a X X X ECOLOGY BLOCK ^• TYP. a X X X BANK SECTION NOT TO SCALE a X X NOTE: REFERENCE FOR MATERIALS ONLY. STAPLE LAYOUT NOT TO SCALE ' ANCHOR TRENCH TYPICAL BANK SECTION NOTES: A. CRUSHED SURFACING BASE COURSE COMPACTED 90 PERCENT. ' WSDOT 9-03.9(3), IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATION FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION GEOTEXTILE EDGE 2012. B. BALLAST ROCK COMPACTED IN 12 INCH LIFTS, WSDOT 9-03.9(1), IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATION FOR ROAD, 3'-0" BRIDGE, AND MUNICIPAL CONSTRUCTION 2012. (12 INCH LIFTS) MIN C. PRE-CAST CONCRETE ABUTMENTS SHINGLE SPLICE D. MAINTAIN 9 INCHES CLEARANCE BETWEEN QUARRY SPALLS AND BRIDGE STRINGERS. E. 6" COBBLES WSDOT 9-03.11(2). IN ACCORDANCE WITH WSDOT STANDARD CONSTRUCTION 201ZTION FOR ROAD, BRIDGE, AND MUNICIPAL GEOTEXTILE LAYOUT NOT TO SCALE F. EXISTING GROUND. G. WILLOW CUTTINGS. 12" H. ENGINEERED STREAMBED MIX WSDOT 9-03.11(2) AND STREAMBED GEOTEXTILE MIN. SEDIMENT WSDOT 9-03.11(1). PERCENTAGE BY VOLUME. Z N GEOTEXTILE NOTES: TAMPED NATIVE 1. ANCHOR TRENCHES ARE TO BE INSTALL AT LEAST 3 FEET BEYOND STAPLE SOIL THE CREST OF THE SLOPE IN A SLOPE CONDITION. STAPLES - 2. OVERLAPS (EDGE TO EDGE) BETWEEN ROLLS SHOULD BE 3 TO 4 3'-0" MAX. CTRS. INCHES. THE (END TO END) SLICE BETWEEN ROLLS SHOULD BE 2 TO 3 FEET AND SHINGLED IN THE DIRECTION OF THE WATER FLOW. ALWAYS SECURELY FASTEN TO THE GROUND THE EDGES AND TYPICAL ANCHOR TRENCH DETAIL OVERLAPS WITH INTERVALS OF 3 FEET. NOT TO SCALE 3. SECURELY FASTEN DOWN THE CENTER OF EACH ROLL STAGGERING 24" MIN. CENTERLINE STAPLES BETWEEN THE OUTSIDE STAPLES WITH A I END OVERLAP SPACING INTERVAL OF 3 FEET. GEOTEXTILE FLOW 4. 3 - 4 STAPLES PER SQUARE YARD. 5. ALWAYS INSTALL TO ROWS OF STAPLES SPACED 1.5 x 1.5 FEET APART AT THE ROLL SPLICE LOCATIONS. STAPLE 6 INSTALL ADDITIONAL AS REQUIRED TO ENSURE CONTINUOUS CONTACT WITH THE SO . TYPICAL SHINGLE SPLICE DETAIL NOT TO SCALE 7. 8 INCH MINIMUM U-SHAPED STAPLES SHOULD BE INSTALLED FLUSH WITH THE SOIL SURFACE. REFERENCE NUMBER: LEADING EDGES OF FABRIC SHALL BE BURIED A MINIMUM OF 12 APPLICANT NAME: CHES AT A MINIMUM 45 DEGREE DOWN ANGLE. WASHINGTON DEPT. of FISH & WILDLIFE PROPOSED PROJECT: BRIDGE AND WALKWAY INSTALLATION LOCATION: McKERNAN HATCHERY N:H37:14-1 SHEET 12 OF 12 DATE:2/27 2015 t--------------------------------------- � AGENCY USE ONLY � MDate received: WASHINGTON STATE Se Army Corps ; of Engineers t t Seattle DisMct � t Agency reference#: Joint Aquatic Resources Permit , I Application (DARPA) Form°2 Tax Parcel#(s): I � t t USE BLACK OR BLUE INK TO ENTER ANSWERS IN THE WHITE SPACES BELOW. t ----------------------- t l l I I Part 1—Project Identification 1. Project Name (A name for your project that you create. Examples: Smith's Dock or Seabrook Lane Development) [Lelpj WDFW McKernan Hatchery Culvert Removal Part 2—Applicant The person and/or organization responsible for the project. [help] 2a. Name (Last, First, Middle) Knudsen, Cindy 2b. Organization (If applicable) Washington State Fish and Wildlife 2c. Mailing Address (Street or PO Box) 600 Capitol Way North 2d. City, State, Zip Olympia, WA. 98501 2e. Phone(1) A Phone(2) 2g. Fax 2h. E-mail ( 360) 902 8300 (360) 902 8422 (360) 902 8376 Cindy.knudsen@dfw.wa.gov Additional forms may be required for the following permits: • If your project may qualify for Department of the Army authorization through a Regional General Permit(RGP),contact the U.S.Army Corps of Engineers for application information(206)764-3495. • If your project might affect species listed under the Endangered Species Act,you will need to fill out a Specific Project Information Form(SPIF)or prepare a Biological Evaluation. Forms can be found at http//www nws usace army mil/Missions/CivilWorks/Regulatory/PermitGuidebook/EndangeredSpecies.aspx. • Not all cities and counties accept the JARPA for their local Shoreline permits.If you need a Shoreline permit,contact the appropriate city or county government to make sure they accept the JARPA. 2To access an online JARPA form with[help]screens,go to http://www.epermitting.wa.gov/site/alias resourcecenterharpa iarpa form/9984/iarpa form.asp For other help,contact the Governor's Office for Regulatory Innovation and Assistance at(800)917-0043 or help(ilora.wa.gov. JARPA Revision 2012.2 Page 1 of 15 Part 3—Authorized Agent or Contact Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b of this application.) hei 3a. Name (Last, First, Middle) Knudsen, Cynthia J. 3b. Organization (If applicable) Washington State Fish and Wildlife 3c. Mailing Address (Street or PO Box) 600 Capitol Way North 3d. City, State, Zip Olympia, WA. 98501 3e. Phone(1) 3f. Phone(2) 3g. Fax 3h. E-mail (360) 902 8300 (360) 902 8422 (360) 902 8376 Cindy.knudsen@dfw.wa.gov Part 4—Property Owner(s) Contact information for people or organizations owning the property(ies)where the project will occur. Consider both upland and aquatic ownership because the upland owners may not own the adjacent aquatic land. [help] ® Same as applicant. (Skip to Part 5.) ❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.) ❑ There are multiple upland property owners. Complete the section below and fill out JARPA Attachment A for each additional property owner. ❑ Your project is on Department of Natural Resources (DNR)-managed aquatic lands. If you don't know, contact the DNR at(360) 902-1100 to determine aquatic land ownership. If yes, complete JARPA Attachment E to apply for the Aquatic Use Authorization. 4a. Name (Last, First, Middle) 4b. Organization (If applicable) Washington State Fish and Wildlife 4c. Mailing Address (Street or Po Box) 600 Capitol Way North 4d. City, State, Zip Olympia, WA. 98501 4e. Phone(i) 4f. Phone(2) 4g. Fax 4h. E-mail (360) 902 8300 (360) 902 8422 (360) 902 8376 Cindy.knudsen@dfw.wa.gov JARPA Revision 2012.2 Page 2 of 15 Part 5-Project Location(s) Identifying information about the property or properties where the project will occur. hf eM ❑ There are multiple project locations (e.g. linear projects). Complete the section below and use JARPA Attachment B for each additional project location. 5a. Indicate the type of ownership of the property. (Check all that apply.) hf eAl ❑ Private ❑ Federal ® Publicly owned (state,county,city,special districts like schools, ports,etc.) ❑ Tribal ❑ Department of Natural Resources (DNR)— managed aquatic lands (Complete JARPA Attachment E) 5b. Street Address (Cannot be a PO Box. If there is no address, provide other location information in 5p.) hf elpl McKernan Hatchery W. 411 Deyette Road 5c. City, State, Zip(If the project is not in a city or town, provide the name of the nearest city or town.) hel Shelton, WA. 98584 5d. County hel Mason 5e. Provide the section, township, and range for the project location. hel '/4 Section Section Township Range 16 21 N R4W 5f. Provide the latitude and longitude of the project location. hei 9 p J [—e] • Example:47.03922 N lat./-122.89142 W long.(Use decimal degrees-NAD 83) 47.3072, N. Lat. /-123.204 W Long. NAVD 88 5g. List the tax parcel number(s)for the project location. [help] • The local county assessor's office can provide this information. 421163260010 5h. Contact information for all adjoining property owners. (If you need more space, use JARPA Attachment C.) [help] Name Mailing Address Tax Parcel # (if known) Washington State Dept. of Fish Washington State Dept. of Fish &Wildlife 421163260020 and Wildlife 600 Capitol Way North .................................................................................................................................................................................................................................................... Olympia, WA. 98501 Hunter Et. Al James M & Joan P.O. Box 147 421163100030 .................................................................................................................................................................................................................................................... Union WA. 98592 Mikesell, Roger D. & Judith E. 251 W. Deyette Rd. 421163200010 ................................................................................................................................................................................................................................................... Shelton, WA. 98584 Unter Et.AI. Greg, Curt Hunter P.O. Box 2049 42116-33-00000 ............................................................................................................................--......................................................................................... .......................... Shelton Wa. 98584 4211632000020 JARPA Revision 2012.2 Page 3 of 15 5i. List all wetlands on or adjacent to the project location. [help] No wetlands are present. 5j. List all waterbodies (other than wetlands) on or adjacent to the project location. hf eM Weaver Creek is at the project location 5k. Is any part of the project area within a 100-year floodplain? hel ❑ Yes ® No ® Don't know (A portion of the property parcel appears to be out of the floodplain) 51. Briefly describe the vegetation and habitat conditions on the property. hei The proposed project is located at the McKernan fish hatchery. The project location is in a channelized portion of Weaver Creek flowing through hatchery grounds that is used for juvenile rearing. There is vegetative cover on the banks of Weaver Creek upstream and downstream of the project location with deciduous trees(willow and maple)and herbaceous plants such as willow shrubs grasses,thistle and blackberry. Weaver Creek is characterized by cobble and gravel substrates with moderate depth and flow conditions. There are beaver dams nearby. Weaver Creek has water input from springs near but not directly adjacent to the project location. The project vicinity is in a natural area with large woody debris along the natural course of the stream with approximately 85%mixed hardwood and deciduous cover. The substrate in Weaver Creek adjacent to the project location has mixed instream cobble sizes. Instream fines are present with typical low summer flows. No wetlands are present near the project location. According to USGS Washington Stream Stats3,Weaver Creek is within a basin area that has a mean annual precipitation of 97.9 inches. There is a drainage area at the project site of 0.11 square miles. Peak flow through the project area for a 100 year flow event is estimated at 42.3 cfs. There are several natural spring inputs draining into the general project area. 5m. Describe how the property is currently used. hei The property is used as a fish hatchery. 5n. Describe how the adjacent properties are currently used. hei The project is in a natural forested area with rural residential and agricultural properties nearby. 5o. Describe the structures (above and below ground) on the property, including their purpose(s)and current condition. h[ eipl At the proposed project location,there are several outbuildings,hatchery raceways, staff residences, and rearing ponds. 5p. Provide driving directions from the closest highway to the project location, and attach a map. hey From Interstate 5,take exit 104 Right for US-101 North toward Port Angeles/Aberdeen. Keep right to stay on US-101 N. After 21.3 miles,turn left onto W. Skokomish Valley Road for 1.7 miles and then turn left onto W. Deyette Road. Turn right to stay on W. Deyette Road. The project location is at the western edge of the property. Location: T 21N,R 4W, S 16 (47.3072,-123.204). Part 6—Project Description 3 http://water.usgs.gov/osw/streamstatsNVashington.html JARPA Revision 2012.2 Page 4 of 15 6a. Briefly summarize the overall project. You can provide more detail in 6b. LbLeM Weaver Creekflows through the McKernan Hatchery, where it is used near the hatchery entrance as an in-line rearingpond. The rearing pond is 28 to 30 feet wide with a weir at the downstream end and 2 screened culverts at the upstream end that are frequently backwatered. The two damaged 4 foot x 42 foot CMP screened culverts will be removed and replaced with a 42 foot long 12 foot wide bridge, with a new removable screen system used to contain juvenile fish during rearing.Rootwads will also be placed at the end of the in line channel to create fish habitat. The new screen system under the bridge includes a poured slab, steel walkway, screen frame, and removable screens. When fish are not being reared, the screens are removable and the rearing pond will become an open 28-30 foot wide channel and fish passable. The new bridge is supported by precast spread footings. The existing ecology block walls of the pond will be extended through the footprint of the bridge and used as the bridge abutments. Stream bed material will be placed within Ordinary High Water (OHW) in the new in-stream_channel. Theproject below OHW will have geotextile, ecology blocks, bridge footings and streambed material.Above Ordinary High Water will have backfill crushed rock material, bridge abutments and the new bridge. The fill will come from a local quarry.Any excavated material will be disposed of at an approved facility out of the flood plain. Supersacks will be placed to isolate the construction area at both ends of the bridge portion of the project. Water will be rerouted through a bypass pipe, and then through the existing channel. Any water exposed to construction activities will not be allowed to reenter the stream. During construction, sediment laden water will be pumped into a settling pond that is separated from any source of clean water. Sediment control measures will include careful dewatering, straw mulch, silt fence, and/or straw wattles. Water will be pumped to an uplands area where it will be filtered to prevent turbid water or other contaminants from re-entering Weaver Creek. Before construction, no clearing of vegetation will be done. Upon completion of the project, upstream banks and any disturbed soils will be planted with a native grass/shrub mix. The bridge site will be repaved upon completion to match existing conditions. Underneath the bridge on both sides, willow cuttings will be planted. Construction will be performed during approved work windows and within permit regulations.All permits will be obtained before construction starts. 6b. Describe the purpose of the project and why you want or need to perform it. hel The McKernan Hatchery currently operates an in-line rearing pond on Weaver Creek that is constructed with ecology blocks and a geotextile liner. The rearing pond is bound by an existing weir at the lower end and 2 screened culverts at the upper end. The existing culverts are beginning to fail. This maintenance repair is required to remove the two CMP eroding damaged culverts, install a bridge with a new screening system under the bridge. This repair will improve hatchery operations,provide a better fish rearing system, and restore the habitat where the culverts are presently located.Rootwads will be placed at the end of the in-line channel to protect the banks against erosion, and to provide habitat. The proposed project will restore fish passage in Weaver Creek when fish are not being reared in the channel. Weaver Creek will also have a more natural passage of water during flood conditions. Rootwads will protect the banks at the end of the rearing channel against erosion and provide habitat. 6C. Indicate the project category. (Check all that apply) hel ® Commercial ❑ Residential ❑ Institutional ❑ Transportation ❑ Recreational ® Maintenance ❑ Environmental Enhancement Fd_ Indicate the major elements of your project. (Check all that apply) [help] JARPA Revision 2012.2 Page 5 of 15 ❑ Aquaculture ® Culvert (removal) ❑ Float ❑ Retaining Wall ® Bank Stabilization ❑ Dam /Weir ❑ Floating Home (upland) ❑ Boat House ❑ Dike/ Levee /Jetty ❑ Geotechnical Survey ❑ Road ❑ Boat Launch ❑ Ditch ❑ Land Clearing ❑ Scientific Measurement Device ❑ Boat Lift ❑ Dock/ Pier ❑ Marina / Moorage ❑ Stairs ® Bridge ❑ Dredging ❑ Mining ❑ Stormwater facility ❑ Bulkhead ❑ Fence ❑ Outfall Structure ❑ Swimming Pool ❑ Buoy ❑ Ferry Terminal ❑ Piling/Dolphin ❑ Utility Line ® Channel Modification ❑ Fishway ❑ Raft ® Other: Rootwad placement 6e. Describe how you plan to construct each project element checked in 6d. Include specific construction methods and equipment to be used. [help] • Identify where each element will occur in relation to the nearest waterbody. • Indicate which activities are within the 100-year floodplain. Weaver Creekflows through the McKernan Hatchery, where it is used as a 28 to 30 feet wide in-line rearing pond. There is a weir at the downstream end and 2 damaged screened culverts at the upstream end. The culverts are frequently backwatered. The two culverts will be removed and a bridge(42 foot long x 12 foot wide)will be installed with a new removable screen system to contain juvenile fish during rearing. At the downstream end of the project, rootwads will be pressed into place with an excavator staged on the bank of Weaver Creek. Construction access will be gained though hatchery grounds; no trees will be removed and no new site access roads will be created. Only minimal ground disturbance is expected. Supersack bags filled with pea gravel reinforced with plastic lining material will be placed at both ends of the project, and Weaver Creek will be diverted around the project area with bypass pipes. The height of the supersacks will be raised to an elevation thatprevents stream flow from entering the work area. The super-sack sandbags are each filled with approximately I cubic yard of sand or gravel with an impermeable plastic liner will be woven through the middle of the sack layers. Siltation curtains will be installed to limit turbidity impacts.Interior walls may be placed within the isolated area into separate smaller areas for a more efficient handling of construction water. Water in the construction area will be diverted to an upland bio-infiltration site where the diverted water cannot reenter Weaver Creek. Hay bales staked and entrenched with a wood stake or rebar will be placed along the low side of the bio- infiltration site to prevent water from re-entering Weaver Creek. This site will be staked infield by the engineer prior to construction. Water diversion techniques will be approved by the project engineer, and in accordance with the terms and conditions of the HPA and other required permits. Streambed mix(3 inch minus) will be installed in the stream bed after the culverts have been removed. Turbidity impacts are expected to be short in duration, site specific, and temporary in nature. Since this area has typical low flow during summer, the turbidity impacts will more than likely be confined to the construction area within the sediment control structures, and limited at a maximum to 200 to 300 feet downstream during construction activities. Rewatering the area will be done slowly and according to BMPs. Construction activities will be at low water levels. Since maximum peak velocity is estimated at considerably less than IOcfs in the culvert removal area during the seasonal low flow work window, the maximum amount of sediment transport is not expected to extend any farther than an estimated maximum distance of 300 feet. Work will be conducted during approved work windows during low flow conditions and as approved by all required permits. Noise from construction activities above ambient levels is limited to the working hours between 7 a.m. and 6 p.m. In water construction activities are expected to be completed in a maximum of two weeks, staging of equipment may occur JARPA Revision 2012.2 Page 6 of 15 earlier. Typical construction machinery will be used including dump truck, excavator, track hoe and compactor all staged above OHW. No area will be cleared for temporary access, No trees will be removed and machines will not enter the water. After the existing fill from the proposed project site is removed the existing culverts will be removed and disposed of offsite at an approved landfill. Any materials purchased for the proposed project, if required, will come from local quarry. In the unlikely event that historic artifacts are discovered, construction activities will stop and the proper authorities will be notified. Short term construction activities may affect a pool in the project location if one exists, however, habitat will be restored at project completion that will match conditions present at the site for pool frequency and pool quality. Fish removal will be done by dragging nets through the project area, then staking nets above and below the project area, to prevent any possible species from entering the site during construction, or as required by permits. At project completion, sandbags will be removed by hand, and then the bypass pipe, silt fence, and fish screen materials will be removed. Sediment controls will include careful dewatering, straw mulch, silt fence, and/or straw wattles. Upon completion of the project upstream banks will be planted with a native grass/shrub mix. Please see project drawings for additional details. 6f. What are the anticipated start and end dates for project construction? (Month/Year) h • If the project will be constructed in phases or stages, use JARPA Attachment D to list the start and end dates of each phase or stage. Anticipated In water: August 1 — 15, 2015 Start date: July, 2015 End date: August 31, 2016 ❑ See JARPA Attachment D 6g. Fair market value of the project, including materials, labor, machine rentals, etc. hel $ 200,000 6h. Will any portion of the project receive federal funding? hel • If yes, list each agency providing funds. ❑ Yes ® No ❑ Don't know Part 7—Wetlands: Impacts and Mitigation ❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area. (If there are none, skip to Part 8.) hei ] 7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. [help] ® Not applicable 7b. Will the project impact wetlands? hel ❑ Yes ® No ❑ Don't know 7c. Will the project impact wetland buffers? [help] ❑ Yes ® No ❑ Don't know 7d. Has a wetland delineation report been prepared? [help] • If Yes,submit the report, including data sheets,with the JARPA package. ❑ Yes ® No JARPA Revision 2012.2 Page 7 of 15 7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating System? hel • If Yes,submit the wetland rating forms and figures with the JARPA package. ❑ Yes ® No ❑ Don't know 7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? [held • If Yes,submit the plan with the JARPA package and answer 7g. • If No,or Not applicable,explain below why a mitigation plan should not be required. ❑ Yes ❑ No ® Not applicable 7g. Summarize what the mitigation plan is meant to accomplish, and describe how a watershed approach was used to design the plan. heI N/A 7h. Use the table below to list the type and rating of each wetland impacted, the extent and duration of the impact, and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a similar table, you can state (below)where we can find this information in the plan. [hgjpj Activity (fill, Wetland Wetland Impact Duration Proposed Wetland drain, excavate, Name' type and area (sq. of impact3 mitigation mitigation area flood, etc.) rating ft. or type (sq. ft. or category22 Acres) acres) N/A If no official name for the wetland exists,create a unique name(such as"Wetland 1"). The name should be consistent with other project documents,such as a wetland delineation report. 2 Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System.Provide the wetland rating forms with the JARPA package. 3Indicate the days,months or years the wetland will be measurably impacted by the activity.Enter"permanent"if applicable. 4 Creation(C), Re-establishment/Rehabilitation(R),Enhancement(E),Preservation(P), Mitigation Bank/In-lieu fee(B) Page number(s)for similar information in the mitigation plan, if available: 7L For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in cubic yards that will be used, and how and where it will be placed into the wetland. hel N/A 7j. For all excavating activities identified in 7h, describe the excavation method, type and amount of material in cubic yards you will remove, and where the material will be disposed. [held N/A Part 8—Waterbodies (other than wetlands): Impacts and Mitigation In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) [help] ® Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.) JARPA Revision 2012.2 Page 8 of 15 8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment. hel ❑ Not applicable Weaver Creek stream flow under the bridge is expected to match the present ecological functions at project completion. No change in hydrology is expected by the result of this project. When the culverts are removed, there will be no effects from backwatering,ponding, and sediment caused by the eroding culverts entering Weaver Creek. Floodplain flows will return to more natural functions. Supersacks will be placed to isolate the construction area, and water will be rerouted. Any water exposed to construction activities will not be allowed to reenter the stream.All precautions will be taken to avoid exposing Weaver Creek to concrete pouring activities. Sediment control measures will include careful dewatering, straw mulch, silt fence, and/or straw wattles. Any water in the construction area will be pumped to an upland bio-infiltration site separated from any source of clean water. Hay bales staked and entrenched with a wood stake or rebar will be placed along the low side of the bio- infzltration site to prevent water from re-entering Weaver Creek. Best Management Practices during construction will protect water quality in Weaver Creekfrom turbidity and other pollutants. Water diversion techniques will be approved by the project engineer, and in accordance with the terms and conditions of the HPA and other required permits. At project completion, sandbags used during water diversion will be removed by hand, and then the bypass pipe and silt fence, and fish screen materials will be removed. Rewatering the area will be done according to BMPs. Since maximum peak velocity is estimated at considerably less than IOcfs in the culvert removal area during the seasonal low flow work window, the maximum amount of sediment transport will not reach farther than an estimated maximum distance of 300 feet. Upon completion of the project, upstream banks will be planted with a native grass and shrub mix. Willow cuttings will be placed underneath the bridge.Any disturbed soils will be reseeded.No clearing of vegetation will be done. Please refer to the project drawings for detailed plant placements. The site will be repaved upon completion. Construction will be performed during approved work windows, and within permit regulations. 8b. Will your project impact a waterbody or the area around a waterbody? hel ® Yes ❑ No 8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland waterbodies? hel • If Yes, submit the plan with the JARPA package and answer 8d. • If No,or Not applicable,explain below why a mitigation plan should not be required. ❑ Yes ❑ No ® Not applicable This maintenance project will remove culverts, and install rootwads. Fish passage and habitat conditions will be improved. 8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was used to design the plan. • If you already completed 7g you do not need to restate your answer here. [hel N/A JARPA Revision 2012.2 Page 9 of 15 8e. Summarize impact(s) to each waterbody in the table below. heI Activity (clear, Waterbody Impact Duration Amount of material Area (sq. ft. or dredge, fill, pile name' location of impact3 (cubic yards) to be linear ft.) of drive, etc.) placed in or waterbody removed from directly affected waterbody Excavate Over Weaver Above 2 weeks 63 cy native fill 504 sq feet Creek OHW underneath roadway above Weaver Creek Fill Weaver Above 2 weeks Quarry Spalls 60 sq ft Creek OHW 5 c Fill Adjacent to Above 1 day Bridge Footings 96 sq ft Weaver OHW 5 Cy precast concrete Creek Fill Weaver Below 2 weeks Ecology Blocks 120 sq ft Creek OHW 35 c Fill Weaver Below 2 Weeks Concrete sill 3 cy 180 sq ft Creek OHW Fill Weaver Below 2 weeks Streambed Mix 504 sq ft Creek OHW 10 c Fill Weaver Below 1 day 20 cy (2) Rootwads 200+ sq ft Creek OHW If no official name for the waterbody exists,create a unique name(such as"Stream 1")The name should be consistent with other documents provided. 2Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent,provide the distance between the impact and the waterbody and indicate whether the impact will occur within the 100-year flood plain. 3Indicate the days,months or years the waterbody will be measurably impacted by the work. Enter"permanent"if applicable. 8f. For all activities identified in 8e, describe the source and nature of the fill material, amount (in cubic yards) you will use, and how and where it will be placed into the waterbody. heI Fill materials will come from a local quarry. All fill will be placed from an excavator staged above OHW. 5 cy quarry spalls(60 sq ft)above OHW 35 cy Ecology Blocks 35 cy(120 sq ft)below OHW 3 cy Concrete poured sill 3 cy, (180 sq ft)below OHW 10 cy Streambed mix, 10 cy,(504 sq ft)below OHW Precast Bridge footings: above OHW: 5 cy(96 sq ft) Rootwads— 20 cy(200 sq ft)placed below OHW. Some materials of the rootwad will reach above OHW. 8g. For all excavating or dredging activities identified in 8e, describe the method for excavating or dredging, type and amount of material you will remove, and where the material will be disposed. [help] 63 cubic yards of native soil material will be excavated above OHW. These materials are located under the roadway, and above the culverts. These materials will be disposed of off-site. Part 9—Additional Information Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of this section as you can. It is ok if you cannot answer a question. 9a. If you have already worked with any government agencies on this project, list them below. rheipi Agency Name Contact Name Phone Most Recent Date of Contact Mason County Grace Miller (360) 427 9670 1/23/15 USACE Darren Habel (206) 764 6883 1/23/15 JARPA Revision 2012.2 Page 10 of 15 WDFW Margie Bigelow ( 360) 427-2179 13/2/15 9b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 of this JARPA on the Washington Department of Ecology's 303(d) List? [help] • If Yes, list the parameter(s)below. • If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at: http://www.ecy.wa.gov/programs/wq/303d/. ❑ Yes ® No 9C. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? [Le/PJ • Go to http://cfpub.epa.gov/surf/locate/index.cfm to help identify the HUC. Skokomish Watershed-- 17110017 9d. What Water Resource Inventory Area Number(WRIA#) is the project in? hf elp] • Go to http://www.ecy.wa.gov/services/gis/maps/wria/wria.htm to find the WRIA#. 16 9e. Will the in-water construction work comply with the State of Washington water quality standards for turbidity? heI • Go to http://www.ecy.wa.gov/programs/wq/swcis/criteria.html for the standards. ® Yes ❑ No ❑ Not applicable 9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline environment designation? [help] • If you don't know, contact the local planning department. • For more information,go to: http://www.ecy.wa.gov/programs/sea/sma/laws rules/173-26/211 designations.htm1. ❑ Rural ❑ Urban ❑ Natural ❑ Aquatic ® Conservancy ❑ Other 9g. What is the Washington Department of Natural Resources Water Type? heI • Go to http://www dnr wa gov/BusinessPermits/Topics/ForestPracticesApplications/Pages/fp watertyping aspx for the Forest Practices Water Typing System. ❑ Shoreline ® Fish ❑ Non-Fish Perennial ❑ Non-Fish Seasonal 9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater manual? heI • If No, provide the name of the manual your project is designed to meet. ® Yes ❑ No Name of manual: Western Washington Stormwater Manual 9i. Does the project site have known contaminated sediment? heI • If Yes, please describe below. ❑ Yes ® No 9j. If you know what the property was used for in the past, describe below. [help] This site has been the site of the McKernan Hatchery for several years. 9k. Has a cultural resource (archaeological) survey been performed on the project area? [help] JARPA Revision 2012.2 Page 11 of 15 • If Yes, attach it to your JARPA package. ❑ Yes ® No 91. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project area or might be affected by the proposed work. hei Steelhead, Coastal/Puget Sound DPS (Oncorhynchus mykiss) Chinook, Puget Sound ESU(Oncorhynchus tshawytscha) Chum salmon,Hood Canal summer ESU(Oncorhynchus keta) 9m. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and Species List that might be affected by the proposed work. hei Steelhead, Coastal/Puget Sound DPS (Oncorhynchus mykiss) Chinook,Puget Sound ESU(Oncorhynchus tshawytscha) Chum salmon, Hood Canal summer ESU(Oncorhynchus keta) Bull trout, Coastal/Puget Sound IRU (Salvelinus confluentus) CRITICAL HABITAT Chinook,Puget Sound ESU(Oncorhynchus tshawytscha) -Critical Habitat ending at(47.3097, -123.2384)Weaver Creek (George Adams Fish Hatchery), south of the project location. Chum salmon,Hood Canal summer ESU(Oncorhynchus keta) -Critical Habitat is found in Mason County in the South Fork of the Skokomish River but not at the project location,ending at(47.3209,-123.2211). Chum salmon, Hood Canal summer ESU(Oncorhynchus keta), critical habitat is present in the watershed in the lower end of the Skokomish Subbasin and nearest to the proposed project at endpoint(47.3209,-123.2211) approximately one mile NE (overland) from the hatchery in an unnamed stream segment off of the south fork of the Skokomish River. There are possibly(unknown) opportunities for chum to migrate through Weaver Creek,but spawning or rearing opportunities are not believed to be occurring at the project location. Bull trout Coastal/Puget Sound IRU Bull Trout are present in the Skokomish River,but available data does not place bull trout or their critical habitat at or near the proposed project location. Limiting factors include fines and low summer flows that could affect water temperatures and opportunities for rearing of bull trout. The closest location of bull trout critical habitat is approximately one mile NE of the proposed project location in the South Fork of the Skokomish River(47.315,- 123.247). They are not typically found in Weaver Creek. There are listed Marbled Murrelet(Brachyamphus marmoratus) and Northern Spotted Owl(Strix occidentalis caruina), and Critical Habitat for Marbled murrelet, and Northern spotted owl in Mason county. There are no Marbled murrelet or Northern spotted owls or anywhere near the project location. Giant chain fern(Woodwardia fimbriata) is within one mile of the project location. Within two miles of the project location there are low elevation sphagnum bogs,with dulichium arundinaceum Acidic Fen and schoenoplectus subterminalis Herbaceous Vegetation.No rare plants or rare plant habitat areas are found at the project location. Part 10—SEPA Compliance and Permits Use the resources and checklist below to identify the permits you are applying for. • Online Project Questionnaire at http://apps.ecy.wa.gov/opas/. • Governor's Office for Regulatory Innovation and Assistance at(800) 917-0043 or help(aD-ora.wa.gov. • For a list of addresses to send your JARPA to, click on agency addresses for completed JARPA. JARPA Revision 2012.2 Page 12 of 15 10a. Compliance with the State Environmental Policy Act (SEPA). (Check all that apply.) h(�el • For more information about SEPA,go to www.ecy.wa._qov/programs/sea/sepa/e-review.htmi. ® A copy of the SEPA determination or letter of exemption is included with this application. ❑ A SEPA determination is pending with (lead agency). The expected decision date is ❑ I am applying for a Fish Habitat Enhancement Exemption. (Check the box below in 1Ob.) hel ❑ This project is exempt (choose type of exemption below). ❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt? ❑ Other: ❑ SEPA is pre-empted by federal law. 10b. Indicate the permits you are applying for. (Check all that apply.) hel LOCAL GOVERNMENT Local Government Shoreline permits: ❑ Substantial Development ❑ Conditional Use ❑ Variance X Shoreline Exemption Type (explain): Maintenance— Mason County Other City/County permits: ❑ Floodplain Development Permit ❑ Critical Areas Ordinance STATE GOVERNMENT Washington Department of Fish and Wildlife: ® Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption—Attach Exemption Form Effective July 10, 2012, you must submit a check for $150 to Washington Department of Fish and Wildlife, unless your project qualifies for an exemption or alternative payment method below. Do not send cash. Check the appropriate boxes: ❑$150 check enclosed. Check# Attach check made payable to Washington Department of Fish and Wildlife. ❑ My project is exempt from the application fee. (Check appropriate exemption ® HPA processing is conducted by applicant-funded WDFW staff. Agreement#85743 ❑ Mineral prospecting and mining. ❑ Project occurs on farm and agricultural land. (Attach a copy of current land use classification recorded with the county auditor,or other proof of current land use.) ❑ Project is a modification of an existing HPA originally applied for, prior to July 10, 2012. HPA# Washington Department of Natural Resources: ❑ Aquatic Use Authorization Complete JARPA Attachment E and submit a check for$25 payable to the Washington Department of Natural Resources. Do not send cash. JARPA Revision 2012.2 Page 13 of 15 Washington Department of Ecology: ❑ Section 401 Water Quality Certification FEDERAL GOVERNMENT United States Department of the Army permits (U.S. Army Corps of Engineers): ® Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters) United States Coast Guard permits: ❑ Private Aids to Navigation (for non-bridge projects) Part 11—Authorizing Signatures Signatures are required before submitting the JARPA package. The JARPA package includes the JARPA form, project plans, photos, etc. [help] 11 a. Applicant Signature (required) rheipi I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work only after I have received all necessary permits. I hereby authorize the agent named in Part 3 of this application to act on my behalf in matters related to this application. (initial) By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the permitting agencies entering the property where the project is located to inspect the project site or any work related to the project. (initial) 'VIA-HIN 4 To iq 57AT�F �iS J-��Q-�l!� VOW Ll�� Applicant Printed Name Applicant Signature Dat 11 b. Authorized Agent Signature [help] I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work only after all necessary permits have been issued. it j pA + 1 l�� 1 ?Y> v yY,e lam► AuthoFized Agent Printed Name Authorized Agent Signature Date 11 c. Property Owner Signature (if not applicant) hei Not required if project is on existing rights-of-way or easements. I consent to the permitting agencies entering the property where the project is located to inspect the project site or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the landowner. Property Owner Printed Name Property Owner Signature Date 18 U.S.0§1001 provides that:Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly falsifies,conceals,or covers up by any trick, scheme,or device a material fact or makes any false,fictitious, or fraudulent statements or JARPA Revision 2012.2 Page 14 of 15 representations or makes or uses any false writing or document knowing same to contain any false,fictitious,or fraudulent statement or entry, shall be fined not more than$10,000 or imprisoned not more than 5 years or both. If you require this document in another format,contact the Governor's Office for Regulatory Innovation and Assistance(ORIA)at(800) 917-0043. People with hearing loss can call 711 for Washington Relay Service. People with a speech disability can call(877)833-6341. ORIA publication number: ENV-019-09 rev.08/2013 JARPA Revision 2012.2 Page 15 of 15 �4 STATj� .r b 6 r J+ w o State of Washington DEPARTMENT OF FISH AND WILDLIFE Mailing Address: 600 Capitol Way N-Olympia,Washington 98501-1091 -(360)902-2200,TDD(360)902-2207 Main Office location:Natural Resources Building-1111 Washington Street SE-Olympia,WA DETERMINATION OF NONSIGNIFICANCE (DNS) Name of Proposal: DNS 15-014: MCKERNAN HATCHERY CULVERT REMOVAL Description of Proposal: Weaver Creek flows through the WDFW McKernan Hatchery, where it is used near the hatchery entrance as an in-line rearing pond. The rearing pond is 28 to 30 feet wide with a weir at the downstream end and 2 screened culverts at the upstream end that are frequently backwatered. The two damaged 4 foot x 42 foot CMP screened culverts are located within 30 foot wide ponded area. These culverts will be removed and replaced with a 42 foot x 12 foot wide bridge, with a new removable screen system used to contain juvenile fish during rearing. The new screen system includes a poured slab, steel walkway, screen frame, and removable screens. When fish are not being reared,the screens are removable and the rearing pond will become an open 28-30 foot wide channel and fish passable. The bridge is supported by precast spread footings. The existing ecology block walls of the pond will be extended through the footprint of the bridge and used as the bridge abutments. Stream bed material will be placed within Ordinary High Water(OHW) in the new in-stream channel. Prop onent/Applicant: Washington State Department of Fish and Wildlife (WDFW) Contact: Cindy Knudsen 600 Capitol Way North Olympia,WA 98501 (360) 902-8422 Cindy.KnudsenL&dfw.wa.gov Location of Proposal, including street,if any: WDFW McKernan Hatchery, off Hwy 101 northwest of Shelton, Mason County, Washington: Township 21N, Range 4W, Section 16. Lead Agency: Washington Department of Fish and Wildlife(WDFW) WDFW has determined that this proposal will likely not have a significant adverse impact on the environment. Therefore, state law' does not require an environmental impact statement (EIS). WDFW made this determination of nonsignificance(DNS) after we reviewed the environmental checklist and other information on file with us. We issued this DNS according to state rules.2 We will not act on this proposal for 14 days from the date we issued the DNS. Agencies, affected tribes, and members of the public are invited to comment on this proposal or DNS. We must receive your comments within 14 days of the date of this letter. The comment period will end at 5:00 pm on March 18,2015. Method of Comment: The following procedures shall govern the method to comment on agency SEPA proposals. Comments received through these procedures are part of the official SEPA record for this proposal. You can submit your comments any one of the following ways: • Email to SEPAdesk2C&dfw.wa.gov • Online at the WDFW SEPA website comment link at: http://wdfw.wa.gov/licensin,/sepa/ • Fax to (360) 902-2946; • Mail to the address below. Responsible Official: Lisa Wood Position/Title: SEPA/NEPA Coordinator, WDFW Regulatory Services Section Address: 600 Capitol Way North, Olympia,WA 98501-1091 After the comment period closes, applicants may view the updated status of this proposal on the WDFW SEPA website: hqp://wdfw.wa.gov/licensing/sgpa/. Once the status is posted as final, applicants and permittees may take action on the proposal. When a proposal is modified or withdrawn, notice will be given in accordance with state law.' If you have questions about this DNS or the details of the proposal, contact Lisa Wood at the address, e-mail, or fax number above; you can also call her at (360) 902-2260. DATE OF ISSUE: March 4, 2015 SIGNATURE: 64- kffl�_ Footnotes 1. RCW 43.2 1 C.030(2)(c) 2. WAC 197-11-340(2). SEPA Log Number:15-015.dns Environmental Application WDFW McKernan Hatchery Culvert Removal and Bridge Replacement Washington State Fish and Wildlife 600 Capitol Way Olympia,WA. 98501 3/9/2015 RE: WDFW McKernan Hatchery Culvert Removal and Bridge Replacement 411 W. Deyette Road Shelton,WA. 98584 Development Description Identify and describe the proposed project,including the type of materials to be used, construction methods,principle dimensions and other pertinent information. Weaver Creek flows through the McKernan Hatchery where it is used near the hatchery entrance as an in- line rearing pond. The rearing pond is 28 to 30 feet wide with a weir at the downstream end and 2 screened culverts at the upstream end that are frequently backwatered. The two damaged 4 foot x 42 foot CMP screened culverts are located within 30 foot wide ponded area. This project will remove the culverts and replace them with a 42 foot x 12 foot wide bridge with a new removable screen system used to contain juvenile fish during rearing. The new screen system includes a poured slab, steel walkway, screen frame, and removable screens. When fish are not being reared, the screens are removable and the rearing pond will become an open 28-30 foot wide channel and fish passable. The new bridge is supported by precast spread footings. The existing walls of the pond will be extended through the footprint of the bridge and used as the bridge abutments. Stream bed material will be placed within Ordinary High Water(OHW) in the new in-stream channel. The project below OHW will have geotextile, ecology blocks, bridge footings and streambed material. Above Ordinary High Water will have backfill crushed rock material, bridge abutments and the new bridge. The fill will come from a local quarry.Any excavated material will be disposed of at an approved facility out of the flood plain. Supersacks will placed to isolate the construction area, and water will be rerouted. Any water exposed to construction activities will not be allowed to reenter the stream. It will be pumped to an uplands area where siltation will be filtered to prevent turbid water re-entering Weaver Creek. Sediment control measures will include careful dewatering, straw mulch, silt fence, and/or straw wattles. During construction, sediment laden water will be pumped into a settlingpond that is separatedfrom any source of clean water. Upon completion of the project, upstream banks will be planted with willows and a native grass/shrub mix. No clearing of vegetation will be done. The site will be repaved upon completion. Any other areas of disturbed soils will be reseeded. Large rootwad materials will be placed just downstream of the in-line rearing channel to protect the banks of Weaver Creek against erosion and to provide habitat. Disturbed soils will be restored with native grass mix. On both sides of the bridge and underneath the bridge willows and native grasses will be planted. Willow cuttings will be placed underneath the bridge. Environmental Application WDFW McKernan Hatchery Culvert Removal and Bridge Replacement Washington State Fish and Wildlife 600 Capitol Way Olympia,WA.98501 The proposed project will restore fish passage in Weaver Creek when fish are not being reared in the channel. Best Management Practices during construction will protect water quality from turbidity and other pollutants. Construction will be performed during approved work windows, and within permit regulations. All permits will be obtained before construction starts. USE (Identify) current use of property with existing improvements Weaver Creekflows through the McKernan Hatchery where the creek is used near the hatchery entrance as an in- line raring pond. There are two damaged 4 foot x 42 foot CMP screened culverts at one end of the rearing pond. Maintenance repairs are required to continue hatchery operations in this rearing pond. The damaged culverts will be removed and replaced with a 42 foot long x 12 foot wide bridge with a new removable screen system used to contain juvenile fish during rearing. Weaver Creek stream flow under the bridge is expected to match the present ecological functions at project completion. No change in hydrology is expected by the result of this project. When the culverts are removed, there at project completion floodplain flows will return to more natural functions. Reason for requesting Development: A maintenance repair is required at the McKernan Hatchery to remove two CMP eroding damaged culverts at the end of an in-line rearing pond in Weaver Creek. This repair will improve hatchery operations,provide a better fish rearing system, and restore the habitat where the culverts are presently located. Fish passage in Weaver Creek will be restored when fish are not being reared in the channel. At project completion Weaver Creek will have a more natural passage of water during flood conditions that will provide relief to nearby floodplain area. Please refer to enclosed JARPA and project drawing for additional details. SEPA ENVIRONMENTAL CHECKLIST UPDATED 2014 I � Purpose of checklist: Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal are significant. This information is also helpful to determine if available avoidance, minimization or compensatory mitigation measures will address the probable significant impacts or if an environmental impact statement will be prepared to further analyze the proposal. Instructions for applicants: hel This environmental checklist asks you to describe some basic information about your proposal. Please answer each question accurately and carefully, to the best of your knowledge. You may need to consult with an agency specialist or private consultant for some questions. You may use "not applicable" or "does not apply' only when you can explain why it does not apply and not when the answer is unknown. You may also attach or incorporate by reference additional studies reports. Complete and accurate answers to these questions often avoid delays with the SEPA process as well as later in the decision- making process. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Instructions for Lead Agencies: Please adjust the format of this template as needed. Additional information may be necessary to evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse impacts. The checklist is considered the first but not necessarily the only source of information needed to make an adequate threshold determination. Once a threshold determination is made, the lead agency is responsible for the completeness and accuracy of the checklist and other supporting documents. Use of checklist for nonproject proposals: hel For nonproject proposals (such as ordinances, regulations, plans and programs), complete the applicable parts of sections A and B plus the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). Please completely answer all questions that apply and note that the words "project," "applicant," and "property or site" should be read as "proposal," "proponent," and "affected geographic area," respectively.The lead agency may exclude (for non-projects)questions in Part B - Environmental Elements—that do not contribute meaningfully to the analysis of the proposal. A. background ItLel 1. Name of proposed project, if applicable: hel McKernan Hatchery Culvert Removal and Bridge Placement 2. Name of applicant: [hel SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 1 of 15 Washington State Department of Fish and Wildlife 3. Address and phone number of applicant and contact person: h� elpl j Washington State Department of Fish and Wildlife 600 Capitol Way North Olympia, WA. 98501 Cindy Knudsen 360 902 8422 Cindy.knudsen(a))d .wa. ov 4. Date checklist prepared: hf elpl March 3, 2015 5. Agency requesting checklist: hel Washington State Department of Fish and Wildlife 6. Proposed timing or schedule (including phasing, if applicable): hel Summer 2015 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. [hel By removing damaged culverts and replacing them with a bridge, this project provides facility maintenance for continued hatchery operations.At project completion, the repaired Weaver Creek rearing pond will continue to rear juvenile salmon. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. hel A Biological Assessment, wetlands delineation and a no net rise report will be prepared for this site. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. hel None are known. 10. List any government approvals or permits that will be needed for your proposal, if known. hel An Army Corps of Engineers permit, HPA, shoreline exemption, and a buildingpermit will be required. SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 2 of 15 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) hf elpl Weaver Creek flows through the McKernan Hatchery, where it is used near the hatchery entrance as an in-line rearing pond. The rearing pond is 28 to 30 feet wide with a weir at the downstream end and 2 screened culverts at the upstream end that are frequently backwatered. The two damaged 4 foot x 42 foot CMP screened culverts are located within 30 foot wide ponded area. These culverts will be removed and replaced with a 42 foot x 12 foot wide bridge, with a new removable screen system used to contain juvenile fish during rearing. The new screen system includes a poured slab, steel walkway, screen frame, and removable screens. When fish are not being reared, the screens are removable and the rearing pond will become an open 28- 30 foot wide channel and fish passable. The bridge is supported by precast spread footings. The existing ecology block walls of the pond will be extended through the footprint of the bridge and used as the bridge abutments. Stream bed material will be placed within Ordinary High Water(OHW) in the new in-stream channel. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. h From Interstate 5, take exit 104 Right for US-101 North toward Port Angeles/Aberdeen. Keep right to stay on US- 101 N. After 21.3 miles, turn left onto W. Skokomish Valley Road for 1.7 miles, then turn left onto W. Deyette Road. Turn right to stay on W. Deyette Road. The project location is at the western edge of the property. Location: T 21N, R 4W, S 16(47.3072,-123.204). B. ENVIRONMENTAL ELEMENTS JtLeM 1. Earth a. General description of the site hel (circle one): Flat, rolling, hilly, steep slopes, mountainous, other The construction site is generally flat, surrounded by forested areas. b. What is the steepest slope on the site (approximate percent slope)? hf elpl The steepest slope at the site is 2%. c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any agricultural land of long-term commercial significance and whether the proposal results in removing any of these soils. hI e SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 3 of 15 The site contains Dungeness fine sandy loam (Dg), typically found in floodplains. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. hf e None are known. e. Describe the purpose, type, total area, and approximate quantities and total affected area of any filling, excavation, and grading proposed. Indicate source of fill. hel Excavation Materials: Roadway and native materials over Weaver Creek 63 cy(504 sq ft)above OHW Fill Materials: quarry spalls 5 cy (60 sf)above OHW Ecology Blocks Concrete 35 cy (60 sq)ft above OHW Precast Concrete Bridge footings 5 cy(96 sgft) above OHW Backfill crushed rock material gravel bridge approach areas(20 cy)above OHW Streambed mix 10 cy(504 sq ft) below OHW Poured concrete sill for screens 3 cy(180 sq ft) below OHW Large Woody Material 10 cy(200+sq ft)below OHW Square footage amounts are approximate. The project also includes geotextile material lining the stream banks and under quarry spalls.All fill materials will come from a local quarry.Any excavated material will be disposed of at an approved facility out of the flood plain. All fill will be placed from an excavator staged above OHW. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. hel Yes erosion could occur as a result of construction activities. Best Management Practices(BMPs)will be used to prevent erosion. Supersacks will placed to isolate the construction area, and water will be rerouted through a bypass pipe. Any water exposed to construction activities will not be allowed to reenter the stream. Construction water will be pumped to an uplands area where siltation will be filtered to prevent turbid water re-entering Weaver Creek. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? hf elpl The only new impervious area will be the surface area of the new bridge(42 feet by 12 feet wide). h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: fbpjpj Sediment control BMP measures will include careful dewatering, straw mulch, silt fence, and/or straw wattles. During construction, construction process water will be pumped into a settling pond that is separated from any source of clean water. No construction water will enter Weaver Creek. No vegetation clearing will be done, no trees will be removed. Upon completion of the project, all disturbed areas will be planted with a native grass/srub mix. SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 4 of 15 The bridge approach areas will be repaved upon completion.Any other areas of disturbed soils will be reseeded.Large Wood Materials will be placed with an excavator from the bank of Weaver Creek hatchery grounds, no machines will enter the water. i 2. Air a. What types of emissions to the air would result from the proposal during construction., operation, and maintenance when the project is completed? If any, generally describe and give approximate quantities if known. hf e Typical emissions from heavy equipment are expected. The completed project will not have any emissions. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. hf elpl No source of off-site emissions or odor will affect this proposal. c. Proposed measures to reduce or control emissions or other impacts to air, if any: hf elpl No measures are proposed to reduce or control emissions. 3. Water a. Surface Water: h� elPl 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. hf elpl Yes, Weaver Creek is at the project location. Weaver Creek-flows into Puget Sound. Weaver Creek routinely has a water depth of 0,5 to 2.0 feet. Expected velocities are less than ]fps or 2 fps. 2)Will the project require any work over, in, or adjacent to (within 200 feet)the described waters? If yes, please describe and attach available plans. hf elpl The project will require working in, over, and adjacent to Weaver Creek. Water will be temporarily rerouted with a bypass pipe around the work site, and construction will be done in a dry area. Please refer to attached plans. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. hl e Fill will be placed instream before water is returned to Weaver Creek.No dredging will be done. No wetlands or wetland buffers will be disturbed. Streambed mix will be obtained from a local quarry. Fill materials:streambed mix(10 cy), ecology blocks(35 cy),concrete(3 cy) 4)Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. hf elM SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 5 of 15 This project requires water diversion around the project area to remove the two failing culverts. Weaver Creek will be diverted around the construction area, using supersacks and bypass pipes. Expected diversion velocities are less than 1 fps to 2 fps. Water diversion techniques will be approved by the project engineer, and in accordance with the terms and conditions of the HPA and other jequiredpermits. Atproject completion, sandbags used during water diversion will be removed by hand, and then the bypass pipe and silt fence, and fish screen materials Voill be removed. 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. [Le M Yes, the entire project is within the 100 year floodplain. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. hI elpl No waste materials will be discharged into surface water. Best Management Practices will be used to prevent turbid water from reentering Weaver Creek. Refueling of construction equipment will be done away from the construction area where any spilled materials will not enter the creek. b. Ground Water: 1)Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a general description of the well, proposed uses and approximate quantities withdrawn from the well. Will water be discharged to groundwater? Give general description, purpose, and approximate quantities if known. hl e Groundwater will not be withdrawn from a well or from any other source for this project.No water will be discharged to groundwater during construction or from the completed project. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any(for example: Domestic sewage; industrial, containing the following chemicals. . . ; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s)are expected to serve. [hel No waste material will be discharged into the ground from septic tanks or from any other source. c. Water runoff(including stormwater): 1) Describe the source of runoff(including storm water)and method of collection and disposal, if any(include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. hf ejo Stormwater will run off the surface of the new bridge directly into the water of Weaver Creek. 2) Could waste materials enter ground or surface waters? If so, generally describe. hL e No waste material will be discharged into the ground from septic tanks or from any other source. 3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so, describe. SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 6 of 15 Drainage patterns will be affected in the vicinity of the site. Water will flow more naturally in Weaver Creek. Culvert removal will assist in passing high water events and floodplain functions. I d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern impacts, if any: The proposed project will return Weaver Creek to a more natural flow pattern. Culvert removal will assist in passing water during high water events and assist in restoring floodplain functions. 4. Plants h� elpl a. Check the types of vegetation found on the site: hel _xdeciduous tree: alder, maple, aspen, other _x_evergreen tree: fir, cedar, pine, other x shrubs _x_g rass pasture crop or grain Orchards, vineyards or other permanent crops. wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other x other types of vegetation b. What kind and amount of vegetation will be removed or altered? hf e No vegetation will be removed or altered. The project is along Weaver Creek in an area where there are paved areas and grassy banks.Any incidental removal of vegetation will be restored with native grasses, c. List threatened and endangered species known to be on or near the site. hf elpl Within two miles of the site there are some rare plants typically found in low elevation freshwater wetlands or sphagnum bogs. No threatened and endangered species of plants are found at or near the project site. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: h( elpl Disturbed soils will be restored with native grass mix. On both sides of the bridge and underneath the bridge willow cuttings will be placed. e. List all noxious weeds and invasive species known to be on or near the site. No noxious weeds or invasive species of plants are known to be on or near the proposed project site. 5. Animals a. List any birds and other animals which have been observed on or near the site or are known to be on or near the site. Examples include: [hel birds: hawk, heron, eagle, songbirds, other: SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 7 of 15 mammals: deer, bear, elk, beaver, other: fish: bass, salmon, trout, herring, shellfish, other b. List any threatened and endangered species known to be on or near the site. hf elpl Steelhead, Coastal/Puget Sound DPS(Oncorhynchus mykiss) Chinook, Puget Sound ESU(Oncorhynchus tshawytscha) Chum salmon, Hood Canal summer ESU(Oncorhynchus keta) There are listed Marbled Murrelet(Brachyamphus marmoratus)and Northern Spotted Owl(Strix occidentalis caruina), and Critical Habitat for Marbled murrelet, and Northern spotted owl in Mason county. There are no marbled murrelet or Northern spotted owls or anywhere near the project location. c. Is the site part of a migration route? If so, explain. hf elpl Possible migration for Chinook, steelhead, coho, and native cutthroat trout exists at the proposed project location. d. Proposed measures to preserve or enhance wildlife, if any: hf e The proposed project will restore fish passage in Weaver Creek when fish are not being reared in the channel. Best Management Practices during construction will protect water quality from turbidity and other pollutants. Construction will be performed during approved work windows, and within permit regulations. All permits will be obtained before construction starts. e. List any invasive animal species known to be on or near the site. No invasive animal species are known to be on or near the site. 6. Energy and natural resources a. What kinds of energy(electric, natural gas, oil, wood stove, solar)will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. hf e No source of energy will be required. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. h� elPl No. c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: hI gjo No energy conservation features are proposed as apart of this project. 7. Environmental health SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 8 of 15 a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. hf elpl 1) Describe any known or possible contamination at the site from present or past uses. No contamination at the site is iknown. 2) Describe existing hazardous chemicals/conditions that might affect project development and design. This includes underground hazardous liquid and gas transmission pipelines located within the project area and in the vicinity. No existing hazardous chemicals or conditions are known to be at the site that would affect project development. 3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the project's development or construction, or at any time during the operating life of the project. No toxic or hazardous chemicals will be used or produced during the project, or at any time during the operating life of the project. 4) Describe special emergency services that might be required. None. 5) Proposed measures to reduce or control environmental health hazards, if any: Best Management Practices will be used to prevent water or soil contamination from any source of fuel used during construction. A spill kit will be at the construction site if any contaminants are spilled. b. Noise 1)What types of noise exist in the area which may affect your project(for example: traffic, equipment, operation, other)? hI elp] None. 2)What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indi- cate what hours noise would come from the site. JLgjpJ None. 3) Proposed measures to reduce or control noise impacts, if any: hf gm None. 8. Land and shoreline use a. What is the current use of the site and adjacent properties?Will the proposal affect current land uses on nearby or adjacent properties? If so, describe. hf elpl SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 9 of 15 The McKernan Hatchery is at the project location. Nearby properties are rural residential with some agricultural areas. This project will not affect nearby or adjacent properties. b. Has the project site been used as working farmlands or working forest lands? If so,,describe. How much agricultural orl,forest land of long-term commercial significance will be converted to other uses as a result of the proposal, if any? If resource lands have not been designated, how many acres in farmland or forest land tax status will be converted to nonfarm or nonforest use? h No, this site has not been used as a working forest land.No land conversion of any kind will be done. 1)Will the proposal affect or be affected by surrounding working farm or forest land normal business operations, such as oversize equipment access, the application of pesticides, tilling, and harvesting? If so, how: No, this site will not be affected by surrounding working farm areas or forest land business operations, application ofpesticides, tilling or harvesting operations.Access for oversize equipment is not typically used at this hatchery site. c. Describe any structures on the site. [Lpjpj At the proposedproject location, there are several outbuildings, hatchery raceways, staff residences, and rearing ponds. d. Will any structures be demolished? If so, what? tbelpl Culverts will be removed at the project area. e. What is the current zoning classification of the site? h� elpl Rural Commercial 3 (RC3). f. What is the current comprehensive plan designation of the site? hf elpl Conservancy g. If applicable, what is the current shoreline master program designation of the site? hj elp� This project is considered to be an aquaculture development within a 'conservancy'designated shoreline. h. Has any part of the site been classified as a critical area by the city or county? If so, specify. hf glo The project is located within or near a flood zone.A critical areas report, and a no net rise declaration will be provided to Mason County. i. Approximately how many people would reside or work in the completed project? hf elpl SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 10 of 15 Several WDFW staff members will work at the hatchery facility, including the area of the Weaver Creek rearing pond. No WDFW staff will reside at the project(bridge)location. j. Approximately how many people would the completed project displace? [belpJ This project will not displace any persons. k. Proposed measures to avoid or reduce displacement impacts, if any: h( e o No measures are proposed to reduce displacement impacts. L. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: h( eipj m. Proposed measures to ensure the proposal is compatible with nearby agricultural and forest lands of long-term commercial significance, if any: The hatchery has been in operation at this site for several years, and this facility is compatible with surrounding agricultural and forest lands. 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, mid- dle, or low-income housing. hf elpl None. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. hf e c. Proposed measures to reduce or control housing impacts, if any: hel None. 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? hf e The bridge deck will be placed at ground level. The bridge railing is 4 feet high. b. What views in the immediate vicinity would be altered or obstructed? h� elpl None. c. Proposed measures to reduce or control aesthetic impacts, if any: hf elpl None. 11. Light and glare SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 11 of 15 a. What type of light or glare will the proposal produce? What time of day would it mainly occur? h[ elpl None. i b. Could light or glare from the finished project be a safety hazard or interfere with views? hel None. c. What existing off-site sources of light or glare may affect your proposal? Lela] None. d. Proposed measures to reduce or control light and glare impacts, if any: [help] None. 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity?LLP.!PJ There are hiking,fishing, wildlife viewing, and river access areas nearby. b. Would the proposed project displace any existing recreational uses? If so, describe. h[ elM No. c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: hf e None. 13. Historic and cultural preservation a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old listed in or eligible for listing in national, state, or local preservation registers located on or near the site? If so, specifically describe. [hel A review of the database maintained by the Washington State Department of Archaeology and Historic Preservation (DAHP)shows no buildings, structures, or sites recorded in or near the project. b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation? This may include human burials or old cemeteries. Are there any material evidence, artifacts, or areas of cultural importance on or near the site? Please list any professional studies conducted at the site to identify such resources. Lp1 A review of the database maintained by DAHPand available historic maps show no landmarks, features or other evidence of indian or historic use or occupation known at this time.As part of WDFW's planning process a cutlrual review of the project will be completed. The review will include consultation with affected tribes and DAHP. c. Describe the methods used to assess the potential impacts to cultural and historic resources on or near the project site. Examples include consultation with tribes and the department of SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 12 of 15 archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc. h( eM A determination of the probability for the project to impact cultural resources will be based largely upon review and analysis ofpast environmental and cultural contexts and previous cultural resource studies and sites. Research to be conducted for this assessment includes review of environmental and cultural contexts from a variety of sources including the Washington State Department of Archaeology and Historic Preservation (DAHP), Washington Information System for Architectural and Archaeological Records Data (WISAARD), Bureau of Land Management's General Land Office (GLO) Survey Records database, HistoryLink, Historic Map Works, University of Washington's Digital Collection, and Washington State University's Early Washington Maps Collection. As the project requires a federal permit, government to government consultation is the responsibility of the USA CE. d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to resources. Please include plans for the above and any permits that may be required. Cultural review of the project and the results of consultation would inform final project design. In the even that the project encounters archaeological deposits or features, WDFW's Inadvertent Discovery Plan should be enacted. Contractors and WDFW staff will be briefed on the plan prior to project initiation. 14. Transportation a. Identify public streets and highways serving the site or affected geographic area and describe proposed access to the existing street system. Show on site plans, if any. hL elp Highway 101, Skokomish Valley Road Serve this site. Please see project drawings. b. Is the site or affected geographic area currently served by public transit? If so, generally describe. If not, what is the approximate distance to the nearest transit stop? Lhe�l ] The nearest public site is unknown. c. How many additional parking spaces would the completed project or non-project proposal have? How many would the project or proposal eliminate? hL ell ] None. d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle or state transportation facilities, not including driveways? If so, generally describe (indicate whether public or private). hL e�I ] This project will place a bridge will be placed on private property. e. Will the project or proposal use (or occur in the immediate vicinity of)water, rail, or air transportation? If so, generally describe. hL e SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 13 of 15 No, this project is on private property, that utilizes of water rail or air transportation. f. How many vehicular trips per day would be generated by the completed project or proposal? If known,'indicate when peak volumes would occur and what percentage of the volume would be trucks'(such as commercial and nonpassenger vehicles). What data or transportation models were used to make these estimates?[hel No trips will be generated by the completed project. The bridge will be used during typical hatchery operations. g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest products on roads or streets in the area? If so, generally describe. No the bridge is on private state property, only used for typical hatchery operations. h. Proposed measures to reduce or control transportation impacts, if any: hf p None. 15. Public services a. Would the project result in an increased need for public services (for example: fire protection, police protection, public transit, health care, schools, other)? If so, generally describe. hI elpl No. b. Proposed measures to reduce or control direct impacts on public services, if any. hf elpl None. 16. Utilities a. Circle utilities currently available at the site: hel electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other These utilities are available on the hatchery grounds but not at the project location. b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. [hel No utilities are proposed. Typical construction activities will use generators or other sources of available power if utilities are required. C. Signature HELP The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 14 of 15 Signature: Name of signee Position and Agency/Organization Date Submitted: SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 15 of 15 Restoration Programmatic for the State of Washington Specific Project Information Form U.S. Army Corps of Engineers, Seattle District, Regulatory Branch July 29, 2008 version Use this form to notify the U.S. Army Corps of Engineers, Seattle District(Corps) of a proposed restoration project that falls within the range of the nine restoration activities considered by National Marine Fisheries Service (NMFS) and the U.S. Fish and Wildlife Service (USFWS) during its Section 7 of the Endangered Species Act (ESA) consultation(NMFS Reference No. 2008/03598; USFWS Reference No. 13410-2008-F-0209). You may also use this form if your project slightly deviates from the description and scope of the nine project categories addressed in this consultation. However, should the resulting impacts exceed those considered in the NMFS and USFWS Biological Opinion you will need to consult individually(which generally takes longer) and potentially provide additional information. The Corps is responsible, in most cases, for ensuring that a project complies with the requirements of Section 106 of the National Historic Preservation Act. Table of Contents IGENERAL INFORMATION..................................................................................................................................1 II EFFECT DETERMINATIONS FOR FISH SPECIES USFWS&NMFS..........................................................9 III EFFECT DETERMINATIONS FOR LISTED TERRESTRIAL SPECIES.....................................................15 IVSIGNATURE...........................................................................................................................................................20 APPENDIX A:DEWATERING AND FISH CAPTURE PROTOCOL........................................................................22 I GENERAL INFORMATION A. Date: 3/3/2015 Corps reference no.: B. Applicant name (same as in DARPA): Washington State Fish and Wildlife Address Washington State Fish and Wildlife 600 Capitol Way North Olympia, WA 98501 C. Agent Name (same as on JARPA): Cindy Knudsen Address: Washington State Fish and Wildlife 600 Capitol Way North + pia, WA 9R5n1 D. Location(s) of activity: Section: 16 Township: 21 N Range: 4W Latitude (xxx° xx' xx.x"): 470 18 '25.92" (47.3072) Longitude(xxx° xx' xx.x"): -1232 12' 3994" (-123.204) 1 UTM: Waterbody: Weaver Creek County: Mason ESU or IRU: Puget Sound E. Project elements. In the table below, fill in the maximum length of each project element proposed and the number of structures where applicable. This information will be used by the Services for calculating your take exemption: Action Category Project Length and Width Number of where applicable Structures 1. Fish Passage: a. Culvert Replacement and N/A Relocation b. Retrofitting Culverts N/A c. Culvert Removal 48"x 42 feet 2 d. Tidegate Removal N/A e. Removal or Modification of N/A Sediment Bars or Terraces f. Temporary Placement of Erosion prevention materials: Sandbags, Hay Bales and supersack sandbags two bags Ecology Blocks high, single row hay bales will be used as described: page 5 and 6 of project drawings. g. Construction of Structures to N/A Provide Passage over Small Dams 2. Installation of Instream Structures: a. Placement of Woody Debris 10 cy, approx.. (10 feet across) b. Placement of Live Stakes 120 sq yd. Approx. 180 2 foot on center c. Placement of Engineered Log N/A Jams d. Grade Control ELJs N/A e. Trapping Mobile Wood N/A f. Placement of Boulders N/A 2 Action Category Project Length and Width Number of where applicable Structures g. Boulder Weirs and Roughened N/A Channels h. Gravel Placement Associated 20 cy above OHW with Structure Placement 3. Levee Removal and N/A Modification 4. Side Channel/Off Channel (Approximately) 200 s.q. ft., Habitat Restoration and under bridge Reconnection 5. Salmonid Spawning Gravel 10 cy spawning gravel Restoration 6. Forage Fish Spawning Gravel N/A Restoration 7. Hardened Fords and Fencing N/A for Livestock Stream Crossings 8. Irrigation Screen Installation N/A and Replacement 9. Debris and Structure Removal N/A *For all action categories selected at section IE of this SPIF, the project will comply with all elements of the project description and the conservation measures. Exceptions noted below. F. Description of the proposed work: [Describe the work to be accomplished including purpose, number and type of structures to be installed or constructed, construction materials and machinery to be used, and anticipated construction techniques to be employed. You may attach additional pages or, if completing this form by computer, expand the space below to provide this information. Attach maps or drawings to clearly illustrate the location, nature, and extent of the proposed work.] Weaver Creekflows through the McKernan Hatchery, where the creek is used near the hatchery entrance as an in-line rearing pond. The rearing pond is 28 to 30 feet wide with a weir at the downstream end and 2 screened culverts at the upstream end, which are frequently backwatered. The two damaged 4 foot x 42 foot CMP screened culverts are located within 30 foot wide ponded area. These culverts will be removed and replaced with a 42 foot x 12 foot wide bridge, with a new removable screen system used to contain juvenile fish during rearing. 3 The new screen system includes a poured slab,steel walkway, screen frame, and removable screens. When fish are not being reared, the screens are removable and the rearing pond will become an open 28-30 foot wide channel and fish passable. The bridge is supported by precast spread footings. The existing walls of the pond will be extended through the footprint of the bridge and used as the bridge abutments. Stream bed material will be placed within Ordinary High Water(OH99 in the new in-stream channel. The project below OHW will have geotextile, ecology blocks, bridge footings and streambed material.Above Ordinary High Water will have backfill crushed rock material, bridge abutments and the new bridge and a bridge walkway. The fill will come from a local quarry. Any excavated material will be disposed of at an approved facility out of the flood plain. Supersacks, two layers high will be placed to isolate the construction area, and water will be rerouted using bypass pipe. Any water exposed to construction activities will not be allowed to reenter the stream. It will be pumped to an uplands area where siltation will be filtered to prevent turbid water re-entering Weaver Creek. Sediment control measures will include careful dewatering, straw mulch, silt fence, and/or straw wattles. During construction, sediment laden water will be pumped into a settling pond that is separated from any source of clean water. Upon completion of the project, upstream banks will be planted with a native shrub mix.No clearing of vegetation will be done. The site will be repaved upon completion.Any other areas of disturbed soils will be reseeded. Disturbed soils will be restored with native grass mix. On both sides of the bridge and underneath the bridge native plants will be planted. Willow cuttings will be placed underneath the bridge. Please refer to the project drawings for detailed plant placements. The proposed project will restore fish passage in Weaver Creek when fish are not being reared in the channel. Best Management Practices during construction will protect water quality from turbidity and other pollutants. Construction will be performed during approved work windows, and within permit regulations.All permits will be obtained before construction starts. G. Project timing: Start date Jul 11)2015 Start Date In-water Work August 1, 2015 End date September,2015 End Date In-water Work August 15, 2015 H. Anticipated cubic feet per second (CFS) of stream at time of construction: Less than I foot pre second or 2 feet per second is expected. I. How much area do you propose to clear for temporary access? No area will be cleared for temporary access. J. How many trees and what sizes will be felled for temporary access? No trees will be felled for temporary access. 4 K. Will your temporary access traverse across slopes steeper than 30%? No. Temporary access will be through McKernan Hatchery grounds. The slope is less than 3%. L. How many temporary stream crossings do you propose? List all best management practices (BMPs) proposed to avoid and minimize impacts from stream crossings. No streams will be crossed. Access to the construction site will be through the McKernan hatchery grounds on paved areas. Equipment will be staged from above OHW on the banks of Weaver Creek. M. Culvert replacements: 1. Append the applicable "Summary Form for Fish-Passage Design Data"that can be found in the WDFW Culvert Manual ((Bates et al. 2003) Appendix F). See Attached. 2. Append maintenance plan that shows that culvert will be in design condition prior to each fish passage season. Culverts will be removed, but not replaced with additional culverts. A bridge and a walkway will be installed. 3. If your project is in gradients 6— 10 % and abridge is not feasible, use stream simulation option and provide annual monitoring data of substrate, invert elevation, and channel form (elements of roughened channel: boulders, pools, low flow channel) including a picture prior to each migration season. This project will be from 0 -3%grade. Culverts will be removed and abridge and walkway will be installed. No change in grade is expected. 4. If your culvert is longer than 150 feet include tribal comments. If you discussed your design with WDFW, include WDFW comments or a record of your conversation with WDFW. This project will remove two culverts presently on site. The bridge that will be installed is 12 feet wide x 42 feet long. 5. Are you increasing the amount of rip-rap. If so,by how much? No riprap will be used. The project will consist ofplacement of geotextile, ecology blocks, and streambed material below Ordinary High Water. Above Ordinary High Water will be quarry spalls, crushed rock material, bridge abutments, and the new bridge and walkway. 5 6. Describe how proper ecological functions (bedload movement, debris movement, flood flows) in addition to fish passage will be met. The pond is currently backwatered downstream and routinely has a water depth of 0.5 to 2.0 feet and velocities of less than 1 fps to fps. Stream flow under the bridge at project completion is expected to match present ecological functions in Weaver Creek. Floodplain flows will return to more natural functions. 7. If you are increasing the length or width of a road: The roadway over Weaver Creek will not be increased in length or width. A new bridge will replace the current roadway in the same footprint. The width of the pond is approximately 30 feet. The width of the bridge would be a continuation of the pond at 28- 30 feet. a. Quantify the increased impervious surface created as a result of this activity. During excavation and removal of the culverts, earth will be removed, and a bridge placed over Weaver Creek. Less impervious surfaces results with the installation of the bridge. b. List measures that you propose to use to avoid impacts to resources and water quality. The proposed project will restore fish passage in Weaver Creek when fish are not being reared in the channel. No equipment will enter the water. Best Management Practices during construction will prevent water from entering Weaver Creek. Water quality will be protected from turbidity and other pollutants. No waste materials will be discharged into surface water. Construction will be performed during approved work windows, and within permit regulations. Water in Weaver Creek will be temporarily rerouted around the construction area using supersacks and pipes, work will be done in a dry area. Streambed mix will be placed in stream before water is returned to Weaver Creek. No dredging will be done. No wetlands or wetland buffers will be disturbed. Refueling of construction equipment will be done away from the construction area where any spilled materials will not enter the creek. After construction, disturbed soils will be restored with native grass mix. On both sides of the bridge and underneath the bridge, native plants will be planted. Willow cuttings will be planted underneath the bridge. Please refer to the project drawings for plant placements. Measures shall be taken to ensure that no petroleum products, hydraulic fluid,fresh cement, sediments, sediment-laden water, chemicals, or any other toxic or deleterious materials are allowed to enter or leach into waters of the U.S. To the extent feasible, work requiring use of heavy equipment will be completed by working from the top of the bank. If required, stream crossings will be performed at right angle if possible; and. no stream crossings will be performed at spawning sites when spawners are 6 present or eggs or alevins could be in the gravel; and the number of crossings will be minimized. All waste material such as construction debris, silt, excess dirt or overburden resulting from this project will generally be deposited above the limits of floodwater in an upland disposal site. Note: Permanent road improvements that result in increased traffic or development are not permitted under this PBA. This project will not result in increased traffic or development at the McKernan Hatchery. N. Rock grade control structures: How much combined rock is proposed for structures? No rock control grade structures are proposed as a component of this project. O. Removal or modification of sediment bars or terraces: Has there been previous removal of sediment at this location? If yes when and how much? No sediment has been removed at this location previously. P. Side Channel/Off Channel Habitat Creation: 1. Has a reach assessment or analysis been conducted for this project? No. A reach assessment has not been completed for this project. At the downstream end of the project, rootwads will be pressed into place with an excavator staged on the bank of Weaver Creek. 2 How many years will the project take to complete? This project could take from three to six weeks to complete. 3. Demonstrate sufficient hydrology for a self-sustaining channel. Weaver Creek is at the McKernan Hatchery where fish have been raised in this channel for several years. No change in hydrology is expected by the result of this project. Water will have a more natural flow through the creek after completion. Q. Will you be isolating the work area? [Explain how your decision on working in the wet or dry, or partially isolation the area, will minimize impacts to salmonids.] Yes, the construction area will be isolated by diverting the water through pipes and pumping it to an uplands location where it will enter a settling pond and filtered through straw bales and siltation curtains and natural surfaces before water eventually returns to Weaver Creek. Impacts to salmonids will be minimal because best management practices will be used to protect water quality, as described in 7b (above). Work will be done during approved work windows, and within permit regulations. 7 R. Give a maximum estimate for the duration and length of downstream turbidity impacts. The Services will use this estimate for giving you your take exemption. (During construction you will be monitoring downstream sedimentation every 20 min to verify/refine your given estimate.) Expected water velocity is a slow velocity,from I —3 feet per second. Water in the construction area will be pumped uplands and routed around the site. Construction will be done in dry conditions. Clean washed gravel will be used for placement instream under the bridge, sized specifically for fish spawning. Turbidity could enter Weaver Creek when water is reintroduced to the site at job completion, and during supersack placement and removal. These effects are with a limited duration, temporary, and within approved work windows. Effects are not expected to travel more than 300 feet downstream. S. Explain what equipment will generate noise above ambient levels and for what period during the day and for how many days. Noise will be generated during normal work hours from 7 a.m. to 6 p.m. and.from typical construction equipment such as dump trucks, excavator, and track hoe and pickup trucks. Work is expected to take less than three weeks. T. Please attach HPA or explain why you do not need one. The HPA will be obtained before construction work starts. It will be submitted with this application, or as soon as obtained. U. If your project does not meet all of the criteria outlined in the PBA, but is a restoration action of similar scope and impacts, contact the Services with the project's description, conservation measures and reason(s) it may not currently fit under the PBA. Provide below any supporting conversations with NMFS and/or USFWS staff, including a list of the PBA criteria your project won't meet. This is a living document. We are continuously working on refining the proposed/covered actions and conservation measures. This project meets the intent of the Programmatic Biological Assessment of Restoration Actions in Washington State. The project will comply with all general conservation measures of the PBA. The project will comply with all of the conservation measures frequently associated with restoration actions, with the following exceptions: General Conservation measures Section I Pre-Construction/Surveying: (number 5) Page 23 8 • The programmatic requires that no permanent access-ways will be built. This project installs a bridge that will be a permanent access way of a fish rearing area on the grounds of McKernan Hatchery. General Conservation Measures: (Section 1) Page 27 Frequently Associated with some of the Proposed Restoration Actions This project will comply with all of the PBAs conservation measures frequently associated with restoration actions; however, this project does not comply with number 7: Installation of Bank Stabilization Features in all sections (a through g). • This project will use precast concrete ecology blocks under the bridge as a bank stabilization measure commonly required as bridge footings. • After water is diverted away from the construction area, a poured in place cement footing will be placed in Weaver Creek required as a sill for fish screens. The fish screens are amended at the edges with an approved instream gravel mix. This project addresses Weaver Creek habitat degradation caused by instream culvert. Bank stabilization measures to support more natural habitat in Weaver Creek by restoring natural flow patterns. Concrete blocks are not approved as bank stabilization features. This project requires precast concrete blocks underneath the bridge that will be subject to erosion from high water events. Willow cuttings will be planted underneath the bridge, above the bridge foundation to provide habitat during high water events and to prevent erosion. The project will comply with all of the PBA's conservation measures frequently associated with restoration actions, with the only exceptions noted above. Excluded Elements (EAs) This project is not proposing any excluded activities or excluded restoration actions defined as excluded under the PBA. II EFFECT DETERMINATIONS FOR FISH SPECIES USFWS & NMFS Each project should have the appropriate effect determination. The PBA allows for No Effect (NE), Not Likely to Adversely Affect (NLAA), or Likely to Adversely Affect (LAA) determinations for listed species. Each determination must be adequately documented in this form. If you need assistance in determining the appropriate effect determination, consult the Corps, USFWS, and NMFS staff. Check all currently listed evolutionarily significant units (ESUs) or Interim Recovery Units (IRUs) that may occur in the fifth field watershed where the proiect is located. Endangered Upper Columbia River Spring-run Chinook(Oncorhynchus tshawytscha) Snake River Sockeye (Oncorhynchus nerka) Upper Columbia River Steelhead (Oncorhynchus mykiss) 9 Threatened Bull trout, Coastal/Puget Sound IRU (Salvelinus confluentus) Bull trout, Columbia River IRU (Salvelinus confluentus) Coho salmon, Lower Columbia River ESU (O. kisutch) Chinook salmon, Lower Columbia River ESU (Oncorhynchus tshawytscha) x Chinook salmon, Puget Sound ESU (Oncorhynchus tshawytscha) Chinook salmon, Snake River Spring/Summer-run ESU (Oncorhynchus tshawytscha) Chinook salmon, Snake River Fall-run ESU (Oncorhynchus tshawytscha) Chum salmon, Columbia River ESU (Oncorhynchus keta) x Chum salmon, Hood Canal summer ESU (Oncorhynchus keta) Steelhead trout, Lower Columbia River ESU (Oncorhynchus mykiss) Steelhead trout, Middle Columbia River ESU (Oncorhynchus mykiss) x Steelhead trout, Coastal/Puget Sound DPS (Oncorhynchus mykiss) Steelhead trout, Snake River ESU (Oncorhynchus mykiss) Designated Critical habitat for Coastal/Puget Sound bull trout IRU Critical habitat for Columbia River bull trout IRU Critical habitat for Columbia River chum salmon ESU Critical habitat for Hood Canal summer chum salmon ESU Critical habitat for Lower Columbia River Chinook salmon ESU (47.3097,-123.2384)Weaver Creek x Critical habitat for Upper Columbia River Spring-run Chinook salmon ESU Critical habitat for Snake River Spring/Summer-run Chinook salmon ESU Critical habitat for Snake River Fall-run Chinook salmon ESU Critical habitat for Puget Sound Chinook salmon ESU Critical habitat for Lower Columbia River steelhead trout ESU Critical habitat for Upper Columbia River steelhead trout ESU Critical habitat for Middle Columbia River steelhead trout ESU Critical habitat for Snake River steelhead trout ESU Lake Ozette Sockeye salmon are not covered by this programmatic at this time. Directions: Use the Notes section under each question to document your rational and decision making process for presence or absence of the fish, and the effect determination. FILL OUT THIS SECTION FOR EACH INDIVIDUAL ESU THAT OCCURS IN THE FIFTH FIELD WATERSHED Effect Determination by Species: Steelhead, Coastal/Puget Sound DPS (Oncorhynchus mykiss) Chinook, Puget Sound ESU (Oncorhynchus tshawytscha) Chum salmon, Hood Canal summer ESU (Oncorhynchus keta) 10 ESU and critical habitat: Chum salmon, Hood Canal summer ESU (Oncorhynchus keta) - Critical Habitat Critical Habitat for Chum is in Mason County, in the South Fork of the Skokomish River but not at the project location(47.3209,-123.2211) 1) Is the project in a fifth- field watershed that contains or has the potential to contain insert species) Steelhead, Coastal/Puget Sound DPS (Oncorhynchus mykiss) Chinook, Puget Sound ESU (Oncorhynchus tshawytscha) YES If yes, list fifth field watershed, and go to question 2. Fifth-field watershed: NO If no, the project will have "No Effect" on (insert species). Go to question 5. Notes: 2) Do the stream(s) in which impacts may occur contain suitable habitat for Steelhead, Coastal/Puget Sound DPS(Oncorhynchus mykiss) Chinook, Puget Sound ESU(Oncorhynchus tshawytscha)? Yes. For bull trout use Tables 1 &2 of Appendix A and/or the draft recovery plans (available at: http://www.fws.gov/pacific/bulltrout/recovery.html) and a distribution map the USFWS posted at http://www.fws.gov/westwafwo/index.html to determine if your project is within critical habitat for bull trout. For other salmon you may use the NMFS critical habitat web page at http://www.nwr.noaa.gov/Salmon-Habitat/Critical-Habitat/CH-Maps.cftn determine if your project is within critical habitat. YES x If yes, what type of habitat is present? Spawning x Rearing x Migratory Corridor x Not known Go to Question 3. NO If no, the project will have "No Effect" on (insert species). Go to question 5. Notes: The proposed project is in a rural area surrounded by rural residential and agricultural properties. Mason County Skokomish River Compressive Flood Hazard Management (2007)plan states that along much of Weaver Creek and unnamed tributaries in the Valley, the existing riparian zone has been degraded and altered by past pasturing and farming practices. 11 Habitat in the general project location has an 85%overhead cover mixed hardwood and deciduous cover. Weaver Creek has mixed cobble sizes instream, with instream fines present during typical low summer flows. The proposed project will remove two damaged eroding culverts that will restore habitat where the culverts are located. Fish will be able to migrate into a rearing channel within the hatchery without passing through the culverts. Habitat will be restored where the culverts are located with approved instream gravel mix and restorative plantings. Habitat exists at the project location for Chinook and Steelhead for rearing and migration (and possibly infrequent spawning). There is vegetative cover on the banks of Weaver Creek upstream and downstream of the project location including deciduous trees (willow and maple) and herbaceous plants such as willow shrubs grasses, thistle and blackberry. Weaver Creek is characterized by cobble and gravel substrates with moderate depth and flow conditions. Weaver Creek has water input from springs that contribute flow to Weaver Creek near the project location. 3) Approximately how far is the project from the nearest suitable habitat (in river miles, upstream or downstream) for chum salmon, Chinook salmon, Steelhead? Go to question 4. Chum salmon, Hood Canal summer ESU(Oncorhynchus keta), critical habitat is present in the watershed in the lower end of the Skokomish Subbasin and nearest to the proposed project at endpoint (47.3209,-123.2211) approximately one mile NE(overland) in an unnamed stream segment off of the south fork of the Skokomish River. There are possibly (unknown) opportunities for chum to migrate through Weaver Creek, but spawning or rearing opportunities are not believed to be occurring at the project location. Chinook, Puget Sound ESU(Oncorhynchus tshawytscha) - Critical Habitat for Chinook is in Mason County in the South Fork of the Skokomish River, and up to (4 7.309 7,-123.2384) Weaver Creek Bull trout are present in Mason County in the general watershed region (Skokomish River South Fork). Presence of bull trout at the project location is undocumented. The last end point identified for critical habitat for bull trout is north of the project location in the South Fork of the Skokomish River at 47.425,-123.354. Notes: 4) Does the proposed activity have the potential to alter or affect the following indicators: temperature, sediment, chemical contamination/nutrients, physical barriers, substrate embeddedness, large woody debris, pool frequency, pool quality, off-channel habitat, refugia, wetted width/depth ratio, streambank condition, floodplain connectivity, peak/base flows, drainage network, disturbance history, function of riparian reserves, or disturbance regime? 12 YES x If yes,briefly explain which habitat elements will be affected and indicate if the effects will be short term or long-term. For example, many activities will have increased levels of turbidity during project implementation,but are expected to result in long-term improvements to the target indicators Temperature—short term affects may raise temperature slightly during construction activities but there will be long term improvements to habitat at completion of the project. Sediment-short term affects may raise sediment levels slightly that could reach as far as 100-300 feet downstream, but best management practices will be used and there will be long term improvements at completion of the project. Sediment impacts are temporary short lived and construction related. Best management practices will used throughout all project activities. Chemical contamination/nutrients-short term affects may disturb levels of substrate that could affect nutrient levels slightly at the project location, but there will be long term improvements at completion of the project. Best management practices will used throughout all project activities. Physical barriers—This project removes two culverts that are physical barriers to fish passage. Removal of the culverts will be a temporary disturbance to Weaver Creek; however removal of the culverts will provide long term improvements to fish habitat at project completion, because more natural flow and habitat conditions will be restored to Weaver Creek. Best management practices will used throughout all project activities. Substrate embeddedness-Short term effects from this project may increase temporary impacts to substrate embeddedness at the project location, however, substrate will be replaced at the project location that is representative of the typical substrate in the vicinity of the project location. Fine materials(3 inch minus), will be embedded in the restored substrate that will match typical conditions in the stream bed areas at and around the site providing longterm improvements at project completion. Best management practices will used throughout all project activities. Lame woody debris—Habitat throughout the project vicinity has large woody debris throughout the natural course of the stream. This project will not disturb any LWD at or near the project location, although there may be some incidental removal of some shrub material, sticks, or grass during project activities. Best management practices will used throughout all project activities, and the area will be restored by planting native plant materials including some willow and native shrub species.At the downstream end of the project, rootwads will be pressed into place with an excavator staged on the bank of Weaver Creek. Pool frequency-Pool quality- Short term construction activities may affect a pool in the project location (if one exists), however, habitat will be restored at project completion that will complement any existing habitat in the vicinity including restoring the area to match conditions present at the site for pool frequency and pool quality. Removal of the eroding damaged culverts will provide long term improvements at project completion. Best management practices will used throughout all project activities. Off channel habitat- This project is not in a location considered off channel habitat; however, removal of the culverts will have positive effects on all surrounding habitat areas. Natural flow will be established through the area that is expected to have long term improvements at completion of the project.At the downstream end of the project, rootwads will be pressed into place with an excavator staged on the bank of Weaver Creek. 13 Re u is-Short term affects will affect some bank areas of refugia near where the culverts will be removed, however, during the expected work window there will be fewer rearing individuals using refugia in the project location. There are expected to be long term improvements to the general habitat in (he area at the completion of theproject. Best management practices will used throughout allproject activities, including replanting the area after project completion with native plant species.At the downstream end of the project, rootwads will be pressed into place with an excavator staged on the bank of Weaver Creek. Wetted width depth ratio—There will be some short term changes to the wetted habitat area during project activities, due to rechanneling the stream in the area and diverting water in the construction area to an uplands area and reestablishing a new channel area at project completion, When the project is completed there will be overall improvements throughout the course of the stream. This project will return the area to more natural wetted width and depth ratio conditions that will provide overall habitat improvement with more normal floodplain functions. Best management practices will used throughout all project activities. Streambank condition-Short term affects will change the habitat in the immediate project location, by removal of some instream and bank cover, however there are thought to be few individuals present during the approved work window, and restoration plantings will be done with native species that will eventually reestablish stream bank conditions. Long term improvements are expected at project completion. Refer to project drawings for a list of proposed plantings that will eventually restore the area. Floodplain connectivity—This project restores the area by removing the eroding damaged culverts. This will create more natural movement of waters through the stream during flood conditions, and provide relief to the nearby floodplain area. Long term improvements are expected at project completion that will improve floodplain connectivity. Peak-base flows-This project restores the area by removing the eroding damaged culverts to create more natural movement of waters through the stream during flood conditions assisting more natural movement of peak-base flows through the area. Long term improvements are expected at project completion. Drainage network—This project restores the area by removing the eroding damaged culverts to create more natural drainage network of waters through the typical stream flow patterns including flood conditions. This project is expected to provide relief to the nearby floodplain area. Long term improvements are expected at project completion. Disturbance history-Short term affects from water diversion during construction will create short term disturbance history that will affect the micro climates present at the site for native and listed species, however, these communities will reestablish when water is returned to the stream due to restoration activities at the site duringproject completion. There will be long term improvements at completion of the project due to returning the stream to more natural flow patterns. Function of riparian reserves—Restoration plantings in the project area will contribute to the long term improvement of riparian reserves in the area. Function of riparian areas will be maintained at the project completion. Best management practices will used throughout all project activities. Disturbance regime-This project will contribute to the disturbance regime in the area through short term affects due to water diversion, but there will be long term improvements at project completion. Best management practices will used throughout all construction activities. There will be turbidity generated by project activities, however water, (if present) will be diverted through a pipe pumped to an upland location where it will be filtered through hay bales and or straw wattles, and filtered through grassy areas where 14 water will eventually be reintroduced downstream of the construction activities. These Best Management Practices will produce less disturbance from siltation and turbidity to Weaver Creek. NO If no, the project will have "No Effect" on (insertspecies). Go to question 4. Notes: 5) Provide rationale for effect determination Effect Determination: not likely to adversely effect This project diverts Weaver Creek away from its usual course during a time when listed salmonids are not likely to be present. During construction, and the project restores and improves habitat functions provided by the original channel,by restoring fish passage and installing large woody material habitat structures. Listed fish are not expected to be at the project area during approved work windows. Fish removal will be done by moving fish out of the area with nets. This project will be conducted during seasonal low flow conditions. Construction effects will be temporary, of short duration and during approved work windows to avoid impacts to any species that could be present at the site. Restoration activities will remove silted gravel materials along with the culverts, and restore the stream section in this area with approved instream gravel materials. Over time the replanted area will provide cover for migrating and rearing individuals. Steelhead,Coastal/Puget Sound DPS(Oncorhynchus mykiss):not likely to adversely affect NLTAA Chinook,Puget Sound ESU(Oncorhynchus tshawytscha): not likely to adversely affect NLTAA Chum salmon,Hood Canal summer ESU(Oncorhynchus keta):not likely to adversely affect NLTAA Critical Habitat,Chinook,Puget Sound ESU(Oncorhynchus tshawytscha):not likely to adversely affect NLTAA Critical Habitat-Chum salmon,Hood Canal summer ESU(Oncorhynchus keta): not likely to adversely affect NLTAA Note: If you are dewatering an area, electroshocking in an area, or are doing major in-water work where listed salmonids are likely to be present during the work window, you will probably have a LAA effect determination. Note: If you are dewatering an area, electroshocking in an area, or are doing major in-water work where listed salmonids are likely to be present during the work window, you will probably have a LAA effect determination. III EFFECT DETERMINATIONS FOR LISTED TERRESTRIAL SPECIES 1. To determine which listed species may occur in the project area follow the steps below: a. Obtain a county species list from the USFWS web page. http://www.fws.gov/westwafwo/se/SE List/endangered Species asp http://www.fws.gov/eastemwashington/count%pecies%201ists htm b. Site-specific information of listed species occurrences in Washington State may be obtained from the Washington Department of Fish and Wildlife Priority Habitat and Species Program http://www.wdfw.wa.gov/hab/phspage.htm and from the Washington 15 Department of Natural Resources Natural Heritage Program at http://www.dnr.wa.gov/nhp . c. Remove species from the species list when habitat is not available for the species in the project area or"vicinity of activity" (generally 1 mile radius around the project site. The area that may be affected by any project impacts including noise and turbidity.) 2. When filling out the information below consider: Each project should have the appropriate effect determination. The PBA allows for NE or NLTAA determinations for terrestrial species, and NE, NLTAA or LTAA for aquatic species. Each determination must be adequately documented in this form. If you need assistance in determining the appropriate effect determination, request help from a Corps ESA Coordinator or the USFWS. The USFWS contact is Tom McDowell at 360-753-9426. a. For information on species biology, range and critical habitat use the USFWS web site: http://www.fws.gov/westwafwo/index.html b. Conservation Measures are listed in Appendix B c. If you do not implement all conservation measures related to the species present please explain. LISTED TERRESTRIAL SPECIES Please refer to the PBA for actions that may affect these species and conservation measures to protect terrestrial species. For information on the listed terrestrial and aquatic species that occur in Washington, visit the following website: ecos.fws.gov_or contact the following FWS field offices: Western Washington Office in Lacey: (360) 753-6044 John Grettenberger Central Washington Office in Wenatchee: (509) 665-3508 Jessica Gonzales Eastern Washington office in Spokane: (509) 891-6839 Suzanne Audet COASTAL ECOSYSTEMS Listed Species: Brown Pelican (Pelecanus occidentalis), Oregon silverspot butterfly (Speyeria zerene hippolyta), and Snowy Plover (Charadrius alexandrinus nivosus): a) Will the activity occur in Grays Harbor, Wahkiakum, Pacific, Jefferson or Clallam Counties? No Put NE under"Effect Determination" for these three coastal species. Yes If yes go to b) b) Will the activity alter sand islands or coastal dunes and meadows in Grays Harbor or Pacific County? No Yes c) Conservation Measures to be applied: N/A d) Effect Determination for coastal species and rationale: 16 No Effect(NE)for Brown Pelican (Pelecanus occidentalis), Oregon silverspot butterfly (Speyeria zerene hippolyta), and Snowy Plover (Charadrius alexandrinus nivosus. This project is in Mason County. Habitat for these species does not occur at the project location. CARNIVORES and CARIBOU 1. Gray Wolf(Canis lupus)—The range of the grey wolf includes the Blue Mountains, northeast Washington (Rocky Mountains) and the Cascade Mountains. There are no confirmed records of wolves west of the Cascade Crest and no documented den sites in the state. 2. Grizzly Bear (Ursus arctus horribillis)—The grizzly bear recovery plan identifies high alpine areas in the North Cascades (north of Interstate 90 to the Canadian border) as important for recovery of this species in Washington. 3. Canada lynx (Lynx Canadensis) -This species occurs in high elevation forests (generally above 4,000 feet) in the North Cascades and northeast Washington. 4. The woodland caribou (Rangifer tarandus caribou) occurs in high elevation forests (generally above 4,000 feet) in northeast Washington (Pend Oreille County). a) Will the activity be conducted in or near mountain meadows or forest openings, high elevation forests, or ungulate wintering or calving sites in the geographic areas where these listed species may occur? No Yes If yes, apply the appropriate seasonal restrictions identified in the PBA to minimize disturbance If you do not know whether your project will affect suitable habitat or feeding areas for these species, please contact the USFWS office in Spokane. a) Effect Determination for these species and rationale. Document any supporting conversations with USFWS staff: Habitat for the Gray Wolf(Canis lupus), Grizzly Bear(Ursus arctus horribillis), Canada lynx (Lynx Canadensis), and woodland caribou (Rangifer tarandus caribou)is not at the project area. Grey Wolf is found primarily west of the cascade crest, however, there are no documented den sites in Mason County. Habitat is found for the grizzly bear in the North Cascades and northeast Washington; however there are no documented grizzly bear(s) in Mason County. Habitat for Canada lynx and woodland caribou occurs in high elevation forests. There are no high elevation forests at the project location. Determination for the above species: No Effect(NE) Pygmy rabbit(Brachylagus idahoensis) 1. The pygmy rabbit historically was found in dense, tall sagebrush areas east of the Columbia River (Douglas, Adams, Lincoln, Grant and Benton Counties). a) Will the activity occur in native sagebrush areas of the central Columbia Plateau? No Put NE under"Effect Determination" and proceed to next species. 17 Yes If yes, contact the USFWS. d) Effect Determination and rationale: No Effect(NE)- Habitat not at project location for pygmy rabbit MATURE FORESTS in the CASCADE and OLYMPIC MOUNTAINS: Marbled Murrelet(Brachyramphus marmoratus) For information on the marbled murrelet, see http://www.fws.gov/pacific/marbledmurrelet/index.html a) Are you within 50 miles of marine water? No Put NE under"Effect Determination" and proceed to next species Yes b) Is there suitable habitat(mature conifer-dominated forests over 80 years old) within 200 feet of the project vicinity? No Yes Not known c) Will the activity generate noise above ambient levels within 200 feet (1.0 mile if blasting, low- elevation aircraft operations, or pile driving) of potential suitable nesting habitat? No Yes If yes, apply conservation measures to minimize disturbance. d) Does the activity include low elevation operation of aircraft, pile driving, or blasting within 1 mile of suitable or occupied nesting or foraging habitat? No Yes If yes, apply seasonal restrictions to minimize disturbance. Activities in the marine environment that include pile driving or blasting may need to go through individual consultation. Contact the USFWS office in Lacey for specific restrictions related to underwater sound in marine areas. e) Will the project affect suitable nesting habitat or designated critical for marbled murrelets? Activities that remove or kill trees with suitable platforms, remove suitable platforms, or reduce the suitability of the stand as nesting habitat are not covered under this PBA. No. f) Notes: g) Conservation Measures to be applied: N/A h) Effect Determination and rationale: N/A. This activity is not in Marbled murrelet sections, or near adjacent sections that will disturb nesting areas, or foraging sites for the Marbled Murrelet. 18 Northern spotted owl (Strix occidentalis caurina) For information, including critical habitat designation see http://ecos.fws.gov/speciesProfile/SpeciesReport.do?sl2code=B08B This species is undergoing review for habitat. The latest FR publication is 07 012011. 071011201176 FR 38575 38576 The web linkprovides information that indicates that habitatfor the Northern spotted owl exists in the Olympic Mountain region, however this project is not believed to be within critical habitat for the northern spotted owl or in any areas where construction activities could disturb this species. a) Is there suitable habitat (mature conifer forests over 80 years old) within 200 feet of the project vicinity? No Put NE under"Effect Determination" and proceed to next species Yes Not known This project area is within areas where there have been primarily second growth conifer forests. No suitable habitat is expected to be within the project area. NE b) What type of forest habitat is present in the vicinity of the activity? nesting or foraging habitat dispersal habitat designated critical habitat none d) Will the activity occur in nesting or foraging habitat? No Yes If yes, apply seasonal operating restrictions to minimize disturbance. e) Will the activity generate above ambient noise within 200 feet(1.0 mile if blasting, pile driving or aircraft operations) of suitable nesting habitat? No Yes If yes, apply seasonal restrictions. f) Will the activity occur in or remove trees from spotted owl designated critical habitat? No Yes If yes, explain how/if this will affect the function of the stand. g) Notes: h) Conservation Measures to be applied: N/A i) Effect Determination for northern spotted owls: Effect Determination for designated critical habitat for the northern spotted owl: NE—no spotted owls are within the proposed project location. NE—no effect is expected for critical habitat for the northern spotted owl. Listed Plants: No herbicide use, mechanical vegetation management, or construction activities are permitted in areas that could support listed plants under this programmatic. 19 Information on these species can be found at: ham://ecos.fws.gov, the Washington Department of Fish and Wildlife Priority Habitat and Species Program at(360)-902-2543 or their website at www.wdfw.wa.gov/hab/phspage.hti-n, or the Washington Department of Natural Resources Natural Heritage Program at (360) 902-1667 or their website at www.dnr.wa.gov/nhp/. 1. Hackelia venusta (showy stickseed)this species occurs in Chelan County, between 984 and 1,600 feet in elevation, in the Ponderosa Pine zone 2.Lomatium bradshawii(Bradshaw's desert-parsley)—this species occurs in wetlands, prairies and grasslands in Clark County 3. Sidalcea oregana var. calva (Wenatchee Mountains checker-mallow) - this species is found in the Peshastin Creek watersheds in Chelan County. Information on critical habitat for this species can be found at: http://ecos.fws.gov/docs/federal_register/fr3793.pdf 4. Castilleja levisecta (golden paintbrush) -this plant occurs in Island, San Juan, and Thurston Counties and is found in open grasslands, prairies, and grass dominated coastal bluffs. 5. Howellia aquatilis (water howellia)—this aquatic plant is found in and around seasonal wetlands in Mason, Pierce, Thurston, Clark, and Spokane Counties. 6.Lupinus sulphureus ssp. kincaidii (Kineaids lupine) -this plant occurs near Boistfort, Lewis County in native upland prairie habitat. 7. Sidalcea nelsoniana (Nelson's checkermallow)- this plant is found in wetlands, stream corridors, or wet prairies in Lewis or Cowlitz Counties. 8. Silene spaldingh (Spalding's silene/catchfly)—this plant is also associated with native prairies and occurs in Asotin, Lincoln, Spokane, and Whitman Counties. 9. Spiranthes diluvialis (Ute ladies'-tresses)—this plant grows on the margins of springs, wet meadows, floodplains, and riparian areas in Okanagon and Grant County Please document conversations with USFWS staff and provide adequate information on botanical surveys and/or habitat analysis to support your effect determination. Effect determination for listed plants: NE. There are no Howellia aquatilis locations near the project area in Mason County. The other plants are not anywhere near Mason County. IV SIGNATURE 20 I hereby verify that this work will comply with all applicable requirements of the above- referenced Biological Opinion should a Department of the Army authorization be issued for this work. Certain categories of activities require the permittee to submit-post construction reports to the Corps and/or the Services. These reports are identified in the PBA. For projects deviating from PBA criteria, the Services may require additional post-construction reporting. These additional reports will be clearly identified and agreed upon by the Services and applicant during the coordination process. By signing this form, the applicant agrees to submit within the required time frame all applicable post-construction reports. Signature of Applicant: 0 ate: Signature of Agent: Cq Date: 21 APPENDIX A: DEWATERING AND FISH CAPTURE PROTOCOL Work to facilitate habitat restoration may occur in isolation from flowing waters or in flowing water depending on site conditions to minimize impacts to salmonids. If bull trout or other listed salmonids could be present in the vicinity of the project use the following dichotomous key to determine which dewatering protocol and timing window you need to implement for your project. This key references information within the Draft Recovery Plan for the Coastal- Puget Sound Distinct Population Segment of Bull Trout Volumes I and II(USFWS 2004a; USFWS 2004b), and the Draft Recovery Plan for the Columbia River Distinct Population Segment of Bull Trout(USFWS 2002). http://www.fws.gov/pacific/bulltrout/recovery.html. If you have questions, contact the USFWS. 1. Is the project located within a documented or potential bull trout Local Population Area that is excluded from coverage under this programmatic consultation(see Table 1)? a. Yes—Dewatering in a documented or potential bull trout Local Population Area in eastern Washington is not covered under this programmatic consultation. Complete an individual section 7 consultation for the project. Please contact the USFWS office in Spokane or Wenatchee for assistance. b. No—go to 2 2. Is the project located within a water body where any listed salmonids are likely to be present? For specific bull trout areas where projects are permitted see Table 2. a. Yes—go to 3 b. No - use "Protocol for Dewatering Outside High Likelihood Listed Fish Areas 3. Is the stream flow at the time of project construction anticipated to be greater than or equal to 5 cubic feet per second and is the dewatered stream length (not including the culvert and plunge pool length, if present) greater than or equal to 33 ft? a. No -use "Protocol for Dewatering Outside High Likelihood Listed Fish Areas"; b. Yes - use "Protocol I Dewatering Within High Likelihood Listed Fish Areas"; and consult with a USFWS bull trout biologist staff on appropriate timing window. 22 Table 1: Bull Trout Spawning and Rearing Areas that are Excluded from the Programmatic (Listed in order of WRIA number) Management or Core Area Spawning and Rearing Areas Excluded Recover Unit (no in-water work is permitted in these areas) Umatilla-Walla Walla Walla Core Mill Creek and tributaries Walla River Basin Area Wolf Fork above Coates Creek WRIA 32 N Fk Touchet and tributaries upstream of Wolf Fk confluence S Fk Touchet River and tributaries above Griffin Creek Snake River Basin Asotin Creek N Fk Asotin Creek including Charley and Cougar Creeks—above confluence with Charley Cr Tucannon River Tucannon River from confluence with Little Tucannon Upper Tucannon River and tributaries above confluence with WRIA 35 Hixon Creek Cummings Creek Middle Columbia Yakima River Core WRIA 37 River Basin Area N and MFk Ahtanum Creek-above the confluence of S Fk S Fk Ahtanum Creek—above confluence with N Fk Ahtanum WRIA 38 Rattlesnake Creek—upstream of confluence with Naches River WRIA 39 Taneum Creek—upstream of Taneum Campground Upper Yakima—upstream of Lake Easton Dam Cle Elum River—upstream of confluence with Yakima River N Fk Teanaway—upstream of confluence with Yakima River Upper Columbia Wenatchee River Core Upper Wenatchee and tributaries above confluence with the River Basin Area Chiwawa,including Nason Cr,Little Wenatchee,White and the WRIA 45 Chiwawa Rivers Chiwaukum Creek and Icicle Creek—upstream from confluence with the Wenatchee River Ingalls Creek-upstream of confluence with Peshastin Creek Entiat River Core Entiat River—above confluence with the Mad River Area Mad River—above confluence with Entiat River WRIA 46 Methow River Core Upper Methow tributaries-Lost River,Early Winters Cr,W Fk Area Methow,Goat Cr,and Wolf Cr WRIA 48 Chewack River—upstream of Twentymile Cr Twisp River and tributaries above confluence of,and including, Little Bridge Creek Gold Cr—upstream of confluence with Methow River Northeast Pend Oreille River Le Clerc Creek—upstream of mouth Washington WRIA 62 1 Spawning and rearing areas on lands administered by the U.S.Forest Service or Bureau of Land Management are not listed because these lands are not included in this Programmatic 23 Table 2 List of streams and marine areas that important for bull trout recovery where in-water work is permitted Management Unit Bull Trout Areas Olympic Peninsula- Hood Canal and independent tributaries Marine Strait of Juan de Fuca and independent tributaries(includes Bell,Morse,Ennis, Siebert Creeks) Pacific Ocean and independent coastal tributaries(includes Goodman, Mosquito,Cedar,Steamboat,Kalaloch and Joe Creeks,Raft,Moclips and Copalis Rivers) Lower Chehalis River/Grays Harbor and independent Tributaries(includes Humptulips,Wishkah,Wynoochee and Satsop Rivers) Olympic Peninsula Dungeness River—mouth to RM 10 Freshwater Skokomish River—mouth to head of Cushman Reservoir Hoh River—mouth to headwaters Queets River—mouth to headwaters Quinault River- mouth to headwaters Puget Sound-Marine All marine shorelines including North Puget Sound,Main Basin,Whidbey Basin,and South Puget Sound Puget Sound- Samish River,Whatcom Creek,Squalicum Creek,Duwamish and lower Green Freshwater River,and Lower Nisqually River including the Nisqually River estuary and McAllister Creek(FMO areas outside of core areas) Lake Washington including the following: lower Cedar River;Sammamish River;Lakes Washington,Sammamish,and Union;and Ship Canal Nooksack River—mouth to National Forest boundary(North and South Forks) Skagit River—mouth to National Forest boundary Stillaguamish River—mouth to headwaters of N Fork;Deer Creek—mouth to National Forest boundary; S Fork and Canyon Cr—mouth to National Forest boundary Snohomish/Skykomish—mouth to confluence of Skykomish and Snoqualmie Rivers;Pilchuck River; Snoqualmie River to falls;Tolt River;Skykomish River —mouth to National Forest boundary,including Sultan River,Woods Creek and Wallace River;S Fk Skykomish to National Forest boundary Puyallup River—mouth,including Mowich River,to National Park boundary; Carbon River—mouth to National Forest boundary; White River—mouth to National Forest boundary 24 Management Unit Bull Trout Areas Lower Columbia Lewis River—mouth to RM 75(Upper Falls),inclµding Swift,Yale,and Mervin Reservoirs Klickitat River—mouth to confluence of W FK Klickitat Mainstems of the Columbia,Snake,Walla Walla,Pend Oreille,and Grande Ronde Rivers Middle Columbia River Ahtanum Creek—mouth to confluence of N and S Forks Basin Naches River—mouth to confluence of Little Naches and Bumping River Tieton River—mouth to Rimrock Lake Yakima River—mouth to Easton(RM 203)and Teanaway River Upper Columbia River Wenatchee River—mouth to confluence of the Chiwawa;Peshastin Cr— Basin mouth to confluence of Ingalls Cr;Chewack River—confluence with Wenatchee to RM 20;Beaver Cr—mouth to Blue Buck Cr Entiat River—mouth to confluence with Mad River Methow River—mouth to confluence of Lost River Northeast Washington Pend Oreille River;Tacoma Cr- mouth to Little Tacoma; Small Creek— Pend Oreille River mouth to forks;Sullivan Creek to and including Sullivan Lake Walla Walla River Touchet River—mouth to forks; Basin S Fk Touchet River—to confluence of Griffin Cr N Fk Touchet to Wolf Fork;Wolf Fork to confluence of Coates Cr Mill Creek and tributaries Snake River Basin Mainstem Snake and Grande Ronde Rivers; Asotin Creek—mouth to confluence of N Fk Asotin and Charley Cr; Tucannon River—mouth to confluence of Hixon Cr 25 Protocol I Dewatering Within High Likelihood Listed Fish Areas A. Fish Capture—General Guidelines 1. Fish Capture Methods a. Minnow traps. Optional. Traps may be left in place prior to dewatering and may be used in conjunction with seining. Once dewatering starts, minnow traps should only be used if there is someone present to check the traps every few hours, and remove the traps once the water level becomes too low. b. Seining. Required. Use seine with mesh of a size to ensure entrapment of the residing ESA-listed fish and age classes. c. Sanctuary dip nets. Required. Use in conjunction with other methods as area is dewatered. d. Electrofishing. Optional. Use electrofishing only after other means of fish capture have been exhausted or where other means of fish capture are not be feasible. Applicants shall adhere to NMFS Backpack Electrofishing Guidelines (NMFS 2000). 2. Fish capture operations will be conducted by or under the supervision of a fishery biologist experienced in such efforts and all staff working with the capture operation must have the necessary knowledge, skills, and abilities to ensure the safe handling of all ESA-listed fish. 3. The applicant must obtain any other Federal, State and local permits and authorizations necessary for the conduct of fish capture activities. 4. A description of any capture and release effort will be included in a post-project report, including the name and address of the supervisory fish biologist, methods used to isolate the work area and minimize disturbances to ESA-listed species, stream conditions before and following placement and removal of barriers; the means of fish removal; the number and size of fish removed by species and age class; condition upon release of all fish handled; and any incidence of observed injury or mortality. 5. Storage and Release. ESA-listed fish must be handled with extreme care and kept in water at all times during transfer procedures. The transfer of ESA-listed fish must be conducted using a sanctuary net that holds water during transfer, whenever necessary to prevent the added stress of an out-of-water transfer. A healthy environment for non-ESA listed fish shall be provided by large buckets (five gallon minimum to prevent overcrowding) and minimal handling of fish. The water temperature in the transfer buckets shall not exceed the temperature of cold pool water in the subject stream. Retain fish the minimum time possible to ensure that stress is minimized, temperatures do not rise, and dissolved oxygen remains suitable. Release fish as near as possible to the isolated reach in a pool or area that provides cover and flow refuge. 26 B. Dewater Instream Work Area and Fish Capture Fish screen. Except for gravity diversions that have gradual and small outfall drops directly into water, all water intake structures must have a fish screen installed, operated, and maintained in accordance with NMFS Guidelines (NMFS 1997; Chapter 11 in NMFS 2008). The sequence for stream flow diversion will be: Note: this sequence will take one 24-hour period prior to construction to complete(of which 12 hours are for staged dewatering with 6 hours overnight). We suggest you start in the morning the day before project construction is scheduled and leave the reach dewatered overnight according to instruction below. 1. Install flow conveyance devices (pumps, discharge lines, gravity drain lines, conduits, and channels),but do not divert flow. 2. Install upstream barrier. Allow water to flow over upstream barrier. 3. Install block net at upstream end of work area. Block nets will be checked every 4 hours, 24 hours a day. If any fish are impinged or killed on the nets they will be checked hourly. 4. Reduce flow over upstream barrier by one-third for a minimum of 6 hours. 5. Inspect as discharge is diminishing and in dewatered areas for stranded and trapped fish and remove them with sanctuary dip nets. 6. Reduce flow over upstream barrier by an additional one-third for a minimum of 6 hours. 7. Again, inspect dewatered areas for stranded and trapped fish and remove them with sanctuary dip nets. 8. Leave the project area in a stable, low flow(one third of flow) condition, overnight, allowing fish to leave the area volitionally. 9. In the morning, remove any remaining fish from the area to be dewatered using seines and/or hand held sanctuary dip-nets. 10. Divert upstream flow completely. 11. Install downstream barrier if necessary(only in low gradient, backwatered reaches). 12. If water remains within the work area; seine, dip net, and lastly electrofish (if using this technique), the project area until catch rates have reached no fish for 3 consecutive passes. Move rocks as needed to flush fish and effectively electrofish the work area. 13. If needed, pump water out of isolated pools within the project area to a temporary storage and treatment site or into upland areas and filter through vegetation prior to reentering the stream channel. Continue to seine, dip net and electrofish while pumping. 14. If fish continue to be captured, shut pump off before average water depths reach one foot. Continue to seine, dip net and electrofish until no fish are caught for 3 consecutive passes. 15. Pump dry and check substrate for remaining fish. 16. Continue to pump water from the project area as needed for the duration of the project. The diversion structure is typically a temporary dam built just upstream of the project site with sand bags that are filled with clean gravel or stream/floodplain rock and covered with plastic sheeting. A portable bladder dam or other non-erosive diversion technologies may be used to contain stream flow. Mining of stream or floodplain rock can be used for diversion dam construction if it does not result in significant additional floodplain or stream disturbance. Often gravel has to be moved to key in logs in which case it makes sense to use this gravel for the diversion structure. 27 The temporary bypass system must consist of non-erosive techniques, such as a pipe or a plastic-lined channel, both of which must be sized large enough to accommodate the predicted peak flow rate during construction. In cases of channel rerouting, water can be diverted to one side of the existing channel. Dissipate flow at the outfall of the bypass system to diffuse erosive energy of the flow. Place the outflow in an area that minimizes or prevents damage to riparian vegetation. If the diversion inlet is a gravity diversion and is not screened to allow for downstream passage of fish,place diversion outlet in a location that facilitates gradual and safe reentry of fish into the stream channel. C. Rewater Instream Work Area Remove stream diversion and restore stream flow. Heavy machinery operating from the bank may be used to aid in removal of diversion structures. Slowly re-water the construction site to prevent loss of surface water downstream as the construction site streambed absorbs water and to prevent a sudden increase in stream turbidity. Look downstream during re-watering to prevent stranding of aquatic organisms below the construction site. All stream diversion devices, equipment, pipe, and conduits will be removed and disturbed soil and vegetation will be restored after the diversion is no longer needed. 28 Protocol II Dewatering Outside High Likelihood Listed Fish Areas If bull trout or other listed salmonids are captured at any time during the dewatering process, immediately notify a USFWS bull trout biologist or NMFS biologist and obtain guidance to either continue to dewater and remove fish or stop activities and re-water the project site. Normal guidance: 1. If you encounter listed fish at or prior to step 3 switch to Protocol I 2. If you encounter listed fish after step 3, continue to dewater and remove fish, paying close attention to presence of additional listed salmonids. A. Fish Capture—General Guidelines 1. Fish Capture Methods a. Minnow traps. Optional. Traps may be left in place prior to dewatering and may be used in conjunction with seining. Once dewatering starts, minnow traps should only be used if there is someone present to check the traps every few hours, and remove the traps once the water level becomes too low. b. Seining. Required. Use seine with mesh of such a size to ensure entrapment of the residing ESA-listed fish and age classes. c. Sanctuary dip nets. Required. Use in conjunction with other methods as area is dewatered. d. Electrofishing. Optional. Use electrofishing only after other means of fish capture have been exhausted or where other means of fish capture are not be feasible. Applicants shall adhere to NMFS Backpack Electrofishing Guidelines. 2. Fish capture operations will be conducted by or under the supervision of a fishery biologist experienced in such efforts and all staff working with the seining operation must have the necessary knowledge, skills, and abilities to ensure the safe handling of all ESA-listed fish. 3. The applicant must obtain any other Federal, State and local permits and authorizations necessary for the conduct of fish capture activities. 4. A description of any seine and release effort will be included in a post-project report, including the name and address of the supervisory fish biologist, methods used to isolate the work area and minimize disturbances to ESA-listed species, stream conditions before and following placement and removal of barriers; the means of fish removal; the number and size of fish removed by species; conditions upon release of all fish handled; and any incidence of observed injury or mortality. 5. Storage and Release. Fish must be handled with extreme care and kept in water to the maximum extent possible during transfer procedures. A healthy environment for the stressed fish shall be provided by large buckets (five gallon minimum to prevent overcrowding) and minimal handling of fish. The temperature of the water shall not exceed the temperature in large deep holding pools of the subject system. The transfer of any ESA-listed fish must'be conducted using a sanctuary net that holds water during transfer, to prevent the added stress of 29 an out-of-water transfer. Retain fish the minimum time possible to ensure that stress is minimized, temperatures do not rise, and dissolved oxygen remains suitable. Release fish as near as possible to the isolated reach in a pool or area that provides cover and flow refuge. B. Dewater Instream Work Area and Fish Capture Fish screen. Except for gravity diversions that have gradual and small outfall drops directly into water, all water intake structures must have a fish screen installed, operated, and maintained in accordance with the NMFS Guidelines (NMFS 1997; Chapter 11 in NMFS 2008). The sequence for stream flow diversion would be as follows: 1. Install flow conveyance devices (pumps, discharge lines, gravity drain lines, conduits, and channels), but do not divert flow. 2. Install block net at upstream end or work area. 3. Seine and dip net through the entire project area in a downstream direction, starting at the upstream end; thereby moving fish out of the project area. Then, if necessary electrofish. 4. Install upstream barrier and divert upstream flow completely. 5. Capture any remaining fish using hand held dip-nets. 6. Install downstream barrier if necessary(only in low gradient backwatered reaches). 7. If water remains within the work area; seine and dip net, if necessary electrofish the project area until catch rates have reached no fish for 3 consecutive passes. 8. Pump water out of isolated pools within the project area to a temporary storage and treatment site or into upland areas and filter through vegetation prior to re-entering the stream channel. Continue to seine, dip net, or electrofish while pumping. 9. If fish continue to be captured, shut pump off before average water depths reach one foot. Continue to seine, dip net, or electrofish until no fish are caught for 3 consecutive passes. 10. Pump dry and check substrate for remaining fish and remove them. 11. Continue to pump water from the project area as needed for the duration of the project. The diversion structure is typically a temporary dam built just upstream of the project site with sand bags that are filled with clean gravel or stream/floodplain rock and covered with plastic sheeting. A portable bladder dam or other non-erosive diversion technologies may be used to contain stream flow. Mining of stream or floodplain rock can be used for diversion dam construction if it does not result in significant additional floodplain or stream disturbance. Often gravel has to be moved to key in logs in which case it makes sense to use this gravel for the diversion structure. The temporary bypass system must consist of non-erosive techniques, such as a pipe or a plastic-lined channel,both of which must be sized large enough to accommodate the predicted peak flow rate during construction. In cases of channel rerouting, water can be diverted to one side of the existing channel. Dissipate flow at the outfall of the bypass system to diffuse erosive energy of the flow. Place the outflow in an area that minimizes or prevents damage to riparian vegetation. If the diversion inlet is a gravity diversion and is not screened to allow for downstream passage of fish, place diversion outlet in a location that facilitates gradual and safe reentry of fish into the stream channel. 30 C. Rewater Instream Work Area Remove stream diversion and restore stream flow. Heavy machinery operating from the bank may be used to aid in removal of diversion structures. Slowly re-water the construction site to prevent loss of surface water downstream as the construction site streambed absorbs water and to prevent a sudden increase in stream turbidity. Look downstream during re-watering to prevent stranding of aquatic organisms below the construction site. All stream diversion devices, equipment, pipe, and conduits will be removed and disturbed soil and vegetation will be restored after the diversion is no longer needed. Literature Cited NMFS (National Marine Fisheries Service). 1997. Fish Screening Criteria for Anadromous Salmonids. NMFS Southwest Region, (January 1997). 12 p. http:Hswr.mufs.noaa.gov/hcd/fishscm.pdf NMFS (National Marine Fisheries Service). 2000. Guidelines for Electrofishing Waters Containing Salmonids Listed Under the ESA. http://www.nwr.noaa.gov/ESA-Salmon-Regulations- Permits/4d-Rules/upload/electro2000.pdf NMFS (National Marine Fisheries Service). February 2008. ANADROMOUS SALMONID PASSAGE FACILITY DESIGN. http://www.nwr.noaa.gov/Salmon- Hydropower/FERC/upload/Fish Passage_Design.pdf USFWS (USFWS). 2002. Bull trout (Salvelinus confluentus) draft recovery plan. Chapter One. Fish and Wildlife Service, Portland, Oregon. 137 pp. USFWS (USFWS). 2004a. Draft Recovery Plan for the Coastal-Puget Sound Distinct Population Segment of Bull Trout (Salvelinus confluentus). Volume I (of 11): Puget Sound Management Unit. Portland, Oregon. 389 + xvii pp. USFWS (USFWS). 2004b. Draft Recovery Plan for the Coastal-Puget Sound Distinct Population Segment of Bull Trout(Salvelinus confluentus). Volume II(of II): Olympic Peninsula Management Unit. Portland, Oregon. 277 +xvi pp. 31 LITERATURE CITED Bates,K.,B.Bernard,B.Heiner,J.P.Klavas,and P.D.Powers. 2003. Design of Road Culverts for Fish Passage. Washington Department of Fish and Wildlife,Olympia,WA. http://wdfw.wa.gov/hab/engineer/cm/culvert manual final.pdf NMFS(National Marine Fisheries Service). 2000. Guidelines for Electrofishing Waters Containing Salmonids Listed Under the Endangered Species Act. 32