Loading...
HomeMy WebLinkAboutBLD2023-00967 Heatpump - BLD Inspections - 10/4/2023 INSPECTION CARD Mason County 615 W. Alder St. Building 8, Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov PERMIT# BLD2023-00967 PROJECT ADDRESS 61 N Gull PI Hoodsport, WA 98548 PARCEL# 422055200051 PROJECT DESCRIPTION Turnkey installation of ductless heat pump system OWNER MERRITT JOHN SCOTT E& KRISTIN L ADDRESS 410 214TH AVE SE PHONE CONTRACTOR ALPINE DUCTLESS LLC ADDRESS 8036 RIVER DR SE SUITE 201 PHONE 360.253.381.8743 CONTRACTOR LICENSE ALPINDL876JO LENDER INSPECTION I P DATE Comments INSPECTION INSP DATE Comments Mechanical/Plumbing Final , Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov B DD2023-00967 MECHANICAL - RESIDENTIAL PROJECT DESCRIPTION: TURNKEY INSTALLATION OF DUCTLESS ISSUED: 08/17/2023 HEAT PUMP SYSTEM SITE ADDRESS: 61 N GULL PL HOODSPORT EXPIRES: 02/13/2024 PARCEL: 422055200051 APPLICANT: MERRITT JOHN SCOTT E&KRISTIN L OWNER: MERRITT JOHN SCOTT E&KRISTIN L 410 214TH AVE SE 410 214TH AVE SE SAMMAMISH,WA 98074 SAMMAMISH,WA 98074 CONTRACTOR: ALPINE DUCTLESS LLC 8036 RIVER DR SE SUITE 201 OLYMPIA,WA 98501 360.253.381.8743 GENERAL CONTRACTOR'S LICENSE: ALPINE DUCTLESS LLC License: ALPINDL876JQ 8036 RIVER DR SE SUITE 201 Expires: 04/19/2025 OLYMPIA,WA 98501 360.253.381.8743 FEES: Paid Due Technology Flat Convenience $5.00 $0.00 Fee State Fee-Residential $6.50 $0.00 Mechanical Fees $33.00 $0.00 Final Inspection $80.00 $0.00 Mechanical Base Fee $30.00 $0.00 Totals : $154.50 $0.00 FIXTURES Qty Mechanical Fixtures 1.0000 Air Handlers- Miscellaneous 1.0000 Heat Pumps) Printed by:Nikita Huckabey on:09/26/2023 10:50 AM Page 1 of 3 Mason County Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov MECHANICAL - RESIDENTIAL BLD2023-00967 REQUIRED INSPECTIONS Mechanical/Plumbing Final Inspection CONDITIONS * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. * All furnace installations shall meet the minimum efficiencies set forth in the current edition of the Washington state energy code (WSEC). any portion of the mechanical system that is altered or replaced shall meet the minimum standards set forth in the WSEC and international mechanical code. * OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. Printed by:Nikita Huckabey on:09/26/2023 10:50 AM Page 2 of 3 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncoun"a.gov MECHANICAL - RESIDENTIAL BLD2023-00967 The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency (ORCAA). It is unlawful for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos containing materials have been identified and removed from the area to be demolished.Work shall not commence on an asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: Contractor or Authorized Agent: Date: Printed by:Nikita Huckabey on:09/26/2023 10:50 AM Page 3 of 3